This document summarizes bid opening results for construction of dikes along the Ohio River at the Wabash River confluence in Gallatin County, Illinois and Union County, Kentucky. Luhr Bros., Inc. was identified as the apparent low bidder at $8,512,720.00, approximately 11.9% lower than the government estimate of $9,662,595.40. Additional bids were received from Green Dream International LLC as the second low bidder at $12,478,336.00, C.J. Mahan Construction Company LLC as the third low bidder at $13,315,584.00, and Shimmick Construction Company LLC as the fourth low bidder at $18,727,510.00. The related federal contract opportunity notice showed contract W912QR21C0045 for the Wabash River Dikes project was awarded to Luhr Bros., Inc. on September 30, 2021 for $8,512,720.00 through the Department of the Army Corps of Engineers Engineering District Louisville.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Bid Opening Results 16 September 2021 Ohio River Dikes at Wabash Confluence Gallatin County, IL & Union County, KY
W912QR21B0012
Bid Opening Officer: Aaron L. Sanford Bid Opening Specialist: Kari A. Rogers
Apparent Low Bidder:
Luhr Bros. Inc. $8,512,720.00 P.O. Box 50 Columbia, IL. 62236
2nd Low Bidder:
Green Dream International LLC. $12,478,336.00 23W. 8th St. suite. 607 Erie, PA 16501
3rd Low Bidder:
C.J. Mahan Construction Company LLC. $13,315,584.00 3458 Lewis Centre Way Grove City, OH. 43123
4th Low Bidder:
Shimmick Construction Company LLC. $18,727,510.00 530 Technology Dr. Suite 300 Irvine, CA. 92618
Government Estimate: $9,662,595.40
Apparent Low Bid is approximately 11.9% lower than the Government Estimate