This is a Bid Notice from West County Wastewater (WCW) for Force Main Assessment Civil Work services. WCW is accepting sealed bids through their e-Procurement Portal, OpenGov until Friday, September 25, 2026, at 4:15 pm PST, with no late submissions accepted. The project involves civil work to support an in-line assessment of the Tara Hills Force Main being conducted by Pressure Pipe Consulting Company (PPCC). The civil work scope includes installing a Launch Barrel and Receive Barrel, removing a plug valve and replacing it with a full-port gate valve, and establishing by-passes and line-stops. The contractor must also perform potholing at multiple locations to enable access to the pipeline crown for electromagnetic thickness testing. The work is required at three specified work sites where the civil contractor must restore site conditions upon completion. The civil contractor will assist PPCC in launching and retrieving approximately three progressive pigs and one diagnostic and mapping pig (probe), provide support for inserting and retrieving equipment, and supply supplemental water as needed.

The bid documents specify the locations of all proposed work sites and contain detailed requirements for site restoration and contractor support services. Pricing terms, set-aside provisions, contract duration, and other financial details are contained within the complete bid documents available through WCW's e-Procurement Portal.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

undefined

26-IFB-039

FORCE MAIN ASSESSMENT CIVIL WORK (REBID)

West County Wastewater

2910 Hilltop Drive

Richmond, CA 94806

RELEASE DATE: September 11, 2026

DEADLINE FOR QUESTIONS: September 21, 2026

RESPONSE DEADLINE: September 25, 2026, 4:15 pm

RESPONSES MUST BE SUBMITTED ELECTRONICALLY TO:

https://procurement.opengov.com/portal/wcwd https://procurement.opengov.com/portal/%7bproject.government.code%7d undefined

Force Main Assessment Civil Work (rebid)

1. Notice to Bidders

2. Introduction

3. Instruction to Bidders

4. Schedule of Bid

5. Scope of Work

6. Contract Award

7. Terms and Conditions

8. Vendor Questionnaire

Attachments:

A - Final_8.26.26_21EG301_Force_Main_Assessment_Civil_Bid_Doc undefined #26-IFB-039 Title: Force Main Assessment Civil Work (rebid)

1. Notice to Bidders

1.1. Notice

INVITING SEALED BIDS

WEST COUNTY WASTEWATER

Force Main Assessment Civil Work (rebid)

PROJECT NO. 26-IFB-039

NOTICE IS HEREBY GIVEN THAT the Board of West County Wastewater, Richmond, California, invites and will receive sealed bids for furnishing all labor, equipment, materials and services specified for the construction of WCW Project No. 26-IFB-039, Force Main Assessment Civil Work (rebid), in conformance with the approved Contract Documents.

A. The work covered by this contract will be performed at West County Wastewater Tara Hills Lift

Station at 2250 Tara Hills Drive, San Pablo, CA 94806, and will also occur at multiple other locations along the Tara Hills Force Main alignment, as specified in the bid document..

B. The work includes, but is not necessarily limited to, the following:

a.

i. Installation of Launch Barrel

ii. Installation of Receive Barrel

iii. Removal of Plug Valve & Replacement of Full Port Gate Valve

iv. Potholing

v. Project Support

C. The Engineer’s estimate for the work is $1,361,000.

A pre-bid conference to discuss the project will be held at 10:00 am, local time on Thursday, September 17, 2026 at West County Wastewater Tarahills Lift Station 2250 Tara Hills Dr. San Pablo CA, 94806.. A mandatory site visit shall be conducted by all prime contractors interested in bidding the project. This site visit can be done immediately after the pre-bid conference. The alternate time for the mandatory site visit is at 10:00 AM local time on September 8th at the West County Wastewater

Tarahills Lift Station 2250 Tara Hills Dr. San Pablo CA, 94806..

Bid opening date: WCW will receive sealed bids via WCW’s e-Procurement Portal, OpenGov until 4:15 pm, local time, Friday, September 25, 2026. At that time, accepted bids will be publicly opened.

Contract Documents are available on WCW's e-Procurement Portal, without charge.

Inquiries regarding further information about the project shall be submitted in writing through the

OpenGov Question/Answer Tab via WCW's e-Procurement portal, on or before, Question & Answer

Submission Date by Question & Answer Submission Time. Please include the section title for each question, if applicable, in order to ensure that questions asked are responded to correctly. All questions submitted and answers provided shall be electronically distributed to bidders following this solicitation on WCW's e-Procurement Portal.

Notice is hereby given that, pursuant to Part 7, Chapter 1, Article 2, Section 1770 et. seq. of the Labor

Code of the State of California, the successful bidding contractor and its sub contractors shall pay their labor forces not less than the general prevailing rate of per diem wages as determined by the Director of

Industrial Relations, and travel and subsistence pay as such are defined in applicable collective bargaining agreements filed in accordance with Section 1773.8 of said Labor Code, for work needed and performed on this Project. Said determinations, in effect at the time of publishing this notice, are on file at the above identified WCW Office and may be examined there by appointment only, and copies of which are available to any interested party on request. It shall, pursuant to the provisions of Section

1773.2 of said Labor Code, be a requirement of the work for the successful bidding contractor to post and maintain a copy of said wages' determination at the project sited throughout the duration of the work.

