This document is a Bid Schedule for the Fan Coil Unit Repairs project for the First Ladies National Historic Site in Canton, OH. The project is being solicited by the National Park Service, Interior Regions 3/4/5, Ohio Major Acquisition Buying Office under Solicitation Number 140P6424B0007.

The Bid Schedule provides pricing details for various construction items, including isolation valve replacement on multiple floors, site preparation and demolition, mobilization/demobilization, overhead, profit, and bonds. The total Base Bid amount is provided, along with an option for additional isolation valve replacement work on the 3rd and 4th floors. The project is estimated to be between $250,000 and $500,000 and will be awarded as a firm-fixed price contract. The work is set aside 100% for Total Small Businesses, with a NAICS code of 238220 and a size standard of $19 million. A site visit is required, and offerors must have a UEI number and be registered in SAM.

View the file

Other files for this federal contract opportunity

Other files attached to Fan Coil Repairs, newest first.
File Type Posted
Questions_and_Answers_0001.pdf PDF
Sol_140P6424B0007_Amd_0001.pdf PDF
Attachment_-_Drawings-Pictures.pdf PDF
Sol_140P6424B0007.pdf PDF
Attachment_-_Construction_Contract_Admin.pdf PDF
Attachment_-_Notice_to_Contractors.pdf PDF
Specifications_-_Fan_Coil_Repairs.pdf PDF
Attachment_-_Addendum_to_Specifications.pdf PDF
Attachment_-_Limitations_on_Subcontracting_Report.xlsx XLSX spreadsheet
Wage_Determination_-_Stark_Co.pdf PDF
Bid_Schedule_-_Fan_Coil_Repairs.xlsx XLSX spreadsheet
Attachment_-_Submittal_List.pdf PDF
Show all 12

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Unit Quantity Price/ Unit Subtotal

LS 1 -$ -$

LS 1 -$ -$

LS 1 -$ -$

LS 1 -$ -$

LS 1 -$ -$

LS 1 -$ -$

LS 1 -$ -$

Grand Total (Base Bid)

Overhead

Subtotal

Bonds Profit

Construction Items

National Park Service U.S. Department of Interior

First Ladies National Historic Site

BID SCHEDULE

PROJECT: Fan Coil Unit Repairs

Isolation Valve Replacement (1st, 5th and 6th Floor) and all associated work/items

- Materials

- Labor

- Materials Site Preparation, Demolition and all associated work/items

- Labor

Mobilization/Demobilization

- Mob/Demob Costs

Grand Total (Base Bid + Option #3)

Referenced in Project Spec as Option #3 - Isolation Valve Replacement (3rd and 4th Floor) and all associated work/items

- Materials

- Labor

Overhead Profit Bonds

Grand Total (Option #3)