The document is a comprehensive set of engineering plans for the Christensen Road Modifications project located in Cheyenne, Laramie County, Wyoming, prepared by Benchmark Engineers, P.C. The project involves modifications to Christensen Road, focusing on drainage, signage, and lighting improvements at the intersection with Pershing Boulevard. Key elements include installing 821 linear feet of new 18" PVC storm sewer with a 4.85% grade, adding new storm manholes and inlets, replacing curb and gutter, performing asphalt patching, and relocating/removing existing light poles. The project is scheduled for implementation in June 2024, with detailed engineering specifications and typical road section drawings included.
The engineering plans specify technical requirements for construction, including concrete and asphalt paving specifications, erosion control measures, and utility coordination. Contractors are required to comply with City of Cheyenne construction specifications, obtain necessary permits, provide construction surveying, and maintain detailed as-built documentation. Notable technical specifications include using Type II concrete with a minimum 28-day compressive strength of 4500 PSI, implementing storm water pollution prevention plans, and following specific excavation and utility location protocols. The project includes provisions for dryland seeding of disturbed areas, traffic control, and maintaining public safety during construction, with a two-year warranty on public improvements after final acceptance.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
© 2022 Microsoft Corporation © 2022 TomTom © 2022 Microsoft Corporation © 2022 TomTom © 2022 Microsoft Corporati© 2022 Microsoft Corporation © 2022 TomTom
© 2021 Microsoft Corporation © 2021 TomTom
© 2022 Microsoft Corporati© 2022 Microsoft Corporati© 2022 Microsoft Corporati© 2022 Microsoft Corporati© 2022 Microsoft Corporati© 2022 Microsoft Corporati© 2022 Microsoft Corporation © 2022 TomTom on © 2022 TomTom
© 2021 Microsoft Corporation © 2021 TomTom © 2021 Microsoft Corporati© 2021 Microsoft Corporati© 2021 Microsoft Corporation © 2021 TomTom on © 2021 TomTom © 2021 Microsoft Corporati© 2021 Microsoft Corporati© 2021 Microsoft Corporation © 2021 TomTom on © 2021 TomTom on © 2021 TomTom on © 2021 TomTom
SHEET INDEX
COVER
1-2 NOTES
3 TYPICAL SECTIONS
4 STORM LAYOUT AT INTERSECTION
5 STORM P&P 0+00 TO 5+50
6 STORM P&P 5+50 TO 11+00
7 INTERSECTION LIGHTING & SIGNAGE
8-12 WYDOT DETAILS
CITY OF CHEYENNE
JUNE 2024
I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION
OR REPORT WAS PREPARED BY ME, OR UNDER MY
DIRECT SUPERVISION AND THAT I AM A DULY
REGISTERED PROFESSIONAL ENGINEER UNDER
THE LAWS OF THE STATE OF WYOMING.
ENGINEER'S CERTIFICATE
E PERSHING BLVD
C H
R
IS
T E
N S
E N
R D
CHRISTENSEN ROAD MODIFICATIONS
APPROVED
Jun. 11 2024
8:18:29 AM
(DRAINAGE, SIGNAGE,
AND LIGHTING)
Sheet No.
C H
E Y
E N
N E
L
A R
A M
IE
C
O U
N T
Y
W Y
O M
IN
G
Jun. 10, 2024Print Date:
RR, EMDrawn By:
RR
2214.07
Check By:
Design By:
Project No.
SL
C
IT
Y O
F C
H E
Y E
N N
E
T h o m e s A v e n u e
S u it e
C h e y e n n e
W y o m in g
.6
.9 b e n c h m a rk e n g in e e rs
.c o m
Revisions:
C H
R
IS
T E
N S
E N
R O
A D
M O
D
IF
IC
A
T
IO
N S
N O
T E
S
SPECIFICATIONS AND GENERAL NOTES
1. ALL CIVIL SITE WORK (EXCLUDING STRUCTURAL) SHALL BE IN
CONFORMANCE WITH THE MOST CURRENT EDITION OF CITY OF
CHEYENNE & BOARD OF PUBLIC UTILITIES CONSTRUCTION
SPECIFICATIONS AND STANDARD DRAWINGS AND SUPPLIED
SPECIAL PROVISIONS. CITY OF CHEYENNE STANDARD
SPECIFICATIONS, WHICH INCLUDE ALL STANDARD DETAILS, CAN
BE DOWNLOADED IN PDF FORMAT FROM THE CITY'S WEBSITE AT
WWW.CHEYENNECITY.ORG.
2. THE CONTRACTOR SHALL BE RESPONSIBLE FOR OBTAINING
THESE SPECIFICATIONS AND STANDARD DETAILS. THESE
SPECIFICATIONS AND STANDARD DETAILS ARE PART OF THE
CONTRACT DOCUMENTS BUT SHALL NOT BE PROVIDED IN THE
PROJECT MANUAL OR DUPLICATED ON THE CONTRACT DESIGN
PLANS. ALL CIVIL SITE WORK SHALL BE IN CONFORMANCE WITH
THESE STANDARDS AND SPECIFICATIONS AS AMENDED BY THESE
PLANS AND ANY SPECIAL PROVISIONS.
3. NO WORK MAY COMMENCE WITHIN ANY PUBLIC RIGHT-OF-WAY
UNTIL A RIGHT-OF-WAY PERMIT HAS BEEN OBTAINED. THE
CONTRACTOR SHALL DEVELOP AND SUBMIT A CONSTRUCTION
TRAFFIC CONTROL PLAN TO THE CITY OF CHEYENNE, AND THE
ENGINEER. THE PLAN SHALL ADDRESS BOTH VEHICULAR AND
PEDESTRIAN TRAFFIC IN ACCORDANCE WITH THE MOST CURRENT
EDITIONS OF CITY OF CHEYENNE & BOARD OF PUBLIC UTILITIES
CONSTRUCTION SPECIFICATIONS AND STANDARD DRAWINGS AND
THE MANUAL OF UNIFORM TRAFFIC CONTROL DEVICES (MUTCD).
4. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE
COORDINATION OF THE PRE-CONSTRUCTION MEETING AND
WEEKLY CONSTRUCTION MEETINGS WITH THE CITY OF CHEYENNE
AND THE ENGINEER. A MINIMUM OF 3 FULL BUSINESS DAYS
NOTICE IS REQUIRED.
5. THE CONTRACTOR SHALL SUBMIT A CONSTRUCTION SCHEDULE
FOR THE PROJECT AT THE PRE-CONSTRUCTION MEETING. THE
CONTRACTOR SHALL MAINTAIN AN UPDATED SCHEDULE
THROUGHOUT CONSTRUCTION AND SUBMIT UPDATED
SCHEDULES AT THE WEEKLY CONSTRUCTION MEETINGS. ALL
COSTS, MATERIAL AND LABOR TO GENERATE AND PROVIDE
UPDATES TO THE CONSTRUCTION SCHEDULE SHALL BE
INCIDENTAL TO THE PROJECT.