Bids to receive consideration must be submitted by the bona fide prime contractor who proposes to undertake the work and who is properly licensed in accordance with the Contractor's License Law as provided beginning at Section 7000 of the Business and Professions Code of the State of California. The valid license(s) required for the work are as follows: Class A (General Engineering Contractor), Class C-

34 (Pipeline Contractor), or Class C-42 (Sanitation System Contractor). Each bid submitted must be on the forms furnished within the Project Contract and must be accompanied by a certified or cashier's check or bidder's bond for an amount not less than ten (10) percent of the aggregate total bid.

The Contractor shall be allowed to substitute securities for any moneys withheld to ensure performance under this Contract pursuant to Section 22300 of the California Public Contract Code.

The WCW Board of Directors reserves the right to reject any or all bids for the work and waive any irregularity in bids received.

Dated at Richmond, California, this 31st day of August, 2026

William Silver, Project Manager

County of Contra Costa, State of California

2. Introduction

2.1. Summary

West County Wastewater ("WCW") is accepting sealed bids via their e-Procurement Portal, OpenGov until Friday, September 25, 2026, 4:15 pm PST. Late submissions shall not be accepted.

WCW has contracted with Pressure Pipe Consulting Company (PPCC) to perform an in-line assessment of the Tara Hills Force Main. The assessment will require launching and receiving a series (approximately 3) progressive pigs and one (1) diagnostic and mapping pig (probe). To perform this in-line phase of the assessment, Civil work is required to install a Launch Barrel, install a Receive Barrel, and remove a plug valve and replace it with a full-port gate valve. By-passes and line-stops will be required to perform this work. Additional scope to assess the pipe condition will also be performed by electromagnetic thickness testing. For the consultant to perform this exterior analysis phase of the condition assessment, potholing must be provided by the Civil Contractor to enable access to the pipeline crown. The civil work scope also includes assisting the assessment pigging/probe consultant in launching and retrieving the pigs and probe. The Civil Contractor will also be required to restore site conditions at the (3) locations where civil work is performed and at the location of potholes. The locations of the proposed work sites are specified in the bid documents. The Civil Contractor will also assist the Assessment Consultant by providing support with tasks to insert and retrieve the pigs and the probe, and to supply supplemental water.

2.2. Background

West County Wastewater (WCW) provides wastewater collection and treatment services to approximately 93,000 residents. WCW was created December 19, 1921, pursuant to authority of the

State of California. Today, WCW operates as a political subdivision of the State of California as an independent special district. WCW's current political boundaries are comprised of the City of San Pablo, a portion of the City of Richmond, a portion of the City of Pinole and some unincorporated areas within western Contra Costa County.

WCW's system includes 249 miles of gravity sewer pipelines, 17 lift stations, 6 miles of pressurized force mains, and a water quality resource recovery plant with an NPDES permitted capacity of 12.5 million gallons per day (MGD).

2.3. Contact Information

William Silver

Project Manager

2910 Hilltop Drive

Richmond, CA 94806

Email: wsilver@wcwd.org

Phone: (510) 239-9217

Department:

Infrastructure and Planning mailto:wsilver@wcwd.org tel:(510)239-9217

2.4. Timeline

Release Project Date September 11, 2026

Pre-Bid Meeting (Mandatory) September 17, 2026, 10:00am

West County Wastewater Tarahills Lift Station 2250

Tara Hills Dr. San Pablo CA, 94806.

Alternate Pre-Bid Meeting (Non-

Mandatory)

September 18, 2026, 10:00am

West County Wastewater Tarahills Lift Station 2250

Tara Hills Dr. San Pablo CA, 94806.

Question Submission Deadline September 21, 2026, 5:00pm

Question Response Deadline September 22, 2026, 5:00pm

Proposal Submission Deadline September 25, 2026, 4:15pm

Notice to Proceed (Tentative) November 16, 2026

3. Instruction to Bidders

3.1. PREPARATION AND SUBMISSION OF PROPOSALS

Proposals shall be submitted via WCW’s e-Procurement Portal, ProcureNow as required by this solicitation. All proposal forms shall be properly executed and all information shall be provided as required. Failure to comply may be cause for rejection of the proposal.

The quantities included in the bid proposal are estimates of the work to be completed. WCW may add work of the same nature to this Contract if the addition is in the best interests of WCW.

Partial or incomplete proposals will not be accepted. Proposals shall be in strict conformity with the approved Contract Documents for Project No.26-IFB-039, Force Main Assessment Civil Work (rebid), and any Addenda thereto.

The bidder shall submit its proposal prior to the stated closing time. Any proposal received after the stated closing time for receipt of proposals will not be accepted through the e-Procurement Portal.

The preparation of a proposal shall be by and at the expense of the bidder.

Changes in or additions to the bid form, recapitulation of the work bid upon, alternative bids or any other modifications of the bid form which are not specifically called for in the Contract Documents may result in rejection of the bid by WCW, as not being responsive to the Notice to Contractors. No oral or telephonic modification of any bid submitted will be considered.

Proposals shall be firm for sixty (60) calendar days from and after the stated closing time, or until a

Contract is fully executed by WCW and a bidder, whichever is earlier.

3.2. EXAMINATION OF DOCUMENTS AND EXPLANATION TO BIDDERS

Any bidder planning to submit a proposal is responsible for examining with appropriate care the complete Contract Documents, including all Addenda, and is also responsible for being informed with respect to all conditions which might in any way affect the cost or the performance of any work.

Failure to do so will be at the sole risk of the bidder, and no relief can be given for errors or omissions by the bidder.

