Bid Notice-Vista Continuation High School Modernization - Outdoor Learning Shade Canopy with ALTERNATE.pdf

PDF 5 MB Posted

Attached to
Vista Continuation High School Modernization: Outdoor Learning Shade Canopy with ALTERNATE
Solicitation number
6946
Issued by
Kern County, California

About this file

Summary

This is a Bid Notice and associated contract documents for the Kern High School District (a California public school district) soliciting bids for BID NO. 6946, Vista Continuation High School Modernization: Outdoor Learning Shade Canopy project. The scope of work involves providing a turn-key pre-engineered outdoor learning shade canopy at Vista Continuation High School located at 200 P Street, Bakersfield, California 93304. A non-mandatory pre-bid job walk and meeting is scheduled for Wednesday, October 7, 2026 at 10:00 a.m. at the Vista Continuation High School Job Trailer to familiarize prospective bidders with Department of Industrial Relations (DIR) Compliance Monitoring Unit and Disabled Veteran Business Enterprise (DVBE) Program requirements. Sealed bids are due Wednesday, October 21, 2026 at 2:00 p.m. at Conference Room "A" in the Kern High School District Business Services Department located at 5801 Sundale Avenue, Bakersfield, California 93309. The contract includes a base bid and one alternate bid option. The anticipated contract duration is approximately 490 calendar days as defined in the Construction Manager's Construction Schedule. Plans and specifications are available through Blueprint Service Company and via the PlanetBids portal.

Bidders must submit bid security equal to 10 percent of the total bid price in the form of cash, certified check, cashier's check, or bid bond. Prequalification is required for the prime contractor and certain listed subcontractors under Public Contract Code Section 20111.6 prior to bid opening. The project is subject to prevailing wage requirements, Department of Industrial Relations Division of Labor Standards Enforcement (DLSE) compliance monitoring with certified payroll submission via the eCPR system, and all contractors and subcontractors must be registered with DIR pursuant to Labor Code Section 1725.5. Required contractor's license classifications are C-61 and D-34. Insurance requirements include Workers' Compensation, Comprehensive General Liability ($1,000,000 per occurrence/$2,000,000 aggregate minimum), Comprehensive Auto Liability ($1,000,000 combined single limits), and other specified coverages. The successful bidder must execute the Construction Agreement and provide Payment Bond (100 percent of contract amount) and Performance Bond (100 percent of contract amount) within 10 working days of award. The contract is subject to liquidated damages for failure to meet completion and milestone deadlines. No federal funds are being used for this project.

View the file

Other files

File Type Posted
Bid Notice.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Vista Continuation High School Modernization

S P E C I F I C AT I O N S F O R

KERN HIGH SCHOOL DISTRICT

Michael Zulfa, Ed.D., Superintendent

DVBE COMPLIANCE AND DEPARTMENT OF INDUSTRIAL

RELATIONS (DIR) PUBLIC WORKS COMPLIANCE MONITORING

BID No. 6946—OUTDOOR LEARNING SHADE CANOPY

Bid Submittal Date:

Wednesday, October 21, 2026

Opening Time:

2:00 P.M.

Conference Room “A”

Non-Mandatory Job Walk:

Wednesday, October 7, 2026 @ 10:00 A.M.

Meet at the Vista Continuation High School, Job Trailer

200 P Street Bakersfield, CA 93304

24-13004 SEALS PAGE 000107 - 1 of 2

SECTION 000107

SEALS PAGE

Architect Jamie N. Miller TETER, Inc.

10000 Stockdale Hwy., Suite 350 Bakersfield, California 93311 Phone: (661) 843-8400 Fax: (661) 843-8448

Structural Engineer of Record Eric Bailey TETER, Inc.

7535 North Palm Ave., Suite 201 Fresno, California 93711 Phone: (559) 437-0887 Fax: (559) 438-7554

Civil Engineer Robert Swanson Swanson Engineering Inc.

2000 Oak Street, Suite 150 Bakersfield, California 93301 Phone: (661)-831-4919

Mechanical Engineer of Record Steven Jones TETER, Inc.

7535 North Palm Ave., Suite 201 Fresno, California 93711 Phone: (559) 437-0887 Fax: (559) 438-7554

24-13004 SEALS PAGE 000107 - 2 of 2

Electrical Engineer of Record Jason March TETER, Inc.

10000 Stockdale Hwy., Suite 350 Bakersfield, California 93311 Phone: (661) 843-8400 Fax: (661) 843-8448

Landscape Architect Megan Rios Rios Design 3805 Ora Vista Avenue Bakersfield, California 93311 Phone: (661) 835-9259

Fire Protection Engineer Wayne Cordiner Cordiner Consulting, LLC.

PO Box 319 Flora MS 39071 Phone: (601) 790-0463 i

01-TABLE OF CONTENTS (Multiple Prime Project)

VISTA CONTINUATION HIGH SCHOOL MODERNIZATION

BID NO. 6946 – OUTDOOR LEARNING SHADE CANOPY

COVER PAGE

APPROVALS

SECTION I

DIVISION 0 BID AND AGREEMENT DOCUMENTS

01-TABLE OF CONTENTS .................................................................................................. i – vii 02-NOTICE TO CONTRACTORS CALLING FOR BIDS (MULTIPLE BIDS) ....................... 1 – 6 03-INSTRUCTIONS TO BIDDERS .................................................................................... 1 – 16

⧫ 04-BID FORM (MULTIPLE BIDS) ........................................................................... 1 – 6 ⧫ 05-BID BOND .......................................................................................................... 1 - 2 ⧫ 06-LIST OF SUBCONTRACTORS ......................................................................... 1 – 3 ⧫ 07-NON-COLLUSION DECLARATION .................................................................. 1 - 2 ⧫ 08-EXCLUSION OF ASBESTOS PRODUCTS ....................................................... 1 - 2 ⧫ 09-NOTIFICATION OF ASBESTOS MATERIAL LOCATIONS ......................... 1 ONLY ⧫ 10-EXCLUSION OF LEAD PRODUCTS ................................................................. 1 - 2

⧫ 11-CERTIFICATE OF ATTENDANCE AT MANDATORY JOB WALK .................... 1 - 2

⧫ 12-FINGERPRINTING CERTIFICATION BY CONTRACTORS .................................................... 1 - 2 ⧫ 13-CONTRACTOR’S QUALIFICATION’S QUESTIONNAIRE ................................ 1 – 8 ⧫ 14-SUBSTITUTION LISTING ................................................................................. 1 – 3 ⧫ 15-SUBSTITUTION WARRANTY FORM ................................................................ 1 - 2 ⧫ 16-DVBE PARTICIPATION .................................................................................. 1 – 11

