Summary

This is a Request for Qualifications (RFQ) issued by the State of Colorado, specifically Colorado Northwestern Community College (CNCC), for architectural and engineering consulting services. CNCC seeks a qualified firm to evaluate Holland West, a 9,242-square-foot residential facility constructed in 1962, assess its existing conditions, and develop space utilization and renovation options aligned with institutional goals and available funding. The building, which houses athletics staff and specialty program faculty, was assessed in 2023 with identified deferred maintenance needs of approximately $4.7 million and a Facility Condition Index of 0.166, indicating significant building system and infrastructure renewal requirements including roof replacement, sanitary sewer line failures, foundation settlement, and aging mechanical and electrical systems. The mandatory pre-submittal conference and site tour is scheduled for Tuesday, September 8, 2026, at 1:00 PM MST at 500 Kennedy Drive, Rangely, Colorado. Qualifications submittals are due Tuesday, September 15, 2026, at 1:00 PM MST via BidNet Direct. The short list of firms will be announced Thursday, September 17, 2026, with oral interviews anticipated during the week of October 5, 2026, either in-person at the McLaughlin Building or virtually. Selection is anticipated for the week of October 12, 2026, with contract negotiation and design start also expected during that week.

The estimated project cost is $1,500,000 with a Design/Bid/Build project delivery approach. The selected consultant must comply with Buy Clean Colorado Act requirements regarding Environmental Product Declarations and maximum acceptable global warming potential limits for eligible materials. Minimum requirements include demonstrated design experience on at least two projects each exceeding $1,000,000 in hard costs, two years of operation under the same business name, no prior termination by the State for non-performance, attendance at the mandatory pre-submittal conference, and completion of the Acknowledgment and Attestation Form and CNCC Response Sheet. Colorado labor must comprise at least 80 percent of the work performed per C.R.S. 8-17-101. Preference is given to Colorado resident vendors and Colorado labor, and respondents are encouraged to partner with Service-Disabled Veteran Owned Small Businesses or historically disadvantaged businesses. The evaluation criteria include project team qualifications, firm and team capabilities, prior experience, project approach addressing budget methodology and quality control, equity and diversity initiatives, and work location proximity to the project site.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

RFQ-AE R3 pg. 1

REV 9/2025

REQUEST FOR

QUALIFICATIONS

ARCHITECTURAL / ENGINEERING /

CONSULTING SERVICES

State of Colorado Colorado Northwestern Community College

Notice Number: CNCC FY27-003 Project Number: 27-200 Project Title: Holland West Remodel_ Estimated Project Cost: ____$1,500,000________________________________________

Table of Contents

I. NOTICES

II. PROJECT OVERVIEW

III. MINIMUM REQUIREMENTS

IV. MANDATORY PRE-SUBMITTAL CONFERENCE AND SITE TOUR

V. SCHEDULE

VI. QUESTIONS, CLARIFICATIONS AND ADDENDA

VII. POINT OF CONTACT/CLARIFICATION

VIII. SUBMITTALS OF QUALIFICATIONS

IX. METHOD OF SELECTION AND AWARD

A. Short List B. Oral Interview

X. EVALUATION OF QUALIFICATIONS

A. PREQUALIFICATION SUBMITTAL CRITERIA

1. PROJECT TEAM

2. FIRM/TEAM CAPABILITIES

3. PRIOR EXPERIENCE

4. PROJECT APPROACH

5. EQUITY, DIVERSITY AND INCLUSION

6. WORK LOCATION

XI. ORAL INTERVIEWS EVALUATION CRITERIA

1. PROJECT TEAM

2. TEAM CAPABILITIES

RFQ-AE R3 pg. 2

REV 9/2025

3. PRIOR EXPERIENCE

4. PROJECT APPROACH

RFQ-AE R3

Rev 09/2025

I. NOTICES

1. For State Public Works C.R.S. §8-17-101 - Colorado labor shall be employed to perform at least 80% of the work. Colorado labor means any person who is a resident of the state of Colorado at the time of the Public Works project.

2. All respondents accept the conditions of this RFQ, including but not limited to, the following:

a. All submittals shall become the property of the State of Colorado and will not be returned.

b. Late submittals shall not be evaluated.

c. The State reserves the right to reject any or all submittals on the basis of being unresponsive to this RFQ or for failure to disclose requested information.

d. The State shall not be liable for any costs incurred by respondents in the preparation of submittals and proposals nor in costs related to any element of the selection and contract negotiation process.

e. Any restriction as to the use of submitted materials must be clearly indicated as proprietary. The requested limitation or prohibition of use or release shall be identified in writing on a cover sheet. Blanket claims of proprietary submittals will not be honored. Fee proposals will be considered proprietary.

f. The respondent has reviewed Appendix B and by responding has agreed that the terms and conditions of the sample Architect/Engineer/Consultant Contract are expressly workable without reservation.

