Bid Document (1).pdf

PDF 14 MB Posted

Attached to
Paving Quarry on Grant 1 and Left Turn Lane
Solicitation number
0909-172-00, C1
Issued by
Harris County, Texas

About this file

Summary

This is a bid document and contract package for paving and infrastructure work issued by Harris County Municipal Utility District No. 583 in Harris County, Texas. The project, titled "Paving to Serve Quarry on Grant SEC 1 and Left Turn Lane at Quarry Springs Boulevard" (Project No. 0909-172-00, Contract No. 1), involves earthwork, paving, erosion control, and miscellaneous construction items for a single-family residential subdivision. Major work items include roadway stripping and excavation (17.2 acres and 9,885 cubic yards respectively), subgrade preparation and stabilization (16,533 square yards combined), installation of reinforced concrete pavement (15,589 square yards), concrete curb installation (8,495 linear feet), asphalt driveway and left turn lane work (611 and 941 square yards respectively), and storm sewer installation (142 linear feet of 24-inch RCP). A pre-bid conference will be held remotely on Friday, July 31, 2026, at 9:00 a.m. Local Time via teleconference at (978) 990-5000, access code 356847. Sealed electronic bids are due by Friday, August 7, 2026, at 9:00 a.m. Local Time, with public opening at IDS Engineering Group, 13430 Northwest Freeway, Suite 700, Houston, Texas 77040. The owner reserves the right to award the contract within ninety (90) days of bid opening. Contract time for completion is not specified in the bid form but shall be measured in calendar days from the Notice to Proceed, with Substantial Completion required before Final Completion.

Bidders must submit bids through www.CivcastUSA.com and provide bid security equal to 5 percent of the total bid amount, either as a bid bond or certified/cashier's check. The successful bidder must furnish performance and payment bonds at 100 percent of the contract price and a two-year maintenance bond at 50 percent of construction costs. Surety companies must maintain a minimum Best Key Rating of "B+" or better and be authorized to issue bonds in Texas. The contract price will be determined by the base bid amount plus or minus any approved change orders for extra work items. Minimum unit prices are established for certain extra work items (import fill at $8.00 per cubic yard, cement stabilized sand at $22.00 per cubic yard, Class A concrete at $250.00 per cubic yard, and reinforcing steel at $0.50 per pound). Contractors and subcontractors must comply with prevailing wage rate requirements under Texas Government Code Chapter 2258, with minimum wage rates specified in Attachment B. Economic disincentives of $1,000 per calendar day apply for failure to complete work within the specified contract time. Owner is exempt from Texas sales and use taxes as a political subdivision, and contractors must pass on applicable tax savings. All bidders must submit a completed Texas Ethics Commission Form 1295 with their bid to be eligible for contract award.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CONTRACT DOCUMENTS AND

TECHNICAL SPECIFICATIONS

PAVING TO SERVE QUARRY ON GRANT SEC 1 AND LEFT TURN

LANE AT QUARRY SPRINGS BOULEVARD

HARRIS COUNTY, TEXAS

HARRIS COUNTY MUNICIPAL UTILITY DISTRICT NO. 583

IDS Project No. 0909-172-00 Contract No. 1

This document is released for the purpose of bidding under the authority of Reagan A. Rucker, P.E. 153628 on 07/24/2026.

It is not to be used for construction purposes.

JULY 2026

Prepared by: IDS Engineering Group 13430 Northwest Freeway, Suite 700 Houston, Texas 77040 t 713.462.3178

TxEng Firm 2726 | TxSurv Firm 10110700

BID SET

APRIL 2026

CONTRACT DOCUMENTS AND TECHNICAL SPECIFICATIONS

FOR

PAVING TO SERVE QUARRY ON GRANT SEC 1 AND LEFT TURN LANE AT QUARRY SPRINGS BOULEVARD Project No. 0909-172-00, Contract No. 1

