Bid Schedule.xls
XLS spreadsheet 227 KB Posted
- Attached to
- INDE - SOLID WASTE & RECYCLING SERVICES
- Solicitation number
- 140P4220R0053
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Sol_140P4220R0053.pdf | ||
| B03 Wage Determination.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ELINs-BASE-FFP
| INDE Solid Waste and Recycling Services | |||||
| IGE | |||||
| Solicitation Number: | |||||
| Exhibit A - CLIN 001 | |||||
| EXHIBIT LINE ITEM NUMBERS (ELINs) | |||||
| ELINs A001 - A010 | |||||
| Line Item 0001 Base Period - Firm Fixed Price Pricing | |||||
| Line Item 0001 Firm Fixed Price - Base Period | |||||
| PROVIDE PRICES TO PERFORM Solid Waste, Recycling, and Hazardous Materials Services per the Performance Work Satement | |||||
| ELINs A001 through A0003 | |||||
| ELIN / Sub ELIN | Description | Quantity | Unit of Issue | Unit Price | Total |
| A001 | Old City Hall | ||||
| Recyclable Waste Collection Point | 12 | MO | $0.00 | ||
| A002 | Security Screening Tent | ||||
| Recyclable Waste Collection Point | 12 | MO | $0.00 | ||
| A003 | Liberty Bell Center | ||||
| Recyclable Waste Collection Point | 12 | MO | $0.00 | ||
| A004 | Independence Visitor Center | ||||
| Recyclable Waste Collection Point | 12 | MO | $0.00 | ||
| A005 | Second Bank | ||||
| Recyclable Waste Collection Point | 12 | MO | $0.00 | ||
| A006 | Ben Franklin Museum | ||||
| Recyclable Waste Collection Point | 12 | MO | $0.00 | ||
| A007 | Merchant Exchange Building | ||||
| Recyclable Waste Collection Point | 12 | MO | $0.00 | ||
| A008 | Law Enforcement Operations Center | ||||
| Recyclable Waste Collection Point | 12 | MO | $0.00 | ||
| A009 | 325 Walnut St | ||||
| Recyclable Waste Collection Point | 12 | MO | $0.00 | ||
| A010 | Maintenance Facility | ||||
| A010AA | Recyclable Waste Collection Point | 12 | MO | $0.00 | |
| A010AB | Solid Waste (40cy container and compactor) | 12 | MO | $0.00 | |
| A010AC | Hazardous Waste | 12 | MO | $0.00 | |
| TOTAL FFP WORK | $0.00 |
SECTION J
EXHIBIT A
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Per Linear Foot to Provide Reconditioning and Maintenance Service for Barbwire Fence.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Per Linear Foot to Provide Reconditioning and Maintenance Service for Ornamental Steel Fence.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Per Linear Foot to Provide Reconditioning and Maintenance Service for Wood Fence.
PROVIDE A UNIT PRICE FOR THE REMOVAL AND DISPOSAL OF FENCE COMPLETE, FENCE POSTS, BARBWIRE, BARBED TAPE.
IN ACCORDANCE WITH SECTION C, C.10.1.l
ELIN A001EW through A001FI Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Per Linear Foot to Provide Removal Service for Chain link Fence.
Including Fabric, Posts, Gates, Rails, Tension Wire, Barbwire/Barbed Tape.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Per Linear Foot to Provide Removal Service for Chain link Fence Gates including tracks (not posts).
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Per Linear Foot to Provide Removal Service for Ornamental Steel Fence. Including Posts and Gates Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Per Linear Foot to Provide Removal Service for Wood Fence. Including Posts and Gates.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Per Linear Foot to Provide Removal Service for Barbwire Fence. Including Posts and all wire.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Each to Provide Removal Service for Fence Posts. Including Posts Footing with Braces and Supports as Required.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Each to Provide Removal Service for Fence Posts. Post Cut-off Flush.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Each to Provide Removal Service for Fence Posts. Driven Post.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Each to Provide Removal Service for Fence Posts. Including Posts Footing with Braces and Supports as Required.