17-ESCROW AGREEMENT FOR SECURITY DEPOSITS IN LIEU OF RETENTION ........ 1 – 3

18-CONSTRUCTION AGREEMENT ................................................................................... 1 – 4 19-PAYMENT BOND ........................................................................................................... 1 – 2 20-PERFORMANCE BOND................................................................................................. 1 – 3 21-DRUG-FREE WORKPLACE CERTIFICATION .............................................................. 1 – 2 22-DAVIS BACON COMPLIANCE CERTIFICATION (NOT APPLICABLE) ......................... 1 - 2 23-WORKERS’ COMPENSATION CERTIFICATE ......................................................... 1 ONLY

24-NOT USED

25-BID QUESTION FORM ............................................................................................. 1 ONLY 26-SHOP DRAWING TRANSMITTAL ............................................................................ 1 ONLY 27-CHANGE ORDER .......................................................................................................... 1 – 2 28-APPLICATION AND CERTIFICATE FOR PAYMENT .................................................... 1 – 5 29-LIST OF DRAWINGS ....................................................................................................... 1-3

30-EXCLUSION OF ASBESTOS PRODUCTS (CONTRACT CLOSEOUT) .................. 1 ONLY

31-EXCLUSION OF LEAD PRODUCTS (CONTRACT CLOSEOUT) ............................ 1 ONLY 32-INDEX TO GENERAL CONDITIONS ............................................................................. 1 – 2 33-GENERAL CONDITIONS ............................................................................................. 1 – 89 34-SUPPLEMENTAL GENERAL CONDITIONS(NOT USED) ....................................... 1 ONLY ◊ 35-SUFFICIENT FUNDS DECLARATION ............................................................. 1 – 2 ◊ 36-ROOF PROJECT CERTIFICATION .................................................................. 1 – 2 ◊ 37-IRAN CONTRACTING ACT CERTIFICATION .................................................. 1 – 2 38-NOTICE OF CLAIM ................................................................................................... 1 ONLY ii

39-APPLICATION AND CERTIFICATE FOR PAYMENT ............................................... 1 ONLY

⧫ or ◊ (Indicates items that must be returned by the time of bid opening, or bidder may be declared

“Nonresponsive”.)