All questions relative to the Contract Documents shall be in writing and shall be submitted in writing through the ProcureNow Question/Answer Tab via the WCW's e-Procurement portal, on or before, Monday, September 21, 2026 by 5:00 pm. Please include the section title for each question, if applicable, in order to ensure that questions asked are responded to correctly. All questions submitted and answers provided shall be electronically distributed to bidders following this solicitation on WCWs e-Procurement Portal.

Should the bidder find discrepancies in or omissions from the Contract Documents, or should the intent or meaning of the documents appear unclear or contain patent ambiguities, the bidder shall at once notify WCW of such findings. Questions received less than ten (l0) calendar days prior to the date for opening of the bids may not be answered. The bidder making such request shall be solely responsible for its timely receipt by WCW. Replies to such findings may be made in the form of addenda which shall be posted on WCW's e-Procurement Portal. Addenda notifications will be emailed to all persons on record as following this IFB. Failure of any bidder to receive any such addenda or interpretation shall not relieve such bidder from any obligation under their bid as submitted. All addenda so issued shall become part of the contract documents. Only questions answered by formal written addenda will be binding.

Copies of the Contract Documents are available for examination without charge via the e-Procurement portal.

Copies of the Contract Documents may be obtained for a non-refundable fee of $110.00 per set if requested by mail. Payment must be made prior to the time any documents are mailed. Make check and/or money order payable to West County Wastewater (WCW).

West County Wastewater

2910 Hilltop Drive

Richmond, CA 94806

3.3. SITE INSPECTION AND CONDITIONS

It is the intent of WCW to provide a safe working environment under normal conditions. BECAUSE OF

POTENTIALLY HAZARDOUS CONDITIONS SUCH AS CONFINED SPACES, POTENTIALLY EXPLOSIVE

ATMOSPHERES, AND POSSIBLE EXPOSURE TO PATHOGENS, SPECIALIZED EQUIPMENT MAY BE

NECESSARY AND STRICT CONFORMANCE WITH SAFETY REGULATIONS WILL BE REQUIRED. Attention is further directed to Section titled "Article GC-20, Laws and Regulations".

In addition to examination of the Contract Documents, each prospective bidder shall become fully informed regarding all existing and expected conditions and matters which could affect any work or performance of any work in any way, and especially the cost of performing any work. The project may be visited and conditions discussed at the pre-bid conference set forth in, “Notice to Contractors”.

Any failure to fully investigate the sites or the foregoing conditions shall not relieve the bidder from responsibility for estimating properly the difficulty or cost of successfully performing any work. Neither

WCW nor any of its representatives or agents assumes any responsibility for any understanding or representation made by WCW or any of its representatives or agents prior to the execution of a

Contract pursuant to the Contract Documents.

3.4. WCW'S MODIFICATION OF THE DOCUMENTS

WCW may modify any provision or part of the document at any time prior to three (3) calendar days before closing time, provided that the closing time set forth in “Notice to Bidders”, may be extended by

WCW at any time prior to said closing time. Such revisions, if any, will be in the form of addenda which will be posted on WCW's e-Procurement Portal. Addenda notifications will be emailed to all persons on https://secure.procurenow.com/portal/wcwd/projects/296457/document?section=2849418 record as following this IFB.

Addenda issued during the time of bidding shall become a part of the documents furnished bidders for the preparation of bids, shall be covered in the bids and shall be made a part of the Contract. Failure to so acknowledge may result in the bid being rejected as non- responsive. Failure of any bidder to receive such addenda shall not be grounds for non-compliance with the terms of the instructions.

3.5. REGISTRATION OF CONTRACTORS

All bidders shall be licensed under the provisions of Chapter 9, Division 3, or the Business and

Professions Code of the State of California to do the type of work contemplated in the project and shall be skilled and regularly engaged in the general class or type of work called for under the Contract.

Each bidder shall set forth in its proposal the number, classification, and date of expiration of such license.

3.6. SCHEDULE OF BID

Bids shall be prepared and submitted in ProcureNow under “Schedule of Bid”. The Total Base Bid shall constitute full compensation for furnishing all materials and doing all work indicated on the drawings or herein specified.

Bidders are advised that a potential exists for the performance of extra work and furnishing of materials by the Contractor which is required for the proper completion of the work or construction of the whole of the project as originally contemplated.

3.7. COMPARISON OF PROPOSALS

Proposals will be compared on the basis of the Total Base Bid stated in “Schedule of Bid ”.

WCW agrees to examine and consider each bid submitted in consideration of the bidder's agreements, as set forth and as set forth in the proposal forms.

Any proposal which, in the opinion of WCW, is so unbalanced between the various Contract items as to be detrimental to the best interests of WCW, will be rejected.

3.8. BIDDER'S STATEMENT OF EQUIPMENT/MATERIAL MANUFACTURERS AND

SUPPLIERS AND STATEMENT OF SUBCONTRACTORS

In the form entitled Bidder's Statement of Equipment/Material Manufacturers and Suppliers, each bidder must submit the name of each person, company, or firm who will, off the job site, specially fabricate and/or provide materials or equipment proposed to be furnished under the bid.

In the form entitled Bidder's Statement of Subcontractors, the bidder shall submit the name and location of the place of business of each subcontractor who will perform work or labor or render service to the prime contractor in or about the construction of the work or improvement, or a subcontractor licensed by the State of California who under subcontract to the prime contractor specially fabricates https://secure.procurenow.com/portal/wcwd/projects/296457/document?section=2849420 and installs a portion of the work or improvement according to detailed drawings contained in the Plans

Specifications, in an amount in excess of one-half of one percent (l/2%) of the proposal total or five thousand ($5,000) dollars, whichever is greater, as set forth in the Schedule of Bid. The prime contractor shall indicate the portion which will be done by each such contractor for each such portion as its defined by the subcontractor in its bid.