TABLE OF CONTENTS

CONTRACT DOCUMENTS

• Invitation to Bidders

• Instructions to Bidders

• Proposal

• Contract

• General Conditions of the Contract

1. Attachment A – Insurance Requirements

2. Attachment B – Minimum Wage Rate Scale

3. Attachment C – Pay Estimate Forms

• Special Conditions of the Contract Part A

• Special Conditions of the Contract Part B

• Texas Sales and Use Tax Exemption Certification

• Payment Bond

• Performance Bond

• Maintenance Bond

APRIL 2026

INVITATION TO BIDDERS

Sealed Electronic Bids addressed to HARRIS COUNTY MUNICIPAL UTILITY DISTRICT NO. 583, Attention Board of Directors, will be electronically received, until Friday, August 7, 2026 at 9:00 a.m. Local Time, and then publicly opened and read at IDS Engineering Group, 13430 Northwest Freeway, Suite 700, Houston, Texas 77040 for “PAVING TO SERVE QUARRY ON GRANT SEC 1 AND LEFT TURN LANE AT QUARRY SPRINGS BOULEVARD, Project No. 0909-172-00, Contract No. 1, HARRIS COUNTY, Texas” In addition to the opening of sealed Bids at the address above, you may dial in to the public opening of sealed Bids via teleconference. To join via teleconference dial (978) 990-5000 and use access code 356847.

Scope of Work of the Contract Documents includes the following: paving to serve a single family residential subdivision.

Bids received after the closing time will be returned unopened. A pre-bid conference will be held remotely on Friday, July 31, 2026 at 9:00, a.m. Local Time. To join the pre-bid teleconference dial (978) 990-5000 and use access code 356847.

Each Bid must be accompanied by a Bid bond or a certified or cashier’s check, acceptable to the Owner, in an amount not less than five percent (5%) of the total amount Bid, as a guarantee that the successful bidder will enter into the Contract Documents and execute the Bonds on the forms provided and provide the required insurance certificates and Bonds within seven (7) days after the date Contract Documents are received by the successful bidder. If a certified or cashier’s check is provided, the successful bidder shall deliver, at the bid opening address, the original certified or cashier’s check within one (1) business day of receipt of the bid opening.

Copies of the bidding documents may be reviewed and obtained from www.CivcastUSA.com: search “Paving Quarry on Grant 1 and Left Turn Lane”. Bidders must register on this website in order to view and/or download specifications, plans, soils report, and environmental reports for this Project. There is NO charge to view or download documents.

Bidder must submit its Bid and Bid Securities in compliance with Owner’s Order Adopting Section 49.2731 Electronic Bidding Rules and all Bids and Bid Securities must be submitted through www.CivcastUSA.com.

Bidder must register on this website to submit a Bid and Bid Security and there is no charge to submit Bids and Bid Securities on this website.

By submitting a Bid, bidder acknowledges and agrees that the Contract Documents may be accepted, executed, or agreed to using an Electronic Signature, as defined by and in accordance with Owner’s Electronic Signature Rules for Construction Contracts.

The Owner reserves the right to reject any or all Bids and to waive all defects and irregularities in bidding or bidding process except the time for submitting a Bid. The successful bidder, if any, will be the responsible bidder, which in the Board’s judgment will be most advantageous to the District and result in the best and most economical completion of the Project.

The requirements of Subchapter J, Chapter 552, Government Code, may apply to this Bid and the bidder agrees that the Contract Documents can be terminated if the bidder knowingly or intentionally fails to comply with a requirement of that subchapter.

http://www.civcastusa.com/

HARRIS COUNTY MUNICIPAL UTILITY DISTRICT NO. 583 INSTRUCTION TO BIDDERS

1 of 7 APRIL 2026

INSTRUCTIONS TO BIDDERS

1. PREPARATION OF BIDS. Unless otherwise directed in the Invitation to Bidders, each Bid must be submitted on the bid forms provided or on photocopies of the forms, in conformity with the requirements of the Invitation to Bidders, these Instructions to Bidders (“Instructions”), and the instructions printed on the bid form. In addition, if submitting a paper Bid, the Bid must be submitted in duplicate.

All blanks on the bid form must be completed and no change shall be made to the bid form or any other of the Contract Documents. All amounts must be in figures, with amounts extended and totaled. If minimum unit prices have been established for certain items, the minimum unit prices will be shown on the bid form. See Paragraph 8 of these Instructions. If the bidder chooses not to bid on optional items (if any), “No Bid” must be entered in the bid space. Any Bid may be rejected if it contains any omission, erasure, alteration, addition, irregularity of any kind, or items not called for; if it does not submit prices for each of the items in the bid form; if it is not signed by the bidder; if it is unbalanced; or if it in any manner, fails to conform to the conditions of the Invitation to Bidders and these Instructions. An “unbalanced” Bid means a Bid containing unit prices that are significantly less than cost for some items and significantly more than cost for others. This may be evidenced by submission of unit price Bid items where the cost is significantly higher/lower than the cost of the same Bid items submitted by other Bidders on the same Project.