CONSTRUCTION MANAGER SCOPE OF WORK

BID NO. 6946 – OUTDOOR LEARNING SHADE CANOPY

SECTION II TECHNICAL SPECIFICATIONS

DIVISION 01 GENERAL REQUIREMENTS

011100 SUMMARY OF WORK

011103 ADDENDA

011105 USE OF ARCHITECT’S ELECTRONIC FILES

012300 ALTERNATES

012500 SUBSTITUTION PROCEDURES

012600 CONTRACT MODIFICATION PROCEDURES

012605 DSA HOURLY FEE SERVICES

012613 REQUEST FOR INFORMATION (RFI)

012900 PAYMENT PROCEDURES

013113 PROJECT MANAGEMENT AND COORDINATION

013119 PROJECT MEETINGS

013200 CONSTRUCTION PROGRESS DOCUMENTATION

013233 PHOTOGRAPHIC DOCUMENTATION

013300 SUBMITTAL PROCEDURES

014000 QUALITY AND TESTING REQUIREMENTS

014200 REFERENCES

015000 TEMPORARY FACILITIES AND CONTROLS

015116 FIRE SAFETY DURING CONSTRUCTION

016000 PRODUCT REQUIREMENTS

017300 EXECUTION

017419 CONSTRUCTION WASTE MANAGEMENT AND DISPOSAL

017700 CLOSEOUT PROCEDURES

017823 OPERATION AND MAINTENANCE DATA

017836 WARRANTIES

017839 PROJECT RECORD DRAWINGS

017900 DEMONSTRATION AND TRAINING

018113 SUSTAINABLE DESIGN REQUIREMENTS, DSA CALGREEN

019113 GENERAL COMMISSIONING REQUIREMENTS

DIVISION 02 EXISTING CONDITIONS

023000 SUBSURFACE INVESTIGATION

024119 SELECTIVE DEMOLITION

DIVISION 03 CONCRETE

031512 POST INSTALLED CONCRETE ANCHORS

033000 CAST-IN-PLACE CONCRETE

033543 POLISHED CONCRETE FINISHING

033910 TOPICAL CONCRETE VAPOR CONTROL BARRIER

034843 PRECAST ARCHITECTURAL CONCRETE BENCHES

DIVISION 04 MASONRY

iii

042200 CONCRETE UNIT MASONRY

DIVISION 05 METALS

051200 STRUCTURAL STEEL FRAMING

051213 ARCHITECTURALLY EXPOSED STRUCTURAL STEEL FRAMING

053100 STEEL DECKING

054000 COLD-FORMED METAL FRAMING

055000 METAL FABRICATIONS

055100 METAL STAIRS

055113 BAR GRATINGS

055133 METAL LADDERS

055200 METAL RAILINGS

DIVISION 06 WOOD AND PLASTICS

061000 ROUGH CARPENTRY

061600 PLYWOOD PANEL SHEATHING

061643 EXTERIOR CEMENT BOARD SHEATHING

061800 GLUED-LAMINATED CONSTRUCTION

064116 PLASTIC LAMINATE CASEWORK

064118 SOLID SURFACE COUNTERTOPS

066400 FIBERGLASS REINFORCED PLASTIC PANELING

DIVISION 07 THERMAL AND MOISTURE PROTECTION

071326 SELF-ADHERING SHEET WATERPROOFING

072114 THERMAL FOAM PLASTIC BOARD WALL INSULATION

072116 BLANKET INSULATION

072500 WEATHER RESISTIVE BARRIERS

072616 UNDERSLAB VAPOR RETARDER

074113 STANDING SEAM METAL ROOF PANELS

074213 METAL WALL AND SOFFIT PANELS

075423 THERMOPLASTIC POLYOLEFIN (TPO) ROOFING

076200 SHEET METAL FLASHING AND TRIM

077233 ROOF ACCESS HATCHES

077283 ROOF EMERGENCY IDENTIFICATION PANELS

078413 PENETRATION FIRESTOPPING

079200 JOINT SEALANTS

079500 EXPANSION CONTROL

DIVISION 08 OPENINGS

081053 DOOR LOUVER AND LITE FRAMES

081113 HOLLOW METAL DOORS AND FRAMES

081416 FLUSH WOOD DOORS

083113 ACCESS DOORS AND FRAMES

083313 OVERHEAD COILING COUNTER DOORS

083323 OVERHEAD COILING DOORS

083613 SECTIONAL DOORS

084113 ALUMINUM FRAMED ENTRANCES AND STOREFRONTS

085619 PASS WINDOWS

087100 DOOR HARDWARE

088716 SAFETY AND SECURITY WINDOW FILM

088000 GLAZING

089000 LOUVERS

iv

DIVISION 09 FINISHES

092400 PORTLAND CEMENT PLASTERING

092900 GYPSUM BOARD

093000 TILING

095113 ACOUSTICAL PANEL CEILINGS

096001 FLOORING MOISTURE AND pH TESTING

096513 RESILIENT BASE AND ACCESSORIES

096516 RESILIENT SHEET FLOORING

096519 RESILIENT LUXURY VINYL PLANK FLOORING

096520 RESILIENT TILE FLOORING

096723 RESINOUS FLOORING

096816 CARPETING

098433 ACOUSTIC WALL PANELS

097723 VINYL COVERED TACKBOARD PANELS

099100 PAINTING

DIVISION 10 SPECIALTIES

101116 MARKER BOARDS

101400 SIGNAGE

101405 DIMENSIONAL LETTER CHARACTER SIGNAGE

101463 ELECTRONIC MESSAGE SIGNAGE

102113 TOILET COMPARTMENTS

102600 WALL PROTECTION

102800 TOILET ROOM ACCESSORIES

104116 EMERGENCY KEY CABINETS (KNOX BOX)

104415 FIRE EXTINGUISHERS AND CABINETS

105113 METAL LOCKERS

105153 LOCKER ROOM BENCHES

107516 FLAGPOLES

DIVISION 11 EQUIPMENT

110113 OWNER FURNISHED CONTRACTOR INSTALLED EQUIPMENT

111136 ELECTRIC VEHICLE SUPPLY EQUIPMENT (EVSE)

113013 RESIDENTIAL APPLIANCES

114000 FOOD SERVICE EQUIPMENT

115213 PROJECTION SCREENS

115223 AUDIO VISUAL EQUIPMENT SUPPORTS

116623 GYMNASIUM EQUIPMENT

116823 OUTDOOR BASKETBALL EQUIPMENT

116823 BASEBALL FIELD EQUIPMENT

DIVISION 12 FURNISHINGS

123663 EPOXY RESIN LAB COUNTER TOPS

123661 QUARTZ COUNTERTOPS

139313 INTERIOR BIKE RACKS

DIVISION 13 SPECIAL CONSTRUCTION

133416 PERMANENT BLEACHERS

DIVISION 14 CONVEYING EQUIPMENT

142400 MODULAR HYDRAULIC ELEVATORS

v

DIVISIONS 15 - 20 PAGES - NOT USED

DIVISION 21 FIRE SUPPRESSION

210517 SLEEVES AND SLEEVE SEALS FOR FIRE SUPPRESSION PIPING

210518 ESCUTCHEONS FOR FIRE SUPPRESSION PIPING

210523 GENERAL DUTY VALVES FOR FIRE PROTECTION PIPING

210529 HANGERS AND SUPPORTS FOR FIRE SUPPRESSION PIPING & EQUIP.

210548 VIBRATION AND SEISMIC CONTROLS FOR FIRE SUPPRESSION PIPING AND

EQUIPMENT

210553 IDENTIFICATION FOR FIRE SUPPRESSION PIPING AND EQUIPMENT

211100 FACILITY FIRE SUPPRESSION WATER SERVICE PIPING

211119 FIRE DEPARTMENT CONNECTIONS

211313 WET PIPE SPRINKLER SYSTEMS

DIVISION 22 PLUMBING

220000 GENERAL PLUMBING PROVISIONS

220050 PLUMBING

DIVISION 23 HEATING, VENTILATING, AND AIR CONDITIONING

230100 GENERAL MECHANICAL PROVISIONS

230500 COMMON WORK RESULTS FOR HVAC

230513 COMMON MOTOR REQUIREMENTS FOR HVAC EQUIPMENT

230529 HANGERS AND SUPPORTS FOR HVAC PIPING AND EQUIPMENT

230548 VIBRATION AND SEISMIC CONTROLS FOR HVAC PIPING AND EQUIPMENT

230553 IDENTIFICATION FOR HVAC PIPING AND EQUIPMENT

230593 TESTING, ADJUSTING, AND BALANCING FOR HVAC

230700 HVAC INSULATION

230800 COMMISSIONING OF HVAC

233113 METAL DUCTS

233300 AIR DUCT ACCESSORIES

233423 HVAC POWER VENTILATORS

233723 HVAC GRAVITY VENTILATORS

237413 PACKAGED, OUTDOOR, CENTRAL-STATION AIR-HANDLING UNITS

238126 SPLIT-SYSTEM AIR-CONDITIONERS

DIVISION 25 - NOT USED

DIVISION 26 ELECTRICAL

260000 SUMMARY OF ELECTRICAL WORK

260100 GENERAL CONDITIONS FOR ELECTRICAL WORK

260500 BASIC ELECTRICAL MATERIALS AND METHODS

260526 GROUNDING

262213 DRY TYPE TRANSFORMERS (600 V AND LESS)

262413 SWITCHBOARDS

262416 PANELBOARDS

265113 LIGHTING

266100 LIGHTING CONTROL SYSTEMS

269500 ELECTRICAL ACCEPTANCE TESTS

DIVISION 27 COMMUNICATIONS

270000 COMMUNICATIONS GENERAL

vi

270528 COMMUNICATIONS PATHWAYS

271000 PERMANENT STRUCTURED CABLING

274100 AUDIO VIDEO SYSTEMS

DIVISION 28 ELECTRONIC SAFETY AND SECURITY

283100 FIRE ALARM/EMERGENCY VOICE ALARM COMMUNICATION SYSTEM

DIVISION 31 EARTHWORK

311100 SITE CLEARING

312000 EARTHWORK

312005 TRENCHING

313116 TERMITE CONTROL

DIVISION 32 EXTERIOR IMPROVEMENTS

321216 ASPHALT PAVING

321313 CONCRETE PAVING AND WALKS

321373 CONCRETE PAVING JOINT SEALANTS

321700 PAVING SPECIALTIES

321823 BASEBALL FIELD SURFACING

323113 CHAIN LINK FENCES AND GATES

323115 CHAIN LINK BASEBALL BACKSTOPS

323119 DECORATIVE METAL FENCES AND GATES

323313 BICYCLE RACKS

328000 IRRIGATION SYSTEM

329219 SEEDING

329223 SOD

329300 TREES, PLANTS, AND GROUND COVER

DIVISION 33 UTILITIES

331000 WATER DISTRIBUTION

333000 SANITARY SEWERAGE

334000 STORM DRAINAGE FACILITIES

DIVISION 48 ELECTRICAL POWER GENERATION

481400 SOLAR ENERGY ELECTRIC POWER GENERATION

APPENDIX TITLE PAGES

No. 1 GEOTECHNICAL INVESTIGATION REPORT No. 2 HAZARDOUS MATERIALS REPORT

02-NOTICE TO CONTRACTORS CALLING FOR BIDS (Multiple Prime Project)

2, 3.

