This is a Bid Notice issued by the Contra Costa Community College District for the removal and replacement of rooftop HVAC units at the Student Union building. The project involves removing two existing rooftop HVAC units (AC-6 and AC-7) and installing two new 7.5-ton heat pump rooftop units, along with all necessary ductwork, piping, and electrical connections. The invitation number is D-1279, with a posting date of August 19, 2026, and a bid due date of September 17, 2026, at 2:00 PM PDT. A mandatory onsite pre-bid meeting is scheduled for August 27, 2026, at 9:00 AM PDT at 321 Golf Club Road, Pleasant Hill, California 94523, where attendance is required and participants must sign in at the Student Union Building. Electronic bid responses are required and must include a bid form and proposal, bid bond, designated subcontractors list, site visit certification, and non-collusion declaration.

The award type is lump sum, with a bid bond requirement of 10 percent, a payment bond of 100 percent, and a performance bond of 100 percent. The project is categorized under commercial and institutional building construction and plumbing, heating, and air-conditioning contracting. Specific design requirements include Carrier 50GEQM08A2A6-0A0A0 basis of design, electric resistance heating of 13 kW for AC-6 and 11 kW for AC-7, reuse of existing roof curbs with adapters as needed, BACnet gateway installation for campus ALC BAS connection, and electrical circuit modifications to accommodate new equipment specifications. The purchasing department is located at 500 Court Street, Martinez, California 94553, with Ben Cayabyab serving as the contact at 925-229-6956 or bcayabyab@4cd.edu.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Contra Costa Community College District

Opportunity Detail

Bid Bond

Pre-Bid Meeting Information

D-1279 STUDENT UNION ROOFTOP HVAC UNIT REPLACEMENT

Title D-1279 STUDENT UNION ROOFTOP HVAC UNIT REPLACEMENT Invitation #

Posting Date 08/19/2026 8:14 PM (PDT) Project Stage Bidding Bid Due Date 09/17/2026 2:00 PM (PDT)

Response Format Electronic

Type Bid Response Types Line Items

Bid Form and Proposal (required) Bid Bond (required) Designated Subcontractors List (required) Site Visit Certification (required) Non-collusion Declaration (required)

Type of Award Lump Sum Categories 236220 - Commercial and Institutional Building Construction

238220 - Plumbing, Heating, and Air-Conditioning Contractors

Department Purchasing Address 500 Court Street

Martinez, California 94553

County Contra Costa

Offer Valid Liquidated Damages Estimated Bid Value Start/Delivery Date

Project Duration

Bid Bond 10.00% Payment Bond 100.00%

Performance Bond 100.00%

Pre-Bid Meeting Yes Meeting Type Onsite

Date & Time 08/27/2026 9:00 AM (PDT) Address 321 Golf Club Rd., Pleasant Hill, CA 94523

Attendance Required Yes

8/24/26, 3:23 PM PlanetBids Vendor Portal https://vendors.planetbids.com/portal/67229/bo/bo-detail/145274 1/2

Online Q&A

Contact Information

Description

Search & Bid on Thousands of Contracts

Additional Details All participants are required to sign in front of the Student Union Building. Park at Parking LOT 8 for easy access to Student Union Building.

Online Q&A No

Contact Info Ben Cayabyab 925-229-6956 bcayabyab@4cd.edu

Bids to Owner's Agent

Scope of Services Remove and dispose 2 existing rooftop HVAC units AC-6 and AC-7. Install two new 7.5-ton heat pump rooftop units and make all ductwork, piping and electrical connections as needed.

Other Details Basis of design: Carrier 50GEQM08A2A6-0A0A0.

Include a maximum of 13 kW of electric resistance heating for AC-6 and 11 kW of electric resistance heating for AC-7. Reuse existing roof curb and provide curb adaptor if required.

Curb shall have spring isolation unless unit fan and compressor are internally isolated. Include BACnet gateway for connection to campus ALC BAS. Change electrical circuit breaker size and feed wire as needed to be compatible with new equipment.

Notes

Special Notices Local Programs & Policies www.vendorline.com

8/24/26, 3:23 PM PlanetBids Vendor Portal https://vendors.planetbids.com/portal/67229/bo/bo-detail/145274 2/2 https://vendor.planetbids.com/

File details come from the government source that posted it. Updated .