Posts Set in Concrete/Asphalt.
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Per Square Foot to Patch and Refinish Concrete or Asphalt Surface.
Surface Depth to Match Surrounding.
Unit Price Each to Remove and Dispose of or Save and Store (for reuse) Barbwire Single Arm Support.
Unit Price Each to remove and Dispose of or Save and Store (for reuse) Barbwire Double (V) Arm Support.
Lump Sum Price for the recycling of removed materials. Based on a Percentage Added to Removal Item Ordered
SECTION J
EXHIBIT A
Lump Sum Price for the Recycling of Removed Materials. Based on a Percentage Added to Removal Item Ordered, ELIN A001EK to A001EW. Figured on a Quantity of 1,000. The Quantity Provided is for Establishing the Percentage Rate Only.
PROVIDE A UNIT PRICE TO PERFORM EXPEDITED SERVICES.
IN ACCORDANCE WITH SECTION C, C.10.2
ELIN A001FJ
Lump Sum Price for Expedited Maintenance and Repair Services. Based on a Percentage Added to Task Order Total. Figured on a Quantity of 1,000. The Quantity Provided is for Establishing the Percentage Rate Only.
SECTION J
EXHIBIT A
SECTION J
EXHIBIT A
PROVIDE A UNIT PRICE FOR THE RENTAL OF TEMPORARY CHAIN LINK FENCE.
IN ACCORDANCE WITH SECTION C, C.10.3
ELIN A001FK THROUGH A001FP
Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Per Linear Foot to Provide Temporary Chain link Fence.
6' Fence Height Driven Posts Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Per Linear Foot to Provide Temporary Chain link Fence.
12' Panel, 6' Height Driven Posts Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Per Linear Foot to Provide Temporary Chain link Fence.
12' Panel, 6' Height, Free-Standing Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Per Linear Foot to Provide Temporary Chain link Fence.
Driven Posts With Barbwire, 7' Fence Height Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Per Linear Foot to Provide Temporary Chain link Fence.
12' Panel, With Barbwire, 7' Height Driven Posts Unit Price Per Linear Foot to Provide Red Wood or Cedar Fence Including Dog Ear Fence Boards, Posts, Rails, Braces and all Hardware.
Fence Board Height of 6' Unit Price Per Linear Foot to Provide Temporary Chain link Fence.
12' Panel, With Barbwire, 7' Height, Free-Standing
ELINs-Base -BPA
| INDE Solid Waste and Recycling Services | ||||||
| IGE | ||||||
| Solicitation Number: | ||||||
| Exhibit A - CLIN 002 | ||||||
| ELINs A700 - A703 | ||||||
| Line Item 0002 BPA Price - Base Period | ||||||
| Provide Prices for Solid Waste and Recycling Services - BPA | ||||||
| ELINs A700 through A703 | ||||||
| Informational subELINs use numeric characters (01, 02, 03, etc.) if pricing at the ELIN level, and using the subELINs for information only, use numeric characters as the last two digits for the subELINs (A00101). >> | ||||||
| ELIN | Product Name (120 Characters) | Description Extended | Estimated Quantity | Unit of Issue | Unit Price | Extended Price |
| A700 | General Waste | The contractor shall provide a general waste or construction and debris container, up to 30 cy in size, as directed. | 2 | EA | $0.00 | |
| A701 | Recyclable Waste | The Contractor shall provide recycable waste container, up to 20cy in size, as directed. | 1 | EA | $0.00 | |
| TOTALBPA PRICE BASE YEAR | $0.00 |
ELINs - 1st Opt-FFP