SEE EXHIBIT "A"

Vista Continuation High School Modernization 200 P Street Bakersfield, CA, 93304

4. PROJECT DESCRIPTION SEE EXHIBIT "A"

This project is anticipated to start on approximately seeEx$bi!-i.A"_and is anticipated to have a duration as defined in the Constru for completion.

The entire project is anticipated to have a duration of Four Hundred Ninetv (490) calendar davs.

BID DEADLINE: Bids are due on Wednesdav. October 21. 2026 at 2:00 p.m. or at any other date or time as set by Addendum.

A separate bid, including all documents required to be included with a bid, must be submitted for each Contract.

6. PLACE OF BID RECEIPT Kern High School District (OWNER) Conference Room "A" 5801 Sundale Avenue Bakersfield, CA 93309

METHOD OF BID RECEIPT: Personal delivery, courier, or mailed via United States Postal Service to below address:

Richard J. Ruiz, Director

KERN HIGH SCHOOL DISTRICT

Business Services Department 5801 Sundale Avenue Bakersfield, CA 93309

OWNER:

PROJECT IDENTIFICATION NAME

PROJECT LOCATION:

PLANS ARE AVAILABLE AT

(Hard Copy)

Kern High School District

Blueprint Service Company 1 100 18th Street Bakersfield, CA 93301

(661) 327-2501 https://vendors. planetbids. com/portal/1 43 1 9/portal-home

SEE EXHIBIT "A"

8.

The initial set of plans and specifications are provided at no cost to listed Prospective Bidders, with subsequent sets available for purchase by contractors.

OR, DOWNLOAD PDF:

9. SEALED BID MARKING

Kem High School District (Reu. 512026)

Vista Continuation High School Modemization Bid N0.6946

Multiple Bid Set Notice To Contractors Calling for Bids

10 ALTERNATES: lf alternate bids are identified in the Bid Form for one of the above Contracts, the contract will be awarded to the lowest responsive and responsible bidder on the basis indicated below: lf an alternate applies to a bid package it will have a separate Notice to Contractors and Bid Form.

[Check one and only one]

(a) The lowest bid shall be the lowest bid price on the base contract without consideration of the prices bid on the additive or deductive alternate items.

(b) The lowest bid shall be the lowest total of the base bid and all prices bid on the alternate items.

(c) The lowest bid shall be the lowest total of the bid prices on the base contract and alternates [identify alternate bid items by number or description in the particular order ] taken in order, up to a maximum amount to be publicly disclosed before the first bid is opened.

(d) The lowest bid shall be determined in a manner that prevents any information that would identify any of the bidders or proposed subcontractors or suppliers from being revealed to the public entity before the ranking of all bidders from lowest to highest has been determined.

n (e) Not applicable to these contracts, as no alternates are requested

11. NON-MANDATORY JOB WALK:

A non-mandatory pre-bid meeting and job walk for the listed contracts is scheduled for Wednesdav. October 7. 2026. at 10:00 a.m. at Vista Continuation Hish School Job Trailer. 200 P Street. Bakersfield. CA 93304 to acquaint prospective bidders with the requirements of the Department of lndustrial Relations (DlR) Compliance Monitoring Unit (CMU) and Disabled Veteran Business Enterprise (DVBE) Program, and Contractor/Subcontractor Prequalification Requirements. Attendance at the entire job walk or meeting is mandatory and failure to attend the entire job walk or entire meeting will result in your bid being rejected as non-responsive.

12. PLAN DEPOSIT REQUIRED: The initial set of plans and specifications is provided at no cost to registered plan holders, with subsequent sets available for purchase by contractors.

13. This project n requires X does not require prequalification pursuant to Public Contract Code section 20111.6 of all general contractors and all mechanical, electrical and plumbing subcontractors IS,EEEXH,!BIL-"A",). lf required, a prequalification package may be obtained by downloading the necessary forms from https:/iwww.kernhigh.orqiappsipaqes/businessservices A bid will not be accepted from any bidder that is required to submit the completed questionnaire and supporting documents pursuant to AB 1565, but has not done so at least ten (10) business days prior to the date fixed for public opening of sealed bids or that has not been prequalified for at least five (5) business days prior to that date.

14. This is a prevailing wage project. OWNER has ascertained the general prevailing rate of per diem wages in the locality in which this work is to be performed for each craft or type of worker needed

X

Kem High School District (Rev. 5/2026) Vista Continuation High School Modemization:

Bid No. 6946

Multiple Bid Set

16.

Kem High School District (Reu.512026)

Vista Continuation High School Modemization Bid No,6946 to execute these contracts. These rates are on file at OWNER'S office, and a copy may be obtained upon request, or at www.dir.ca.qov. A copy of these rates shall be posted at the job site.

It shall be mandatory upon the contractors to whom the contracts are awarded (CONTRACTOR), and upon any subcontractor, to pay not less than the specified rates to all workers employed by them in the execution of the contracts.

The contracts to be awarded on this project includes provisions for assessment of liquidated damages pursuant to Government Code Section 53069.85 and Public Contract Code section 7203 for CONTRACTOR failing to complete the Work before the completion deadline, failing to complete a milestone scope of work before its deadline, or causing delay to the overallcompletion of the Project (see the Agreement). See the Construction Manager's Construction Schedule (attached to the lnstructions to Bidders) for these completion and milestone deadlines.

A Payment Bond for contracts over $25,000 and a Performance Bond for all contracts will be required prior to commencement of work. These bonds shall be in the amounts and form called for in the Contract Documents.

Pursuant to the provisions of Public Contract Code Section 22300, CONTRACTOR may substitute certain securities for any funds withheld by OWNER to ensure CONTRACTOR'S performance under the contract. At the request and expense of CONTRACTOR, securities equivalent to any amount withheld shall be deposited, at the discretion of OWNER, with either OWNER or a state or federally chartered bank as the escrow agent, who shall then pay any funds othenrvise subject to retention to CONTRACTOR. Upon satisfactory completion of the contract, the securities shall be returned to CONTRACTOR.