The bidder must sign its Bid. If the Bid is made by a partnership or corporation, the name and address of the partnership or corporation must be shown together with the names and addresses of the partners or officers. If the Bid is made by an individual, it must be executed by that person; if made by a partnership, it must be executed by one of the partners (and if by a limited partnership, then executed by the general partner); or if made by a corporation, it must be executed in the corporate name by the president or a vice-president (or other corporate officer accompanied by evidence of authority to sign) and the corporate seal must be affixed and attested by the secretary or assistant secretary of the corporation.

The corporate address and state of incorporation shall be shown below the signature.

When applicable, evidence of authority to conduct business as an out-of-state corporation in the State of Texas must be provided in accordance with the paragraph entitled QUALIFICATION OF BIDDERS. State contractor license number, if any, must also be shown.

The Bid and the Bid Security must be sealed and must identify the contents (i.e., Bid or Bid Security), the bidder’s name, and the job name and number, and be addressed to the Owner as prescribed in the Invitation to Bidders.

2. CONTRACT DOCUMENTS. The Contract Documents are complementary and must be read together as a whole; what is called for by one is binding as if called for by all.

Bidders desiring further information or further interpretation of any part of the Contract Documents are hereby obligated to submit a written request online to the www.CivcastUSA.com system for such information to Engineer not less than two (2) calendar days before the Bid opening. If appropriate, answers to these requests will be given, in writing, to all bidders as addenda to the Contract Documents, and when each addendum is issued it becomes a part of the Contract Documents. No explanation or interpretation of the Contract Documents, other than written addenda, is binding.

Should a bidder find discrepancies or errors in or omissions from the Contract Documents or should the bidder be in doubt as to any meaning, the bidder is hereby obligated to notify Engineer in writing. It is http://www.civcastusa.com/

2 of 7 APRIL 2026 the responsibility of each bidder to determine if it has received all addenda, complete files of which will be maintained at the Engineer’s office and the office designated to receive the Bids, if any.

Each bidder must inform itself fully of the construction and labor conditions under which the Work will be performed and will be presumed to have inspected the Site and to have read and to be thoroughly familiar with the Contract Documents. Failure to do so will not relieve the successful bidder of its obligation to furnish all materials and labor necessary to carry out the requirements of the Contract Documents and to complete the Work for the consideration in its Bid.

3. PRE-BID CONFERENCE. A pre-bid conference among Owner, Engineer, prospective bidders, and others will be held to discuss the scope of the Work and to answer questions concerning the Work. No addendum will be issued at this conference, but an addendum will be issued afterwards, if necessary, to answer questions. The pre-bid conference will be held at the place and time stated in the Invitation to Bidders or as modified by written addenda.

4. BID SECURITY. Each Bid must be accompanied by a bid bond or a certified or cashier’s check, acceptable to the Owner, in an amount not less than five (5) percent of the total amount bid (the “Bid Security”), as a guarantee that the successful bidder will enter into the Contract and execute the required Bonds on the forms provided and provide the required insurance certificates and Bonds within seven (7) days after the date Contract Documents are received by the successful bidder. Bid Securities will be returned to all but the three (3) most qualified, responsible bidders within three (3) days after opening of Bids, and the latter’s Bid Securities will be returned after complete execution of the Contract Documents.

If the successful bidder does not enter into the Contract after notice of award, then the bidder’s Bid Security will be forfeited and will be retained by Owner. If the award of the Contract to the successful bidder is canceled or not executed for any reason, the Owner may accept the next lowest bid and proceed with the next-lowest qualified bidder.

5. BONDS. The successful bidder must furnish a performance bond and a payment bond each in the sum of 100 percent (100%) of the Contract Price. The successful bidder must also provide a two-year (2) Maintenance Bond for fifty (50) percent of the cost of the construction of the improvements that will be owned by Harris County Municipal Utility District No. 583. The Bonds must be in the form prescribed by the Contract Documents except as required otherwise by Laws and Regulations. The Bonds must be from a surety company holding a permit from the State of Texas to act as surety. Unless otherwise specified, the cost of proving Bonds must be included in the bidder’s total Bid amount. The surety company must have a minimum Best Key Rating of “B+” or better. The surety company, the agency and agent issuing the Bonds must be authorized to issue Bonds in Texas in an amount equal to the total Contract Price and such authorization must be recorded in the files of the Texas Department of Insurance. The person executing the Bonds must be a licensed Texas local recording agent and such licensing must be recorded in the files of the Texas Department of Insurance. All Bonds signed by an agent must be accompanied by a certified copy of the agent’s authority to act. The Bonds must be executed by a duly appointed representative of the surety company licensed by the State of Texas as a General Lines Agent and such licensing must be recorded in the files of the Texas Department of Insurance. If the surety company does not have such a rating due to the length of time it has existed, the surety company must be eligible to participate in the surety bond guarantee program of the Small Business Administration and must be an approved surety listed in the current U.S. Department of Treasury Circular 570, and must meet all of the rules and regulations of the Treasury Department with respect to performance and payment bonds for federal jobs, including specifically the rules related to underwriting limitation. For contracts over $100,000, the surety must also hold a certificate of authority from the United States Secretary of Treasury to qualify as a surety on obligations permitted or required under federal law, or have obtained reinsurance for any liability in excess of $1,000,000 from a reinsurer that is authorized and admitted as a reinsurer in the State of Texas