| INDE Custodial Services and Window Cleaning | |||||
| IGE | |||||
| Solicitation Number: | |||||
| Exhibit A - CLIN 003 | |||||
| EXHIBIT LINE ITEM NUMBERS (ELINs) | |||||
| ELINs B001 - B010 | |||||
| Line Item 0001 Base Period - Firm Fixed Price Pricing | |||||
| Line Item 0003 Firm Fixed Price - Base Period | |||||
| PROVIDE PRICES TO PERFORM Solid Waste, Recycling, and Hazardous Materials Services per the Performance Work Satement | |||||
| ELINs B001 through B0003 | |||||
| ELIN / Sub ELIN | Description | Quantity | Unit of Issue | Unit Price | Total |
| B001 | Old City Hall | ||||
| Recyclable Waste Collection Point | 12 | MO | $0.00 | ||
| B002 | Security Screening Tent | ||||
| Recyclable Waste Collection Point | 12 | MO | $0.00 | ||
| B003 | Liberty Bell Center | ||||
| Recyclable Waste Collection Point | 12 | MO | $0.00 | ||
| B004 | Independence Visitor Center | ||||
| Recyclable Waste Collection Point | 12 | MO | $0.00 | ||
| B005 | Second Bank | ||||
| Recyclable Waste Collection Point | 12 | MO | $0.00 | ||
| B006 | Ben Franklin Museum | ||||
| Recyclable Waste Collection Point | 12 | MO | $0.00 | ||
| B007 | Merchant Exchange Building | ||||
| Recyclable Waste Collection Point | 12 | MO | $0.00 | ||
| B008 | Law Enforcement Operations Center | ||||
| Recyclable Waste Collection Point | 12 | MO | $0.00 | ||
| B009 | 325 Walnut St | ||||
| Recyclable Waste Collection Point | 12 | MO | $0.00 | ||
| B010 | Maintenance Facility | ||||
| B010AA | Recyclable Waste Collection Point | 12 | MO | $0.00 | |
| B010AB | Solid Waste (40cy container and compactor) | 12 | MO | $0.00 | |
| B010AC | Hazardous Waste | 12 | MO | $0.00 | |
| TOTAL FFP WORK | $0.00 |
ELINs-1st Opt-BPA
| INDE Solid Waste and Recycling Services | ||||||
| IGE | ||||||
| Solicitation Number: | ||||||
| Exhibit A - CLIN 004 | ||||||
| ELINs B700 - B703 | ||||||
| Line Item 0004 BPA Price - Base Period | ||||||
| Provide Prices for Solid Waste and Recycling Services -BPA | ||||||
| ELINs B700 through B703 | ||||||
| Informational subELINs use numeric characters (01, 02, 03, etc.) if pricing at the ELIN level, and using the subELINs for information only, use numeric characters as the last two digits for the subELINs (A00101). >> | ||||||
| ELIN | Product Name (120 Characters) | Description Extended | Estimated Quantity | Unit of Issue | Unit Price | Extended Price |
| B700 | General Waste | The contractor shall provide a general waste or construction and debris container, up to 30 cy in size, as directed. | 2 | EA | $0.00 | |
| B701 | Recyclable Waste | The Contractor shall provide recycable waste container, up to 20cy in size, as directed. | 1 | EA | $0.00 | |
| TOTALBPA PRICE BASE YEAR | $0.00 |
ELINs - 2nd Opt - FFP
| INDE Custodial Services and Window Cleaning | |||||
| IGE | |||||
| Solicitation Number: | |||||
| Exhibit A - CLIN 001 | |||||
| EXHIBIT LINE ITEM NUMBERS (ELINs) | |||||
| ELINs C001 - C010 | |||||
| Line Item 0005 Base Period - Firm Fixed Price Pricing | |||||
| Line Item 0005 Firm Fixed Price - Base Period | |||||
| PROVIDE PRICES TO PERFORM Solid Waste, Recycling, and Hazardous Materials Services per the Performance Work Satement | |||||
| ELINs C001 through C003 | |||||
| ELIN / Sub ELIN | Description | Quantity | Unit of Issue | Unit Price | Total |