Securities eligible for investment shall include those listed in Government Code Section 16430, bank and savings and loan certificates of deposit, interest bearing demand deposit accounts, standby letters of credit, or any other security mutually agreed to by CONTRACTOR and OWNER.

CONTRACTOR shall be the beneficial owner of any securities substituted for funds withheld and shall receive any interest on them. The escrow agreement shall be in the form indicated in the Contract Documents.

To perform the work required by this Notice, CONTRACTOR must possess a valid and active contractor's license of the following type: SEE EXHIBIT "A".

19. lCheck Onel

This Project is not subject to the requirements of Subchapter 4.5 of Chapter 8 of Title 8 of the California Code of Regulations for compliance monitoring and enforcement by the DlR.

This Project is subject to the requirements of Subchapter 4.5 of Chapter 8 of Title 8 of the California Code of Regulations for compliance monitoring and enforcement by the DlR. Contractor and all subcontractors must furnish certified payroll records to the Department of lndustrial Relations' Division of Labor Standards Enforcement (DSLE) weekly using the eCPR system. To enroll or obtain additional information and assistance, go to D I R eCPR website at https :/ia pps. dir. ca, qov/eC PR/DAS/altloq i n.

Public works projects shall be subject to compliance monitoring and enforcement by the Department of lndustrial Relations. A contractor or subcontractor shall not be qualified to submit a bid or to be listed in a bid proposal subject to the requirements of Public Contract Code section

Multiple Bid Set Notice To Contracton Calling for Bids

20.

4104 unless currently registered and qualified under Labor Code section 1725.5 to perform public work as defined by Division 2, Par17, Chapter 1 (SS1720 et seq.) of the Labor Code. A contractor or subcontractor shall not be qualified to enter into, or engage in the performance of, any contract of public work (as defined by Division 2, Part 7, Chapter 1 (SS1720 et seq.) of the Labor Code) unless currently registered and qualified under Labor Code section 1725.5 to perform public work.

The following notice is given as required by Labor Code Section 1771.5(b)(1): CONTRACTOR and any subcontractors are required to review and comply with the provisions of the California Labor Code, Part7, Chapter 1, beginning with Section 1720, as more fully discussed in the Contract Documents. These sections contain specific requirements concerning, for example, determination and payment of prevailing wages, retention, inspection, and auditing payroll records, use of apprentices, payment of overtime compensation, securing workers' compensation insurance, and various criminal penalties or fines which may be imposed for violations of the requirements of the chapter. Submission of a bid constitutes CONTRACTOR'S representation that CONTRACTOR has thoroughly reviewed these requirements.

These contracts n have X have not been found to be substantially complex. As such, the OWNER E will X will not retain more than 5o/o of the amount of any progress payments on these contracts.

lnsurance Requirements: Each CONTRACTOR shall provide the following insurance coverages, which shall remain in full force and effect during the contract. Bidders are referred to Article 58 of the General Conditions for more detailed information:

[Check those that apply]:

X Workers'Compensation

X Comprehensive General Liability Requirement A - $1,000,000.00 per Occurrence, $2,000,000.00 Aggregate Requirement B - $2,000,000.00 per Occurrence, $4,000,000.00 Aggregate Requirement G - $5,000,000.00 per Occurrence, $10,000,000.00 Aggregate

CONTRACTOR shall require its subcontractors, if any, to take out and maintain commercial liability insurance with policy limits not less than $1,000,000 per occurrence and $2,000,000 aggregate per project on bodily injury and property damage.

(See page 5 of 5 Exhibit "A" for Comprehensive General Liability lnsurance Requirements)

X tr

Comprehensive Auto Liability shall have combined single limits of not less than $1,000,000.

X State Workers' Compensation statutory benefits policy-limits of not less than $1,000,000

Asbestos Abatement $1,000,000 per occurrence with not less than $2,000,000 annual aggregates limits required.

Course of Construction/Builder's Risk /See General Conditions $58,A.J

Contractors Pollution Liability $1,000,000 per occurrence and $1,000,000 aggregate per project, including a 1O-yearextended reporting period.

Kem High School District (Reu. 512026)

Vista Continuation High School Modemization:

Bid N0.6946

Multiple Bid Set

Approved:

Facilities Planning Department

B,anda{f Rowles By

Randall Rowles Director lV, Facilities

KERN HIGH SCHOOL DISTRICT

Business Services Department

By:

ftsf*or'tffirg

Richard J. Ruiz Director, Business Services

GOVERNING BOARD

ffi**g #"* By:

Kenneth R. Seals, Ed.D.

Assistant Superintendent, Business

Kem High School District (Reu. 512026)

Vista Continuation High School Modemization:

Bid No.6946

Multiple Bid Set

Exhibit "A"

REQUIRED

CONTRACTOR'S

LICENSE

C-61 and D-34

INSURANCE

REQUIREMENTS

A

ANTICIPATED

DURATION FOR

COMPLETION

As defined in the Construction Manager's Construction Schedule

PROJECT DESCRIPTION

Turn-key pre-engineered outdoor learning shade canopy.

PROJECT IDENTIFICATION

NAME

Outdoor Learning Shade Canopy

BID

NO.

Please note that prequalification is required Pursuant to Public Contract Code Section 20111.6 for the Prime Gontractor with license classifications A, B, C-4,C-7, C-10, C-16, C-20, C-34, C-36, C-38, C-42,C43 and C-46 and anv listed subcontractors with license classifications

C4, C-7, C-10, C-16, C-20, C-34, C-36, C-38, C-42, C-43 and C-46. The contractor must be on the Kern High School District's Prequalified Contractor Listing. Non-Compliance with this requirement may deem the prime contractor non-responsive.

