Bid Notice-Phase V Communication Facilities Replacement Project (Group A).pdf

PDF 4 MB Posted

Attached to
Phase V Communication Facilities Replacement Project (Group A)
Solicitation number
26-333577
Issued by
Shasta County, California

About this file

This is a bid notice and project manual for the Phase V Communication Facilities Replacement Project (Group A) issued by the California Department of General Services on behalf of the California Department of Forestry and Fire Protection (CalFire) for three communication tower sites in Humboldt and Shasta Counties. The project encompasses replacement work at Pratt Mountain (1512A), Bunchgrass Mountain (1512B), and Mt. Pierce (1512E), with major scope elements including site demolition, excavation, structural steel and self-supporting tower erection, perimeter chain-link fencing, cast-in-place concrete foundations, concrete masonry unit vault construction, electrical panelboards, switchgear installation, standby generator systems, HVAC equipment, plumbing, antenna systems, and associated electrical and communications infrastructure. Sealed bids are due by 2:00 p.m. on September 30, 2026, with a public bid opening scheduled for October 1, 2026, at 10:00 a.m. in West Sacramento, California. Mandatory pre-bid site inspections are required on September 16–17, 2026, with meetings at Bunchgrass Mountain (1:00 p.m. on September 16) and Mt. Pierce and Pratt Mountain (9:00 a.m. on September 17). Contract award is anticipated within 45 days of bid opening. The project manual comprises five books including general procurement requirements, site-specific specifications for each of the three locations, and appendices containing geotechnical investigations, environmental commitment tables, and antenna equipment information.

Bids must be submitted on a lump sum basis with an allowance of $210,000 for unforeseen underground conditions across all three sites. Contractors must hold a California State License Classification A or B, with specialty contractor licenses C-16 (Fire Protection) and C-57 (Well Drilling) required either directly by the prime contractor or through first-tier subcontractors. A mandatory 3% Disabled Veteran Business Enterprise (DVBE) participation requirement applies, with a DVBE incentive program offering bid adjustments of 1–5% for participation exceeding the minimum threshold. A 5% small business preference is available for certified small businesses, and non-small businesses may qualify for the preference by committing to subcontract at least 25% of the net bid price to certified small businesses or microbusinesses. Performance and payment bonds, each in the amount of 100% of the contract price, are required. All contractors and subcontractors must be registered with the California Department of Industrial Relations and comply with prevailing wage requirements based on August 2026 DIR rates. The project is subject to California Air Resources Board fleet vehicle compliance requirements, and bidders must report any use of Generative Artificial Intelligence in bid deliverables. Funding is subject to availability through the state's normal budget process and the Architecture Revolving Fund. The project consultant is GHD, Inc., with Project Director Courtney Wetsell at the Department of General Services.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATE OF CALIFORNIA DEPARTMENT OF GENERAL SERVICES

REAL ESTATE SERVICES DIVISION

PROJECT MANAGEMENT AND DEVELOPMENT BRANCH

PROJECT MANUAL – Book I of V

INTRODUCTORY INFORMATION

BIDDING REQUIREMENTS

CONTRACTING REQUIREMENTS

SPECIFICATIONS

FOR:

PHASE V COMMUNICATION FACILITIES REPLACEMENT –

GROUP A:

1512A - PRATT MTN.

1512B - BUNCHGRASS MTN.

1512E - MT. PIERCE

CALIFORNIA DEPARTMENT OF FORESTRY AND FIRE

PROTECTION (CALFIRE)

HUMBOLDT & SHASTA COUNTIES, CALIFORNIA

Courtney Wetsell, Project Director 279.799.4650 West Sacramento, California

Consultants: GHD, Inc.

08/14/26 1512A, 1512B, 1512E

PROJECT TITLE PAGE

RESDMSTR: 02/03/2014v1 00 01 01 - 1 01512A, B, E

DOCUMENT 00 01 01

PROJECT TITLE PAGE

Title: REPLACE COMMUNICATION FACILITIES, PHASE V – GROUP A:

1. PRATT MOUNTAIN

2. BUNCHGRASS MOUNTAIN

3. MT. PIERCE

Client Agency: DEPARTMENT OF FORESTRY AND FIRE

PROTECTION (CALFIRE)

Location: PRATT MOUNTAIN/ BUNCHGRASS

MOUNTAIN/ MT.PIERCE

HUMBOLDT & SHASTA COUNTIES,

CALIFORNIA

Project Number: 1512A, 1512B, 1512E

Project Director: Courtney Wetsell State of California Department of General Services Real Estate Services Division Project Management and Development Branch 707 Third Street, 4th Floor West Sacramento, California 95605 Telephone Number: 279.799.

Email: Courtney.Wetsell@dgs.ca.gov

Consultant: GHD, Inc.

Matt Weber, Project Manager 943 Reserve Drive Roseville, CA 95678 Telephone Number: (916) 296-3222 Email: Matt.Weber@ghd.com

CERTIFICATIONS PAGE

RESDMSTR: 02/03/2014v1 00 01 05 - 1 001512A, B, E

DOCUMENT 00 01 05

CERTIFICATIONS PAGE

PROJECT TITLE:

1. PRATT MOUNTAIN

2. BUNCHGRASS MOUNTAIN

3. MT. PIERCE

CLIENT AGENCY :

LOCATION:

PROJECT NUMBER :

OWNER :

PROJECT DIRECTOR :

CONSULTANT

REPLACE COMMUNICATION FACILITIES, PHASE V –

GROUP A:

DEPARTMENT OF FORESTRY AND FIRE PROTECTION

(CALFIRE)

A - PRATT MOUNTAIN

(Coordinates: 41°29'56.58"N, 124° 3'36.30"W)

B - BUNCHGRASS MTN.

(Coordinates: 41°29'56.58"N, 124° 3'36.30"W)

E - MT. PIERCE

(Coordinates: 41°29'56.58"N, 124° 3'36.30"W)

HUMBOLDT & SHASTA COUNTIES, CALIFORNIA

1512A, 1512B, 1512E

STATE OF CALIFORNIA

Courtney Wetsell Department of General Services Project Management and Development Branch 707 Third Street, 4th Floor West Sacramento, California 95605 Telephone Number: 279.799.4650 Email: Courtney.Wetsell@dgs.ca.gov

GHD, Inc. Matt.Weber@ghd.com

RESDMSTR: 02/03/2014v1 00 01 05 - 2 001512A, B, E

REGULATORY REVIEWS:

RESDMSTR: 02/03/2014v1 00 01 05 - 3 001512A, B, E

See Site Books 2, 3, & 4 for site Specific Regulatory Stamps

See Site Books 2, 3, & 4 for site Specific Regulatory Stamps

DSA ACCESS COMPLIANCE SFM

TABLE OF CONTENTS

RESDMSTR: 6/20/2025 00 01 10 - 1 1512A, B, E

DOCUMENT 00 01 10

TABLE OF CONTENTS

PROCUREMENT AND CONTRACTING REQUIREMENTS GROUP

BOOK I

DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS

INTRODUCTORY INFORMATION

Pages Document 00 01 01 Project Title Page .......................................................................... 1 only 00 01 05 Certifications Page ........................................................................ 1 through 3 00 01 10 Table of Contents .......................................................................... 1 through 9 00 01 15 List of Drawings ............................................................................. 1 through 8