| C001 | Old City Hall | ||||
| Recyclable Waste Collection Point | 12 | MO | $0.00 | ||
| C002 | Security Screening Tent | ||||
| Recyclable Waste Collection Point | 12 | MO | $0.00 | ||
| C003 | Liberty Bell Center | ||||
| Recyclable Waste Collection Point | 12 | MO | $0.00 | ||
| C004 | Independence Visitor Center | ||||
| Recyclable Waste Collection Point | 12 | MO | $0.00 | ||
| C005 | Second Bank | ||||
| Recyclable Waste Collection Point | 12 | MO | $0.00 | ||
| C006 | Ben Franklin Museum | ||||
| Recyclable Waste Collection Point | 12 | MO | $0.00 | ||
| C007 | Merchant Exchange Building | ||||
| Recyclable Waste Collection Point | 12 | MO | $0.00 | ||
| C008 | Law Enforcement Operations Center | ||||
| Recyclable Waste Collection Point | 12 | MO | $0.00 | ||
| C009 | 325 Walnut St | ||||
| Recyclable Waste Collection Point | 12 | MO | $0.00 | ||
| C010 | Maintenance Facility | ||||
| C010AA | Recyclable Waste Collection Point | 12 | MO | $0.00 | |
| C010AB | Solid Waste (40cy container and compactor) | 12 | MO | $0.00 | |
| C010AC | Hazardous Waste | 12 | MO | $0.00 | |
| TOTAL FFP WORK | $0.00 |
ELINs - 2nd Opt - BPA
| INDE Solid Waste and Recycling Services | ||||||
| IGE | ||||||
| Solicitation Number: | ||||||
| Exhibit A - CLIN 006 | ||||||
| ELINs A700 - A703 | ||||||
| Line Item 0006 BPA Price - Base Period | ||||||
| Provide Prices for Solid Waste and Recycling Services -BPA | ||||||
| ELINs C700 through C703 | ||||||
| Informational subELINs use numeric characters (01, 02, 03, etc.) if pricing at the ELIN level, and using the subELINs for information only, use numeric characters as the last two digits for the subELINs (A00101). >> | ||||||
| ELIN | Product Name (120 Characters) | Description Extended | Estimated Quantity | Unit of Issue | Unit Price | Extended Price |
| C700 | General Waste | The contractor shall provide a general waste or construction and debris container, up to 30 cy in size, as directed. | 2 | EA | $0.00 | |
| C701 | Recyclable Waste | The Contractor shall provide recycable waste container, up to 20cy in size, as directed. | 2 | EA | $0.00 | |
| TOTALBPA PRICE BASE YEAR | $0.00 |
ELINs - 3rd Opt - FFP
| INDE Custodial Services and Window Cleaning | |||||
| IGE | |||||
| Solicitation Number: | |||||
| Exhibit A - CLIN 007 | |||||
| EXHIBIT LINE ITEM NUMBERS (ELINs) | |||||
| ELINs D001 - D010 | |||||
| Line Item 0001 Base Period - Firm Fixed Price Pricing | |||||
| Line Item 0007 Firm Fixed Price - Base Period | |||||
| PROVIDE PRICES TO PERFORM Solid Waste, Recycling, and Hazardous Materials Services per the Performance Work Satement | |||||
| ELINs D001 through D010 | |||||
| ELIN / Sub ELIN | Description | Quantity | Unit of Issue | Unit Price | Total |
| D001 | Old City Hall | ||||
| Recyclable Waste Collection Point | 12 | MO | $0.00 | ||
| D002 | Security Screening Tent | ||||
| Recyclable Waste Collection Point | 12 | MO | $0.00 | ||
| D003 | Liberty Bell Center | ||||
| Recyclable Waste Collection Point | 12 | MO | $0.00 | ||
| D004 | Independence Visitor Center | ||||
| Recyclable Waste Collection Point | 12 | MO | $0.00 | ||
| D005 | Second Bank | ||||
| Recyclable Waste Collection Point | 12 | MO | $0.00 | ||
| D006 | Ben Franklin Museum | ||||
| Recyclable Waste Collection Point | 12 | MO | $0.00 | ||
