Bid_Schedule__-_HQ_Roof_Replacement.pdf

PDF 287 KB Posted

Attached to
Headquarters and West Beach Roof Replacement
Solicitation number
140P6421R0030
Issued by

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sub Total Cost

1 2 3 4 5 6 7 8 9

1 B101 HQ RANGER STATION + GENERATOR ROOM 5,183 SF -$ -$ -$ -$

2 B107 HQ RECEIVING 2,394 SF -$ -$ -$ -$

3 B108 HQ CUSTODIAL SERVICES 1,387 SF -$ -$ -$ -$

4 B111 HQ FIRE STATION NO. 1 2,212 SF -$ -$ -$ -$

5 B112 HQ MANAGEMENT OFFICE 2,358 SF -$ -$ -$ -$

6 B302 WB CONTACT STATION 703 SF -$ -$ -$ -$

Mobilization 0.0% -$

Bonding 0.0% -$ Overhead 0.0% -$

Profit 0.0% -$ Grand Total -$

NOTE:

THE CONTRACTOR SHALL VERIFY ALL THE DIMENSIONS IN THE FIELD.

UNITED STATES DEPARTMENT OF THE INTERIOR

National Park Services

Indiana Dunes National Park

HEAD QUARTER/ WEST BEACH

ITEM DESCRIPTION QNTY UNITSBLDG

NO.

Labor Amount

Material Amount

Equipment Amount

SUMMARY

EPDM Roof Replacement - BID SCHEDULE

$/SF Labor Amount $ / SF Material

Amount $ / LS Equipment Amount Cost

1 2 3 4 5 6 7 8 9 10 11

Demolition - Clean Up, Remove existing flashing, membrane / Insulation all the way down to the decking (Include Generator Room)(Remove: Roof Edge & Flashing, roof drain strainer, clamps, roof vents and boots)

5,183 SF ‐$ ‐$ ‐$ ‐$ ‐$ ‐$ ‐$

Roofing - Roof and Deck Insulation (Include Insulation, Fascia and Metal Flashing, Underlayment materials, decking repairs)

5,183 SF ‐$ ‐$ ‐$ ‐$ ‐$ ‐$ ‐$

Ethylene-Propylene-Diene-Monomer Roofing (EPDM) Fully adhered (Include Board Roof Insulation, Tapers for drainage, Cover Board, 1/2 inch, Flexible walkways, Roof drain strainers and clamps, Roof vents and boots)

5,183 SF ‐$ ‐$ ‐$ ‐$ ‐$ ‐$ ‐$

Mobilization 0.0% ‐$

NOTE: Bonding 0.0% ‐$ THE CONTRACTOR SHALL VERIFY ALL THE DIMENSIONS IN THE FIELD. Overhead 0.0% ‐$

Profit 0.0% ‐$ Grand Total ‐$

UNITED STATES DEPARTMENT OF THE INTERIOR

National Park Services

Indiana Dunes National Park

HEAD QUARTER B101 (EPDM Roof Replacement) BID SCHEDULE

ITEM

LABOR MATERIAL EQUIPMENT

DESCRIPTION QNTY UNITS

Amount $ / SF Material

Amount $ / LS Equipment Amount Cost

1 2 3 4 5 6 7 8 9 10 11

Demolition - Clean Up, Remove existing flashing, membrane / Insulation all the way down to the decking(Remove: Roof Edge & Flashing, roof drain strainer, clamps, roof vents and boots)

2,394 SF ‐$ ‐$ ‐$ ‐$ ‐$ ‐$ ‐$

Roofing - Roof and Deck Insulation (Include Insulation, Fascia and Metal Flashing, Underlayment materials, decking repairs)

2,394 SF ‐$ ‐$ ‐$ ‐$ ‐$ ‐$ ‐$

Ethylene-Propylene-Diene-Monomer Roofing (EPDM) Fully adhered (Include Board Roof Insulation, Tapers for drainage, Cover Board, 1/2 inch, Flexible walkways, Roof drain strainers and clamps, Roof vents and boots)

2,394 SF ‐$ ‐$ ‐$ ‐$ ‐$ ‐$ ‐$

Mobilization 0.0% ‐$

NOTE: Bonding 0.0% ‐$ THE CONTRACTOR SHALL VERIFY ALL THE DIMENSIONS IN THE FIELD. Overhead 0.0% ‐$

Profit 0.0% ‐$ Grand Total ‐$

EQUIPMENT

UNITED STATES DEPARTMENT OF THE INTERIOR

National Park Services

Indiana Dunes National Park

HEAD QUARTER B107 (EPDM Roof Replacement) BID SCHEDULE

ITEM DESCRIPTION QNTY UNITS

LABOR MATERIAL

Amount $ / SF Material

Amount $ / LS Equipment Amount Cost

1 2 3 4 5 6 7 8 9 10 11

Demolition - Clean Up, Remove existing flashing, membrane / Insulation all the way down to the decking (Remove: Roof Edge & Flashing, roof drain strainer, clamps, roof vents and boots, Gutters and Downspouts)

1,387 SF ‐$ ‐$ ‐$ ‐$ ‐$ ‐$ ‐$

Roofing - Roof and Deck Insulation (Include Insulation, Fascia and Metal Flashing, Underlayment materials, decking repairs, Gutters and Downspouts)

1,387 SF ‐$ ‐$ ‐$ ‐$ ‐$ ‐$ ‐$

Ethylene-Propylene-Diene-Monomer Roofing (EPDM) Fully adhered (Include Board Roof Insulation, Tapers for drainage, Cover Board, 1/2 inch, Flexible walkways, Roof drain strainers and clamps, Roof vents and boots)

