bidnotice.pdf

PDF 113 KB Posted

Attached to
Road Improvements on US-24 from Fordson Drive
Solicitation number
82053-221894
Issued by
Wayne County, Michigan

About this file

This is a bid notice from the State of Michigan for a road improvement project in Wayne County. The project involves 4.89 miles of hot mix asphalt cold milling and resurfacing on US-24 from Fordson Drive to north of Plymouth Road and M-153 from Vernon Street to US-24, spanning the cities of Dearborn and Dearborn Heights. Work includes detail 7 joint repairs, concrete pavement repairs, concrete ramp upgrades, and pavement markings. The project includes a 3-year materials and workmanship pavement warranty. The letting is scheduled for September 25, 2026 at 10:30 AM local time at 425 W. Ottawa Street, Lansing, Michigan. The project completion date is November 15, 2027. Proposal and plans are available for examination online.

The project requires prime contractors to maintain net classification 12139 Cb prequalification, with an additional subclassification of N9-3G required either by the prime contractor or a prequalified subcontractor designated prior to contract award. A 5.00 percent Small Business Program (SBP) participation requirement is mandated, with no Disadvantaged Business Enterprise (DBE) participation required. The contract control section is 013, with contract ID 82053-221894, project number 26A1146, and federal project number 82053. See proposal documents for bidder guaranty information.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Letting of: 261106

10:30 AM, Local Time 425 W. OTTAWA ST., LANSING, MI 48933

Call Number Contract ID Control Section Project Number Federal Project Number

013 82053-221894 221894ANH 82053 26A1146

Description: 4.89 mi of hot mix asphalt cold milling and resurfacing, detail 7 joint repairs, concrete pavement repairs, concrete ramp upgrades and pavement markings on US-24 from Fordson Drive to north of Plymouth Road and M-153 from Vernon Street to US-24 in the cities of Dearborn and Dearborn Heights, Wayne County. This project includes a 3 year materials and workmanship pavement warranty.

Required DBE Participation: 0.00%

Required SBP Participation: 5.00%

Net Classification Required For This Project: ** 12139 Cb **

Estimated Pages For Plans: 0

Completion Date: 11/15/2027

12:00:00 AM

In addition to the above minimum prequalification requirement for prime contractors this project includes a subclassification of N9-3G. If the prime contractor is not prequalified in this subclassification it must use a prequalified subcontractor. This subcontractor must be designated prior to award of the contract to the confirmed low bidder.

Date Advertised: 9/25/2026

See proposal for bidder guaranty information.

Proposal and plans, if applicable, are available for examination online at <http://mdotcf.state.mi.us/public/eprop/login/index.cfm>

Notice of Advertisement Report v1

AASHTOWare Project™ Version 5.04.04 Revision 047

File details come from the government source that posted it. Updated .