Failure to list subcontractors in the “Bidder's Statement of Subcontractors” is an express statement by the bidder that it will perform that portion of the work with its own forces. Any request for substitution of a listed subcontractor must be made as provided in the Public Contract Code Section 4107. The prime contractor may not substitute any person or subcontractor for a listed subcontractor without first obtaining written permission of WCW's Board of Directors.

3.9. QUALIFICATION OF BIDDERS

Each bidder shall examine the site and submit with its proposal a financial responsibility, technical ability, and experience statement, substantially in the form included as, “Bidder's Statement of Financial

Responsibility, Technical Ability, and Experience”.

If bidder is a corporation, it shall submit its state of incorporation in addition to its business address; if a partnership or joint venture, full names of all partners or joint venturers shall be given in the form included in the Proposal.

WCW expressly reserves the right to reject any proposal if it determines that the bidder's business and technical organization, financial resources, plant and equipment to be used in performing work, or lack of successful experience in performing work, or lack of successful experience in performing work of similar type and magnitude, is such that it is not in WCW’s best interest to accept the bidder's proposal.

Contractors or subcontractors who have been determined to have violated any public work laws as set forth in Labor Code Section 1777.7 shall be denied the privilege to bid the work as provided therein.

3.10. CERTIFICATION OF COMPLETION REQUIREMENTS

Each bidder shall submit, as part of its proposal, a completed and executed certificate pertaining to the acceptability of the construction time frame as set forth in “Certificate Regarding Completion Time”.

The Contract time for this work shall be deemed to start five (5) calendar days from the date of the

Notice to Proceed. Contractor must submit a reasonable construction schedule in accordance with

Attachments – “Special Conditions, SC-4, CONSTRUCTION SCHEDULE, PROCEDURES AND, METHODS”.

3.11. PROPOSAL SECURITY

No proposal will be considered unless it is accompanied by proposal security in the form of a certified check or a cashier's check, payable to the order of West County Wastewater, for a sum not less than ten percent (10%) of the proposal total as set forth in the Schedule of Bid, or a bidder's bond in the same amount executed as surety by a corporation acceptable to WCWand authorized to issue such surety bond in the State of California. Such bond shall be in substantial conformity with the form included as

“Bidder’s Bond”. Payment of the proposal security in cash is not acceptable.

https://secure.procurenow.com/portal/wcwd/projects/296457/document?section=2849419

Within fifteen (15) calendar days after execution of the Contract pursuant to the Contract Documents, and in any event not later than seventy (70) calendar days after the proposal opening, WCW will return to each bidder the proposal security which accompanied its proposal, except such security which may have been forfeited in accordance with the provisions of the Contract Documents.

3.12. BIDDER'S MODIFICATION AND WITHDRAWAL OF PROPOSALS

A bidder may, without prejudice to itself, modify or withdraw its proposal by written request, provided that the request is received by WCW prior to the closing time, at the place where the proposals are to be opened. Following withdrawal of its proposal, the bidder may submit a new proposal, provided that such new proposal is received prior to the stated bid opening date as provided in "Notice to Bidders ".

3.13. SUBSTITUTIONS

Proposals for substitution of materials, methods, and alternatives thereto not specified in the

Specifications shall be submitted in writing to WCW. Failure to submit requests for substitutions will be considered as evidence that the work will be accomplished with materials and by methods specified and in a manner approved by WCW.

3.14. PROPOSAL OPENING AND AWARD OF CONTRACT

Proposals will be kept unopened until the time stated for opening of proposals. At such time, the contents of the proposal will be made public. No responsibility shall attach to WCW or any of its officers, employees, or representatives for the premature opening of a proposal. All bidders or their authorized representatives are invited to be present at the proposal opening.

If award is made, it will be based on the lowest responsive, responsible bid whose base bid is the lowest.

The right is reserved, as the interest of WCW may require, to reject any or all proposals and to waive any informality in proposals received.

Within sixty (60) days after the time of opening of the bids, WCW will act either to accept a bid, to reject all bids or with the consent of the bidders and their sureties to extend the time in which WCW may act.

The acceptance of a bid will be evidenced by a Notice of Award of Contract in writing, delivered in person or by certified mail to the bidder whose bid is accepted. No other act of WCW will constitute acceptance of a bid. The Award of Contract shall obligate the bidder whose bid is accepted to furnish performance and payment bonds and evidences of insurance, and to execute the Agreement in the form set forth in the Contract Documents. The Contract will require the completion of the Work according to the Contract Documents.

The Agreement shall be executed by the successful bidder and returned, together with the Contract bonds and evidences of insurance, within the specified time period after receiving written Notice of

Award of the Contract. Time is of the essence in this regard. After execution by the owner, one copy of the Agreement shall be returned to Contractor.

The failure of any bidder to whom WCW may award the Contract, as aforesaid to sign and return to

WCW, the Contract together with the required Performance Bond, Payment Bond, and insurance certificates and endorsements the specified time period, shall entitle WCW to declare a breach of

Contract by such bidder, to award the Contract to another bidder in accordance with the provisions of the Contract Documents, and to declare a forfeiture of the bidder's proposal security accompanying its proposal.

In the event of such failure, WCW will suffer damage, the amount of which is difficult, if not impossible, to ascertain, and WCW shall therefore be entitled to retain the amount of such cashier or certified check, submitted by the bidder as proposal security, or to enforce the provisions of the Bidder's Bond in the amount thereof, as liquidated damages for such breach of Contract, as provided by applicable law.

