Bid Notice-Vista Continuation High School Modernization - Fencing with ALTERNATE.pdf

PDF 154 KB Posted

Attached to
Vista Continuation High School Modernization: Fencing with ALTERNATE
Solicitation number
6945
Issued by
Kern County, California

About this file

Vista Continuation High School Modernization: Fencing with Alternate

This is a Bid Notice for the Vista Continuation High School Modernization fencing project issued by the California school district. The project encompasses the installation of chain link fence and gates, decorative metal fence and gates, and chain link baseball backstops. The scope of work includes both the primary fencing work and an alternate component. Interested bidders are required to submit bids in accordance with the project specifications and timelines outlined in the notice. Site visits and pre-bid meetings may be available for potential contractors to review the project location and clarify technical requirements prior to submission.

The bid notice establishes the requirements for contractor qualifications, insurance coverage, and bonding arrangements necessary for project execution. Bidders should review all project documents, including detailed specifications and drawings, to ensure accurate cost estimation. The notice will specify submission deadlines, evaluation criteria, and the anticipated award timeline. Additional details regarding pricing structures, any applicable prevailing wage requirements, minority or women-owned business enterprise set-asides, and project funding sources would be detailed in the complete bid documents and project specifications available through the issuing agency.

View the file

Other files

File Type Posted
Bid Notice.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Fencing

PROJECT: Vista Continuation High School – New Campus 200 P Street Bakersfield, CA 93304

DSA NUMBER: 03-125803

OWNER: Kern High School District 5801 Sundale Ave.

Bakersfield, CA 93309

In addition to the items noted in the Contract Documents and General Conditions, which are applicable to ALL Prime Contractors, the Specific Scope of the Work shall include, but not necessarily be limited to the items listed below in accordance with the applicable drawings and specification section(s). Prime Contractors shall review all sections below and include any costs to comply in their base Bid. NOTE: The term “Provide” is defined as “to furnish and install, complete and ready for the intended use.” Be advised that every contractor is bidding as a Prime Contractor directly to the District.

SECTION A: SCOPE OF WORK

1. Provide all work specified within the following specification sections and drawings except those listed as “Work by Others”:

a. Section: 087100 Door Hardware

b. Section: 104116 Emergency Key Cabinets (Knox Box)

c. Section: 323113 Chain Link Fences and Gates

d. Section: 323115 Chain Link Baseball Backstops

e. Section: 323119 Decorative Metal Fences and Gates

2. Provide all chain link and decorative metal fencing and gates per the contract documents.

3. Provide Alternate No. 04: 10’-0” perimeter chain link fencing per specification section 012300

Alternates.

4. All chain link and decorative metal gates are to include the appropriate hardware including but not limited to, hinges, catches hasps, locks (with guards, latches, cane post, panic hardware with guards), rollers, roller guides, attachment hardware when attaching to concrete, CMU or any other surface adjacent the gate.

5. Provide vehicle gates per the contract documents.

6. Provide all baseball and softball field chain link fencing, including backstops and dugouts, per the contract documents.

7. Comply with Section 3 of San Joaquin Kit Fox Mortality Reduction, Den Management, Den Replacement and Exclusion Fencing Plan

8. Coordinate roller gate hardware with concrete contractor for track installation.

9. Provide shop drawings referencing accessories, hardware, and gate operation.

10. Provide post footings, layout, staking, excavation, and rebar associated with this package.

11. Provide all required posts, corner posts, rails, braces, post tops, tension hardware, fastening clips, hardware, plates, angles, toppers, etc. to produce a complete fencing system.

12. Provide vinyl slats and perforated mesh panels per contract documents.

13. Provide all welding of steel rolling gates, hinged gates, man gates, double gates, fencing panels of the size and type noted.

14. This prime contractor shall allow sufficient time between setting any fence post and installing any fence fabric for the forming and pouring of any flatwork, or mow strip. This work must be coordinated with the Site concrete contractor through the Construction Manager.

15. Mow strips shown/noted in the contract documents where chain link fencing is installed will be provided by the site concrete contractor and are not part of this scope.

16. Provide a contained clean out area to be used for cleaning all trucks, tools, wheelbarrows, etc., used to pour any concrete under this proposal package. No such material will be cleaned out/rinsed onto bare soil on this site. All such material will be removed and properly disposed of offsite as part of this contract work. The cleanout shall be erected a minimum of 24 hours prior to a concrete pour or SCA will cancel the pour. All costs associated with delays shall be the responsibility of this prime contractor. Proper removal and off-site disposal of the cleanout shall be performed as soon as liquids have evaporated.

17. Provide emergency key cabinets.

18. Provide finish (paint etc.) of all ornamental fencing gates that are part of this work as noted in the contract documents.

19. Provide all excavation, bedding, shading, backfill and compaction required to perform this work.

Note: Restoration of sub grade to within +/-¼” of sub-grade is part of this contract.

20. Provide off-site removal of spoils generated from this work.

21. Prime Contractor is responsible for locating and protecting all existing underground utilities in area of construction.

22. Prime Contractor is responsible for contacting underground service alert and all governing authorities prior to start of any construction as specified.

23. Prime Contractor shall provide all measures necessary to protect their work, tools, materials, equipment, and property as described in Articles 17 and 20 of the 33-General Conditions (Multiple Prime Project).

24. Prime Contractor will be responsible for all billings, submittals, schedule updates, drawing updates and required documents, as may be applicable to the project, through our cloud-based project management program, Procore.

25. Prime Contractor is to be aware of, and acknowledge the California Incidental Take Permit and the Mortality Reduction, Den Management, Den Replacement & Exclusion Fencing Plan provided as part of the contract documents. Prime contractor to take necessary measures to meet the avoidance guidelines.

26. Provide all as-built documentation reflecting any field modifications to the Construction Manager prior to final acceptance.

SECTION B: EXCLUSIONS

1. Temporary fencing

2. Temporary toilets

3. Dumpsters (use dumpsters provided by Construction Manager)

4. Mow strips / fence curb