6. THE CONTRACTOR SHALL NOTIFY THE CITY OF CHEYENNE AT
LEAST TWO (2) WORKING DAYS PRIOR TO START OF ANY WORK.
ALL SUBSEQUENT INSPECTIONS REQUIRE THE SAME 48 HOUR
ADVANCE NOTICE. THERE SHALL BE NO WORK WITHIN THE PUBLIC
RIGHT-OF-WAY ON SATURDAYS, SUNDAYS, OR HOLIDAYS UNLESS
SPECIFICALLY APPROVED IN WRITING BY THE CITY OF CHEYENNE
CONSTRUCTION SERVICES.
7. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL ASPECTS OF
SAFETY, INCLUDING, BUT NOT LIMITED TO, EXCAVATION,
TRENCHING, SHORING, TRAFFIC CONTROL, AND SECURITY. THE
CONTRACTOR SHALL PROVIDE ALL LIGHTS, SIGNS, BARRICADES,
FLAG PERSONS, OR OTHER DEVICES NECESSARY TO PROVIDE
FOR PUBLIC SAFETY. THE OWNER AND ENGINEER EXERCISE NO
CONTROL OF THE SAFETY OR ADEQUACY OF ANY EQUIPMENT,
BUILDING COMPONENTS, SCAFFOLDING, FORMS, OR OTHER
WORK AIDS USED IN OR ABOUT THE PROJECT, OR IN SUPERVISION
OF THE SAME.
8. THE CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING
CONSTRUCTION SURVEYING/STAKING TO CONSTRUCT THE
PROPOSED IMPROVEMENTS TO THE LINES AND GRADES SHOWN
ON THE PLANS. CONTROL POINTS WITHIN THE LIMITS OF
CONSTRUCTION SHALL BE PROTECTED, IF POSSIBLE, OR NEW
CONTROL POINTS ESTABLISHED, AS NECESSARY, TO COMPLETE
THE WORK.
9. IMPROVEMENTS INSTALLED SHALL BE SURVEYED AFTER
INSTALLATION TO PROVIDE ACCURATE AS-BUILT INFORMATION TO
THE CITY OF CHEYENNE. AS-BUILT INFORMATION SHALL BE KEPT
ON THE CONSTRUCTION SITE AT ALL TIMES AND MADE AVAILABLE
TO THE CITY OF CHEYENNE.
10. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL MATERIAL
TESTING AND CERTIFICATIONS, AS REQUIRED, UNLESS
OTHERWISE SHOWN ON THE PLANS.
11. NO SOIL BORINGS WERE PERFORMED FOR FOR THIS PROJECT.
THE ORIGINAL GEOTECHNICAL REPORT FOR CHRISTENSEN ROAD
IS AVAILABLE.
12. THE CONTRACTOR SHALL NOT PERFORM ANY WORK BEYOND THE
LIMITS OF CONSTRUCTION (OR INTENT OF THESE PLANS). ANY
DAMAGE TO ANYTHING OUTSIDE THESE LIMITS SHALL BE
REPAIRED OR REPLACED PER CITY STANDARDS AND
SPECIFICATIONS AT NO COST TO THE OWNER.
13. ANY FACILITIES DAMAGED DURING CONSTRUCTION, INCLUDING
TRAVEL PATHS USED FOR THE IMPORTATION OF MATERIALS AND
EQUIPMENT, SHALL BE RESTORED TO THEIR ORIGINAL CONDITION
BY THE CONTRACTOR PRIOR TO FINAL ACCEPTANCE. EXISTING
FENCES, TREES, STREETS, SIDEWALKS, CURB AND GUTTER,
LANDSCAPING, STRUCTURES, AND IMPROVEMENTS DESTROYED,
DAMAGED, OR REMOVED DUE TO CONSTRUCTION SHALL BE
REPLACED OR RESTORED IN LIKE KIND AT THE CONTRACTOR'S
EXPENSE, UNLESS OTHERWISE INDICATED ON THE APPROVED
PLANS. NO ADDITIONAL PAYMENT SHALL BE ALLOWED FOR
REPAIR OR REPLACEMENT OF DAMAGED FACILITIES UNLESS
OTHERWISE APPROVED BY THE OWNER AND ENGINEER.
14. THE CONTRACTOR SHALL PROVIDE SUPERINTENDENT ON-SITE AT
ALL TIMES DURING CONSTRUCTION ACTIVITIES. THE
SUPERINTENDENT SHALL BE RESPONSIBLE FOR, BUT NOT LIMITED
TO THE FOLLOWING TASKS:
14.A. MUST BE KNOWLEDGEABLE AND FAMILIAR WITH PLANS,
SPECS, ADDENDUMS, AND SHOP DRAWINGS.
14.B. MANAGE THE CONSTRUCTION ACTIVITIES OF ALL
SUB-CONTRACTORS ON-SITE. REVIEW AND APPROVE SHOP
DRAWINGS OF SUB-CONTRACTORS.
14.C. REVIEW STAKEOUT DATA, SURVEY STAKES, AND VERIFY
AGAINST THE DESIGN PLANS PRIOR TO ASSOCIATED
CONSTRUCTION ACTIVITIES.
14.D. OBTAIN APPROVAL FROM THE OWNER/ENGINEER PRIOR TO
BEGINNING ANY FORCE ACCOUNT EFFORTS.
14.E. PROVIDE AN ACCURATE WEEKLY CONSTRUCTION
SCHEDULE.
14.F. BE AVAILABLE DURING NON-WORKING HOURS FOR
EMERGENCIES, INCLUDING STORM WATER MANAGEMENT &
EROSION CONTROL SITUATIONS.
15. ALL CONSTRUCTION WATER SHALL BE THE RESPONSIBILITY OF
THE CONTRACTOR.
16. UPON COMPLETION OF CONSTRUCTION, ALL WORK AREAS SHALL
BE CLEANED AND RESTORED TO A CONDITION EQUAL TO, OR
BETTER, THAN THAT WHICH EXISTED BEFORE CONSTRUCTION.
17. AFTER FINAL ACCEPTANCE BY THE CITY OF CHEYENNE, PUBLIC
IMPROVEMENTS DEPICTED ON THE APPROVED PLANS SHALL BE
GUARANTEED TO BE FREE FROM MATERIAL AND WORKMANSHIP
DEFECTS FOR A PERIOD OF TWO YEARS FROM THE DATE OF
ACCEPTANCE.
PROJECT CONTROL
HORIZONTAL CONTROL IS BASED ON WYOMING STATE PLANE EAST
ZONE 4901 (NAD 83). VERTICAL CONTROL IS NAVD 88.
EROSION CONTROL NOTES
1. THE CONTRACTOR SHALL CONTROL STORM WATER RUNOFF,
DUST, AND MUD FROM ALL CONSTRUCTION ACTIVITIES PER
LOCAL, STATE, AND FEDERAL REQUIREMENTS.