BIDDING REQUIREMENTS

Document 00 11 00 Invitation for Bids ........................................................................... 1 through 4 00 21 00 Instructions to Bidders ................................................................... 1 through 8 Appendix 00 21 00.01 Request for Bidding Interpretation ................................................. 1 only Document 00 22 00 Supplementary Instructions to Bidders .......................................... 1 only 00 22 10 DVBE Participation Program Requirements ................................... 1 through 3 00 41 00 Bid Form (Sample) ........................................................................ 1 through 10 00 43 13 Bidder’s Bond (Sample) ................................................................. 1 only 00 43 16 Certified Small Business Subcontractor(s) Summary (Sample) ..... 1 through 2 00 45 46 Payee Data Record (Sample) ........................................................ 1 through 2 00 91 13 Addendum (Sample)……………………………………………………1 through 3

CONTRACTING REQUIREMENTS

Document 00 52 00 Agreement (Sample) ..................................................................... 1 only 00 61 13 Performance Bond (Sample) ......................................................... 1 only 00 61 14 Payment Bond to Accompany Construction Contract (Sample) ..... 1 only 00 63 63 Construction Contract Change Order (Sample) ............................. 1 only 00 72 00 General Conditions of the Contract for Construction ...................... 1 through 31 00 73 00 Supplementary Conditions ............................................................. 1 through 13

SPECIFICATIONS GROUP

GENERAL REQUIREMENTS SUBGROUP

DIVISION 01 - GENERAL REQUIREMENTS

Section 01 10 00 Summary ....................................................................................... 1 through 8 01 21 00 Allowances .................................................................................... 1 through 2 01 25 00 Substitution Procedures ................................................................. 1 through 2

RESDMSTR: 6/20/2025 00 01 10 - 2 1512A, B, E

01 29 00 Payment Procedures ..................................................................... 1 through 4 01 31 00 Project Management and Coordination .......................................... 1 through 6 01 32 00 Construction Progress Documentation .......................................... 1 through 7 01 32 33 Photographic Documentation ........................................................ 1 through 3 01 33 00 Submittal Procedures .................................................................... 1 through 8 01 33 29.08 Buy Clean California Act Requirements ......................................... 1 through 2 01 40 00 Quality Requirements .................................................................... 1 through 6 01 50 00 Temporary Facilities and Controls ................................................. 1 through 7 01 56 39 Temporary Tree and Plant Protection ............................................ 1 through 5 01 57 23 Temporary Storm Water Pollution Control ..................................... 1 through 4 01 60 00 Product Requirements ................................................................... 1 through 5 01 64 00 Owner-furnished Products ............................................................. 1 through 3 01 73 00 Execution ...................................................................................... 1 through 7 01 74 19 Construction Waste Management and Disposal ............................ 1 through 5 Form 01 74 19.01 Construction Waste Estimate (A,B,& E) ......................................... 1 only 01 74 19.02 Waste Management Report (A, B & E) .......................................... 1 through 2 Section 01 74 20 Recycled Content Certification (A, B & E) ...................................... 1 through 3 Form 01 74 20.01 Recycled Content Certification Worksheet (Example) .................... 1 through 2 01 74 20.02 State Agency Buy Recycled Campaign Procurement Summary (Example) (A, B & E) ...................................................................................... 1 through 2 Section 01 75 00 Starting and Adjusting ................................................................... 1 through 3 01 77 00 Closeout Procedures ..................................................................... 1 through 12 Form STD 817 Prime Contractor’s Certifications – DVBE Subcontractor Report ... 1 through 5 01 77 00.01 Contractor’s Certification of Small Business Participation .............. 1 only 01 77 00.02 Contractor’ Certification of Small Business Participation ................ 1 only Section 01 79 00 Demonstration and Training .......................................................... 1 through 4

BOOK II - PRATT MTN.

DIVISION 02 – EXISTING CONDITIONS

Section 02 4000 Demolition ..................................................................................... 1 through 2 02 41 16 Groundwork for Structures ............................................................. 1 through 3

DIVISION 03 – CONCRETE

Section 03 10 00 Concrete Forming and Accessories ............................................... 1 through 5 03 20 00 Concrete Reinforcing ..................................................................... 1 through 3 03 30 00 Cast-In-Place Concrete ................................................................. 1 through 8

DIVISION 04 – MASONRY

Section 04 22 00 Concrete Unit Masonry .................................................................. 1 through 9

DIVISION 05 – METALS

Section 05 05 23 Metal Fastenings ........................................................................... 1 through 9 05 12 00 Structural Steel Framing ................................................................ 1 through 3 05 30 00 Metal Decking ................................................................................ 1 through 3 05 41 00 Steel Studs .................................................................................... 1 through 4

DIVISION 06 – WOOD, PLASTICS, AND COMPOSITES

RESDMSTR: 6/20/2025 00 01 10 - 3 1512A, B, E

Section 06 10 00 Rough Carpentry ........................................................................... 1 through 2

DIVISION 07 – THERMAL AND MOISTURE PROTECTION

Section 07 21 00 Thermal Insulation ......................................................................... 1 through 2 07 92 00 Joint Sealants ................................................................................ 1 through 4

DIVISION 08 – OPENINGS

Section 08 11 13 Standard Hollow Metal Doors ........................................................ 1 through 2 08 12 13 Hollow Metal Frames ..................................................................... 1 through 2 08 71 00 Door Hardware .............................................................................. 1 through 3

DIVISION 09 – FINISHES

Section 09 20 00 Plaster and Gypsum Board ............................................................ 1 through 2 09 54 53 Fiberglass Reinforced Panel .......................................................... 1 through 2 09 67 16 Epoxy Flooring .............................................................................. 1 through 3 09 91 00 Painting ......................................................................................... 1 through 7

DIVISION 13 – SPECIAL CONSTRUCTION

Section 13 36 13.13 Self-Supporting Steel Communications Tower ............................... 1 through 8 13 50 00 Antennas ....................................................................................... 1 through 17

DIVISION 15 – RESERVED (NOT USED)

DIVISION 16 – RESERVED (NOT USED)

DIVISION 17 – RESERVED (NOT USED)

DIVISION 18 – RESERVED (NOT USED)

DIVISION 19 – RESERVED (NOT USED)

FACILITY SERVICES SUBGROUP

DIVISION 20 – RESERVED (NOT USED)

DIVISION 22 – PLUMBING

Section 22 00 00 Plumbing ....................................................................................... 1 through 15

DIVISION 23 – HEATING, VENTILATING, AND AIR CONDITIONING (HVAC)

Section 23 00 00 Heating, Ventilating and Air Conditioning ....................................... 1 through 17 23 05 00 General Requirements for Mechanical Work ................................. 1 through 15

DIVISION 24 – RESERVED (NOT USED)

DIVISION 25 – INTEGRATED AUTOMATION (NOT USED)