| D007 | Merchant Exchange Building | ||||
| Recyclable Waste Collection Point | 12 | MO | $0.00 | ||
| D008 | Law Enforcement Operations Center | ||||
| Recyclable Waste Collection Point | 12 | MO | $0.00 | ||
| D009 | 325 Walnut St | ||||
| Recyclable Waste Collection Point | 12 | MO | $0.00 | ||
| D010 | Maintenance Facility | ||||
| D010AA | Recyclable Waste Collection Point | 12 | MO | $0.00 | |
| D010AB | Solid Waste (40cy container and compactor) | 12 | MO | $0.00 | |
| D010AC | Hazardous Waste | 12 | MO | $0.00 | |
| TOTAL FFP WORK | $0.00 |
ELINs - 3rd Opt - BPA
| INDE Solid Waste and Recycling Services | ||||||
| IGE | ||||||
| Solicitation Number: | ||||||
| Exhibit A - CLIN 008 | ||||||
| ELINs D700 - D703 | ||||||
| Line Item 008 BPA Price - Base Period | ||||||
| Provide Prices for Solid Waste and Recycling Services -BPA | ||||||
| ELINs D700 through D703 | ||||||
| Informational subELINs use numeric characters (01, 02, 03, etc.) if pricing at the ELIN level, and using the subELINs for information only, use numeric characters as the last two digits for the subELINs (A00101). >> | ||||||
| ELIN | Product Name (120 Characters) | Description Extended | Estimated Quantity | Unit of Issue | Unit Price | Extended Price |
| D700 | General Waste | The contractor shall provide a general waste or construction and debris container, up to 30 cy in size, as directed. | 2 | EA | $0.00 | |
| D701 | Recyclable Waste | The Contractor shall provide recycable waste container, up to 20cy in size, as directed. | 2 | EA | $0.00 | |
| TOTALBPA PRICE BASE YEAR | $0.00 |
ELINs - 4th Opt - FFP
| INDE Custodial Services and Window Cleaning | |||||
| IGE | |||||
| Solicitation Number: | |||||
| Exhibit A - CLIN 009 | |||||
| EXHIBIT LINE ITEM NUMBERS (ELINs) | |||||
| ELINs E001 - E010 | |||||
| Line Item 0009 Base Period - Firm Fixed Price Pricing | |||||
| Line Item 0009 Firm Fixed Price - Base Period | |||||
| PROVIDE PRICES TO PERFORM Solid Waste, Recycling, and Hazardous Materials Services per the Performance Work Satement | |||||
| ELINs E001 through E0010 | |||||
| ELIN / Sub ELIN | Description | Quantity | Unit of Issue | Unit Price | Total |
| E001 | Old City Hall | ||||
| Recyclable Waste Collection Point | 12 | MO | $0.00 | ||
| E002 | Security Screening Tent | ||||
| Recyclable Waste Collection Point | 12 | MO | $0.00 | ||
| E003 | Liberty Bell Center | ||||
| Recyclable Waste Collection Point | 12 | MO | $0.00 | ||
| E004 | Independence Visitor Center | ||||
| Recyclable Waste Collection Point | 12 | MO | $0.00 | ||
| E005 | Second Bank | ||||
| Recyclable Waste Collection Point | 12 | MO | $0.00 | ||
| E006 | Ben Franklin Museum | ||||
| Recyclable Waste Collection Point | 12 | MO | $0.00 | ||
| E007 | Merchant Exchange Building | ||||
| Recyclable Waste Collection Point | 12 | MO | $0.00 | ||
| E008 | Law Enforcement Operations Center | ||||
| Recyclable Waste Collection Point | 12 | MO | $0.00 | ||
| E009 | 325 Walnut St | ||||
| Recyclable Waste Collection Point | 12 | MO | $0.00 | ||
| E010 | Maintenance Facility | ||||
| E010AA | Recyclable Waste Collection Point | 12 | MO | $0.00 | |
| E010AB | Solid Waste (40cy container and compactor) | 12 | MO | $0.00 | |
| E010AC | Hazardous Waste | 12 | MO | $0.00 | |
| TOTAL FFP WORK | $0.00 |