3. The respondent has reviewed Appendix B and by responding has agreed that the terms and conditions of the sample Architect/Engineer/Consultant Contract are expressly workable without reservation. Any exceptions to the contract must be communicated formally in writing before the solicitation closes. Bearing in mind any and all exceptions may be considered non-negotiable.

4. Per C.R.S. §24-92-117, a public construction project in the amount of five hundred thousand dollars or more shall be subject to the Buy Clean Colorado (BCCO) Act program requirements. The BCCO Act requires the Office of the State Architect to establish a maximum acceptable global warming potential (GWP) limit for each category of eligible materials, which include asphalt and asphalt mixtures, cement and concrete mixtures, glass, post-tension steel, reinforcing steel, structural steel, and wood structural elements. For any solicitation for a contract for the design of an eligible project, a State Agency or institution shall require the designer who is awarded the contract to include in project specifications when final construction documents are released, a current Environmental Product Declaration (EPD) that meets the maximum acceptable GWP limits for each eligible material specified for the project. A contractor that is awarded a contract for an eligible project shall not install any eligible materials on the project until the contractor submits an EPD for each eligible material procured for the project.

5. Preference shall be given to Colorado resident vendors and for Colorado labor, as provided by law.

II. PROJECT OVERVIEW

Introduction

Colorado Northwestern Community College (hereinafter referred to as CNCC) was founded in 1962 as “Rangely College”. Today CNCC serves 1,700 students between its two campuses and online offerings. The main campus in Rangely sits atop a mesa overlooking the Rio Blanco river valley. It is home to top-notch programs in Dental Hygiene, Aviation Flight, Aviation Maintenance, and a National Park Ranger Academy.

One of our auxiliary dorms, Holland West, is a 9,242-square-foot residential facility constructed in 1962. It primarily houses our athletics staff and specialty program faculty. In 2023, the building was evaluated as part of a campus-wide Facility Condition Assessment (FCA) conducted by an independent architecture and engineering firm. The assessment identified approximately $4.7 million in deferred maintenance needs and assigned the facility a Facility Condition Index (FCI) of 0.166, indicating significant building system and infrastructure renewal requirements. Key deficiencies include roof replacement, sanitary sewer line failures, foundation settlement, aging mechanical and electrical systems, accessibility improvements, and extensive interior renovations.

The State of Colorado, CNCC, is soliciting bids from qualified Architect/Engineering firms to evaluate Holland West, assess existing conditions, and develop space utilization and renovation options that align with institutional goals and available funding.

Background

The State of Colorado, CNCC, is soliciting this Request for Qualifications (RFQ) is to select an architectural firm to evaluate Holland West, assess existing conditions, and develop space utilization and renovation options that align with institutional goals and available funding.

The selected consultant's analysis will establish a baseline for future decision-making and support recommendations to the Rio Blanco County District Board and the System Office regarding the building's long-term use and renovation strategy.

With the passing of HB21-1303, this project is required to comply with the Buy Clean

Colorado Act requirements and the selected firm will need to verify design is within the established maximum acceptable global warming potential (GWP) limits for categories of eligible materials.

CNCC anticipates using a Design / Bid /Build (DBB) approach to project delivery. The Architect/Engineer is expected to provide Basic Services as described in the sample

Architect/Engineer/Consultant Agreement and Terms and Conditions of the Contract unless otherwise noted.

The process to be used in the selection of the Architect/Engineer/Consultant is comprised of two steps.

In STEP I submittals will be screened and scored as described in detail in Section X.

STEP II is the Oral Interview as described in detail in Section XI. A Jury Panel of individuals who will be involved in the project and/or understand the required services associated with the project will evaluate responses to this. Upon completion of the evaluation of the Submittals, a limited number of firms will be invited to the oral interviews.

III. MINIMUM REQUIREMENTS

Notice is hereby given to all interested parties that all firms will be required to meet all minimum requirements to be considered for this project. Interested parties should be prepared to show evidence of the following to be considered as qualified, as a minimum:

1. Not previously terminated by the State for non-performance on a State Buildings contract or procurement.

2. The consultant must have been in the same business under the same name for the last two (2) years.

3. Demonstrated design experience in projects of similar scope and complexity for at least two (2) projects each in excess of $ 1,000,000 (hard costs), utilizing the expertise present in their Colorado Office; and

4. Attended and signed in at the Mandatory Pre-Submittal Conference

5. The Acknowledgment and Attestation Form (Appendix C) & CNCC Response sheet (Appendix D),are both mandatory requirements for a respondent to be considered responsive to this RFQ Prequalification Submittal.

a. Qualifications made by a respondent in executing this form may render a submittal non-responsive as determined by the State.