DIVISION 26 – ELECTRICAL

RESDMSTR: 6/20/2025 00 01 10 - 4 1512A, B, E

Section 26 01 00 Basic Electrical Requirements ....................................................... 1 through 9 26 01 26 Electrical Testing ........................................................................... 1 through 9 26 05 19 Low-Voltage Power Conductors and Cables .................................. 1 through 10 26 05 26 Grounding and Bonding ................................................................. 1 through 16 26 05 29 Electrical Hangers and Supports ................................................... 1 through 5 26 05 33.13 Conduit .......................................................................................... 1 through 10 26 05 33.16 Electrical Boxes ............................................................................. 1 through 3 26 05 36 Interior Cable Tray ......................................................................... 1 through 3 26 05 43 Underground Ducts and Structures ............................................... 1 through 6 26 05 48 Seismic Restraint for Electrical Equipment .................................... 1 only 26 05 53 Electrical Identification ................................................................... 1 through 7 26 24 16 Panelboards .................................................................................. 1 through 8 26 27 26 Wiring Devices .............................................................................. 1 through 7 26 27 26.10 Miscellaneous Electrical Devices ................................................... 1 through 4 26 28 16 Overcurrent Protection Devices ..................................................... 1 through 7 26 32 13 Standby System Generator Set ..................................................... 1 through 14 26 36 23 Automatic Transfer Switches ......................................................... 1 through 10 26 51 13 Interior Lighting .............................................................................. 1 through 9

DIVISION 27 – COMMUNICATIONS

Section 27 53 19 Internal Cellular, Paging and Antenna Systems ............................. 1 only

DIVISION 28 – ELECTRONIC SAFETY AND SECURITY (NOT USED)

DIVISION 29 – RESERVED (NOT USED)

SITE AND INFRASTRUCTURE SUBGROUP

DIVISION 30 – RESERVED (NOT USED)

DIVISION 31 – EARTHWORK

Section 31 01 50 Maintenance of Excavation Support and Protection ....................... 1 through 2 31 10 00 Site Preparation (Clearing and Grubbing) ...................................... 1 only 31 20 00 Earth Moving ................................................................................. 1 through 11 31 23 13 Subgrade Preparation ................................................................... 1 through 8 31 23 16.26 Rock Removal ............................................................................... 1 through 2 31 23 33 Trenching and Backfill ................................................................... 1 through 7 31 25 00 Erosion and Sedimentation Control ............................................... 1 through 5 31 25 13 Storm Water Pollution Prevention Plan .......................................... 1 through 2

DIVISION 32 – EXTERIOR IMPROVEMENTS

Section 32 11 23 Aggregate Base Courses ............................................................... 1 only 32 31 13 Chain Link Fence ........................................................................... 1 through 4

DIVISION 33 – UTILITIES (NOT USED)

DIVISION 34 – TRANSPORTATION (NOT USED)

RESDMSTR: 6/20/2025 00 01 10 - 5 1512A, B, E

DIVISION 35 – WATERWAY AND MARINE CONSTRUCTION (NOT USED)

DIVISION 36 – RESERVED (NOT USED)

DIVISION 37 – RESERVED (NOT USED)

DIVISION 38 – RESERVED (NOT USED)

DIVISION 39 – RESERVED (NOT USED)

PROCESS EQUIPMENT SUBGROUP (NOT USED)

BOOK III – BUNCHGRASS MTN

DIVISION 02 – EXISTING CONDITIONS

Section 02 40 00 Demolition ..................................................................................... 1 through 2 02 41 16 Groundwork for Structures ............................................................. 1 through 3

DIVISION 03 – CONCRETE

Section 03 10 00 Concrete Forming and Accessories ............................................... 1 through 5 03 20 00 Concrete Reinforcing ..................................................................... 1 through 3 03 30 00 Cast-In-Place Concrete ................................................................. 1 through 8

DIVISION 04 – MASONRY

Section 04 22 00 Concrete Masonry Unit .................................................................. 1 through 9

DIVISION 05 – METALS

Section 05 05 23 Metal Fastenings ........................................................................... 1 through 9 05 12 00 Structural Steel Framing ................................................................ 1 through 3 05 30 00 Metal Decking ................................................................................ 1 through 3 05 41 00 Steel Studs .................................................................................... 1 through 4

DIVISION 06 – WOOD

Section 06 10 00 Rough Carpentry ........................................................................... 1 through 2

DIVISION 07 – THERMAL AND MOISTURE PROTECTION

Section 07 21 00 Thermal Insulation ......................................................................... 1 through 2 07 92 00 Joint Sealants ................................................................................ 1 through 4

DIVISION 08 – WINDOWS AND DOORS

Section 08 11 13.13 Standard Hollow Metal Doors ........................................................ 1 through 2 08 12 13 Hollow Metal Frames ..................................................................... 1 through 2 08 71 00 Door Hardware .............................................................................. 1 through 3

DIVISION 09 – FINISHES

Section 09 20 00 Plaster Gypsum Board................................................................... 1 through 2

RESDMSTR: 6/20/2025 00 01 10 - 6 1512A, B, E

09 54 53 Fiberglass Reinforced Panel .......................................................... 1 through 2 09 67 16 Epoxy Flooring .............................................................................. 1 through 3 09 91 00 Painting ......................................................................................... 1 through 7

DIVISION 13 – SPECIAL CONSTRUCTION

Section 13 36 13.13 Self-Supporting Steel Communications Tower ............................... 1 through 8 13 50 00 Antennas ....................................................................................... 1 through 17

DIVISION 22 – PLUMBING

Section 22 00 00 Plumbing ....................................................................................... 1 through 14

DIVISION 23 – HEATING, VENTILATING AND AIR CONDITIONING

Section 23 00 00 Heating, Ventilating and Air Conditioning ....................................... 1 through 17 23 05 00 General Requirements for Mechanical Work ................................. 1 through 15

DIVISION 26 – ELECTRICAL

Section 26 01 00 Basic Electrical Requirements ....................................................... 1 through 9 26 01 26 Electrical Testing ........................................................................... 1 through 9 26 05 19 Low-Voltage Power Conductors and Cables .................................. 1 through 10 26 05 26 Grounding and Bonding ................................................................. 1 through 16 26 05 29 Electrical Hangers and Supports ................................................... 1 through 4 26 05 33.13 Conduit .......................................................................................... 1 through 10 26 05 33.16 Electrical Boxes ............................................................................. 1 through 3 26 05 36 Interior Cable Tray ......................................................................... 1 through 3 26 05 43 Underground Ducts and Structures ............................................... 1 through 6 26 05 48 Seismic Restraint for Electrical Equipment .................................... 1 only 26 05 53 Electrical Identification ................................................................... 1 through 7 26 24 16 Panelboards .................................................................................. 1 through 8 26 27 26 Wiring Devises .............................................................................. 1 through 7 26 27 26.10 Miscellaneous Electrical Devices ................................................... 1 through 4 26 28 16 Overcurrent Protection Devices ..................................................... 1 through 7 26 32 13 Stanby System Generator Set ....................................................... 1 through 15 26 36 23 Automatic Transfer Switches ......................................................... 1 through 10 26 51 13 Interior Lighting .............................................................................. 1 through 9

DIVISION 27 – COMMUNICATIONS

Section 27 53 19 Internal Cellular, Paging and Antenna Systems ............................. 1 only

DIVISION 31 – EARTHWORK

Section 31 01 50 Maintenance of Excavation Support and Protection ....................... 1 through 2 31 10 00 Site Preparation (Clearing and Grubbing) ...................................... 1 only 31 20 00 Earth Moving ................................................................................. 1 through 11 31 23 13 Subgrade Preparation ................................................................... 1 through 8 31 23 16.26 Rock Removal ............................................................................... 1 through 2 31 23 33 Trenching and Backfill ................................................................... 1 through 7 31 25 00 Erosion and Sedimentation Control ............................................... 1 through 5 31 25 13 Strom Water Pollution Prevention Plan .......................................... 1 through 2