2. THE CONTRACTOR SHALL BE RESPONSIBLE FOR INSURING THAT
NO MUD OR DEBRIS WILL BE TRACKED ONTO THE EXISTING
PUBLIC STREET SYSTEM. MUD, SEDIMENT, AND DEBRIS MUST BE
REMOVED FROM PAVED ROADWAYS BY THE END OF THE
WORKING DAY BY A MACHINE BROOM SWEEP OR OTHER METHOD
AS APPROVED BY THE CITY OF CHEYENNE. NO ADDITIONAL
PAYMENT WILL BE ALLOWED FOR THIS ITEM AS IT WILL BE
CONSIDERED SUBSIDIARY TO EROSION CONTROL.
3. THE CONTRACTOR SHALL BE RESPONSIBLE FOR SEDIMENT
REMOVAL AFTER ALL RUNOFF PRODUCING STORM EVENTS.
AFTER A STORM EVENT, ALL STANDING WATER SHALL BE PUMPED
OUT TO PROTECT ROADWAY SUBGRADE.
4. STORM SEWER INLETS, CULVERTS, DITCHES, AND
CREEKS/STREAMS/RIVERS SHALL BE PROTECTED FROM
SEDIMENT AND DEBRIS FROM DISTURBED AREAS DURING
CONSTRUCTION. STORM SEWER PIPES AND STRUCTURES THAT
ARE CONTAMINATED BY SEDIMENTATION FROM CONSTRUCTION
ACTIVITIES SHALL BE CLEANED IMMEDIATELY TO THE
SATISFACTION OF THE CITY OF CHEYENNE.
5. THE CONTRACTOR SHALL BE RESPONSIBLE FOR OBTAINING,
KEEPING CURRENT, AND TRANSFERRING THE WYPDES PERMIT
FOR THIS PROJECT.
6. THE CONTRACTOR SHALL PREPARE AND KEEP A CURRENT STORM
WATER POLLUTION PREVENTION PLAN (SWPPP) AT THE JOBSITE
AND MAINTAIN THIS DOCUMENT UNTIL THE TRANSFER OF WYPDES
PERMIT. THE CONTRACTOR SHALL INSTALL AND MAINTAIN
EROSION CONTROL ITEMS AS REQUIRED BY THE SWPPP TO
DISCHARGE STORM WATER.
7. PENALTY VIOLATIONS AND FINES FOR WYPDES PERMITS SHALL BE
PAID BY THE CONTRACTOR AT NO COST TO THE OWNER AND/OR
THE ENGINEER.
8. DISCHARGES GENERATED FROM DEWATERING OPERATIONS
SHALL BE FILTERED PRIOR TO RELEASE TO A PUBLIC STORM
WATER SYSTEM OR DIRECTLY TO A STREAM OR RIVER.
9. DUST CONTROL WATERING SHALL BE APPLIED AT ANY TIME THAT
BLOWING DUST, RESULTING FROM THE CONTRACTOR'S
OPERATIONS, BECOMES A NUISANCE, VISUAL IMPEDIMENT TO
ADJACENT ROADWAYS, OR IS REQUESTED BY A STATE, COUNTY,
OR CITY AUTHORITY. THE CONTRACTOR SHALL HAVE ADEQUATE
WATERING CAPABILITIES AT THE JOBSITE TO ADDRESS DUST
CONTROL ISSUES. THE CONTRACTOR SHALL CONSIDER THE
PROJECT IS IN A DRY AND WINDY CLIMATE.
10. A CONCRETE WASHOUT AREA(S) FOR THE PROJECT SHALL BE
PROVIDED IN A LOCATION APPROVED BY THE OWNER. THE
CONCRETE WASHOUT AREA SHALL BE INSTALLED IN
CONFORMANCE TO NATIONALLY OR REGIONALLY ACCEPTED BEST
MANAGEMENT PRACTICE (BMPs) FOR FACILITIES OF THIS TYPE.
CONCRETE TRUCKS SHALL NOT WASH OUT IN AREAS THAT
DIRECT DISCHARGE BACK INTO STREETS OR STORM SEWER.
UPON COMPLETION OF THE WORK, THE WASHOUT AREA WILL BE
REMOVED AND PROPERLY DISPOSED OF PRIOR TO THE AREA
BEING RESTORED.
DEMOLITION NOTES
1. THE CONTRACTOR IS RESPONSIBLE FOR THE REMOVAL OF ANY
ITEMS THAT ARE ENCOUNTERED DURING CONSTRUCTION SUCH
AS, BUT NOT LIMITED TO, CONCRETE, ASPHALT, WOOD, STEEL,
PLASTIC, AND SHRUBBERY. IN NO CIRCUMSTANCE SHALL ANY OF
THESE ITEMS BE BURIED. THE CONTRACTOR IS ALSO
RESPONSIBLE FOR THE REMOVAL OF ANY NEW CONSTRUCTION
DEBRIS.
2. ALL CURBING, PAVEMENTS, CONCRETE, FENCING, AND OTHER
OBSTRUCTIONS DESIGNATED FOR REMOVAL AND NOT RECYCLED
FOR USE BY THE OWNER SHALL BE RAZED, REMOVED, AND
PROPERLY DISPOSED OF OFF SITE IN ACCORDANCE WITH LOCAL,
STATE, AND FEDERAL REQUIREMENTS SUCH AS SALVAGE YARDS
AND LAND FILLS.
3. ASPHALT PAVEMENT SHALL BE REMOVED TO A CLEAN, VERTICAL
LINE BY SAWING COMPLETELY THROUGH THE PAVEMENT
SURFACE. PAVEMENT SHALL BE REMOVED A MINIMUM OF 1 FOOT
BEYOND THE REQUIRED EXCAVATION, OR AS SHOWN ON THE
PLANS. REMOVED PAVEMENT SHALL NOT BE USED AS FILL OR
OTHER CONSTRUCTION MATERIAL FOR ANY PART OF THE WORK
AND SHALL BE REMOVED OFF SITE AND DISPOSED OF.
4. CONCRETE PAVEMENT, CURB & GUTTER, SIDEWALK, OR OTHER
CONCRETE SURFACES SHALL BE REMOVED TO A CLEAN,
VERTICAL LINE BY SAWING. REMOVALS SHALL EXTEND TO THE
NEAREST EXISTING JOINT, WHERE POSSIBLE.
5. AGGREGATE SURFACING REMOVED MAY BE STOCKPILED AND
USED AS FILL MATERIAL, AS ALLOWED BY THE SPECIFICATIONS.
REMOVED AGGREGATE MATERIAL SHALL NOT BE REUSED AS
AGGREGATE BASE COURSE OR FOR RESTORING AGGREGATE
SURFACES WITHOUT PERMISSION OF THE CITY OF CHEYENNE.