IV. MANDATORY PRE-SUBMITTAL CONFERENCE AND SITE TOUR

To ensure sufficient information is available to firms preparing submittals, a mandatory pre-submittal conference has been scheduled. Any exceptions need to be explicitly given prior to the event. The intent of this conference is to tour the site and to have CNCC staff able to discuss the project. Firms preparing submittals must attend and sign-in to have their submittals accepted.

A mandatory Pre-Submission Meeting will be held at:

Building Address: 500 Kennedy Dr. Rangely, CO 81648 Room: Weiss Conference Room Date/Time Tuesday, 9/8/2026 @ 1:00PM MST

V. SCHEDULE

The following is a tentative schedule of events for the Submittal process and an outline of the schedule for the balance of the project. All dates are subject to change and changes in the schedule will be issued via addendum.

Request for Qualifications Issued Monday, 8/31/2026

Mandatory Pre-Submittal Conference and Tour Tuesday, 9/8/2026 @ 1:00PM MST Request for Clarifications Due Tuesday, 9/8/2026 @ 5:00PM MST Final Addendum Issued (anticipated) Wednesday, 9/9/2026

Submittals Due (Prequalification: Step I) Tuesday. 9/15/2026 @ 1:00PM MST Interview Short List Announced Thursday, 9/17/2026

Oral Interviews Week of October 5th, 2026 Selection Announced Week of October 12th , 2026

Negotiation of Contract Week of October 12th, 2026 Anticipated Design Start Week of October 12th, 2026 Anticipated Construction Start/Finish TBD

The above schedule is tentative. Responding firms shall be notified of revisions in a timely manner by email or posted on ColoradoVSS & Bidnet Direct website. Respondents may elect to verify times and dates by email, but no earlier than 36 hours before the scheduled date and time.

VI. QUESTIONS, CLARIFICATIONS AND ADDENDA

Owner initiated changes to this RFQ will be issued under numerically sequenced addenda.

Owner initiated changes to this RFQ will be posted in the form of addenda on ColoradoVSS & Bidnet Direct.

Questions and requests for clarifications regarding this project shall be submitted via email before the deadline listed in the above Schedule.

Please include the solicitation notice number “CNCC FY27-003” in your subject line to cncc-purchasing@cncc.edu .

Communication regarding the project during the procurement, outside of this submission process or scheduled procurement milestones is not permitted.

VII. POINT OF CONTACT/CLARIFICATION

Name: Aaron Harris – Procurement Manager Agency: Colorado Northwestern Community College Email Address: cncc-purchasing@cncc.edu Phone: 970-675-3279

VIII. SUBMITTALS OF QUALIFICATIONS

1. This RFQ document, it’s appendices, and any written addenda issued prior to the closing of the solicitation, and written clarifications shall serve as the only basis for the submittal.

mailto:cncc-purchasing@cncc.edu

2. All submittals must comply with the following items, a through h. The State retains the right to waive any minor irregularity, or requirement should it be judged to be in the best interest of the State.

a. Qualifications shall be formatted and tabbed in the exact form and numeric sequence of the Evaluation Form (1 through 7) in Appendix A.

b. Qualifications shall be evaluated in accordance with criteria as indicated in PREQUALIFICATION SUBMITTAL CRITERIA and ranked on the corresponding Evaluation Form in Appendix A.

c. Response to all items shall be complete.

d. All references shall be current and relevant.

e. Complete and execute the Appendix C: Acknowledgment and Attestation Form and submit at the back of the Qualification Submittal,

f. Complete CNCC specific Response Sheet (Appendix D).

g. An electronic copy of the qualification package are to be submitted to the solicitation posting on BidNet Direct. [Insert date] and shall be received no later than 1:00 PM MST.AM/PM (MD/ST).

https://www.bidnetdirect.com/colorado/cncc

No hard copies of the qualifications package will be accepted. Late submittals will be rejected without consideration, unless otherwise explicitly stated. If an exception has been made due to extreme circumstances, an addendum will be published and all firms will have an opportunity to utilize the same grace period and resubmit. The State of Colorado assumes no responsibility for costs related to the preparation of submittals.

IX. METHOD OF SELECTION AND AWARD

A. Short List

1. From the submittals received, a short list of qualified respondents shall be identified using the scoring indicated on the enclosed Evaluation Form, Appendix A.