RESDMSTR: 6/20/2025 00 01 10 - 7 1512A, B, E

DIVISION 32 – EXTERIOR IMPROVEMENTS

Section 32 11 23 Aggregate Base Courses ............................................................... 1 only 32 31 13 Chain Link Fence ........................................................................... 1 through 4

BOOK IV - MT. PIERCE

DIVISION 02 – EXISTING CONDITIONS

Section 02 40 00 Demolition ..................................................................................... 1 through 2 02 41 16 Groundwork for Structures ............................................................. 1 through 3

DIVISION 03 – CONCRETE

Section 03 10 00 Concrete Forming and Accessories ............................................... 1 through 5 03 20 00 Concrete Reinforcing ..................................................................... 1 through 3 03 30 00 Cast-In-Place Concrete ................................................................. 1 through 8

DIVISION 04 – MASONRY

Section 04 22 00 Concrete Masonry Units ................................................................ 1 through 9

DIVISION 05 – METALS

Section 05 05 23 Metal Fastenings ........................................................................... 1 through 9 05 12 00 Structural Steel Framing ................................................................ 1 through 3 05 30 00 Metal Decking ................................................................................ 1 through 3 05 41 00 Steel Studs .................................................................................... 1 through 4

DIVISION 06 – WOOD, PLASTICS AND COMPOSITES

Section 06 10 00 Rough Carpentry ........................................................................... 1 through 2

DIVISION 07 – THERMAL AND MOISTURE PROTECTION

Section 07 21 00 Thermal Insulation ......................................................................... 1 through 2 07 92 00 Joint Sealants ................................................................................ 1 through 4

DIVISION 08 – OPENINGS

Section 08 11 13.13 Standard Hollow Metal Doors ........................................................ 1 through 2 08 12 13 Hollow Metal Frames ..................................................................... 1 through 2 08 71 00 Door Hardware .............................................................................. 1 through 3

DIVISION 9 – FINISHES

Section 09 20 00 Plaster Gypsum Board................................................................... 1 through 2 09 54 53 Fiberglass Reinforced Panel .......................................................... 1 through 2 09 67 16 Epoxy Flooring .............................................................................. 1 through 3 09 91 00 Painting ......................................................................................... 1 through 7

DIVISIOIN 13 – SPECIAL CONSTRUCTION

Section 13 36 13.13 Self-Supporting Steel Communications Tower ............................... 1 through 8

RESDMSTR: 6/20/2025 00 01 10 - 8 1512A, B, E

13 50 00 Antennas ....................................................................................... 1 through 18

DIVISION 22 – PLUMBING

Section 22 00 00 Plumbing ....................................................................................... 1 through 14

DIVISION 23 – HEATING, VENTILATING AND AIR CONDITIONING

Section 23 00 00 Heating, Ventilating and Air Conditioning ....................................... 1 through 17 23 05 00 General Requirements for Mechanical Work ................................. 1 through 15

DIVISION 26 – ELECTRICAL

Section 26 01 00 Basic Electrical Requirements ....................................................... 1 through 9 26 01 26 Electrical Testing ........................................................................... 1 through 9 26 05 19 Low-Voltage Power Conductors and Cables .................................. 1 through 10 26 05 26 Grounding and Bonding ................................................................. 1 through 16 26 05 29 Electrical Hangers and Supports ................................................... 1 through 4 26 05 33.13 Conduit .......................................................................................... 1 through 10 26 05 33.16 Electrical Boxes ............................................................................. 1 through 3 26 05 36 Interior Cable Tray ......................................................................... 1 through 3 26 05 43 Underground Ducts and Structures ............................................... 1 through 6 26 05 48 Seismic Restraint for Electrical Equipment .................................... 1 only 26 05 53 Electrical Identification ................................................................... 1 through 7 26 24 16 Panelboards .................................................................................. 1 through 8 26 27 26 Wiring Devices .............................................................................. 1 through 7 26 27 26.10 Miscellaneous Electrical Devices ................................................... 1 through 4 26 28 16 Overcurrent Protection Devices ..................................................... 1 through 7 26 32 13 Standby System Generator Set ..................................................... 1 through 14 26 36 23 Automatic Transfer Switches ......................................................... 1 through 10 26 51 13 Interior Lighting .............................................................................. 1 through 9

DIVISION 27 – COMMUNICATIONS

Section 27 53 19 Internal Cellular, Paging and Antenna System ............................... 1 only

DIVISION 31 – EARTHWORK

Section 31 01 50 Maintenance of Excavation Support and Protection ....................... 1 through 2 31 10 00 Site Preparation (Clearing and Grubbing) ...................................... 1 only 31 20 00 Earth Moving ................................................................................. 1 through 11 31 23 13 Subgrade Preparation ................................................................... 1 through 8 31 23 16.26 Rock Removal ............................................................................... 1 through 2 31 23 33 Trenching and Backfill ................................................................... 1 through 7 31 25 00 Erosion and Sedimentation Control ............................................... 1 through 5 31 25 13 Strom Water Pollution Prevention Plan .......................................... 1 through 2

DIVISION 32 – EXTERIOR IMPROVEMENTS

Section 32 11 23 Aggregate Base Courses ............................................................... 1 only 32 31 13 Chain Link Fence ........................................................................... 1 through 4

RESDMSTR: 6/20/2025 00 01 10 - 9 1512A, B, E

BOOK V - APPENDICES

A. Geotechnical Investigations:

A Pratt Final Geotechnical

Investigation 1 through 37

B Bunchgrass Final Geotechnical Investigation

1 through 39

E Pierce Final Geotechnical Investigation

1 through 52

B. Environmental Commitment Tables

A Pratt EC Table 1 through 6 B Bunchgrass EC Table 1 through 6 E Mt. Pierce EC Table 1 through 5