GENERAL UTILITY NOTES
1. THE CONTRACTOR SHALL CONTACT ONE CALL OF WYOMING AT
LEAST THREE (3) WORKING DAYS PRIOR TO THE BEGINNING
EXCAVATION OR GRADING TO VERIFY AND LOCATE ALL
REGISTERED UTILITIES WITHIN THE PROJECT LIMITS. OTHER
UNREGISTERED UTILITIES ARE TO BE LOCATED BY CONTACTING
THE RESPECTIVE REPRESENTATIVE. THE CONTRACTOR SHALL BE
SOLELY RESPONSIBLE FOR HAVING ALL UTILITIES LOCATED, AS
MANY TIMES AS REQUIRED, TO SAFELY CONSTRUCT THE
PROJECT. THE CONTRACTOR SHALL TAKE CARE IN PRESERVING
AND RECORDING ALL UTILITY LOCATES.
2. PUBLIC TRAFFIC SHALL BE KEPT A MINIMUM OF 4 FEET FROM ANY
OPEN EXCAVATION WITH THE EXCAVATION BARRICADED AND
PROTECTED AS REQUIRED BY THE MUTCD AND LOCAL & STATE
RULES & REGULATIONS.
3. ANY UTILITIES THAT ARE DISCOVERED DURING CONSTRUCTION
THAT ARE NOT SHOWN ON THE PLANS SHALL BE IMMEDIATELY
BROUGHT TO THE OWNER'S AND ENGINEER'S ATTENTION.
4. EXCAVATION FOR ANY TRENCHING AND SHORING SHALL BE IN
ACCORDANCE WITH CURRENT OCCUPATIONAL SAFETY AND
HEALTH ADMINISTRATION (OSHA) CONSTRUCTION STANDARDS
FOR EXCAVATIONS, AND ALL OTHER APPLICABLE OSHA RULES
AND REGULATIONS. CONTRACTOR SHALL WAIVE ANY AND ALL
CLAIMS AGAINST ENGINEER AND OWNER FOR FAILURE TO
COMPLY WITH OSHA REGULATIONS.
5. TRENCH BOXES OR SHORING IS RECOMMENDED TO BE USED FOR
ALL EXCAVATIONS GREATER THAN 5 FEET TO PREVENT RAVELING
OR SLOUGHING OF THE TRENCH SIDES. EXCAVATIONS OVER 5
FEET THAT ARE CONDUCTED WITHOUT TRENCH BOXES OR
SHORING SHALL BE DONE AT THE CONTRACTOR'S RISK AND ANY
SLOUGHING OR RAVELING OF THE TRENCH SIDE SLOPE
REQUIRING ADDITIONAL TRENCH BACKFILL OR SURFACE
RESTORATION SHALL BE COMPLETED AT THE COST OF THE
CONTRACTOR.
6. STORM WATER RUNOFF SHALL BE DIRECTED AWAY FROM OPEN
EXCAVATIONS DURING CONSTRUCTION. SOIL BERMS MAY BE
USED TO TEMPORARILY REDIRECT STORM WATER RUNOFF.
7. TRENCHES SHALL BE DEWATERED CONTINUOUSLY WHILE UTILITY
INSTALLATION IS IN PROGRESS. DEWATERING SHALL BE
SUBSIDIARY TO OTHER CONTRACT PAY ITEMS.
8. THE CONTRACTOR SHALL PROVIDE ALL LABOR AND MATERIALS
FOR THE COMPLETION OF THE INTENDED IMPROVEMENTS IN
ACCORDANCE WITH THE PLANS AND SPECIFICATIONS. FITTINGS,
ADAPTERS, AND OTHER APPURTENANCES NOT SPECIFICALLY
DESIGNATED ON THE PLANS THAT ARE REQUIRED TO COMPLETE
THE CONSTRUCTION SHALL BE CONSIDERED INCIDENTAL.
STORM SEWER
1. WATERTIGHT JOINTS REQUIRED FOR ALL NEW STORM SEWER. SEE PLAN
AND PLAN AND PROFILE SHEETS FOR SIZING AND LAYOUT OF FITTINGS,
CONNECTIONS, AND ADDITIONAL REQUIREMENTS.
2. STORM MANHOLES, INLETS, AND POND OUTLET STRUCTURES SHALL BE
PRECAST CONCRETE UNITS. SHOP DRAWINGS TO BE SUBMITTED FOR
REVIEW PRIOR TO INSTALLATION.
3. CONTRACTOR SHALL CHECK SURVEY STAKES & GRADES OF STORM
SEWER LINES AND NOTE ON AS-BUILTS. ALL STORM SEWER LINES TO BE
INSTALLED USING LASER GRADE CONTROL DEVICE.
APPROVED
Jun. 11 2024
8:18:24 AM
H
E Y
E N
N E
L
A R
A M
IE
C
O U
N T
Y
W Y
O M
IN
G
Jun. 10, 2024Print Date:
RR, EMDrawn By:
RR
2214.07
Check By:
Design By:
Project No.
SL
C
IT
Y O
F C
H E
Y E
N N
E
T h o m e s A v e n u e
S u it e
C h e y e n n e
W y o m in g
.6
.9 b e n c h m a rk e n g in e e rs
.c o m
Revisions:
C H
R
IS
T E
N S
E N
R O
A D
M O
D
IF
IC
A
T
IO
N S
N O
T E
S
CONCRETE SURFACING NOTES
1. SEE STANDARD SPECS AND THIS SHEET FOR REQUIRED SECTIONS. ALL
CONCRETE SHALL BE TYPE II AND HAVE A MINIMUM 28 DAY COMPRESSIVE
STRENGTH OF 4500 PSI.
2. FIBROUS CONCRETE REINFORCEMENT MATERIAL SHALL BE ADDED AS
REQUIRED BY STANDARD SPECIFICATIONS AND SPECIAL PROVISIONS.
3. ALL EXISTING CURB TO BE REPLACED SHALL BE SAW CUT AT NEXT GOOD
JOINT LINE AND MATCH JOINTS OF EXISTING CURB.
4. ALL JOINT LINES SHALL BE SAWCUT WITHIN THE CITY ROW.
ASPHALT PAVING NOTES
1. SEE THIS SHEET FOR REQUIRED SECTIONS. REFER TO CITY OF CHEYENNE
SPECIFICATIONS FOR ALL PAVING REQUIREMENTS.
2. CRUSHED BASE COURSE SHALL BE GRADING W.
3. THE MIX DESIGN SHALL BE SUBMITTED TO THE ENGINEER FOURTEEN (14)
DAYS PRIOR TO PAVING FOR APPROVAL. ALL ASPHALT PATCHING AND
PAVING SHALL MEET THE REQUIREMENTS OF THE ORIGINAL MIX DESIGN
FOR CHRISTENSEN ROAD PROJECT.
4. NEW ASPHALT SHALL BE SUPPLEMENTED WITH HYDRATED LIME OR LIQUID
ANTI-STRIP AGENTS TO MEET STANDARDS OUTLINED IN THE STANDARD
SPECIFICATIONS.
5. ASPHALT MATERIAL SHALL BE PLACED IN MAXIMUM 2-INCH LIFTS AND SHALL
BE COMPACTED TO 92% OF THE MAXIMUM THEORETICAL DENSITY (ASTM D
2041).