1,387 SF ‐$ ‐$ ‐$ ‐$ ‐$ ‐$ ‐$

Mobilization 0.0% ‐$

NOTE: Bonding 0.0% ‐$ THE CONTRACTOR SHALL VERIFY ALL THE DIMENSIONS IN THE FIELD. Overhead 0.0% ‐$

Profit 0.0% ‐$ Grand Total ‐$

EQUIPMENT

UNITED STATES DEPARTMENT OF THE INTERIOR

National Park Services

Indiana Dunes National Park

HEAD QUARTER B108 (EPDM Roof Replacement) BID SCHEDULE

Amount $ / SF Material

Amount $ / LS Equipment Amount Cost

1 2 3 4 5 6 7 8 9 10 11

Demolition - Clean Up, Remove existing flashing, membrane / Insulation all the way down to the decking (Remove: Roof Edge & Flashing, roof drain strainer, clamps, roof vents and boots, Gutters and Downspouts)

2,212 SF ‐$ ‐$ ‐$ ‐$ ‐$ ‐$ ‐$

Roofing - Roof and Deck Insulation (Include Insulation, Fascia and Metal Flashing, Underlayment materials, decking repairs, Gutters and Downspouts)

2,212 SF ‐$ ‐$ ‐$ ‐$ ‐$ ‐$ ‐$

Ethylene-Propylene-Diene-Monomer Roofing (EPDM) Fully adhered (Include Board Roof Insulation, Tapers for drainage, Cover Board, 1/2 inch, Flexible walkways, Roof drain strainers and clamps, Roof vents and boots)

2,212 SF ‐$ ‐$ ‐$ ‐$ ‐$ ‐$ ‐$

Mobilization 0.0% ‐$

NOTE: Bonding 0.0% ‐$ THE CONTRACTOR SHALL VERIFY ALL THE DIMENSIONS IN THE FIELD. Overhead 0.0% ‐$

Profit 0.0% ‐$ Grand Total ‐$

EQUIPMENT

UNITED STATES DEPARTMENT OF THE INTERIOR

National Park Services

Indiana Dunes National Park

HEAD QUARTER B111 (EPDM Roof Replacement) BID SCHEDULE

Amount $ / SF Material

Amount $ / LS Equipment Amount Cost

1 2 3 4 5 6 7 8 9 10 11

Demolition - Clean Up, Remove existing flashing, membrane / Insulation all the way down to the decking (Remove: Roof Edge & Flashing, roof drain strainer, clamps, roof vents and boots)

2,358 SF ‐$ ‐$ ‐$ ‐$ ‐$ ‐$ ‐$

Roofing - Roof and Deck Insulation (Include Insulation, Fascia and Metal Flashing, Underlayment materials, decking repairs)

2,358 SF ‐$ ‐$ ‐$ ‐$ ‐$ ‐$ ‐$

Ethylene-Propylene-Diene-Monomer Roofing (EPDM) Fully adhered (Include Board Roof Insulation, Tapers for drainage, Cover Board, 1/2 inch, Flexible walkways, Roof drain strainers and clamps, Roof vents and boots)

2,358 SF ‐$ ‐$ ‐$ ‐$ ‐$ ‐$ ‐$

Mobilization 0.0% ‐$

NOTE: Bonding 0.0% ‐$ THE CONTRACTOR SHALL VERIFY ALL THE DIMENSIONS IN THE FIELD. Overhead 0.0% ‐$

Profit 0.0% ‐$ Grand Total ‐$

EQUIPMENT

UNITED STATES DEPARTMENT OF THE INTERIOR

National Park Services

Indiana Dunes National Park

HEAD QUARTER B112 (EPDM Roof Replacement) BID SCHEDULE

Amount $ / SF Material

Amount $ / LS Equipment Amount Cost

1 2 3 4 5 6 7 8 9 10 11

Demolition - Clean Up, Remove existing flashing, membrane / Insulation all the way down to the decking (Remove: Roof Edge & Flashing, roof drain strainer, clamps, roof vents and boots)

703 SF ‐$ ‐$ ‐$ ‐$ ‐$ ‐$ ‐$

Roofing - Roof and Deck Insulation (Include Insulation, Fascia and Metal Flashing, Underlayment materials, decking repairs)

703 SF ‐$ ‐$ ‐$ ‐$ ‐$ ‐$ ‐$

Ethylene-Propylene-Diene-Monomer Roofing (EPDM) Fully adhered (Include Board Roof Insulation, Tapers for drainage, Cover Board, 1/2 inch, Flexible walkways, Roof drain strainers and clamps, Roof vents and boots)

703 SF ‐$ ‐$ ‐$ ‐$ ‐$ ‐$ ‐$

Mobilization 0.0% ‐$

NOTE: Bonding 0.0% ‐$ THE CONTRACTOR SHALL VERIFY ALL THE DIMENSIONS IN THE FIELD. Overhead 0.0% ‐$

Profit 0.0% ‐$ Grand Total ‐$

EQUIPMENT

UNITED STATES DEPARTMENT OF THE INTERIOR

National Park Services

Indiana Dunes National Park

HEAD QUARTER B302 (EPDM Roof Replacement) BID SCHEDULE

Bid Schedule - HQ Roof Replacement 1
Bid Schedule - HQ Roof Replacement 2
Bid Schedule - HQ Roof Replacement 3
Bid Schedule - HQ Roof Replacement 4
Bid Schedule - HQ Roof Replacement 5
Bid Schedule - HQ Roof Replacement 6
Bid Schedule - HQ Roof Replacement 7

File details come from the government source that posted it. Updated .