C. Miscellaneous Tower Equipment Information

1 Antenna Testing &

Analysis 1 through 11

2 Antenna Wrapping Procedure

1 through 5

3 Cal OES PSC & General Contractor Inspection and Acceptance Criteria

1 through 4

4 Grounding Requirement for Vault and Tower

1 through 13

5 Tower Install Coax - Waveguide

1 through 3

END OF DOCUMENT

LIST OF DRAWINGS

RESDMSTR: 02/03/2014 00 01 15 - 1 01512A, B, E

DOCUMENT 00 01 15

PRATT MTN. – INCREMENT 1

Sheet Number Description

GENERAL

PM -G001 COVER SHEET

PM -G002 DRAWING INDEX, DESIGN CRITERIA AND SITE ORIENTATION

PM -G003 ABBREVIATIONS AND SYMBOLS

CIVIL

PM -C101 EXISTING SITE DEMOLITION AND CONSTRUCTION

SEQUENCING PLAN

PM -C102 SITE AND GRADING PLAN

PM -C501 CIVIL SECTIONS AND DETAILS

PM-C502 COMMON SITE DETAILS

ARCHITECTURAL

PM -A101 VAULT FLOOR PLAN, ROOF PLAN AND BUILDING

ELEVATIONS

PM -A102 GENERATOR VAULT PLANS, ELEVATIONS AND SECTION

PM -A501 ARCHITECTURAL DETAILS

PM -A502 ARCHITECTURAL DETAILS

STRUCTURAL

PM -S001 STRUCTURAL NOTES

PM -S101 VAULT FOUNDATION AND ROOF FRAMING PLAN AND

SECTION

PM -S102 TOWER FOUNDATION PLAN AND ELEVATION

PM -S501 COMMON STRUCTURAL DETAILS

PM -S502 STRUCTURAL DETAILS

PM -S503 STRUCTURAL DETAILS

PM -S701 FEEDLINE BRIDGE

PM -S702 FEEDLINE BRIDGE

MECHANICAL

PM -M001 MECHANICAL SYMBOLS, LEGEND, ABBREVIATIONS, AND

GENERAL NOTES

PM -M101 LARGE VAULT – HVAC

PM -M102 GENERATOR VAULT – HVAC

PM -M501 MECHANICAL DETAILS

PM -M601 MECHANICAL SCHEDULES

RESDMSTR: 02/03/2014 00 01 15 - 2 01512A, B, E

ELECTRICAL

PM -E001 ELECTRICAL SYMBOLS LEGEND, ABBREVIATIONS AND

GENERAL NOTES

PM -E101 ELECTRICAL SITE PLAN

PM -E102 LARGE VAULT – LIGHTING, POWER, EQUIPMENT AND

GROUNDING

PM -E103 GENERATOR VAULT LIGHTING, POWER, EQUIPMENT AND

GROUNDING

PM -E104 LARGE VAULT INTERIOR ELEVATIONS – 1

PM -E105 LARGE VAULT INTERIOR ELECATIONS – 2

PM -E501 ELECTRICAL DETAILS – 1

PM -E502 ELECTRICAL DETAILS – 2

PM -E503 ELECTRICAL DETAILS – 3

PM -E504 ELECTRICAL DETAILS – 4

PM -E505 ELECTRICAL DETAILS – 5

PM -E506 ELECTRICAL DETAILS – 6

PM -E601 SINGLE LINE DIAGRAM AND LOAD CALCULATION

PM -E602 ELECTRICAL SCHEDULES – 1

PM -E603 ELECTRICAL SCHEDULES – 2

PM -E604 ALARM STATUS REPORTING SCHEMATICS

PM -E605 ALARM POINT DESCRIPTIONS

PM -E606 INTERCONNECT DIAGRAM VHF ANTENNAS AND RF

CABLING – 1

PM -E607 INTERCONNECT DIAGRAM VHF ANTENNAS AND RF

CABLING – 2

PM -E608 INTERCONNECT DIAGRAM VHF ANTENNAS AND RF

CABLING – 3

PM -E609 SITE ANTENNA LAYOUT AND PRESSURIZATION

EQUIPMENT – 1

PM -E610 SITE ANTENNA LAYOUT AND PRESSURIZATION

EQUIPMENT – 2

PM-E611 -48VDC CRIS OES INTERCONNECT DIAGRAM

PM-E612 -48VDC MW OES INTERCONNECT DIAGRAM

PM-E613 +12VDC OES INTERCONNECT DIAGRAM

TOWER STRUCTURAL DRAWINGS

T-1 COVER SHEET & DRAWING INDEX

S-1 ELEVATION VIEW/NOTES

S-1.1 SST SECTION ALLOWABLE MEMBER FORCES

S-1.2 MONOPOLE SECTIONS ALLOWABLE FORCES

S-2 UPPER POLE

S-3 LOWER POLE

S-4 TOWER SECTION 13V - NESTED POLE

RESDMSTR: 02/03/2014 00 01 15 - 3 01512A, B, E

S-5 TOWER SECTION 13V

S-6 TOWER SECTION 15ST

S-6.1 TOWER SECTION 15ST CONT.

S-7 TOWER SECTION 17ST

S-7.1 TOWER SECTION 17ST CONT.

S-8 TOWER SECTION 19ST

S-9 TYPICAL GRATING/BRACING

S-10 TYPICAL HANDRAIL/DIAGONAL PIPE LIGHTING ROD

EXTENTSION, & SAFETY CLIMB KITS

S-11 CENTER MAST

S-12 COAX CAGE / CLIMBING LADDER, ANTI-CLIMB, & BUS BAR

S-13 ANTENNA LOCATION ELEVATION VIEWS

S-13.1 ANTENNA LOCATION PLAN VIEWS

S-14 FULLY LOADED FACE MOUNTED MICROWAVES

S-14.1 FULLY LOADED LEG MOUNTED MICROWAVES

S-14.2 FULLY LOADED VHF/UHF ANTENNA LOCATIONS

S-15 MW ICE BRIDGE DETAILS

S-15.1 MW ANTENNA ICE SHIELD DETAILS

S-16 MICROWAVE MOUNT KITS

S-17 UHF / VHF ANTENNA MOUNT KITS

S-18 LEG – ELEVATION ID PLATES

S-19 TOWER FOUNDATION SLAB/PIERS

RADIO AND MICROWAVE ANTENNA MOUNTING BRACKETS DRAWINGS

CO-TA1 COVER SHEET AND INDEX

CO-TA1.1 DSA 103

CO-TA2 TOWER STRUCTURAL NOTES

CO-TA3 SITE PRO BRACKET DETAILS

CO-TA5.2 TOWER ANTENNA MOUNTING DETAILS (AMPHENOL ANTEL)

CO-TA6 TOWER ANTENNA MOUNTING DETAILS

(ANDREW/COMMSCOPE)

CO-TA7.2 TOWER ANTENNA MOUNTING DETAILS (SINCLAIR)

CO-TA9 TOWER ANTENNA MOUNTING DETAILS (M2/KRECO)

CO-TA10 TOWER ANTENNA MOUNTING DETAILS

(COMMSCOPE/RFS/SINCLAIR)

CO-TA12 TOWER ANTENNA MOUNTING DETAILS (SCALA)

CO-TA18.1 TOWER ANTENNA MOUNTING DETAILS (TELEWAVE)