6. ALL ASPHALT PATCHING SHALL MEET THE "T" PATCHING SECTIONS
DETAILED IN CITY OF CHEYENNE STANDARD DRAWINGS 02220-01 AND
02515-01.
7. CONTRACTOR SHALL COORDINATE LIMITS OF ASPHALT REMOVAL AND
PATCHING WITH INSPECTOR. ALL ASPHALT PATCH SEAMS MUST FALL
OUTSIDE OF ANY WHEEL PATH.
8. TACK COAT SHALL BE APPLIED TO ALL VERTICAL ASPHALT SURFACES PRIOR
TO PLACEMENT OF ADJOINING ASPHALT PAVEMENT.
OTHER SURFACING NOTES
1. VEGETATED AREAS SHALL BE STRIPPED PRIOR TO EXCAVATION. TOPSOIL
SHALL BE PLACED AND THE DISTURBED AREA SHALL BE RESEEDED.
LIGHT POLE NOTES
1. CONTRACTOR SHALL REMOVE AND REPLACE LIGHT POLES & BASES IN THE
INTERSECTION OF PERSHING BLVD & CHRISTENSEN RD USING THE DETAILS
FROM WYDOT IN THESE PLANS.
AS-BUILT NOTES
1. THE CONTRACTOR SHALL PROVIDE, AT THE COMPLETION OF THE PROJECT
OR EACH PHASE OF THE PROJECT, A COMPLETE SET OF REDLINED
DRAWINGS TO THE ENGINEER FOR CREATION OF AS-BUILT DRAWINGS.
CONTRACTOR TO PROVIDE BOTH PAPER AND ELECTRONIC AS-BUILT
DRAWINGS. THE REDLINED DRAWINGS WILL CONSIST OF A MARKED-UP SET
OF “ISSUED FOR CONSTRUCTION” DRAWINGS VERIFYING THE FOLLOWING:
1.A. ALL LENGTHS, SIZES, AND MATERIAL OF INSTALLED PIPE, MANHOLES,
AND ANY OTHER IMPROVEMENTS.
1.B. ELEVATIONS AT FLOWLINES OF PIPES AND CULVERTS AT DESIGN
LOCATIONS AND GRADE BREAKS, RIM ELEVATION OF INLETS AND
MANHOLES, AND TOP OF CURB INLETS.
1.C. SLOPE OF PIPES INSTALLED BETWEEN MANHOLES, INLETS, AND
OTHER STRUCTURES.
1.D. TOP OF UTILITY ELEVATIONS AND UTILITY SIZE AT ALL EXPOSED
CROSSINGS FOR WATER, WATER SERVICES, GAS, TELEPHONE,
ELECTRICAL CONDUITS, AND FIBER OPTIC.
1.E. HORIZONTAL RELOCATION OF WATER, WATER SERVICES, GAS,
TELEPHONE, ELECTRICAL CONDUITS, AND FIBER OPTIC NOT SHOWN
ON THE PLANS
1.F. ANY OTHER VARIATIONS FROM THE CONSTRUCTION DOCUMENTS
MUST BE CLEARLY NOTED AND DETAILED ON THE PLANS.
2. SEE CITY SPECIFICATION SECTION 01054, 1.11, F FOR ADDITIONAL
REQUIREMENTS REGARDING RECORD DRAWINGS.
3. FINAL RELINED DRAWINGS SHALL BE SUBMITTED PRIOR TO THE
APPLICATION FOR FINAL PAYMENT. NON-CONFORMING REDLINED
DRAWINGS WILL BE RETURNED TO THE CONTRACTOR FOR REVISIONS AND
RESUBMITTAL.
ABBREVIATIONS
~/APPROX APPROXIMATELY
BME BENCHMARK ENGINEERS, P.C.
BMP BEST MANAGEMENT PRACTICE
CL CENTERLINE
DOT DEPARTMENT OF TRANSPORTATION
E EAST
ELEC ELECTRICAL
ELEV ELEVATION
EPA ENVIRONMENTAL PROTECTION AGENCY
EQ EQUAL (OR EQUALLY SPACED)
EQUIV EQUIVALENT
EX EXISTING
FH FIRE HYDRANT
FL FIRE LINE
FL FLOW LINE
FO FIBER OPTIC LINE
FV FIELD VERIFY
C&G CURB AND GUTTER
G GAS
GV GATE VALVE
HDPE HIGH-DENSITY POLYETHYLENE
INV INVERT
LF LINEAR FEET
MECH MECHANICAL
MH MANHOLE
NE NORTHEAST
NW NORTHWEST
OFF OFFSET
OSHA OCCUPATIONAL SAFETY AND HEALTH
ADMINISTRATION
PPE PERSONAL PROTECTIVE EQUIPMENT
PROP PROPOSED
PVC POLYVINYL CHLORIDE
R&R REMOVE & REPLACE
R/RE REFER TO
ROW RIGHT OF WAY
SAN SANITARY
SRPE STEEL REINFORCED POLYETHYLENE
STA STATION
STM STORM
THEO THEORETICAL
TYP TYPICAL
UD UNDER DRAIN
VPC VITRIFIED CLAY PIPE
W WEST
W/ WITH
WTR WATER
8'' MIN. CONCRETE PAVEMENT
(RE: PAVING NOTES AND SPECIFICATIONS)
6'' CRUSHED BASE GRADING W (SUBSIDIARY TO PAVEMENT)
(RE: PAVING NOTES AND SPECIFICATIONS)
6" SUBGRADE (RE: SPECIFICATIONS)
CONCRETE SECTION FOR CONCRETE PAVING, VALLEY
PANS, FILLETS AND COMMERCIAL APPROACHES
TYPE A CURB & GUTTER (REFER TO SPECS)
CURB AND GUTTER PER CITY
OF CHEYENNE SPECS.