ELINS - 4th Opt - BPA
| INDE Solid Waste and Recycling Services | ||||||
| IGE | ||||||
| Solicitation Number: | ||||||
| Exhibit A - CLIN 010 | ||||||
| ELINs E700 - E703 | ||||||
| Line Item 0010 BPA Price - Base Period | ||||||
| Provide Prices for Solid Waste and Recycling Services -BPA | ||||||
| ELINs E700 through E703 | ||||||
| Informational subELINs use numeric characters (01, 02, 03, etc.) if pricing at the ELIN level, and using the subELINs for information only, use numeric characters as the last two digits for the subELINs (A00101). >> | ||||||
| ELIN | Product Name (120 Characters) | Description Extended | Estimated Quantity | Unit of Issue | Unit Price | Extended Price |
| E700 | General Waste | The contractor shall provide a general waste or construction and debris container, up to 30 cy in size, as directed. | 2 | EA | $0.00 | |
| E701 | Recyclable Waste | The Contractor shall provide recycable waste container, up to 20cy in size, as directed. | 2 | EA | $0.00 | |
| TOTALBPA PRICE BASE YEAR | $0.00 |
NAVFAC UOMs
| AC | Acre | FR | Frame | PD | Pad |
| AM | Ampoule | FT | Foot | PG | Package |
| AT | Assortment | FV | Five | PI | Pillow |
| AY | Assembly | FY | Fifty | PM | Plate |
| BA | Ball | GG | Great Gross | PR | Pair |
| BD | Bundle | GI | Gill | PT | Pint |
| BE | Bale | GL | Gallon | PX | Pellet |
| BF | Board Foot | GM | Gram | PZ | Packet |
| BG | Bag | GN | Grain | QT | Quart |
| BK | Book | GP | Group | RA | Ration |
| BL | Barrel | GR | Gross | RD | Round |
| BO | Bolt | HD | Hundred | RL | Reel |
| BQ | Briquet | HF | Hundred Feet | RM | Ream |
| BR | Bar | HK | Hank | RO | Roll |
| BT | Bottle | HP | Hundred Pounds | RX | Thousand Rounds |
| BX | Box | HR | Hours | SB | Square Mile |
| CA | Cartridge | HS | Hundred Square Feet | SC | Square Centimeters |
| CB | Carboy | HW | Hundred Weight | SD | Skid |
| CC | Cubic Centimeter | HY | Hundred Yards | SE | Set |
| CD | Cubic Yard | IN | Inch | SF | Square Foot |
| CE | Cone | JR | Jar | SH | Sheet |
| CF | Cubic Foot | KG | Kilogram | SI | Square Inch |
| CG | Centigram | KM | Kilometer | SK | Skein |
| CI | Cubic Inch | KR | Carat | SL | Spool |
| CK | Cake | KT | Kit | SM | Square Meter |
| CL | Coil | LB | Pound | SO | Shot |
| CM | Centimeter | LF | Linear Foot | SP | Strip |
| CN | Can | LG | Length | SQ | Square |
| CO | Container | LH | Labor Hours | SX | Stick |
| CU | Curie | LI | Liter | SY | Square Yard |
| CY | Cylinder | LM | Linear Meter | TC | Truckload |
| CZ | Cubic Meter | LO | Lot | TD | Twenty-Four |
| DA | Days | LS | Lump Sum | TE | Ten |
| DC | Decagram | LY | Linear Yard | TF | Twenty-Five |
| DE | Decimeter | MC | Thousand Cubic Feet | TG | Gross Ton |
| DG | Decigram | ME | Meal | TN | Ton |
| DL | Deciliter | MF | Thousand Feet | TO | Troy Ounce |
| DM | Dram | MG | Milligram | TS | Thirty-Six |
| DO | Dollars | MI | Mile | TT | Tablet |
| DR | Drum | ML | Milliliter | TU | Tube |
| DW | Pennyweight | MM | Millimeter | UN | Unit |
| DZ | Dozen | MO | Months | US | US U.S.P Unit |
| EA | Each | MR | Meter | VI | Vial |
| EN | Each Collection | MX | Thousand | WK | Week |
| EX | Exposure | OT | Outfit | YD | Yard |
| FD | Fold | OZ | Ounce | YR | Years |
File details come from the government source that posted it. Updated .