You may submit your Pre-Qualification Questionnaire at httos://www.qualitvbidders.com/users/siqn up

To view a current list of Kern High School District pre-qualified contractors go to https://s3.amazonaws.com/cnetwork-prod-ct/reoorts/Kern%20H iqh%20School%20District-Aporoved+Contractors. pdf

Kem High School District (Rev .512026) Vista Continuation High School Modemization:

Bid N0.6946

Multiple Bid Set

Kern High School District (Rev. 5/2026) Multiple Bid Set Vista Continuation High School Modernization: Instructions to Bidders Bid Nos. 6946 Page 1 of 15

03-INSTRUCTIONS TO BIDDERS (Multiple Prime Project)

WARNING: READ THIS DOCUMENT CAREFULLY

DO NOT ASSUME THAT IT IS THE SAME AS OTHER

SIMILAR DOCUMENTS YOU MAY HAVE SEEN

EVEN IF FROM THE SAME OWNER

BID NO. 6946 - VISTA CONTINUATION HIGH SCHOOL MODERNIZATION:

OUTDOOR LEARNING SHADE CANOPY

OWNER: KERN HIGH SCHOOL DISTRICT

1. Preparation of Bid Form.

The Owner invites bids for the above Contract(s) on the form attached to be submitted at the time and place stated in the Notice to Contractors Calling for Bids. Bids shall be submitted on the prescribed Bid Form, completed in full. All bid items and statements shall be properly and legibly filled out. Numbers shall be stated both in words and in figures where so indicated, and where there is a conflict in the words and the figures, the words shall govern. The signatures of all persons shall be in longhand. Prices, wording, and notations must be in ink or typewritten.

If a bidder is submitting bids on more than one of the above Contracts, then the bidder must separately comply with all requirements in the Contract Documents (including these Instructions) for each bid it submits, including separate submittal of the bid documents for each Contract in their own sealed envelope.

2. Form and Delivery of Bids.

The bid must conform to and be responsive to all Contract Documents and shall be made on the Bid Form provided. The complete bid, together with any additional materials required, shall be enclosed in a sealed envelope, addressed and hand-delivered or mailed to the Owner at the address set forth in the Notice to Contractors Calling for Bids, and must be received on or before the time set for the opening of bids. The envelope shall be plainly marked in the upper left-hand corner with the bidder's name, the Contract designation, and the date and time for the opening of bids. It is the bidder's sole responsibility to ensure that its bid is received prior to the bid deadline. In accordance with Government Code Section 53068, any bid received after the scheduled closing time for receipt of bids shall be returned to the bidder unopened.

At the time set for the opening of bids, the sealed bids will be opened and publicly read aloud at the place indicated in the Notice to Contractors Calling for Bids. However, if this Contract calls for prequalification of bidders pursuant to Public Contract Code Section

Bid Nos. 6946 Page 2 of 15

20111.6, only those sealed bids received from bidders who have been prequalified for at least five (5) days prior to bid opening shall be opened and publicly read aloud.

3. Bid Security.

Each bid shall be accompanied by a bid security in cash, a certified or cashier’s check, or bid bond in an amount not less than 10 percent of the total bid price payable to the Owner. The bid security shall be given as a guarantee that if awarded the contract the bidder will execute and return the Construction Agreement within 10 working days after award of the contract and will furnish on the prescribed forms a satisfactory Payment (labor and material) Bond and separate Performance Bond, in accordance with the Contract Documents and Civil Code Sections 9550 et seq., and certificates evidencing that the required insurance is in effect in the amounts set forth in the Contract Documents. In case of refusal or failure to timely execute the Construction Agreement and furnish the required bonds and insurance certificates, the bid security shall be forfeited to the Owner. If the bidder elects to furnish a bid bond as its bid security, the bidder shall use the bid bond form included in the Contract Documents, unless the Owner elects to waive the use of the form provided, in its sole discretion.

4. Signature.

At the various times the Contract Documents are required to be submitted (such as the Bid Form, all bonds, the Designation of Subcontractors form, all Information Required of Bidder or prequalification forms, Workers Compensation Certificate, Drug-Free Workplace Certification, Non-Collusion Affidavit, the Construction Agreement, and all Guarantees), they must be signed in the name of the bidder and must bear the signature of the person or persons duly authorized to sign these documents. Where indicated, if bidder is a corporation, the legal name of the corporation shall first be set forth, together with two signatures: one from among the chairman of the board, president, or vice president, and one from among the secretary, chief financial officer, or assistant treasurer. Alternatively, the signature of other authorized officers or agents may be affixed, if duly authorized by the corporation. Such documents shall include the title of such signatories below the signature and shall bear the corporate seal. Where indicated, if bidder is a joint venture or partnership, the bidder shall submit with the bid certifications signed by authorized officers of each of the parties to the joint venture or partnership, naming the individual (1) who shall be the agent of the joint venture or partnership, (2) who shall sign all necessary documents for the joint venture or partnership and, (3) should the joint venture or partnership be the successful bidder, who shall act in all matters relative to the resulting contract for the joint venture or partnership. If bidder is an individual, his/her signature shall be placed on such documents.

5. Modifications.

Changes in or additions to any of the bid documents, the summary of the work bid upon, or the alternative proposals, or any other modifications which are not specifically called for by the Owner, may result in the Owner’s rejection of the bid as not being responsive.

No oral or telephonic modification of any bid will be considered. However, prior to the

Bid Nos. 6946 Page 3 of 15 opening of bids, a telegraphic modification signed by the bidder and postmarked and received prior to the opening of bids, or a facsimile modification duly signed by the bidder received prior to the opening of bids, may be considered if included within a sealed bid.

6. Erasures, Inconsistent, or Illegible Bids.

The bid submitted must not contain any erasures, interlineations, or other corrections unless each correction creates no inconsistency and is suitably authenticated and noted by signature of the bidder. In the event of inconsistency between words and figures in the bid, words shall control figures. In the event the Owner determines that any bid is unintelligible, illegible, or ambiguous, the Owner may reject the bid as not being responsive.

7. Examination of Site and Contract Documents.

At its own expense and prior to submitting bids, each bidder shall examine all documents relating to the Contract, visit the site, and determine the local conditions which may in any way affect the performance of the work, including the general prevailing rate of per diem wages and other relevant cost factors. Each bidder shall be familiar with all federal, state, and local laws, ordinances, rules, regulations, and codes affecting the performance of the work, including the cost of permits and licenses required for the work. Each bidder shall make such surveys and investigations, including investigation of subsurface or latent physical conditions at the site or where work is to be performed, as it may deem necessary for performance of the work at the price being bid. Each bidder shall determine the character, quality, and quantities of the work to be performed and the materials and equipment to be provided, and shall correlate its observations, investigations, and determinations with all requirements of the Contract.

The Contract Documents show and describe the existing conditions as they are believed to have been used in the design of the work and are only provided as information for the bidder. The Owner is not making any warranties regarding this information. The Owner shall not be liable for any loss sustained by the successful bidder resulting from any variance between the conditions and design data given in the Contract Documents and the actual conditions revealed during the bidder's pre-bid examination or during the progress of the work. Bidder agrees that the submission of a bid shall be incontrovertible evidence that the bidder has complied with and agrees to further comply with all the requirements of this section.