SUBGRADE: REFER TO
SPECIFICATIONS
REUSE EXISTING 11" BASE
PATCHING SECTION
REUSE EXISTING 11" CRUSHED BASE
5'' MIN. HOT PLANT MIX BITUMINOUS PAVEMENT
(RE: PAVING NOTES AND SPECIFICATIONS)
EXISTING SUBGRADE
APPROVED
8:18:29 AM
E X
F E
N C
E
R O
W
R O
W
100.0' ROW
36.0' SHOULDER TO SHOULDER
APPROX. 50.0'
ROADWAY
CHRISTENSEN ROAD
EXISTING TYPICAL SECTION
EXISTING 5" ASPHALT,
11" CRUSHED BASE, &
SUBGRADE TO REMAIN
SAWCUT & REMOVE
EXISTING PAVEMENT
SAWCUT & REMOVE
EXISTING PAVEMENT
EXISTING GREENWAY TO REMAIN
EXISTING EDGE LINE
STRIPING TO REMAIN
EXISTING EDGE LINE
STRIPING TO REMAIN
~4.8' ~4.5'
E X
F E
N C
E
R O
W
R O
W
100.0' ROW
36.0' SHOULDER TO SHOULDER
49' TBC TO TBC
CHRISTENSEN ROAD
PROPOSED TYPICAL SECTION
EXISTING 5" ASPHALT,
11" CRUSHED BASE, &
SUBGRADE TO REMAIN
NEW 24" CURB & GUTTER (TYPE A)
REUSE EXISTING BASE
EXISTING GREENWAY TO REMAIN
EXISTING EDGE LINE
STRIPING TO REMAIN
EXISTING EDGE LINE
STRIPING TO REMAIN
2.0' NEW ASPHALT T-PATCH
2% MIN
NEW 24" CURB & GUTTER (TYPE A)
REUSE EXISTING BASE
2.0' NEW ASPHALT T-PATCH
IMPORTED FILL MATERIAL
AND 4" MINIMUM
STORED/IMPORTED TOPSOIL
IMPORTED FILL MATERIAL
AND 4" MINIMUM
STORED/IMPORTED TOPSOIL
NOTE: CONTRACTOR SHALL INSTALL CURB & GUTTER SUCH THAT A CROSS SLOPE IS MAINTAINED TO THE FLOWLINE OF THE GUTTER.
IN NO CASE SHALL THE FLOWLINE OF THE GUTTER BE PLACED HIGHER THAN THE ASPHALT. CURB & GUTTER SHALL BE INSTALLED AT
A SMOOTH AND CONSTANT GRADE AND SHALL NOT HAVE CONSTANT VARIATIONS JUST TO FOLLOW EXISTING ASPHALT GRADES.
STRIP TOPSOIL
AND STORE
STRIP TOPSOIL
AND STORE
SLOPE
VARIES 2% 2%
2% 2%
NEW 18" PVC STORM
Sheet No.
C H
E Y
E N
N E
L
A R
A M
IE
C
O U
N T
Y
W Y
O M
IN
G
Jun. 10, 2024Print Date:
RR, EMDrawn By:
RR
2214.07
Check By:
Design By:
Project No.
SL
C
IT
Y O
F C
H E
Y E
N N
E
T h o m e s A v e n u e
S u it e
C h e y e n n e
W y o m in g
.6
.9 b e n c h m a rk e n g in e e rs
.c o m
Revisions:
C H
R
IS
T E
N S
E N
R O
A D
M O
D
IF
IC
A
T
IO
N S
T Y
P
IC
A L
S E
C T
IO
N
S
APPROVED
M icro so ft C o rp o ra tio n
M a xa r © C
N E S (2
) D istrib u tio n
A irb u s D
S
M icro so ft C o rp o ra tio n
M a xa r © C
N E S (2
) D istrib u tio n
A irb u
M i M i M i M icro cro cro cro cro cro so f so f so f so f so ft C t C t C t C t C t C t C
EX STM M.H.
TO REMAIN
EX STM MH
TO REMAIN
IN-1
NEW STM INLET (TYPE AA)
RIM: 6050.40
STRUCTURE DEPTH: 4.79
INV. (W): 6045.61 - EX 18" RCP STM
EX 18" RCP STM
TO REMAIN
EX 18" RCP STM
TO REMAIN
EX 24" STM
TO REMAIN
NEW 24" CURB AND GUTTER (TYPE A)
& NEW ASPHALT PATCH
SAWCUT & REMOVE EX ASPHALT
2 6052
EX. CURB & GUTTER
TO REMAIN
EX. CURB & GUTTER
TO REMAIN
REMOVE AND REPLACE
CURB AND GUTTER
EX CONCRETE VALLEY
PAN TO REMAIN
EX 18" RCP STM
TO REMAIN
NEW 24" CURB AND GUTTER (TYPE A)
& NEW ASPHALT PATCH
SAWCUT & REMOVE EX ASPHALT
DRYLAND SEEDING FOR
DISTRUBED AREA
DRYLAND SEEDING FOR
DISTRUBED AREA
Sheet No.
C H
E Y
E N
N E
L
A R
A M
IE
C
O U
N T
Y
W Y
O M
IN
G
Jun. 10, 2024Print Date:
RR, EMDrawn By:
RR
2214.07
Check By:
Design By:
Project No.
SL
C
IT
Y O
F C
H E
Y E
N N
E
T h o m e s A v e n u e
S u it e
C h e y e n n e
W y o m in g
.6
.9 b e n c h m a rk e n g in e e rs
.c o m
Revisions:
C H
R
IS
T E
N S
E N
R O
A D
M O
D
IF
IC
A
T
IO
N S
REMOVE EX INLET & CUT
BACK PIPE TO NEW INLET
CHRISTENSEN RD
G O
L D
E N
B E
L L
T R
L
S T
O R
M L
A Y
O U
T A
T I
N T
E R
S E
C T
IO
N
MH-1
SEE PLAN & PROFILE SHEET
CONTRACTOR TO VERIFY EXISTING
PIPE INVERT BEFORE ORDERING INLET
EX FILLET
TO REMAIN
IN-1
SEE PLAN & PROFILE SHEET
APPROVED
MH-1
NEW 48" STM MH
STA: 0+75.61
RIM: 6054.08
STRUCTURE DEPTH: 2.44
INV. (N): 6051.74 - NEW 18" PVC STM
INV. (E): 6051.94 - NEW 18" PVC STM
INV. (S): 6051.64 - EX 18" RCP STM
821' OF NEW 18" PVC STM @ 4.85%FINISH GRADE
EXISTING GRADE
EX 18" RCP STM
TO REMAIN
IN-2
NEW STM INLET (TYPE B)
STA: 0+50.00
RIM: 6052.29
STRUCTURE DEPTH: 2.09
INV. (N): 6050.20 - EX 18" RCP STM
INV. (S): 6050.20 - EX 18" RCP STM
0+00 0+50 1+00 1+50 2+00 2+50 3+00 3+50 4+00 4+50 5+00 5+50
M icro so ft C o rp o ra tio n
M a xa r © C
N E S (2
) D istrib u tio n
A irb u
M icro M icro
M icro so ft C o rp o ra tio n
M a xa r © C
N E S (2
) D istrib u tio n
A irb u
1+00 2+00 3+00 4+00 5+00 6+00
MH-1
NEW 48" STM MH
IN-3
NEW STM INLET (TYPE AA)
STA:0+75.74 OFF: 6.87
RIM: 6055.18
STRUCTURE DEPTH: 3.03
INV. (W): 6052.15 - NEW 18" PVC STM
NEW 18" PVC STM
7' OF NEW 18" PVC STM @ 3.00%
NEW 24" CURB AND GUTTER (TYPE A)
& NEW ASPHALT PATCH
6070 6075 6080
EX 18" RCP STM
TO REMAIN
SAWCUT & REMOVE EX ASPHALT
NEW 24" CURB AND GUTTER (TYPE A)
& NEW ASPHALT PATCH
SAWCUT & REMOVE EX ASPHALT
DRYLAND SEEDING FOR
DISTRUBED AREA
DRYLAND SEEDING FOR
DISTRUBED AREA
IN-2
NEW STM INLET (TYPE B)
Sheet No.