2. Firms failing to meet the minimum required qualifications will not receive further consideration.

B. Oral Interview

1. Mandatory oral interviews shall be conducted for the short-listed firm(s) only. Interview times and location will be arranged by CNCC and all short-listed firms will be notified in advance. At the option of the State, a visit to the short-listed firm(s) managing home office and/or representative field office may be required.

https://www.bidnetdirect.com/colorado/cncc

C. Method of Selection and Award

1. Submittals will be evaluated by a panel of individuals selected in accordance with state policies. The panel will review and score the submittals. Firms ranked the highest will be invited to an oral interview. It is anticipated no fewer than three (3) or no more than four (4) will be interviewed.

X. EVALUATION OF QUALIFICATIONS

A. PREQUALIFICATION SUBMITTAL CRITERIA

Firms will be judged not only on their past experience for the type of work involved, but also on their ability to address issues critical to the success of the project requirements outlined in this RFQ document. The primary focus of the prequalification evaluation will be the firm(s) capability.

1. PROJECT TEAM

Identify the project principal, the project manager, key staff and subconsultants.

Present a brief discussion regarding how the team's qualifications and experience relate to the specific project.

• Qualifications and relevant individual experience.

• Unique knowledge of key team members relating to the project.

• Experience on projects as a team.

• Key staff involvement in project management and on-site presence.

• Time commitment of key staff.

• Qualifications and relevant subconsultant experience.

2. FIRM/TEAM CAPABILITIES

Organization charts and graphs depicting your capacity may be included.

• Are the lines of authority and coordination clearly identified?

• Are essential management functions identified?

• Are the functions effectively integrated? (e.g., subconsultants’ role delineated)?

• Current and projected work load.

3. PRIOR EXPERIENCE

Include the name and current telephone number of the owner’s project manager for every project listed.

• Experience of the key staff and firm with projects of similar scope and complexity.

• Demonstrated success on past projects of similar scope and complexity.

• References.

4. PROJECT APPROACH

For the project and services outlined in the RFQ document, describe how you plan to accomplish the following project control and management issues:

• Budget Methodology / Cost Control

a. Establish and maintain estimates of probable cost within owner's established budget.

b. Control consultant contract costs

c. Coordinate value engineering activities

d. Budget Considerations

• Quality Control Methodology

a. Insure State procedures are followed

b. Improve energy efficiency through the use of an integrated design process, life cycle costing, the use of an energy standard (current OSA energy code) and the specification of energy efficient materials, systems, and equipment

c. Reduce embodied carbon emissions by utilizing and submitting Environmental Product Declarations (EPDs) that meet the OSA’s maximum acceptable global warming potential (GWP) limits

d. Insure the project is designed for durability and maintainability

• Schedule

a. Manage the required work to meet the established schedule

5. EQUITY, DIVERSITY AND INCLUSION

a. Describe how your firm is incentivized to hire and promote diverse individuals

b. Describe how your team attempts to partner with Service-Disabled Veteran Owned Small Businesses or historically disadvantaged businesses

6. WORK LOCATION

Describe where the prime and subconsultants will do the key work elements of this project.

a. Proximity of firms office as it may affect coordination with the State's project manager and the potential project location.

b. Firm's familiarity with the project area.

c. Knowledge of the local labor and material markets.

XI. ORAL INTERVIEWS EVALUATION CRITERIA

(Note that the primary focus of the Oral Interview will be the proposed project management team members’ capabilities).

It is anticipated that oral interviews will be conducted during the week of October 6th, 2026.

Interviews will be conducted either:

- In-Person:

500 Kennedy Dr.

McLaughlin Bldg. Fireside Conference Room Rangely, CO. 81648

OR

- Virtually via a Meeting Conference Link

. The time for interviews is to be determined. Key personnel from the firm and major consultants who will be directly involved with the project should attend the interview. The interview panel will, in particular, be interested in knowing about the specific project approach proposed and in meeting the individuals who will act as the primary contacts with

CNCC.

1. PROJECT TEAM

2. TEAM CAPABILITIES

3. PRIOR EXPERIENCE

4. PROJECT APPROACH

Appendix A: Evaluation Forms

Appendix A1: Prequalification Submittal/Evaluation Form Appendix A2: Oral Interview Evaluation Form Appendix A3: Submittal and Interview Ranking Matrix

See attachments in solicitation post.