BUNCHGRASS MTN. – INCREMENT 2

GENERAL

BG-G001 COVER SHEET

BG-G002 DRAWING INDEX, DESIGN CRITERIA AND SITE ORIENTATION

BG-G003 ABBREVIATIONS AND SYMBOLS

CIVIL

BG-C101 EXISTING SITE DEMOLITION AND CONSTRUCTION

RESDMSTR: 02/03/2014 00 01 15 - 4 01512A, B, E

SEQUENCING PLAN

BG-C102 SITE AND GRADING PLAN

BG-C501 COMMON SITE DETAILS

BG-C502 COMMON SITE DETAILS

ARCHITECTURAL

BG-A101 VAULT FLOOR PLAN AND ROOF PLAN AND BUILDING

ELEVATIONS

BG-A501 ARCHITECTURAL DETAILS

BG-A502 ARCHITECTURAL DETAILS

STRUCTURAL

BG-S001 STRUCTURAL NOTES

BG-S101 VAULT FOUNDATION, ROOF FRAMING PLAN AND

SECTION

BG-S102 TOWER FOUNDATION PLAN AND ELEVATION

BG-S501 COMMON STRUCTURAL DETAILS

BG-S502 STRUCTURAL DETAILS

BG-S503 STRUCTURAL DETAILS

BG-S701 FEEDLINE BRIDGE

BG-S702 FEEDLINE BRIDGE

MECHANICAL

BG-M001 MECHANICAL SYMBOLS, LEGEND, ABBREVIATIONS, AND

GENERAL NOTES

BG-M101 MEDIUM VAULT – HVAC

BG-M501 MECHANICAL DETAILS

BG-M601 MECHANICAL SCHEDULES

ELECTRICAL

BG-E001 ELECTRICAL SYMBOLS LEGEND, ABBREVIATIONS AND

GENERAL NOTES

BG-E101 ELECTRICAL SITE PLAN

BG-E102 MEDIUM VAULT – LIGHTING, POWER, EQUIPMENT AND

GROUNDING

BG-E103 MEDIUM VAULT INTERIOR ELEVATIONS

BG-E501 ELECTRICAL DETAILS – 1

BG-E502 ELECTRICAL DETAILS – 2

BG-E503 ELECTRICAL DETAILS – 3

BG-E504 ELECTRICAL DETAILS – 4

BG-E505 ELECTRICAL DETAILS – 5

BG-E506 ELECTRICAL DETAILS – 6

BG-E601 SINGLE LINE DIAGRAM AND LOAD CALCULATION

BG-E602 ELECTRICAL SCHEDULES – 1

BG-E603 ELECTRICAL SCHEDULES – 2

BG-E604 ALARM STATUS REPORTING SCHEMATICS

BG-E605 ALARM POINT DESCRIPTIONS

BG-E606 INTERCONNECT DIAGRAM VHF ANTENNAS AND RF

CABLING – 1

RESDMSTR: 02/03/2014 00 01 15 - 5 01512A, B, E

BG-E607 INTERCONNECT DIAGRAM VHF ANTENNAS AND RF

CABLING – 2

BG-E608 SITE ANTENNA LAYOUT AND PRESSURIZATION

EQUIPMENT – 1

BG-E609 SITE ANTENNA LAYOUT AND PRESSURIZATION

EQUIPMENT – 2

BG-E610 -48VDC CRIS OES INTERCONNECT DIAGRAM

BG-E611 -48VDC MW OES INTERCONNECT DIAGRAM

BG-E612 +12VDC OES INTERCONNECT DIAGRAM

WESTERN UTILITY TELECOM, INC. DRAWING INDEX

T-1 COVER SHEET & DRAWING INDEX

S-1 ELEVATION VIEW/NOTES

S-1.1 SST SECTION ALLOWABLE MEMBER FORCES

S-1.2 MONOPOLE SECTION ALLOWABLE MEMBER FORCES

S-2 UPPER POLE

S-3 LOWER POLE

S-4 TOWER SECTION 13V NESTED POLE

S-5 TOWER SECTION 13V

S-6 TOWER SECTION 15ST

S-6.1 TOWER SECTION 15ST CONT.

S-7 TOWER SECTION 17ST

S-7.1 TOWER SECTION 17ST CONT.

S-8 TOWER SECTION 19ST

S-9 TYPICAL GRATING/BRACING

S-10 TYPICAL HAND RAIL/DIAGNOL PIPE LIGHTING ROD

EXTENSION, SAFETY & SAFETYCLIMB KITS

S-11 CENTER MAST

S-12 COAX CAGE/CLIMBING LADDER, ANTI-CLIMB, & BUS BAR

S-13 ANTENNA LOCATION ELEVATION VIEWS

S-13.1 ANTENNA LOCATION PLAN VIEWS

S-14 FULLY LOADED FACE MOUNTED MICROWAVES

S-14.1 FULLY LOADED LEG MOUNTED MICROWAVES

S-14.2 FULLY LOADED VHF/UHF ANTENNA LOCATIONS

S-15 MW ICE BRIDGE DETAILS

S-15.1 MW ANTENNA ICE SHIELD DETAILS

S-16 MICROWAVE MOUNT KITS

S-17 UHF/VHF ANTENNA MOUNT KITS

S-18 LEG/ELEVATION ID PLATES

S-19 TOWER FOUNDATION SLAB/PIERS

SATE OF CALIFORNIA

CO-TA1 COVER SHEET AND INDEX

CO-TA1.1 DSA 103

CO-TA2 TOWER STRUCTURAL NOTES

CO-TA3 SITE PRO BRACKET DETAILS

CO-TA5.2 TOWER ANTENNA MOUNTING DETAILS (AMPHENOL ANTEL)

CO-TA6 TOWER ANTENNA MOUNTING DETAILS

(ANDREW/COMMSCOPE)

CO-TA7.2 TOWER ANTENNA MOUNTING DETAILS (SINCLAIR)

RESDMSTR: 02/03/2014 00 01 15 - 6 01512A, B, E

CO-TA9 TOWER ANTENNA MOUNTING DETAILS (M2/KRECO)

CO-TA10 TOWER ANTENNA MOUNTING DETAILS

(COMMSCOPE/RFS/SINCLAIR)

CO-TA10.1 TOWER ANTENNA MOUNTING DETAILS (RFS/SINCLAIR)

CO-TA14.1 TOWER ANTENNA MOUNTING DETAILS (SCALA)

CO-TA18 TOWER ANTENNA MOUNTING DETAILS (TELEWAVE)