C H
E Y
E N
N E
L
A R
A M
IE
C
O U
N T
Y
W Y
O M
IN
G
Jun. 10, 2024Print Date:
RR, EMDrawn By:
RR
2214.07
Check By:
Design By:
Project No.
SL
C
IT
Y O
F C
H E
Y E
N N
E
T h o m e s A v e n u e
S u it e
C h e y e n n e
W y o m in g
.6
.9 b e n c h m a rk e n g in e e rs
.c o m
Revisions:
C H
R
IS
T E
N S
E N
R O
A D
M O
D
IF
IC
A
T
IO
N S
CHRISTENSEN RD
S T
O R
M P
P
T O
REMOVE EX INLET
APPROVED
821' OF NEW 18" PVC STM @ 4.85%
188' OF NEW 18" PVC STM @ 2.15%
IN-4
NEW STM INLET (TYPE B)
STA: 10+84.59
RIM: 6098.61
STRUCTURE DEPTH: 3.03
INV. (S): 6095.58 - NEW 18" PVC STM
FINISH GRADE
EXISTING GRADE
MH-2
NEW 48" STM M.H.
STA: 8+96.13
RIM: 6095.22
STRUCTURE DEPTH: 3.69
INV. (N): 6091.54 - NEW 18" PVC STM
INV. (S): 6091.54 - NEW 18" PVC STM
5+50 6+00 6+50 7+00 7+50 8+00 8+50 9+00 9+50 10+00 10+50 11+00
M icro so ft C o rp o ra tio n
M a xa r © C
N E S (2
) D istrib u tio n
A irb u
M icro
M icro so ft C o rp o ra tio n
M a xa r © C
N E S (2
) D istrib u tio n
A irb u
6+00 7+00 8+00 9+00 10+00 11+00 11+26
IN-4
NEW STM INLET (TYPE B)
NEW 18" PVC STM
6080 6085 6090
NEW 24" CURB AND GUTTER (TYPE A)
& NEW ASPHALT PATCH
SAWCUT & REMOVE EX ASPHALT
NEW 24" CURB AND GUTTER (TYPE A)
& NEW ASPHALT PATCH
SAWCUT & REMOVE EX ASPHALT
DRYLAND SEEDING FOR
DISTRUBED AREA
DRYLAND SEEDING FOR
DISTRUBED AREA
MH-2
NEW 48" STM M.H.
Sheet No.
C H
E Y
E N
N E
L
A R
A M
IE
C
O U
N T
Y
W Y
O M
IN
G
Jun. 10, 2024Print Date:
RR, EMDrawn By:
RR
2214.07
Check By:
Design By:
Project No.
SL
C
IT
Y O
F C
H E
Y E
N N
E
T h o m e s A v e n u e
S u it e
C h e y e n n e
W y o m in g
.6
.9 b e n c h m a rk e n g in e e rs
.c o m
Revisions:
C H
R
IS
T E
N S
E N
R O
A D
M O
D
IF
IC
A
T
IO
N S
CHRISTENSEN RD
S T
O R
M P
P
T O
APPROVED
8:18:30 AM
© 2023 Microsoft Corporation © 2023 Maxar ©CNES (2023) Distribution Airbus DS © 2023 © 2023 © 2023 © 2023 MicrosoMicrosoMicrosoMicrosoMicrosoft Corpft Corpft Corpft Corpft Corporationorationorationorationorationoration © 2023 © 2023 © 2023 © 2023 Maxar Maxar Maxar ©CNES (©CNES (©CNES (©CNES (2023) D2023) D2023) D2023) Distribuistribution Aition Airbus DSrbus DSrbus DSrbus DSrbus DSrbus DSrbus DSrbus DSrbus DS
© 2023 Microsoft Corporation © 2023 Maxar ©CNES (2023) Distribution Airbus DS © 2023 © 2023 © 2023 © 2023 © 2023 © 2023 © 2023 © 2023 © 2023 © 2023 © 2023 © 2023 MicrosoMicrosoMicrosoMicrosoMicrosoMicrosoMicrosoMicrosoft Corpft Corpft Corpft Corpft Corpft Corpft Corporationorationorationoration © 2023 © 2023 © 2023 © 2023 © 2023 © 2023 © 2023 Maxar Maxar Maxar Maxar ©CNES (©CNES (©CNES (©CNES (2023) D2023) D2023) D2023) Distribuistribuistribuistribution Aition Aition Aition Airbus DSrbus DSrbus DSrbus DSrbus DSrbus DSrbus DSrbus DS
© 2023 Microsoft Corporation © 2022 Maxar ©CNES (2022) Distribution Airbus DS
© 2023 Microsoft Corporation © 2022 Maxar ©CNES (2022) Distribution Airbus DS
© 2023 Microsof© 2023 Microsof© 2023 Microsof© 2023 Microsof© 2023 Microsof© 2023 Microsof© 2023 Microsoft Corporation ©t Corporation ©t Corporation ©t Corporation ©t Corporation ©t Corporation ©t Corporation © 2022 Maxar ©CN 2022 Maxar ©CN 2022 Maxar ©CN 2022 Maxar ©CN 2022 Maxar ©CN 2022 Maxar ©CNES (2022) DistrES (2022) DistrES (2022) DistrES (2022) DistrES (2022) DistrES (2022) Distribution Airbus ibution Airbus ibution Airbus ibution Airbus ibution Airbus ibution Airbus ibution Airbus DS DS DS DS DS DS
© 2023 Microsof© 2023 Microsof© 2023 Microsof© 2023 Microsof© 2023 Microsof© 2023 Microsof© 2023 Microsoft Corporation ©t Corporation ©t Corporation ©t Corporation ©t Corporation ©t Corporation ©t Corporation ©t Corporation ©t Corporation ©t Corporation ©t Corporation © 2022 Maxar ©CN 2022 Maxar ©CN 2022 Maxar ©CN 2022 Maxar ©CN 2022 Maxar ©CN 2022 Maxar ©CN 2022 Maxar ©CN 2022 Maxar ©CN 2022 Maxar ©CN 2022 Maxar ©CN 2022 Maxar ©CNES (2022) DistrES (2022) DistrES (2022) DistrES (2022) DistrES (2022) DistrES (2022) DistrES (2022) DistrES (2022) DistrES (2022) DistrES (2022) DistrES (2022) DistrES (2022) DistrES (2022) Distribution Airbus ibution Airbus ibution Airbus ibution Airbus ibution Airbus ibution Airbus DS DS
© 2023 Microsoft Corporation © 2022 Maxar ©CNES (2022) Distribution Airbus DS
EX UP
EX UP
EX UP
E X
U P
E X
U P
EX UP
EX UP
EX UP
E X
U P
E X
U P
REMOVE & REPLACE
LIGHT POLE
REMOVE & REPLACE
LIGHT POLE
REMOVE & REPLACE
LIGHT POLE
REMOVE & REPLACE
LIGHT POLE
REMOVE & REPLACE
LIGHT POLE
REMOVE & REPLACE
LIGHT POLE
REMOVE & REPLACE
LIGHT POLE
REMOVE & REPLACE
LIGHT POLE
450'
20'
Sheet No.
