Bid Notice-Admin Building Demolition Project.pdf

PDF 589 KB Posted

Attached to
Admin Building Demolition Project
Solicitation number
CSULA-RFQ-001
Issued by
Los Angeles County, California

About this file

This is a Notice to Contractors and Request for Qualifications issued by The Trustees of The California State University for construction manager at risk services on the Admin Building Demolition Project at California State University, Los Angeles. The project involves demolishing the entire Admin Building complex from the top of the 1st floor slab to the penthouse while maintaining active basement and loading dock operations on the South side, along with abatement of all hazardous materials based on specifications from Citadel Environmental Services. The selection process utilizes a two-step approach: respondents submit Statements of Qualifications that will be reviewed by a technical committee to select no more than five finalists, who will then submit proposals in response to a Request for Proposals. Construction Manager at Risk services are divided into two phases with separate contracts issued for each: Design/Preconstruction Services Phase and Construction Phase. Design services will be performed by a separate CSU-prequalified licensed architect. The Statements of Qualifications are due by October 5, 2026, with RFQ documents available on or after August 31, 2026 through the PlanetBids Public Solicitation Portal. Respondents must be prequalified with the Trustees no less than ten business days prior to SOQ submission.

The budgeted direct construction cost for this project is $9,000,000.00. Contractor license requirements include License A or B, C-21 and C-22 licenses, and Hazmat Certification. The Trustees offer a five percent bid advantage to firms certified as "Small Business" by the Department of General Services, Office of Small Business and DVBE Services. Additionally, three percent Disabled Veteran Business Enterprise (DVBE) participation is required for all contracts. This is a public works project subject to prevailing wage rate laws, requiring all respondents, proposers, and all tiers of subcontractors to register with the Department of Industrial Relations and maintain current registration per Labor Code section 1725.5. Points of contact for information include Nato Flores at nflore90@calstatela.edu or 323-681-1645, and Pedro Diaz at pdiaz@calstatela.edu or 323-343-6930.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Construction Mgmt.

700.04.CMR • 5/21

NOTICE TO CONTRACTORS

REQUEST FOR QUALIFICATIONS

FOR CONSTRUCTION MANAGER AT RISK SERVICES

Admin Building Demolition Project Project Number P26013

California State University, Los Angeles 5151 State University Dr, Los Angeles, CA 90032

The Trustees of The California State University are requesting Statements of Qualifications (SOQ) from interested and qualified construction managers (Respondents) to provide preconstruction and construction services for the above-named Project. The Trustees will select a construction manager (general contractor) using a two-step process: (1) this Request for Qualifications (RFQ) from which Respondents may submit SOQ to the Trustees, and (2) the Request for Proposals (RFP) which the Trustees will issue to the shortlisted firms.

A technical review committee shall review the respondents’ SOQ and, based on the criteria identified in the RFQ, the committee shall select no more than five finalists to receive the Request for Proposals. Selection of the winning Proposer will be based on qualifications and proposed fees (a design competition is not utilized). Construction Manager at Risk is a two-phased delivery process: (1) Design/Preconstruction Services Phase and (2) Construction Phase, and the Trustees will issue separate contracts for each phase. Note: the Trustees will issue a separate contract to a licensed, CSU-prequalified architect to perform all design services for this project.

The Project consists of:

1. The scope is to demolish the entire complex from the top of the 1st floor slab all the way to the penthouse.

2. The basement and loading dock on the South are to remain active during and after demolition.

3. The scope also includes the abatement of all hazardous materials that are existing in the building, based on abatement plans and specifications issued by Citadel Environmental Services.

SOQ Submittal Due Date and Time: 10/05/2026

Budgeted Direct Construction Cost: $9,000,000.00

Contractor License Requirement: License A or B, C-21 and C-22 license and a Hazmat Certification

CSU Point of Contact for Information: Nato Flores, nflore90@calstatela.edu, 323-681-1645

RFQ documents will be available on or after 08/31/2026 on the “PlanetBids Public Solicitation Portal” website, https://vendors.planetbids.com/portal/25987/bo/bo-search. Respondents shall first register as a vendor and then log in to the PlanetBids Public Solicitation Portal to search for this project and download the RFQ documents.

If Respondent experiences problems viewing this website, contact the CSU point of contact named above for assistance. Pedro Diaz, Director of Procurement, Administrative Operations at pdiaz@calstatela.edu or (323)343-6930.

Respondents must be prequalified with the Trustees. To do so, submit the prequalification applications no less than ten business days prior to SOQ submittal due date. Respondents shall go

Notice to Contractors - Request for Qualifications for Construction Manager at Risk Services

Page 2 of 2 pages to the following PlanetBids website to register, log in and then select the Prequalification tab to apply.

“California State University, Office of the Chancellor, Vendor Portal” https://vendors.planetbids.com/portal/15331/portal-home

Prequalification documents and plans and specifications will accessible at PlanetBids via the following link: https://vendors.planetbids.com/portal/25987/bo/bo-search. If there are any problems accessing the documents, contact Nato Flores, Facilities Planning Design and Construction, 5151 Room Corporation Yard Rm. 202, State University Drive, Los Angeles, 90032, via e mail at nflore90@calstatela.edu or via telephone at 323 481-1645.

The Trustees shall give a small business a bid advantage of five percent to contracting firms that have been certified as a “Small Business” by the Department of General Services, Office of Small Business and DVBE Services, in accordance with Contract General Conditions (and Supplementary General Conditions) for Construction Manager at Risk with Guaranteed Maximum Price Projects, Article 2.08, Small Business Five Percent Bid Advantage.

Additionally, the Trustees require three percent (3%) Disabled Veteran Business Enterprise (DVBE) participation in all contracts, in accordance with Contract General Conditions (and Supplementary General Conditions) for Construction Manager at Risk with Guaranteed Maximum Price Projects, Article 2.09-g, DVBE Incentive.

When it nears time to bid trades, the selected construction manager shall contact the Trustees’ DVBE Coordinator Renee Sotelo @ rsotelo@calstate.edu

This Project is a public works project and is subject to prevailing wage rate laws (Contract General Conditions, Article 4.02). All Respondents/Proposers and all tiers of subcontractors who will work on this Project shall register with the Dept. of Industrial Relations (DIR) to bid and work on public works projects, and maintain current this registration per Labor Code section

1725.5. For more information, go to http://www.dir.ca.gov/Public-Works/PublicWorks.html.

-End Notice to Contractors-