MT. PIERCE – INCREMENT 3

GENERAL

MP-G001 COVER SHEET

MP-G002 DRAWING INDEX, DESIGN CRITERIA AND SITE ORIENTATION

MP-G003 ABBREVIATIONS AND SYMBOLS

CIVIL

MP-C101 EXISTING SITE DEMOLITION AND CONSTRUCTION

SEQUENCING

MP-C102 SITE AND GRADING PLAN

MP-C501 CIVIL SECTIONS AND DETAILS

MP-C502 COMMON SITE DETAILS

ARCHITECTURAL

MP-A101 VAULT FLOOR PLAN, ROOF PLAN AND BUILDING

ELEVATIONS

MP-A102 GENERATOR VAULT PLANS, ELEVATIONS AND SECTION

MP-A501 ARCHITECTURAL DETAILS

MP-A502 ARCHITECTURAL DETAILS

CIVIL

MP-S001 STRUCTURAL NOTES

MP-S101 VAULT FOUNDATION AND ROOF FRAMING PLAN AND

SECTION

MP-S102 TOWER FOUNDATION PLAN AND ELEVATION

MP-S501 COMMON STRUCTURAL DETAILS

MP-S502 STRUCTURAL DETAILS

MP-S503 STRUCTURAL DETAILS

MP-S701 FEEDLINE BRIDGE

MP-S702 FEEDLINE BRIDGE

MECHANICAL

MP-M001 MECHANICAL SYMBOLS, LEGEND, ABBREVIATIONS, AND

GENERAL NOTES

MP-M101 LARGE VAULT – HVAC

MP-M102 GENERATOR VAULT – HVAC

RESDMSTR: 02/03/2014 00 01 15 - 7 01512A, B, E

MP-M501 MECHANICAL DETAILS

MP-M601 MECHANICAL SCHEDULES

ELECTRICAL

MP-E001 ELECTRICAL SYMBOLS LEGEND, ABBREVIATIONS AND

GENERAL NOTES

MP-E101 ELECTRICAL SITE PLAN

MP-E102 LARGE VAULT – LIGHTING, POWER, EQUIPMENT AND

GROUNDING

MP-E103 GENERATOR VAULT – LIGHTING, POWER, EQUIPMENT AND

GROUNDING

MP-E104 LARGE VAULT – INTERIOR ELEVATIONS – 1

MP-E105 LARGE VAULT – INTERIOR ELEVATIONS – 2

MP-E501 ELECTRICAL DETAILS – 1

MP-E502 ELECTRICAL DETAILS – 2

MP-E503 ELECTRICAL DETAILS – 3

MP-E504 ELECTRICAL DETAILS – 4

MP-E505 ELECTRICAL DETAILS – 5

MP-E506 ELECTRICAL DETAILS – 6

MP-E601 SINGLE LINE DIAGRAM AND LOAD CALCULATION

MP-E602 ELECTRICAL SCHEDULES – 1

MP-E603 ELECTRICAL SCHEDULES – 2

MP-E604 ALARM STATUS REPORTING SCHEMATICS

MP-E605 ALARM POINT DESCRIPTIONS

MP-E606 INTERCONNECT DIAGRAM VHF ANTENNAS AND RF

CABLING – 1

MP-E607 INTERCONNECT DIAGRAM VHF ANTENNAS AND RF

CABLING – 2

MP-E608 INTERCONNECT DIAGRAM VHF ANTENNAS AND RF

CABLING – 3

MP-E609 INTERCONNECT DIAGRAM VHF ANTENNAS AND RF

CABLING – 4

MP-E610 INTERCONNECT DIAGRAM VHF ANTENNAS AND RF

CABLING – 5

MP-E611 SITE ANTENNA LAYOUT AND PRESSURIZATION

EQUIPMENT – 1

MP-E612 SITE ANTENNA LAYOUT AND PRESSURIZATION

EQUIPMENT – 2

PM-E613 -48VDC CRIS OES INTERCONNECT DIAGRAM

PM-E614 -48VDC MW OES INTERCONNECT DIAGRAM

PM-E615 +12VDC OES INTERCONNECT DIAGRAM

TOWER STRUCTURAL SHEETS

T-1 COVER SHEET/DRAWING INDEX

S-1 ELEVATION VIEW/NOTES

S-1.1 SST SECTION ALLOWABLE MEMBER FORCES

S-1.2 MONOPOLE SECTION ALLOWABLE MEMBER FORCES

S-2 UPPER POLE

S-3 LOWER POLE

S-4 TOWER SECTION 13V – NESTED POLE

RESDMSTR: 02/03/2014 00 01 15 - 8 01512A, B, E

S-5 TOWER SECTION 13V

S-6 TOWER SECTION 15ST

S-6.1 TOWER SECTION 15ST CONT.

S-7 TOWER SECTION 17ST

S-7.1 TOWER SECTION 17ST CONT.

S-8 TOWER SECTION 19ST

S-9 TYPICAL GRATING/BRACING

S-10 TYPICAL HAND RAIL/DIAGANOL PIPE, LIGHTING ROD

EXTENSION, & SAFETY CLIMB KITS

S-11 CENTER MAST

S-12 COAX CAGE/CLIMBING LADDER, ANTI-CLIMB, & BUS BAR

S-13 ANETNNA LOCATION ELEVATION VIEWS

S-13.1 ANTENNA LOCATION PLAN VIEWS

S-14 FULLY LOADED FACE MOUNTED MICROWAVES

S-14.1 FULLY LOADED LEG MOUNTED MICROWAVES

S-14.2 FULLY LOADED VHF/UHF ANTENNA LOCATIONS

S-15 MW ICE BRIDGE DETAILS

S-15.1 MW ANTENNA ICE SHIELD DETAILS

S-16 MICROWAVE MOUNT KITS

S-17 UHF/VHF ANTENNA MOUNT KITS

S-18 LEG/ELEVATION ID PLATES

S-19 TOWER FOUNDATION SLAB/PIERS

STRUCTURAL DETAILS FOR RADIO AND MICROWAVE ANTENNA MOUNTING

BRACKETS

CO-TA1 COVER SHEET AND INDEX

CO-TA1.1 DSA 103

CO-TA2 TOWER STRUCTURAL NOTES

CO-TA3 SITE PRO BRACKET DETAILS

CO-TA4 TOWER ANTENNA MOUNTING DETAILS (ANDREW)

CO-TA5.2 TOWER ANTENNA MOUNTING DETAILS (AMPHENOL ANTEL)

CO-TA6 TOWER ANTENNA MOUNTING DETAILS

(ANDREW/COMMSCOPE)

CO-TA6.1 TOWER ANTENNA MOUNTING DETAILS

(ANDREW/COMMSCOPE)

CO-TA7 TOWER ANTENNA MOUNTING DETAILS (HUSTLER/ANTENNA

EXPERT/DIAMOND)

CO-TA7.2 TOWER ANTENNA MOUNTING DETAILS (SINCLAIR)

CO-TA9 TOWER ANTENNA MOUNTING DETAILS (M2/KRECO)

CO-TA10 TOWER ANTENNA MOUNTING DETAILS

(COMMSCOPE/RFS/SINCLAIR)

CO-TA11.2 TOWER ANTENNA MOUNTING DETAILS (DB SPECTRA/SCALA)

CO-TA13 TOWER ANTENNA MOUNTING DETAILS (SCALA)

CO-TA14 TOWER ANTENNA MOUNTING DETAILS (SCALA)

CO-TA14.1 TOWER ANTENNA MOUNTING DETAILS (SCALA)

CO-TA15 TOWER ANTENNA MOUNTING DETAILS (SINCLAIR)

CO-TA17 TOWER ANTENNA MOUNTING DETAILS (SINCLAIR)

CO-TA18 TOWER ANTENNA MOUNTING DETAILS (TELEWAVE)

INVITATION FOR BIDS

RESDMSTR: 10/01/2025 00 11 00 - 1 01512A, B, E

STATE OF CALIFORNIA

DEPARTMENT OF GENERAL SERVICES

PROJECT MANAGEMENT AND DEVELOPMENT BRANCH

DOCUMENT 00 11 00

SEALED BIDS: DGS will receive sealed bids at 707 Third Street, West Sacramento, California 95605, before 2:00 P.M., September 30th, 2026. Bids received after this date/time will not be considered received on time.

A public bid opening will be held on October 1st, 2026 at 10:00 AM. at 707 Third Street, West Sacramento, CA 95605. Bidders may attend virtually or in person. Bidders attending the bid opening in-person will need to meet and sign in at the security guard station in the lobby at the mailing address below. At the public bid opening, all bids received before 2:00 P.M., September 30th, 2026 will be opened and recorded onto a Preliminary Bid Tabulation. Bidders do not need to attend the bid opening as the Preliminary Bid Tabulation will be made available immediately after the bid opening is completed and it will be emailed to invited bidders.

The bid opening may be attended virtually via the following link:

Join: https://teams.microsoft.com/meet/264492875348787?p=UAkX2oxkmfDlBIlCCe Meeting ID: 264 492 875 348 787 Passcode: vN9qX22n

HAND DELIVERED BIDS: Shall be placed in the DGS/OBAS Bid/Proposal Drop Box located in the lobby at 707 3rd Street in West Sacramento. The Drop Box will be opened at 2:00 p.m. Tuesday through Thursday and bids/proposals in the box will be certified as being received before 2:00 p.m.

that day.

