Bid_Schedule__-_HQ_Roof_Replacement.pdf
PDF 287 KB Posted
- Attached to
- Headquarters and West Beach Roof Replacement
- Solicitation number
- 140P6421R0030
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sub Total Cost
1 2 3 4 5 6 7 8 9
1 B101 HQ RANGER STATION + GENERATOR ROOM 5,183 SF -$ -$ -$ -$
2 B107 HQ RECEIVING 2,394 SF -$ -$ -$ -$
3 B108 HQ CUSTODIAL SERVICES 1,387 SF -$ -$ -$ -$
4 B111 HQ FIRE STATION NO. 1 2,212 SF -$ -$ -$ -$
5 B112 HQ MANAGEMENT OFFICE 2,358 SF -$ -$ -$ -$
6 B302 WB CONTACT STATION 703 SF -$ -$ -$ -$
Mobilization 0.0% -$
Bonding 0.0% -$ Overhead 0.0% -$
Profit 0.0% -$ Grand Total -$
NOTE:
THE CONTRACTOR SHALL VERIFY ALL THE DIMENSIONS IN THE FIELD.
UNITED STATES DEPARTMENT OF THE INTERIOR
National Park Services
Indiana Dunes National Park
HEAD QUARTER/ WEST BEACH
ITEM DESCRIPTION QNTY UNITSBLDG
NO.
Labor Amount
Material Amount
Equipment Amount
SUMMARY
EPDM Roof Replacement - BID SCHEDULE
$/SF Labor Amount $ / SF Material
Amount $ / LS Equipment Amount Cost
1 2 3 4 5 6 7 8 9 10 11
Demolition - Clean Up, Remove existing flashing, membrane / Insulation all the way down to the decking (Include Generator Room)(Remove: Roof Edge & Flashing, roof drain strainer, clamps, roof vents and boots)
5,183 SF ‐$ ‐$ ‐$ ‐$ ‐$ ‐$ ‐$
Roofing - Roof and Deck Insulation (Include Insulation, Fascia and Metal Flashing, Underlayment materials, decking repairs)
5,183 SF ‐$ ‐$ ‐$ ‐$ ‐$ ‐$ ‐$
Ethylene-Propylene-Diene-Monomer Roofing (EPDM) Fully adhered (Include Board Roof Insulation, Tapers for drainage, Cover Board, 1/2 inch, Flexible walkways, Roof drain strainers and clamps, Roof vents and boots)
5,183 SF ‐$ ‐$ ‐$ ‐$ ‐$ ‐$ ‐$
Mobilization 0.0% ‐$
NOTE: Bonding 0.0% ‐$ THE CONTRACTOR SHALL VERIFY ALL THE DIMENSIONS IN THE FIELD. Overhead 0.0% ‐$
Profit 0.0% ‐$ Grand Total ‐$
UNITED STATES DEPARTMENT OF THE INTERIOR
National Park Services
Indiana Dunes National Park
HEAD QUARTER B101 (EPDM Roof Replacement) BID SCHEDULE
ITEM
LABOR MATERIAL EQUIPMENT
DESCRIPTION QNTY UNITS
Amount $ / SF Material
Amount $ / LS Equipment Amount Cost
1 2 3 4 5 6 7 8 9 10 11
Demolition - Clean Up, Remove existing flashing, membrane / Insulation all the way down to the decking(Remove: Roof Edge & Flashing, roof drain strainer, clamps, roof vents and boots)
2,394 SF ‐$ ‐$ ‐$ ‐$ ‐$ ‐$ ‐$
Roofing - Roof and Deck Insulation (Include Insulation, Fascia and Metal Flashing, Underlayment materials, decking repairs)
2,394 SF ‐$ ‐$ ‐$ ‐$ ‐$ ‐$ ‐$
Ethylene-Propylene-Diene-Monomer Roofing (EPDM) Fully adhered (Include Board Roof Insulation, Tapers for drainage, Cover Board, 1/2 inch, Flexible walkways, Roof drain strainers and clamps, Roof vents and boots)
2,394 SF ‐$ ‐$ ‐$ ‐$ ‐$ ‐$ ‐$
Mobilization 0.0% ‐$
NOTE: Bonding 0.0% ‐$ THE CONTRACTOR SHALL VERIFY ALL THE DIMENSIONS IN THE FIELD. Overhead 0.0% ‐$
Profit 0.0% ‐$ Grand Total ‐$
EQUIPMENT
UNITED STATES DEPARTMENT OF THE INTERIOR
National Park Services
Indiana Dunes National Park
HEAD QUARTER B107 (EPDM Roof Replacement) BID SCHEDULE
ITEM DESCRIPTION QNTY UNITS
LABOR MATERIAL
Amount $ / SF Material
Amount $ / LS Equipment Amount Cost
1 2 3 4 5 6 7 8 9 10 11
Demolition - Clean Up, Remove existing flashing, membrane / Insulation all the way down to the decking (Remove: Roof Edge & Flashing, roof drain strainer, clamps, roof vents and boots, Gutters and Downspouts)
1,387 SF ‐$ ‐$ ‐$ ‐$ ‐$ ‐$ ‐$
Roofing - Roof and Deck Insulation (Include Insulation, Fascia and Metal Flashing, Underlayment materials, decking repairs, Gutters and Downspouts)
1,387 SF ‐$ ‐$ ‐$ ‐$ ‐$ ‐$ ‐$
Ethylene-Propylene-Diene-Monomer Roofing (EPDM) Fully adhered (Include Board Roof Insulation, Tapers for drainage, Cover Board, 1/2 inch, Flexible walkways, Roof drain strainers and clamps, Roof vents and boots)