8. Withdrawal of Bids.

Any bid may be withdrawn, either personally, by written request, or by telegraphic or facsimile request confirmed in the manner specified above for bid modifications, at any time prior to the scheduled closing time for receipt of bids. In accordance with this paragraph, the bid security shall be returned for bids withdrawn prior to the scheduled closing time for receipt of bids. No bidder may withdraw any bid for a period of 60 days after the award of the contract except as allowed by Public Contract Code section 5101 et seq. A bidder’s unawarded alternate bids remain open for a period of six months after

Bid Nos. 6946 Page 4 of 15 award of contract as irrevocable offers to enter into either change orders or separate contracts for the stated price adjustment.

9. Agreement and Bonds.

The Construction Agreement and the form of the Payment and Performance Bonds which the successful bidder as Contractor will be required to execute are included in the Contract Documents and should be carefully examined by the bidder. The Payment Bond shall be in an amount not less than 100 percent of the amount of the contract in accordance with Civil Code Section 9550. The successful bidder as Contractor will also be required to furnish a separate Performance Bond in the amount of 100 percent of the contract amount. Sufficient bonds shall be fully executed and returned to Owner with the executed Construction Agreement, and no later than the start of the Work.

10. Interpretation of Contract Documents.

If any bidder is in doubt as to the true meaning of any part of the Contract Documents, or finds discrepancies in or omissions from the drawings and specifications, a written request for an interpretation or correction shall be submitted to the Owner on the provided form for such questions. The bidder submitting the written request shall be responsible for its prompt delivery. Any interpretation or correction of the Contract Documents will be made only by addendum issued by the Owner, and a copy of any addendum will be hand-delivered, mailed, or faxed to each bidder known to have received a set of the Contract Documents. No person is authorized to make any oral interpretation of any provision in the Contract Documents, nor shall any oral interpretation be binding on the Owner. If there are discrepancies on drawings, plans, or specifications, or conflicts between drawings, plans, specifications, terms, or conditions, the interpretation of the Owner shall prevail. Bidder shall become familiar with the plans, specifications, and drawings.

SUBMISSION OF A BID WITHOUT REQUESTING CLARIFICATIONS SHALL BE

INCONTROVERTIBLE EVIDENCE THAT THE BIDDER HAS DETERMINED THAT THE

PLANS, SPECIFICATIONS, AND DRAWINGS ARE SUFFICIENT FOR BIDDING AND

COMPLETING THE WORK, THAT BIDDER IS CAPABLE OF READING, FOLLOWING

AND COMPLETING THE WORK IN ACCORDANCE WITH THE PLANS,

SPECIFICATIONS, AND DRAWINGS, AND THAT THE PLANS, SPECIFICATIONS,

AND DRAWINGS FALL WITHIN AN ACCEPTABLE STANDARD FOR THESE ITEMS,

AND THAT BIDDER AGREES THAT THE CONTRACT CAN AND WILL BE

COMPLETED ACCORDING TO THE OWNER'S TIME LINES AND ACCORDING TO

THE PROGRESS SCHEDULE TO BE SUBMITTED BY THE SUCCESSFUL BIDDER

INCORPORATING THE OWNER'S TIME LINES FOR COMPLETION OF THE

CONTRACT.

11. Bidders Interested in More Than One Bid.

No person, firm, or corporation shall be allowed to make or file or be interested in more than one bid for the same work. A person, firm, or corporation that has submitted a sub-

Bid Nos. 6946 Page 5 of 15 proposal to a bidder, or that has quoted prices of materials to a bidder, is not disqualified from submitting a proposal or quoting prices to other bidders or submitting a bid on the Contract.

12. Award of Contract.

(a) The Owner reserves the right to reject any or all bids, or to waive any irregularities or informalities in any bids or in the bidding process, as allowed by law. If two identical low bids are received from responsive and responsible bidders, the Owner will have the discretion to pick whichever bid it wishes, pursuant to Public Contract Code Section 22038.

(b) If made by the Owner, award of the contract will be by action of the governing board or other governing body to the lowest responsive and responsible bidder. In the event an award of the contract is made to a bidder and that bidder fails or refuses to execute the Agreement and provide the required documents within ten days, the Owner may (i) award the contract to the next lowest responsive and responsible bidder or release all bidders, and (ii) pursue the bid bond, or the securities, of the bidder that received the initial award. An election by the Owner to reject all bids does not release the bid security of any bidder who has previously been awarded the contract and failed or refused to execute the Agreement and provide the required documents.

(c) In ascertaining the low bidder, the bids will be examined without reference to any substitutions requested by any bidder, whether or not the substitution request would result in a modification of the contract price.

13. Alternatives.

If alternate bids are called for, the contract will be awarded to the lowest responsive and responsible bidder on the basis indicated in the Notice to Contractors Calling for Bids.

Owner reserves the right to award or reject any, all, or any combination of the alternates called for in the bid documents, whether or not the alternate(s) was included in the calculations used to identify the low bidder. All bid alternates not part of the contract initially awarded by Owner shall remain open and valid for a period of six months after the contract is awarded as irrevocable offers to enter into either change orders or separate contracts on the items for the price adjustment contained in the bid alternate.

14. Prequalification of Bidders. See 02-Notice to Contractors Calling for Bids.

Bid Nos. 6946 Page 6 of 15

15. Competency of Bidders.

In selecting the lowest responsive and responsible bidder, consideration will be given not only to the financial standing but also to the general competency of the bidder for performance of the work. By submitting a bid, each bidder agrees that in determining the successful bidder and its eligibility for the award, the Owner may consider the bidder's experience, facilities, conduct, and performance under other contracts, financial condition, reputation in the industry, and other factors relating to or which could affect the bidder's performance of the Contract. To this end, where bidders are not required to prequalify, each bid shall be supported by a statement of the bidder's experience on the form entitled "Contractor’s Qualifications Questionnaire” included in the bid package provided by the Owner.

The Owner may also consider the qualifications and experience of subcontractors and other persons and organizations (including those who are to furnish the principal items of material and equipment) proposed for those portions of the work. Operating costs, maintenance considerations, performance data, and guarantees of materials and equipment may also be considered by the Owner. In this regard, the Owner may conduct such investigations as the Owner deems necessary to assist in the evaluation of any bid and to establish the responsibility, qualifications, and financial ability of the bidder, proposed subcontractors, and other persons and organizations to do the work to the Owner’s satisfaction within the prescribed time. The Owner may request that bidder submit information to assess the responsibility of the bidder’s proposed subcontractors.