3 of 7 APRIL 2026 and is the holder of a certificate of authority from the United States Secretary of Treasury to qualify as a surety or reinsurer on obligations permitted or required under federal law. If bidder’s proposed surety company, agency or agents do not meet the requirements herein, then Owner may refrain from considering the bidder for Contract award and Owner may require bidder to forfeit its Bid Security.

It is further agreed that the successful bidder will execute the Bonds required for the satisfactory performance of the Work, the fulfillment of any guarantees required, and the prompt payment to all persons supplying labor and materials in the prosecution of the Work, in accordance with the Contract Documents and on the forms provided for this purpose. It is agreed that this Contract is not in effect until the required Bonds are furnished and approved by Owner. Upon increase of the Contract Price authorized by Change Order, Contractor must immediately provide revised Bonds for such increased Contract Price.

Contractor’s failure to provide compliant Bonds may be grounds for immediate termination regardless of whether the Contractor has started the Work on the Project.

If the surety on any Bond furnished by Contractor is declared bankrupt or becomes insolvent or its right to do business is terminated in any state where any part of the Project is located or it ceases to meet the requirements herein Contractor must promptly notify Owner; Developer, if there is a Special Conditions of the Contract Part B; and Engineer and must, within ten (10) calendar days after the event giving rise to such notification, provide another Bond and surety to fulfill the required obligations.

6. DELIVERY OF BIDS. It is each bidder’s responsibility to deliver its Bid and Bid Security as stated in the Invitation to Bidders before the closing time. The fact that a Bid and a Bid Security were dispatched will not be considered. The Bid and Bid Security must be timely delivered to be considered.

7. “OR EQUAL” SUBMISSIONS. Where materials or equipment are specified by a trade or brand name, it is not the intention of the Owner to discriminate against an equal product of another manufacturer, but to set a definite standard of quality or performance. In preparing its proposal, each bidder is expected to include in its base Bid the cost of the item so specified. However, in certain Technical Specification sections, manufacturers are listed followed by “or equal”. In certain other Technical Specification sections, manufacturers are listed with “or equal” not included. In those items where “or equal” is not included, it is hereby added and understood to be included, even though not specifically stated in each Technical Specification. If a bidder chooses to submit a suggested “or equal” product in lieu of a product by one of the named manufacturers, Owner will evaluate the item to determine if it is an “equal”. The bidder is responsible for providing all data required to evaluate an item submitted as a suggested “or equal.” Owner’s decision on whether a suggested manufacturer is an “equal” is final. No claims for additional cost or time delay, etc. will be accepted if a suggested manufacturer is submitted by bidder as an “equal” and Owner decides the item is not “equal”.

Bidder must submit its list of suggested “or equal” items at time of Bid submission. No additional suggested “or equal” items will be considered after bid opening.

8. MINIMUM UNIT PRICE ITEMS. If the approximate quantity and a minimum unit price have been established for items in the bid form, the bidder may not bid a unit price less than the minimum value;

however, it may bid an amount greater than the minimum unit price. If no entry is made in the spaces provided, the minimum unit prices shown apply.

9. EXTRA UNIT PRICE ITEMS. Extra Unit Price Items are included to facilitate payment for changes and alterations that may be required to complete the Work. The Work, as provided by the Contract Documents, is described in bid items other than Extra Unit Price Items. When additional Work covered

4 of 7 APRIL 2026 by Extra Unit Price Items is performed, payment will be based on the quantity constructed and the unit prices entered in the Bid.