RFQ1-App-A

STATE OF COLORADO

OFFICE OF THE STATE ARCHITECT

STATE BUILDINGS PROGRAM

APPENDIX A1: PREQUALIFICATION SUBMITTAL

EVALUATION FORM

Name of Firm:____________________________________________________________________ Name of Project: ____CNCC FY27-002 Holland West Remodel__________________________ Evaluator No:_______________________________________ Date:______________________________________________

RFQ REFERENCE MINIMUM REQUIREMENTS Y ____ N ____

If the minimum requirements (including letter from surety) have not been met, specify the reason(s):

Acknowledgment and Attestation included: Y ____ N ____

INSTRUCTIONS:

1. Criteria: Agencies/Institutions are encouraged to include additional criteria that reflect unique characteristics of the project under each category to help determine the submitter’s overall qualifications.

2. Weights: Agency/Institutions to assign weights, using whole numbers, to all criteria on evaluation forms for inclusion into RFQ document and prior to evaluations.

3. Ratings: Evaluator to assess the strength of each firms qualifications and assign a numerical rating of 1 to 5 using whole numbers

4. Rating: 0 = Not provided, 1 = Unacceptable, 2 = Poor, 3 = Fair, 4 = Good, 5 = Excellent

5. Total Score: Includes the sum of all criteria.

1. PROJECT TEAM Weight X Rating = Score Qualifications and Relevant individual experience x = Unique knowledge of key team members X = Experience on projects as a team X = Key staff involvement in project management and on-site presence X = Time commitment of key staff X = Qualifications and relevant subconsultant experience X =

2. FIRM/TEAM CAPABILITIES Weight X Rating = Score

Are the lines of authority and coordination clearly defined? X =

Are essential management functions identified? X = Are the functions effectively integrated? (e.g., subconsultants’ role delineated)? X = Current and projected work load. X =

3. PRIOR EXPERIENCE Weight X Rating = Score Experience of key staff and firm with projects of similar scope and complexity X = Demonstrated success on past projects of similar scope and complexity X = References X =

4. PROJECT APPROACH Weight X Rating = Score Budget Methodology / Cost Control X = Quality Control Methodology X = Schedule X =

5. EQUITY, DIVERSIY AND INCLUSION Weight X Rating = Score Incentives and promotion of diverse individuals X = Partnering with SDVOSB or other disadvantaged businesses X =

6. WORK LOCATION Weight X Rating = Score Location of prime and subconsultants X = Familiarity with project area X = Knowledge of local labor and material markets X =

Total Score: _________

STATE OF COLORADO

OFFICE OF THE STATE ARCHITECT

STATE BUILDINGS PROGRAM

APPENDIX A2: ORAL INTERVIEW EVALUATION FORM

INSTRUCTIONS/EXAMPLE:

1. Criteria: Agencies/Institutions are encouraged to include additional criteria that reflect unique characteristics of the project under each category to help determine the submitter’s overall qualifications.

2. Weights: Agency/Institutions to assign weights, using whole numbers, to all criteria on evaluation forms for inclusion into RFQ document and prior to evaluations.

3. Ratings: Evaluator to assess the strength of each firms qualifications and assign a numerical rating of 0 to 5 with 5 being the highest rating. (Use whole numbers), 0 is missing information.

4. Total Score: Includes the sum of all criteria. Note: a passing score (as a percentage of the total points available) is optional and should be assigned by the agency/institution prior to evaluation.

CRITERIA Weight X Rating = Score

1. PROJECT TEAM

x =

2. TEAM CAPABILITIES

3. PRIOR EXPERIENCE

4. PROJECT APPROACH

5. WORK LOCATION

TOTAL SCORE

APPENDIX A3: PREQUALIFICATION AND ORAL

INTERVIEW RANKING MATRIX

QUALIFICATION BASED SELECTION

(Use this form to rank and determine the most qualified architectural/engineering/consulting services firm for both the preliminary and interview evaluations.)

FIRM NAME

QUALIFICATIONS

QUALS

SCORE

RANK

EVAL

#1

EVAL

#2

EVAL

#3

EVAL

#4

EVAL

#5

EVAL

#6

Appendix B: Architect/Engineer/Consultant Contract (Standard)

See attachments in solicitation post.

Appendix C:

ACKNOWLEDGEMENT AND ATTESTATION FORM

By responding to this RFQ, the respondent(s) certify that they have reviewed the Agreement and its Exhibits contained herein, and is familiar with their terms and conditions and finds them expressly workable without change or modification.

We certify and declare that the foregoing is true and correct.

Subscribed on _______________________________ at _________________________, Date City

___________________________, State of _____________________________________.

County State

Corporate Officer Signature Date

Secretary Date

Note: Use full corporate name and attach corporate seal here.

Offeror Acknowledges Receipt of Addendum No. ____, ____, ____, ____ (Addenda MUST be acknowledged)

(SEAL)

Appendix D: CNCC Response Sheet