About this file
This is a Bid Notice from San Francisco International Airport (SFO) for the Terminal 3 West Modernization project, specifically soliciting bids for TP 245 - East: Foundations/Piles work. The project encompasses the expansion of Terminal 3 by approximately 631,022 gross square feet and renovation of approximately 516,644 gross square feet of existing facility space. A key component is the Courtyard 4 Connector (C4C), a new 7-story core-and-shell building to be constructed between Terminal 3 and the International Terminal, designed to include secure passenger corridors, baggage handling systems, office space, passenger lounges, employee amenities, a Customs & Border Protection security checkpoint, loading dock, mechanical penthouse, and pump station upgrades. The terminal will remain operational throughout construction, requiring extensive phasing. The notice solicits bids for foundation and pile work as part of this larger modernization initiative that aims to upgrade building systems, implement seismic retrofit measures, improve passenger flow, enhance the overall passenger experience, and add new gates to maximize operational flexibility.
The bid notice establishes the procurement framework for foundation and pile construction activities under the Terminal 3 West Modernization Program, which represents a continuation of SFO's terminal improvement efforts that previously included Boarding Area E and Terminal 3 East renovations. Specific details regarding bid submission deadlines, pre-bid meetings or site visits, bonding requirements, insurance specifications, pricing terms, small business set-asides, and contract award timelines would be contained within the full bid notice documentation and should be reviewed in detail by prospective bidders prior to submission.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
OPEN
Terminal 3 West Modernization - TP 245 - East: Foundations / Piles Design-Builder
21085, 76546, 91200, 91400, 91484, 96800
Project ID: 10071.76 - TP 245
Release Date: Friday, September 4, 2026
Due Date: Tuesday, October 6, 2026 5:00pm
Posted Friday, September 4, 2026 6:00am
All dates & times in Pacific Time - Los Angeles
Draft Response No Bid
Time Remaining: 20 days, 2 hours, 40 minutes
To respond to this project, please click the "Draft Response" button above.
1. Introduction
Post Information Posted At:
Fri, Sep 4, 2026 6:00 AM Sealed Bid Process:
No Private Bid:
No
1.1. Summary
Design-Builder Firm Name: Turner Construction Company
Project Overview:
Terminal 3 West Modernization
The goal of this project is to expand Terminal 3 by approximately 631,022 gross square feet and to renovate approximately
516,644 gross square feet of the existing facility. The terminal will remain in operation throughout the project and will require extensive phasing. This will include upgrading building systems, seismic retrofit, improving passenger flow, enhancing the passenger experience, and new gates to maximize flexibility.
CB
9/16/26, 5:19 PM Project Detail https://procurement.opengov.com/portal/sfoconstruction/projects/300517/document 1/2 https://procurement.opengov.com/
Courtyard 4 Connector (C4C)
The Courtyard 4 Connector (C4C) Project is a new 7-story core-and-shell building, part of the overall Terminal 3 West (T3W)
Modernization Project. The T3W Project is a continuation of the Terminal 3 (T3) Program at San Francisco International Airport
(SFO), which began with renovations and expansions of Boarding Area E (BAE) and Terminal 3 East (T3E). The T3W Project will renovate the western half of Terminal 3 to the same level of passenger experience that was achieved in the other airport terminal projects.
The Courtyard 4 Connector Building will be built between Terminal 3 and the International Terminal (ITB) and will include secure passenger corridors and baggage handling systems connecting T3 and ITB. Additionally, the project will consist of space for offices, assembly (passenger lounges), airport employee amenity space, Customs & Border Protection (CBP) One-Stop passenger security screening checkpoint, loading dock, rooftop mechanical penthouse, and mechanical system upgrades within the existing pump station. Level 1 of C4C is open to the airfield and apron program while levels 2 and 3 are directly connected to T3 and are considered as an extension of that building for egress and plumbing fixture provisions.
Trade Package No.: TP-245
Trade Package Title: East: Foundations / Piles
Description of the Trade Package Scope of Work:
The deep foundations scope for the East Addition include furnishing and installing 20-inch diameter steel pipe piles, micro piles, and foundation piles required to support the building expansion, passenger boarding bridges, and high mast light foundations. The scope also includes mobilization, pile testing, pile cutoffs, spoil and slurry handling, corrosion protection requirements, and all labor, equipment, materials, and testing necessary for a complete deep foundation system.
Trade Package Bid Due Date and Time: 10/6/2026 by 5:00 PM
Estimated Cost: $4.3M
Main Trades of the Trade Package: Foundation, Piles, Concrete
CMD LBE Participation Requirements %: 15%
Design-Builder requirements or prequalification criteria: Please reach out to Briana Padilla at brpadilla@tcco.com for SFO and Turner prequalification criteria for this package.
Contact for Trade Package information: Briana Padilla email: brpadilla@tcco.com
1.2. Timeline
Release Date:
September 4, 2026
Advertisement Completion:
October 6, 2026, 5:00pm
9/16/26, 5:19 PM Project Detail https://procurement.opengov.com/portal/sfoconstruction/projects/300517/document 2/2