10. TIME FOR COMPLETION. Contractor will not be allowed time extensions (i) due to inclement weather except for Force Majeure events as defined under Section 1.01 of the General Conditions of the Contract; (ii) due to non-availability of equipment or material, when the principal units of Work and tasks on the critical path are not in progress or are not delayed by the event of delay, interference, disruption, or hindrance; (iii) when at least seven (7) hours of available working time remain out of the working day;

(iv) while materials are drying and it is possible for the Contractor to enclose the area and use drying devices; (v) when an event of delay, interference, disruption, or hindrance occurs on a day other than a working day or other day when the Contractor had not originally planned to work; (vi) when an event of delay, interference, disruption, or hindrance occurs after the expiration of the Contract Time; (vii) to the extent the Contractor could have anticipated or alleviated the impact of the event of delay, interference, disruption, or hindrance through reasonable efforts; (viii) when events of concurrent delay overlap the claimed delay; and/or (ix) when an extension of time is precluded by any provision of the Contract Documents.

11. QUALIFICATION OF BIDDERS. The apparent most qualified, responsible bidder must submit to Owner, with its Bid, either (i) a fully completed contractor’s statement of qualification or (ii) a written statement that the most recently submitted contractor’s statement of qualification is accurate, which statement of qualification must be considered in the award of the Contract. Failure to accurately complete the contractor’s statement of qualification or to timely submit the statement of qualification will, at Owner’s option, disqualify the bidder from consideration in the award of the Contract. The form of the Contractor’s statement of qualification is available from the Engineer. Owner may reject, at Owner’s sole discretion, a bidder’s statement of qualification if the bidder’s statement of qualification is not on the form provided. Evidence of out-of-state incorporation to conduct business in the state in which the Work is to be performed, along with state contractor license number, must also be provided and is a consideration in the award of the Contract.

12. MODIFICATION AND WITHDRAWAL OF BIDS. Bids may be modified or withdrawn by an appropriate document duly executed (in the manner that a Bid must be executed) and delivered in the same manner as Bids were submitted at any time prior to the opening of Bids. If, within twenty-four (24) hours after Bids are opened, any bidder files a duly signed, written notice with Owner and promptly thereafter demonstrates to the reasonable satisfaction of Owner that there was a material and substantial mistake in the preparation of its Bid despite the exercise of ordinary care, that bidder may withdraw its Bid and the Bid Security will be returned.

13. HOUSE BILL 1295. Provision of Texas Ethics Commission Form 1295 (“TEC Form 1295”) pursuant to Texas Government Code § 2252.908 (the “Interested Party Disclosure Act” or the “Act”): Unless bidder is exempt from such requirements pursuant to Texas Government Code Section 2252.908(c)(4), the Owner may not award the Contract to a bidder unless the bidder has provided to the Owner a completed and signed TEC Form 1295 which has been assigned a certificate number by the Texas Ethics Commission (the “TEC”). Pursuant to the rules prescribed by the TEC, the TEC Form 1295 must be completed online through the TEC’s website, assigned a certificate number, printed, signed, and provided to the Owner. For purposes of completing the TEC Form 1295, the entity’s name is HARRIS COUNTY MUNICIPAL UTILITY DISTRICT NO. 583; the contract ID number is 0909-172-00, Contract No. 1; and the description of goods and services is PAVING TO SERVE QUARRY ON GRANT SEC 1 AND LEFT TURN LANE AT QUARRY SPRINGS BOULEVARD. Neither the Owner nor its consultants have the ability to verify all of Contractor’s information included in a TEC Form 1295, and neither have an obligation nor undertake responsibility for advising any bidder with respect to the proper completion of the TEC Form 1295. BIDDERS SHOULD

5 of 7 APRIL 2026

SUBMIT THEIR TEC FORM 1295 WITH THEIR BID. THE CONTRACT WILL NOT BE AWARDED TO A BIDDER

UNLESS A TEC FORM 1295 HAS BEEN COMPLETED BY THE BIDDER.

14. AWARD OF CONTRACT. Owner reserves the right to reject any or all Bids, including without limitation the right to reject any or all nonconforming, non-responsive, unbalanced or conditional Bids and to reject the Bid of any bidder if Owner believes that it would not be in the best interest of the Project to make award to that bidder, whether because the Bid is not responsive or the bidder is unqualified or of doubtful financial ability or fails to meet any other pertinent standard or criteria of Owner. Owner also reserves the right to waive all informalities and defects in bidding, except time of submitting a Bid.

Discrepancies between the multiplication of units and unit prices in a Bid will be resolved in favor of the unit prices. Discrepancies between the indicated sum of any column of figures and the correct sum thereof will be resolved in favor of the correct sum if the correct sum is evident from the face of the Bid.