3.15. RELIEF OF BIDDERS

Should a bidder claim a mistake was made in its bid, the bidder shall give the WCW written notice within five (5) calendar days after proposal opening of the alleged mistake, and detail in said notice the circumstances under which the mistake occurred all in accordance with Public Contract Code, Section

5103. Final determination of relief of bidders shall be made by WCW Board. Should the WCW Board accept the bidder's claim for relief, the bidder will be released from all obligations and further requirements and its proposal security will be returned as applicable.

3.16. BONDS AND INSURANCE POLICIES

The bidder to whom the contract award is made shall, at the time of execution of the Contract, furnish to WCW a Performance Bond and a Payment Bond, executed as surety by a corporation acceptable to

WCW and authorized to issue such surety bonds in the State of California. Such bonds shall be substantially in the form included with this solicitation. Such Performance Bond and Payment Bond shall be for one hundred (100) percent of the proposal total as set forth in the Schedule of Bid. The entire cost of these bonds shall be borne by the successful bidder.

If the surety on any bond furnished by the Contractor is declared bankrupt, or becomes insolvent, or its right to do business is terminated, or it ceases to meet the requirements of the above paragraph, the

Contractor shall, within five (5) calendar days thereafter, notify WCW and substitute another bond and surety, both of which must be acceptable to WCW.

3.17. NONDISCRIMINATION IN EMPLOYMENT

Contracts for work under this Proposal will obligate the Contractor and subcontractors not to discriminate in employment practices.

3.18. AGREEMENT TO ASSIGN (BIDDERS)

The bidder's attention is directed to the provisions of Government Code, Section 4552, which requires that in submitting a bid to a public purchasing body, bidders offer to assign all rights arising from violations of antitrust regulations to the public entity if the bid is accepted. In pertinent part, Government Code, Section 4552, reads as follows:

In submitting a bid to a public purchasing body, the bidder offers and agrees that if the bid is accepted, it will assign to the purchasing body all rights, title, and interest in and to causes of action it may have under Section 4 of the Clayton Act (15 U.S.C. Sec 15) or under the Cartwright Act (Chapter 2

[commencing with Section 16700] of Part 2 of Division 7 of the Business and Professions Code), arising from the purchase of goods, materials, or services by the bidder for sale to the purchasing body pursuant to the bid. Such assignment shall be made and become effective at the time the purchasing body tenders final payment to the bidder.

3.19. PLANS AND SPECIFICATIONS TO SUCCESSFUL BIDDERS - IS THIS NEEDED??

The bidder to whom award is made may obtain four (4) sets of Plans and Specifications for the work at no extra costs. Additional sets may be purchased at $30.00 per set. It is the Contractor's responsibility to provide its own set(s) of conformed Plans and Specifications.

4. Schedule of Bid

This Schedule of Bid must include all costs required to complete the entire project scope as specified in the bid documents.

CIVIL WORK (INCLUDING ASSESSMENT SUPPORT)

Line items 1-4 are considered lump-sum costs. Line items 5.A-D are estimated bid quantities, and payment is based on actual quantities, as the contract contains quantity-adjustment provisions. The total number of potholes will not exceed 20.

Line Item Description Quantity Additional

Description Unit of

Measure Unit Cost Total

1 Mobilization and

Demobilization

Including but not limited to: Bonds, insurance, survey staking, storm water

BMPs, noise and dust control, temporary facilities such as water, power, fencing, site security, and sanitary facilities, as specified in general requirements.

1 EA

Line Item Description Quantity Additional

Description Unit of

Measure Unit Cost Total

2 Site A – Install Launch

Assembly Install pig-launcher assembly at the site shown in

Appendix A, including, but not limited to:

Demolition, pipes, fittings, couplings, valves and materials, bollards, valve box, linestop with temporary bypass piping, thrust restraints, water from

EBMUD hydrant, test station, site clearing, storm water pollution prevention measures, temporary support of existing utilities, excavation, sheeting and shoring, bedding, backfill, compaction, removal and disposal of trench spoils, old pipe and structures, surface restoration, cleanup, testing, asphalt concrete paving, temporary fencing, site security, lighting, and contractor support during ILI inspection.

Unit of

Measure Unit Cost Total

3 Site B – Replace Plug

Valve Replace one plug valve with a gate valve at the site shown in

Appendix A, including, but not limited to:

Pipes, fittings, couplings, valves and materials, line-stop with temporary bypass piping, thrust restraints, test station, temporary support of existing utilities, excavation, sheeting and shoring, bedding, backfill, compaction, removal and disposal of trench spoils, old pipe and structures, storm water pollution prevention measures, surface restoration, cleanup, testing, landscaping, curb, gutter, sidewalk, and all asphalt concrete paving and base replacement markings affected by the contractor’s construction activities.

Unit of

Measure Unit Cost Total

4 Site D – Install Receive

Assembly Install pig-receiver assembly at the site shown in

Appendix A, including, but not limited to:

Pipes, fittings, couplings, valves and materials, fencing, valve boxes, test station, line-stop with temporary bypass piping, thrust restraints, storm water pollution prevention measures, all site clearing, temporary support of existing utilities, excavation, sheeting and shoring, bedding, backfill, compaction, removal and disposal of trench spoils, old pipe and structures, surface restoration, cleanup, testing, temporary fencing, site security, lighting, and contractor support during ILI inspection.