If mailing bids, ensure the outside of the mailing reads:

ATTENTION: PAVAN RANDHAWA

PHASE V COMMUNICATION FACILITIES REPLACEMENT: GROUP A

1512A - PRATT MTN.

1512B - BUNCHGRASS MTN.

1512E - MT. PIERCE

CALIFORNIA DEPARTMENT OF FORESTRY AND FIRE

PROTECTION (CALFIRE)

HUMBOLDT & SHASTA COUNTIES, CALIFORNIA

PROJECT NO. 1512A, 1512B, 1512E

DO NOT OPEN

DEPARTMENT OF GENERAL SERVICES

OFFICE OF BUSINESS AND ACQUISITION SERVICES

707 3RD STREET, MS 508, WEST SACRAMENTO, CA 95605

The bids shall include all Work pursuant to the Drawings and Project Manual, and Addenda as may be issued prior to bid opening date.

Scope of Work: Major components of Project Work consist of Demolition, excavation, structural steel, fencing, cast in place concrete, CMU block wall vault construction, panelboards, switchgear, generator, tower erection and related work.

RESDMSTR: 10/01/2025 00 11 00 - 2 01512A, B, E

License: Contractors' State License Classification required to bid Project is A or B.

[Refer to Document 00 22 00, Supplementary Instructions to Bidders, Subparagraph 2.1.3 [and 2.1.4], regarding performance of work of a [Fire Protection specialty contractor license classification C-16] [and] [Well Drilling specialty contractor license classification C-57].

Certificate of Reported Compliance (CRC) – Fleet Vehicles: As a condition of Contract award, prior to Contract execution, Contractor shall submit copies of the valid CRCs for any fleet retained by the Contractor or any listed Subcontractor, for which any vehicles subject to the California Air Resources Board In-Use Off-Road Diesel Fueled Fleet Regulations, Section 2449(i), Title 12, California Code of Regulations, are used in the completion of the work included in the Contract.

More information on the In-Use Off-Road Diesel-Fueled Fleets Regulation can be found at the following link: https://ww2.arb.ca.gov/our-work/programs/use-road-diesel-fueled-fleets-regulation

Generative Artificial Intelligence (GenAI): The State of California seeks to realize the potential benefits of GenAI, through the development and deployment of GenAI tools, while balancing the risks of these new technologies.

Bidder must notify the State in writing if it: (1) intends to provide GenAI as a deliverable to the State; or (2), intends to utilize GenAI, including GenAI from third parties, to complete all or a portion of any deliverable that materially impacts: (i) functionality of a State system, (ii) risk to the State, or (iii) Contract performance. For avoidance of doubt, the term “materially impacts” shall have the meaning set forth in State Administrative Manual (SAM) § 4986.2 Definitions for GenAI.

Failure to report GenAI to the State may result in disqualification. The State reserves the right to seek any and all relief to which it may be entitled to as a result of such non-disclosure.

Upon notification by a Bidder of GenAI as required, the State reserves the right to incorporate GenAI Special Provisions into the final contract or reject bids/offers that present an unacceptable level of risk to the State.

Government Code § 11549.64 defines “Generative Artificial Intelligence (GenAI)” as an artificial intelligence system that can generate derived synthetic content, including text, images, video, and audio that emulates the structure and characteristics of the system’s training data.

Availability of Funds: Award of this contract is subject to the availability of funds through the State’s normal budget process and/or transfer of funds to the Department of General Services through the Architecture Revolving Fund.

Pre-bid Site Inspection: Bids will only be accepted from those Contractors having attended BOTH MANDATORY pre-bid site inspection tours on September 16th & 17th, 2026.

The tour of the sites begins with a project orientation meeting on September16th, 2026 and then proceeds by escort to the first tower site at Bunchgrass Mtn. (also known as Hatchet Mtn.).

Representatives of the State and prospective bidders shall meet at 1:00 PM at 19400 Bunch Grass Lookout Rd., Montgomery Creek, CA.

The tour will continue September 17th, 2026, at which time representatives of the State and prospective bidders shall meet at 9:00 A.M. at 50 West Center Street, Rio Dell, CA, and then proceed by escort to the 2nd tower, Mt. Pierce. Following that tour, the 3rd and final meeting location shall be at 324 Alderpoint Rd, Garberville, CA for a tour of Pratt Mountain. The tour and pre-bid site inspection will conclude upon the return escort down the mountain and off private land.

The State’s requirements for Disabled Veteran Business Enterprise (DVBE) participation and other Contract requirements will be presented. Prime Contractors are encouraged to have their Key

RESDMSTR: 10/01/2025 00 11 00 - 3 01512A, B, E

Administrator and DVBE office coordinator attend to receive this information and to have their questions answered. Attendance for the entire inspection is required in order for bidders to be eligible to submit a bid.

Executive Order N-6-22: The Bidder must be advised of Executive Order N-6-22 Russia Sanctions. On March 4, 2022, Governor Gavin Newsom issued Executive Order (EO) N-6-22 regarding Economic Sanctions against Russia and Russian entities and individuals. “Economic Sanctions” refers to sanctions imposed by the U.S. government in response to Russia’s actions in Ukraine, as well as any sanctions imposed under state law. By submitting a bid, Bidder represents that it is not a target of Economic Sanctions. Should the State determine Bidder is a target of Economic Sanctions or is conducting prohibited transactions with sanctioned individuals or entities, that shall be grounds for rejection of the Bidder’s bid any time prior to contract execution, or, if determined after contract execution, shall be grounds for termination by the State.

Drawings and Project Manual: Bid forms, plans, specifications, and addenda will be available for download at http://www.caleprocure.ca.gov. Click on “Start Search”. In the Event Name field, enter the project number and click “Search”. While viewing the Event Details, click on “View Event Package” to view bid forms.

It is recommended that all vendors register as a bidder through the Cal eProcure website at https://www.caleprocure.ca.gov/pages/bidder-vendor.aspx. This will allow for automatic notifications if there is any modification to the Event such as the posting of an addendum or additional documentation.

Bid: Submit on Lump Sum basis with Allowances as set forth in Bid Forms.

DVBE: Participation in Disabled Veterans Business Enterprises (DVBE) program may be required for this project. Refer to Project Manual Document 00 21 00, Project Manual Document 00 22 10 and Bid Forms for requirements. Bidders are advised to commence the required DVBE procedures immediately upon receipt of drawings and project manual.

DVBE Bid Incentive: The DVBE Incentive program is being applied on this project. Refer to Project Manual Document 00 21 00, Article 18.5.

Small Business Preference: Refer to Project Manual Document 00 21 00, Article 5.5

Non-Small Business Subcontractor Preference: Refer to Project Manual Document 00 21 00, Article 5.6

Bonds: Successful bidder shall furnish payment and performance bonds, each in the amount of 100 percent of the Contract price.

Non-Discrimination Program (Government Code § 12990): Refer to Project Manual Document 00 72 00, General Conditions of the Contract for Construction.

Labor Code: Pursuant to Labor Code § 1774, the Contractor to whom the contract is awarded, and any subcontractor under him, shall pay not less than the specified general prevailing rates of per diem to all workers employed in the execution of the contract. Pursuant to Labor Code § 1770 et seq., the Department of Industrial Relations (DIR) has ascertained general prevailing rate of per diem wages in the locality in which the work is to be performed.