C H
E Y
E N
N E
L
A R
A M
IE
C
O U
N T
Y
W Y
O M
IN
G
Jun. 10, 2024Print Date:
RR, EMDrawn By:
RR
2214.07
Check By:
Design By:
Project No.
SL
C
IT
Y O
F C
H E
Y E
N N
E
T h o m e s A v e n u e
S u it e
C h e y e n n e
W y o m in g
.6
.9 b e n c h m a rk e n g in e e rs
.c o m
Revisions:
C H
R
IS
T E
N S
E N
R O
A D
M O
D
IF
IC
A
T
IO
N S
E PERSHING BLVD
IN
T
E R
S E
C T
IO
N
L
IG
H T
IN
G
S
IG
N
A G
E
C H
R
IS
T E
N S
E N
R D
PED. CROSSING AHEAD
SIGN (W11-2) TO REMAIN
REDUCED SPEED LIMIT AHEAD
SIGN (W3-5) TO REMAIN
SPEED LIMIT (R2-1)
SIGN TO REMAIN
STOP SIGN (R1-1)
TO REMAIN
YIELD SIGN (R1-2)
TO REMAIN
PED. CROSSING SIGN
(W11-2) TO REMAIN
MERGE LEFT SIGN
(W4-1) TO REMAIN
YIELD TO PED. (R10-15R)
SIGN TO REMAIN
STOP SIGN AHEAD
(W3-1) SIGN TO REMAIN
ADD NEW
W1-8 SIGN
HORIZONTAL ALIGNMENT SIGN
(W1-8) SIGN TO REMAIN
MOVE EXISTING
W1-4 SIGN TO HERE
EXISTING SIGN
APPROVED
H
E Y
E N
N E
L
A R
A M
IE
C
O U
N T
Y
W Y
O M
IN
G
Jun. 10, 2024Print Date:
RR, EMDrawn By:
RR
2214.07
Check By:
Design By:
Project No.
SL
C
IT
Y O
F C
H E
Y E
N N
E
T h o m e s A v e n u e
S u it e
C h e y e n n e
W y o m in g
.6
.9 b e n c h m a rk e n g in e e rs
.c o m
Revisions:
C H
R
IS
T E
N S
E N
R O
A D
M O
D
IF
IC
A
T
IO
N S
W Y
D O
T D
E T
A
IL
S
NOTES:
1. LUMINARIE FIXTURES SHALL BE REMOVED AND REINSTALLED.
NOTES:
1. REMOVED LUMINARIES ARE TO BE RETURNED TO THE CITY OF CHEYENNE. CONTACT BRAIN STONER AT 307-421-0853.
2. INCIDENTAL TO THIS ITEM IS THE REMOVAL OF ALL LIGHTING CONDUCTORS.
3. DRILLED SHAFTS ARE TO BE COMPLETELY REMOVED.
4. NEW CONDUCTORS SHALL BE INSTALLED FROM EACH PULL BOX TO THE POLE (#8 AWG) AND IN THE POLE (LIGHTING CABLE 3 CONDUCTOR #12 AWG).
5. NOTE THAT 7 OF THE EXISTING POLES ARE DIRECT BURIED FIBERGLASS POLES AND 1 OTHER HAS AN EXISTING DRILLED SHAFT.
BILL OF MATERIALS FOR THE LUMP SUM BID ITEM
"ROADWAY LIGHTING SYSTEM"
(THIS BILL OF MATERIALS IS FOR INFORMATIONAL PURPOSES ONLY)
THESE DETAILS ARE PROVIDED BY THE CITY OF CHEYENNE
APPROVED
H
E Y
E N
N E
L
A R
A M
IE
C
O U
N T
Y
W Y
O M
IN
G
Jun. 10, 2024Print Date:
RR, EMDrawn By:
RR
2214.07
Check By:
Design By:
Project No.
SL
C
IT
Y O
F C
H E
Y E
N N
E
T h o m e s A v e n u e
S u it e
C h e y e n n e
W y o m in g
.6
.9 b e n c h m a rk e n g in e e rs
.c o m
Revisions:
C H
R
IS
T E
N S
E N
R O
A D
M O
D
IF
IC
A
T
IO
N S
W Y
D O
T D
E T
A
IL
S
THESE DETAILS ARE PROVIDED BY THE CITY OF CHEYENNE
APPROVED
H
E Y
E N
N E
L
A R
A M
IE
C
O U
N T
Y
W Y
O M
IN
G
Jun. 10, 2024Print Date:
RR, EMDrawn By:
RR
2214.07
Check By:
Design By:
Project No.
SL
C
IT
Y O
F C
H E
Y E
N N
E
T h o m e s A v e n u e
S u it e
C h e y e n n e
W y o m in g
.6
.9 b e n c h m a rk e n g in e e rs
.c o m
Revisions:
C H
R
IS
T E
N S
E N
R O
A D
M O
D
IF
IC
A
T
IO
N S
W Y
D O
T D
E T
A
IL
S
THESE DETAILS ARE PROVIDED BY THE CITY OF CHEYENNE
APPROVED
H
E Y
E N
N E
L
A R
A M
IE
C
O U
N T
Y
W Y
O M
IN
G
Jun. 10, 2024Print Date:
RR, EMDrawn By:
RR
2214.07
Check By:
Design By:
Project No.
SL
C
IT
Y O
F C
H E
Y E
N N
E
T h o m e s A v e n u e
S u it e
C h e y e n n e
W y o m in g
.6
.9 b e n c h m a rk e n g in e e rs
.c o m
Revisions:
C H
R
IS
T E
N S
E N
R O
A D
M O
D
IF
IC
A
T
IO
N S
THESE DETAILS ARE PROVIDED BY THE CITY OF CHEYENNE
W Y
D O
T D
E T
A
IL
S
APPROVED
H
E Y
E N
N E
L
A R
A M
IE
C
O U
N T
Y
W Y
O M
IN
G
Jun. 10, 2024Print Date:
RR, EMDrawn By:
RR
2214.07
Check By:
Design By:
Project No.
SL
C
IT
Y O
F C
H E
Y E
N N
E
T h o m e s A v e n u e
S u it e
C h e y e n n e
W y o m in g
.6
.9 b e n c h m a rk e n g in e e rs
.c o m
Revisions:
C H
R
IS
T E
N S
E N
R O
A D
M O
D
IF
IC
A
T
IO
N S
W Y
D O
T D
E T
A
IL
S
THESE DETAILS ARE PROVIDED BY THE CITY OF CHEYENNE
APPROVED
File details come from the government source that posted it. Updated .