The Owner reserves the right to reject the bid of any bidder who does not pass any such evaluation to the satisfaction of the Owner, or in the Owner’s sole discretion, to permit substitution of subcontractor(s) found non-responsible.

A prequalified bidder may nonetheless be declared non-responsive or non-responsible prior to award of the contract.

16. Listing Subcontractors.

Each bidder shall submit with its bid a list of the proposed subcontractors on the Contract as required by the Subletting and Subcontracting Fair Practices Act (Public Contract Code Section 4100 and following sections) on the form furnished with the Contract Documents. If alternate bids are called for and the bidder intends to use different or additional subcontractors, a separate list of subcontractors must be submitted for each such alternate bid. The Owner may request that bidder submit information to assess the responsibility of the bidder’s proposed subcontractors. In addition to the information provided with the bid pursuant to the above statutes, the apparent low bidder shall, within 24 hours of the bid opening, provide for all subcontractors their telephone numbers and contractor’s license classification.

17. Workers' Compensation.

In accordance with the provisions of Labor Code Section 3700, the successful bidder shall secure the payment of compensation to all employees. The successful bidder

Bid Nos. 6946 Page 7 of 15 awarded the contract shall sign and file with the Owner, at the time of returning the executed Construction Agreement, and no later than the start of the Work, the certificate which is included as a part of the Contract Documents.

18. Contractor's License.

At the bid opening date and time, if a bidder is not properly licensed to perform the Contract in accordance with Division 3, Chapter 9, of the California Business and Professions Code and the Notice Calling for Bids as required, that bidder’s bid will be rejected as non-responsive. Business and Professions Code Section 7028.15 precludes payment for work or materials unless the Registrar of Contractors verifies to the Owner that the bidder was properly licensed at the time the bid was submitted. If this Contract is federally funded, the bidder must be properly licensed prior to the award of the contract.

Any bidder not properly licensed is subject to penalties under the law and the contract will be considered void. If the license classification specified in these Contract Documents is that of a “specialty contractor” as defined in Business and Professions Code Section 7058, the specialty contractor awarded the contract for this work shall construct a majority of the work in accordance with the provisions of Business and Professions Code Section 7059.

19. Anti-Discrimination.

It is the policy of the Owner that in all work performed under contracts there be no unlawful discrimination against any prospective or active employee engaged in the work because of race, color, ancestry, national origin, religious creed, sex, age, marital status, physical disability, mental disability, or medical condition. The successful bidder agrees to comply with applicable federal and state laws, including but not limited to the California Fair Employment and Housing Act, beginning with Government Code Section 12900 and Labor Code Section 1735. In addition, the successful bidder agrees to require like compliance by any subcontractors employed on the work by that bidder.

20. Hold Harmless.

The successful bidder awarded the contract shall hold harmless and indemnify various parties as more clearly set forth elsewhere in the Contract Documents.

21. Substitutions.

(a) All bids should be calculated and submitted on the Contract as described in the bid documents, and on the assumption that substitution requests submitted with, or after, the bid will not be approved. Notwithstanding the foregoing, substitution requests submitted with, or after, bids will be given due consideration and, if approved, adjustments to the contract (including any adjustment to contract price or time) must be finalized in a Board-approved change order. Bidders not desiring to bid without prior approval of a proposed substitution should follow the procedure contained in this section for pre-bid review of proposed substitutions.

Bid Nos. 6946 Page 8 of 15

(b) Should the bidder wish to request prior to bid opening any substitution for the specified materials, process, service, or equipment, the bidder shall submit a written request on the OWNER’s Substitution Listing form and Substitution Warranty form contained in the bid documents at least ten (10) working days before the bid opening date and time. If the requested substitution is acceptable, the Owner will approve it in an addendum issued to all bidders of record.

Requests received less than ten (10) working days prior to bid opening will not be considered prior to the bid date. Extensions of the bid date shall not operate to extend the deadline for requesting substitutions unless the Owner so states in an addendum issued to all bidders of record.

(c) Other than substitutions granted via addendum prior to the bid date (see previous paragraph), the bidder shall submit with, or after, the bid all proposed substitutions, if any, on the OWNER’s Substitution Listing form and Substitution Warranty form contained in the bid documents.

(d) [Not used]

(e) Unless expressly authorized in the bid documents, no bid may be conditioned on the Owner’s acceptance of a proposed substitution. Any bid containing any such condition may be treated as a non-responsive bid.

(f) It is expressly understood and agreed that the Owner reserves the right to reject any proposed substitution before, with, or after the bid. It is further expressly understood and agreed that in the event the Owner rejects a proposed "equal" item, or any other proposed substitution, the specified material, process, service, or equipment designated by brand name or trade name, or other item as specified, will be provided.

(g) No substitution request of any kind or nature may be made after the bid date, except by the express written permission of the Owner and on such terms as Owner may require, or in an emergency, as in the case where a specified material, process, service, equipment, or other item has become unavailable through no fault of the bidder.

(h) These time limitations shall be complied with strictly, and in no case will an extension of time for completion be granted because of the failure to request the substitution of an item at the times and in the manner set forth herein.

(i) Prior to contract award, the Owner shall notify the bidder of the Owner’s decision concerning proposed substitutions of “equal” items submitted with the bid.

The Owner shall notify bidder of the Owner’s decision on any other proposed substitutions as those decisions are made before or after contract award.

Notification of all decisions by the Owner shall be in writing, and no proposed substitution shall be deemed approved unless the Owner has confirmed it in writing.

Bid Nos. 6946 Page 9 of 15

(j) With respect to all proposed substitutions, the requirements applicable to the Contractor in the Contract Documents shall be applicable to all bidders requesting substitutions.

22. Surety Qualifications.

Bid bonds executed by a surety insurer admitted in the State of California for purposes of issuance of such bonds will be accepted by Owner as sufficient.

Payment and/or performance bonds executed by a surety company admitted in the State of California with a minimum “A minus, VIII” rating (“A minus, V” when the price stated in the Contract Documents is less than $500,000) as rated by the current edition of Best’s Key Rating Guide published by A.M. Best Company, Oldwick, New Jersey 08858, shall be presumed by Owner to be sufficient for the issuance of such bonds. In the alternative, any admitted surety company which satisfies the requirements set forth in Code of Civil Procedure Section 995.660 shall be accepted and approved for the issuance of bonds, and documents demonstrating satisfaction of the requirements of Section 995.660 with respect to the bid bond must be submitted with the bid. No personal sureties will be accepted.

23. Liquidated Damages.

Contractor must complete all Work within the contract time set forth below and in other Contract Documents. Bidders must understand that the goodwill, educational process, and other business of the Owner will be…