Unit of

Measure Unit Cost Total

5.A Potholing Type -

UNPAVED CITY Pothole at up to twenty (20) combined sites/types total along the pipe alignment at the preliminary sites shown in Appendix A, including, but not limited to: Vacuum excavation, hand excavation, backfill, compaction, removal and disposal of trench spoils, surface restoration, cleanup, landscaping, curb, gutter, sidewalk, and all asphalt concrete paving and base replacement markings affected by the contractor’s construction activities.

6 Actual site and quantity to be determined by WCW

EA

Unit of

Measure Unit Cost Total

5.B Potholing Type - PAVED

CITY Pothole at up to twenty (20) combined sites/types total along the pipe alignment at the preliminary sites shown in Appendix A, including, but not limited to: Vacuum excavation, hand excavation, backfill, compaction, removal and disposal of trench spoils, surface restoration, cleanup, landscaping, curb, gutter, sidewalk, and all asphalt concrete paving and base replacement markings affected by the contractor’s construction activities.

4 Actual site and quantity to be determined

Unit of

Measure Unit Cost Total

5.C Potholing Type -

UNPAVED COUNTY

Pothole at up to twenty (20) combined sites/types total along the pipe alignment at the preliminary sites shown in Appendix A, including, but not limited to: Vacuum excavation, hand excavation, backfill, compaction, removal and disposal of trench spoils, surface restoration, cleanup, landscaping, curb, gutter, sidewalk, and all asphalt concrete paving and base replacement markings affected by the contractor’s construction activities.

3 Actual site and quantity to be determined

Unit of

Measure Unit Cost Total

5.D Potholing Type - PAVED

COUNTY Pothole at up to twenty (20) combined sites/types total along the pipe alignment at the preliminary sites shown in Appendix A, including, but not limited to: Vacuum excavation, hand excavation, backfill, compaction, removal and disposal of trench spoils, surface restoration, cleanup, landscaping, curb, gutter, sidewalk, and all asphalt concrete paving and base replacement markings affected by the contractor’s construction activities.

7 Actual site and quantity to be determined by WCW

TOTAL

5. Scope of Work

5.1. Installation of Launch Barrel- Tara Hills lift Station

Install temporary bypass and line-stops.

Install Launch Barrel for Condition Assessment.

Restore site conditions.

5.2. Installation of Receive Barrel- Giant Hwy

Install temporary bypass and line-stops.

Install Receive Barrel for Condition Assessment.

Restore site conditions.

5.3. Civil Work on Rachael Rd.

Install temporary bypass and line-stops.

Remove the plug valve and replace it with a full port gate valve.

Restore site conditions.

5.4. Potholing

Provide up to twenty (20) potholes at various locations as specified by WCW project engineer.

Pothole bid item schedule of values divides the 20 potholes into 6 unpaved City + 4 paved City + 3 unpaved County + 7 paved County = 20

These are estimated bid quantities, and payment is based on actual quantities as the contract contains quantity-adjustment provisions.

Dump spoils at WCW wastewater treatment plant located at 2377 Garden Tract Rd., Richmond, CA

94801.

Restore site conditions.

5.5. Project Support

Assist and coordinate with WCW and consultant to support pigging operation.

This support includes lifting pigs and probe for insertion and retrieval from barrels.

Providing additional water supply from EBMUD hydrant (location specified on plans) for pigging and tool run.

6. Contract Award

6.1. Award and Execution of Contract

The successful bidder will be notified in writing by WCW of Award of Contract within Sixty (60) calendar days after opening of proposals. Accompanying WCW’s Notice of Award will be the Contract, in duplicate, which the successful bidder will be required to sign and return together with the Performance

Bond, Payment Bond, and the required number of copies of insurance certificates and endorsements to

WCW within ten (10) calendar days following receipt of such Notice of Award. WCW will promptly determine whether such Contract, bonds, and insurance certificates and endorsements are as required by the Contract Documents, and upon such determination will forward a fully signed copy of the

Contract to the successful bidder. WCW may issue a Notice to Proceed at any time prior to forwarding the Contract. No work shall be performed at the site prior to the date set forth in the Notice to Proceed.

The failure of any bidder to whom WCW may award the Contract, as aforesaid to sign and return to

WCW, the Contract together with the required Performance Bond, Payment Bond, and insurance certificates and endorsements within the specified time period, shall entitle WCW to declare a breach of

Contract by such bidder, to award the Contract to another bidder in accordance with the provisions of the Contract Documents, and to declare a forfeiture of the bidder's proposal security accompanying its proposal.

6.2. Bonds and Insurance Policies

The Bidder to whom the contract award is made shall, at the time of execution of the Contract, furnish to WCW a Performance Bond and a Payment Bond, executed as surety by a corporation acceptable to

WCW and authorized to issue such Surety Bonds in the state of California. Such bonds shall be substantially in the form included in Subsections 3 and 4 respectively, of Section 01004 of the Contract

Documents. Such Performance Bond and Payment Bond shall be for one hundred (100) percent of the

Proposal total as set forth in the Schedule of Bid, Section 01003, Subsection 2. The entire cost of these bonds shall be borne by the successful Bidder.

If the Surety on any bond furnished by the Contractor is declared bankrupt, or becomes insolvent, or its right to do business is terminated, or it ceases to meet the requirements of the above paragraph, the

Contractor shall, within five (5) calendar days thereafter, notify WCW and substitute another bond and surety, both of which must be acceptable to WCW.

The successful Bidder shall at the time of execution of the Contract deliver to WCW one (1) copy of policies of insurance obtained in accordance with the requirements of the Contract Documents.