1,387 SF ‐$ ‐$ ‐$ ‐$ ‐$ ‐$ ‐$
Mobilization 0.0% ‐$
NOTE: Bonding 0.0% ‐$ THE CONTRACTOR SHALL VERIFY ALL THE DIMENSIONS IN THE FIELD. Overhead 0.0% ‐$
Profit 0.0% ‐$ Grand Total ‐$
EQUIPMENT
UNITED STATES DEPARTMENT OF THE INTERIOR
National Park Services
Indiana Dunes National Park
HEAD QUARTER B108 (EPDM Roof Replacement) BID SCHEDULE
Amount $ / SF Material
Amount $ / LS Equipment Amount Cost
1 2 3 4 5 6 7 8 9 10 11
Demolition - Clean Up, Remove existing flashing, membrane / Insulation all the way down to the decking (Remove: Roof Edge & Flashing, roof drain strainer, clamps, roof vents and boots, Gutters and Downspouts)
2,212 SF ‐$ ‐$ ‐$ ‐$ ‐$ ‐$ ‐$
Roofing - Roof and Deck Insulation (Include Insulation, Fascia and Metal Flashing, Underlayment materials, decking repairs, Gutters and Downspouts)
2,212 SF ‐$ ‐$ ‐$ ‐$ ‐$ ‐$ ‐$
Ethylene-Propylene-Diene-Monomer Roofing (EPDM) Fully adhered (Include Board Roof Insulation, Tapers for drainage, Cover Board, 1/2 inch, Flexible walkways, Roof drain strainers and clamps, Roof vents and boots)
2,212 SF ‐$ ‐$ ‐$ ‐$ ‐$ ‐$ ‐$
Mobilization 0.0% ‐$
NOTE: Bonding 0.0% ‐$ THE CONTRACTOR SHALL VERIFY ALL THE DIMENSIONS IN THE FIELD. Overhead 0.0% ‐$
Profit 0.0% ‐$ Grand Total ‐$
EQUIPMENT
UNITED STATES DEPARTMENT OF THE INTERIOR
National Park Services
Indiana Dunes National Park
HEAD QUARTER B111 (EPDM Roof Replacement) BID SCHEDULE
Amount $ / SF Material
Amount $ / LS Equipment Amount Cost
1 2 3 4 5 6 7 8 9 10 11
Demolition - Clean Up, Remove existing flashing, membrane / Insulation all the way down to the decking (Remove: Roof Edge & Flashing, roof drain strainer, clamps, roof vents and boots)
2,358 SF ‐$ ‐$ ‐$ ‐$ ‐$ ‐$ ‐$
Roofing - Roof and Deck Insulation (Include Insulation, Fascia and Metal Flashing, Underlayment materials, decking repairs)
2,358 SF ‐$ ‐$ ‐$ ‐$ ‐$ ‐$ ‐$
Ethylene-Propylene-Diene-Monomer Roofing (EPDM) Fully adhered (Include Board Roof Insulation, Tapers for drainage, Cover Board, 1/2 inch, Flexible walkways, Roof drain strainers and clamps, Roof vents and boots)
2,358 SF ‐$ ‐$ ‐$ ‐$ ‐$ ‐$ ‐$
Mobilization 0.0% ‐$
NOTE: Bonding 0.0% ‐$ THE CONTRACTOR SHALL VERIFY ALL THE DIMENSIONS IN THE FIELD. Overhead 0.0% ‐$
Profit 0.0% ‐$ Grand Total ‐$
EQUIPMENT
UNITED STATES DEPARTMENT OF THE INTERIOR
National Park Services
Indiana Dunes National Park
HEAD QUARTER B112 (EPDM Roof Replacement) BID SCHEDULE
Amount $ / SF Material
Amount $ / LS Equipment Amount Cost
1 2 3 4 5 6 7 8 9 10 11
Demolition - Clean Up, Remove existing flashing, membrane / Insulation all the way down to the decking (Remove: Roof Edge & Flashing, roof drain strainer, clamps, roof vents and boots)
703 SF ‐$ ‐$ ‐$ ‐$ ‐$ ‐$ ‐$
Roofing - Roof and Deck Insulation (Include Insulation, Fascia and Metal Flashing, Underlayment materials, decking repairs)
703 SF ‐$ ‐$ ‐$ ‐$ ‐$ ‐$ ‐$
Ethylene-Propylene-Diene-Monomer Roofing (EPDM) Fully adhered (Include Board Roof Insulation, Tapers for drainage, Cover Board, 1/2 inch, Flexible walkways, Roof drain strainers and clamps, Roof vents and boots)
703 SF ‐$ ‐$ ‐$ ‐$ ‐$ ‐$ ‐$
Mobilization 0.0% ‐$
NOTE: Bonding 0.0% ‐$ THE CONTRACTOR SHALL VERIFY ALL THE DIMENSIONS IN THE FIELD. Overhead 0.0% ‐$
Profit 0.0% ‐$ Grand Total ‐$
EQUIPMENT
UNITED STATES DEPARTMENT OF THE INTERIOR
National Park Services
Indiana Dunes National Park
HEAD QUARTER B302 (EPDM Roof Replacement) BID SCHEDULE
| Bid Schedule - HQ Roof Replacement 1 |
| Bid Schedule - HQ Roof Replacement 2 |
| Bid Schedule - HQ Roof Replacement 3 |
| Bid Schedule - HQ Roof Replacement 4 |
| Bid Schedule - HQ Roof Replacement 5 |
| Bid Schedule - HQ Roof Replacement 6 |
| Bid Schedule - HQ Roof Replacement 7 |
File details come from the government source that posted it. Updated .