6.3. Workers' Compensation Statement

The Bidder to whom the Contract Award is made shall, at the time of execution of the Contract, furnish to WCW a statement certifying compliance with the workers' compensation provision of the California

Labor Code. Such certification shall be substantially in the form included in Section 01004, Subsection 6 of the Contract Documents.

7. Terms and Conditions

7.1. Award and Execution of Contract

The successful bidder will be notified in writing by WCW of Award of Contract within Sixty (60) calendar days after opening of proposals. Accompanying the WCW’s Notice of Award will be the Contract, in duplicate, which the successful bidder will be required to sign and return together with the Performance

Bond, Payment Bond, and the required number of copies of insurance certificates and endorsements to

WCW within ten (10) calendar days following receipt of such Notice of Award. WCW will promptly determine whether such Contract, bonds, and insurance certificates and endorsements are as required by the Contract Documents, and upon such determination will forward a fully signed copy of the

Contract to the successful bidder. WCW may issue a Notice to Proceed at any time prior to forwarding the Contract. No work shall be performed at the site prior to the date set forth in the Notice to Proceed.

The failure of any bidder to whom WCW may award the Contract, as aforesaid to sign and return to

WCW, the Contract together with the required Performance Bond, Payment Bond, and insurance certificates and endorsements within the specified time period, shall entitle WCW to declare a breach of

Contract by such bidder, to award the Contract to another bidder in accordance with the provisions of the Contract Documents, and to declare a forfeiture of the bidder's proposal security accompanying its proposal.

7.2. Bonds and Insurance Policies

The Bidder to whom the contract award is made shall, at the time of execution of the Contract, furnish to WCW a Performance Bond and a Payment Bond, executed as surety by a corporation acceptable to

WCW and authorized to issue such Surety Bonds in the state of California. Such bonds shall be substantially in the form included in Subsections 3 and 4 respectively, of Section 01004 of the Contract

Documents. Such Performance Bond and Payment Bond shall be for one hundred (100) percent of the

Proposal total as set forth in the Schedule of Bid, Section 01003, Subsection 2. The entire cost of these bonds shall be borne by the successful Bidder.

If the Surety on any bond furnished by the Contractor is declared bankrupt, or becomes insolvent, or its right to do business is terminated, or it ceases to meet the requirements of the above paragraph, the

Contractor shall, within five (5) calendar days thereafter, notify WCW and substitute another bond and surety, both of which must be acceptable to WCW.

The successful Bidder shall at the time of execution of the Contract deliver to WCW one (1) copy of policies of insurance obtained in accordance with the requirements of the Contract Documents.

7.3. Workers' Compensation Statement

The Bidder to whom the Contract Award is made shall, at the time of execution of the Contract, furnish to WCW a statement certifying compliance with the workers' compensation provision of the California

Labor Code. Such certification shall be substantially in the form included in Section 01004, Subsection 6 of the Contract Documents.

7.4. Authority of the Engineer

A. "WCW" is the West County Wastewater. The "Design Engineer" is listed in Notice to Bidders. The

"Engineer" is WCW Engineer of West County Wastewater or the Engineer's duly authorized representative during the life of the Contract. The engineer will observe the work in progress on behalf of WCW. All questions and requests of the Contractor as to compensation (including additional compensation), interpretation of the Contract, instructions, or extensions of time, otherwise shall be submitted in writing to the Engineer for determination.

B. The Engineer is authorized to determine the amount, quality, acceptability, and fitness of all work, materials, and equipment required by the Contract.

C. The Engineer will decide all questions which may arise as to the quality or acceptability of materials furnished and work performed and as to the manner of performance and rate of progress of the work, and the Engineer's decision will be final.

D. The Engineer will decide all questions which may arise as to the coordination and interpretation of the plans and specifications, and the Engineer's decision will be final.

E. The Engineer will decide all questions as to the acceptable fulfillment of the Contract on the part of the Contractor, and the Engineer's decision will be final.

F. The Engineer will decide all questions as to measurement and payment, and the Engineer's decision will be final.

G. The Engineer will have the authority to reject defective work and materials whenever such rejection may be necessary to assure execution of the Contract in accordance with the intent of the Contract Documents.

H. The Engineer will determine all amounts owing to the Contractor.

I. The Engineer will prepare/issue contract change orders for all authorized changes or approved extra work in the Contract.

J. The Engineer will have the authority to monitor project schedules and to enforce project schedule requirements, and to take such measures as may be necessary to maintain overall project schedules.

K. The Engineer will have the authority to enforce and to make effective such decisions and orders which the Contractor fails to carry out promptly.

L. All determinations and instructions of the Engineer whether in response to a question or otherwise will be final unless the Contractor shall file a written protest with the Engineer as set forth in this Article GC-1.

7.5. Contractor's Responsibilities and Appeal Procedure

A. The Contractor shall be solely responsible for requesting instructions or interpretations as required by the Contract, and any costs and expenses, including attorneys' fees, arising from its failure to do so shall be borne by the Contractor.

B. The Contractor shall proceed without delay to perform the work as directed, instructed, determined, or decided by the Engineer and shall comply promptly with such directions, instructions, determinations, or decisions. If the Contractor has any objection thereto, the

Contractor may, within ten (10) calendar days of having received any such directions, instructions, determinations, or decisions, require that any such direction, instruction, determination, or decision be put in writing. Within ten (10) calendar days after receipt of any such written determination, the Contractor may file a written protest with the Engineer stating clearly and in detail the Contractor's objections, the reasons therefor, and the nature and amount of additional compensation or extension of time, if any, to which the Contractor contends it will be entitled thereby. The Contractor shall proceed to perform the work that the

Contractor may contend as being outside the scope of the Contract while the Contractor's protest is being considered. The Contractor is cautioned, however, that unless the Contractor has been ordered by WCW pursuant to Article GC- 12.E., Request for Additional Compensation, to perform changes or extra work additional compensation will not be considered. The

Contractor shall prepare daily cost records and obtain an acknowledgment by the Engineer in accordance with GC-12C, Cost Plus Change Orders.

C. The Engineer will issue a decision upon each protest. If the Engineer determines that the facts support the protest, the Contract will be modified accordingly, in writing. If the Engineer determines that the facts do not support the protest, such request will be denied. The

Engineer's finding of fact of either determination will be given to the Contractor and such findings shall be final and conclusive. At all times, the Contractor shall proceed with the work in accordance with the direction, instruction, determination, or decision of the Engineer. Unless the Contractor follows the requirements of this Article GC-1, the Contractor shall be deemed to have waived all grounds for protest of direction, instruction, determination, or decision and all claims for additional compensation, extensions of time, or damages occasioned thereby for which protest could have been made under this Article GC-1, and shall further be deemed to have accepted such direction, instruction, determination, or decision as being fair, reasonable, and determinative of the Contractor's obligations and rights under the Contract.

D. If the Contractor has outstanding claim issues upon acceptance of the contract work by WCW, the Contractor shall, within thirty (30) calendar days from the date of said acceptance, submit to the Engineer a written statement of all claims it maintains exist arising under or by virtue of the

Contract. No claim will be considered that is not clearly identified in said written statement of claims and no claim will be recognized for which a notice or protest is not prosecuted as required under the provision contained in Articles GC-11, Differing Site Conditions,; GC-12, Changes and Extra Work; GC-42, Liquidated Damages; and GC-53, Utility and Other Existing

Facilities.

1. Claims filed by the Contractor shall be in sufficient detail to enable the Engineer to ascertain the bases and respective amounts of said claims. The Engineer will review and consider the

Contractor's claims; however, the Contractor shall be responsible for furnishing, within a reasonable time, such further information and details as may be requested by the Engineer to ascertain the facts or contentions involved in the Contractor's claims. Failure of the

Contractor to submit such requested information and details shall be sufficient cause for

WCW to deny such claims.

2. Upon final determination of the claims, the Engineer will prepare and issue a final payment in the entire sum found due thereon.

7.6. INTENT OF THE CONTRACT

A. A. It is the intent that all obligations of WCW and the Contractor are fully set forth and described in the Contract. All parts of the Contract are intended to be correlative and complementary, and any work required by one part and not mentioned in another part shall be performed to the same extent and purpose as though required by all parts.

B. The organization of the Contract Documents into sections, parts, and subsections and the arrangement of the contract plans shall not necessarily control the Contractor in dividing any work among any of its subcontractors or in establishing the extent of work to be performed by any trade or craft. The headings or titles of any article, section, subsection, paragraph, provision, or part of the Contract shall not be deemed to limit or restrict the content, meaning, or effect of such article, section, subsection, paragraph, provision, or part. Titles assigned to the various sections and subsections do not necessarily limit the scope of topic, but are assigned solely to designate a central theme which may be further addressed by either volumes, parts, sections, or subsections for particular applications. Absence of reference in any one to other such sections, parts, or subsections shall not in any way serve to waive the requirements otherwise applicable to the work in its entirety. All sections of the Specifications and Project Drawings are interdependent and applicable to the Project as a whole.

C. Where the words "as shown," "as detailed," "as indicated," or words of like import are used in the Contract, reference is to the Project Drawings unless the context clearly indicates a different meaning. Where the words "required," "approved," "determined," "acceptable," "favorably reviewed," "reviewed," "selected," "directed," "equivalent," "equal," "satisfactory," or words of like import are used in the Contract, action by the Engineer or WCW is indicated unless the context indicates otherwise, and all work shall be in accordance therewith. Such action, or failure to act, shall not relieve the Contractor of its contractual responsibilities for performance of the Contract.

D. The Contractor shall perform the work in accordance with the terms of the Contract. The

Specifications and all notes on the Project Drawings are directed to the Contractor and all work shall be performed by it even though phrases such as "the Contractor shall" or "shall be done by the Contractor" are omitted. Where portions of the work are described in general terms, but not in complete detail, the Contractor shall perform the work utilizing skilled trade persons and high quality material. Unless otherwise specified such as deep excavation/shoring, traffic control, or detail design where a registered professional engineer shall be required, the Contractor shall furnish all labor, materials, tools, equipment, and incidentals and do all the work involved in executing the Contract in a timely, satisfactory, and workmanlike manner.

E. The misplacement, addition, or omission of a word or character shall not change the intent of any part of the Contract from that set forth by the Contract as a whole.

F. For the sake of convenience, the masculine/feminine pronoun may be used to designate who performs the work and for other purposes and, in all cases, applies equally to all persons.

Moreover, the word "Contractor" as used in the Contract, applies to the General Contractor. If the Contractor is a partnership or joint venture then for the purpose of the Contract, the members of the partnership or joint venture shall be jointly and severally liable notwithstanding any agreement as between themselves to the contrary.

7.7. DISCOVERY OF ERRORS, OMISSIONS, OR DISCREPANCIES IN THE CONTRACT

A. By execution of the Contract, the Contractor agrees that no request for…