In evaluating Bids, Owner will consider, among other things, the qualifications of bidders, whether the Bids comply with the prescribed requirements, and such substitutions, alternates, unit prices and other data, as may be requested in the bid form or prior to the notice of award. Alternate bid items will not be considered unless requested in the bid form.

Owner may consider the qualifications and experience of subcontractors, suppliers, and other persons and organizations proposed for the Work. Owner also may consider the operating costs, maintenance requirements, performance data and guarantees of major items of materials and equipment proposed for incorporation in the Work.

Owner may conduct such investigations as Owner deems necessary to assist in the evaluation of any Bid and to establish the responsibility, qualifications and financial ability of bidders, proposed subcontractors, suppliers and other persons and organizations to perform and furnish the Work in accordance with the Contract Documents, to Owner’s satisfaction.

BY SUBMITTING A BID, EACH BIDDER AUTHORIZES OWNER TO PERFORM ALL INVESTIGATIONS INTO THE BIDDER’S BACKGROUND, CAPABILITIES, PRIOR EXPERIENCE, AND OTHER FACTORS PERTAINING TO BIDDER’S PERFORMANCE OF THE WORK, AS OWNER DEEMS NECESSARY IN ITS SOLE DISCRETION, AND FOR THAT PURPOSE, SUBMISSION OF A BID ACTS AS BIDDER’S SPECIFIC AUTHORIZATION TO PERSONS AND ENTITIES CONTACTED BY OWNER IN CONNECTION WITH SUCH INVESTIGATIONS TO PROVIDE OWNER WITH THE INFORMATION REQUESTED BY OWNER AND TO DISCUSS AND EXPRESS OPINIONS CONCERNING BIDDER. FURTHER, BY SUBMISSION OF A BID, BIDDER AGREES TO FULLY AND FOREVER WAIVE AND RELEASE ANY CLAIM (KNOWN OR UNKNOWN) IT HAS OR MAY HAVE AGAINST THE OWNER, ENGINEER, DEVELOPER AND THEIR RESPECTIVE ATTORNEYS, EMPLOYEES, CONSULTANTS, REPRESENTATIVES, AND AGENTS (“THE EVALUATING PARTIES”) ARISING OUT OF OR IN CONNECTION WITH THE: (1) ADMINISTRATION, EVALUATION, OR RECOMMENDATION (OR LACK THEREOF) OF ANY BID;

(2) WAIVER OF ANY REQUIREMENTS UNDER THE BID DOCUMENTS OR THE CONTRACT DOCUMENTS; AND

(3) ACCEPTANCE OR REJECTION OF ANY BIDS AND AWARD OF THE CONTRACT.

Owner reserves the right to award the Bid, at Owner’s discretion, based on the amount of the total base bid (without including “Extra Unit Price Items” or “alternate” bid items) or on the amount of the total amount bid (including “Extra Unit Price Items” or “alternate” bid items), or based on any other combination, means or method determined appropriate by Owner.

If the Contract is to be awarded, it will be awarded to the responsible bidder whose evaluation by Owner indicates that the award will be most advantageous to the Owner and result in the best and most economical completion of the Work.

6 of 7 APRIL 2026

If the Contract is to be awarded, Owner will give the successful bidder a notice of award within ninety

(90) days after the day of the Bid opening. All bidders must honor the Contract Price on their bid form, if the Contract is awarded within the timeframe provided herein. A Notice to Proceed will be issued within a reasonable period after the Contract Documents are fully executed.

Within seven (7) calendar days of receipt from the Owner of the notice of award, the successful bidder must submit to the Engineer the payment and performance bonds and all information or other items necessary to complete the Contract Documents, including the required insurance, anticipated construction schedule, and Contractor’s safety program. See SAFETY under Section 5.20 of the General Conditions of the Contract. The successful bidder must return the fully executed Contract Documents to Engineer within seven (7) calendar days of receipt, or Owner may at its sole discretion disqualify the Bid and accept another Bid and the bidder must, at Owner’s option, forfeit its Bid Security.

15. TAXES, LICENSES AND FEES. Certain taxes, licenses, fees, and other similar items are part of the cost of the Work, and it is bidder’s responsibility to familiarize itself with these costs and to observe and comply with the Laws and Regulations relating to same. The prices, sums, rates, and other charges set forth in the bidder’s Bid must cover and include all such costs. Owner is exempt from Texas sales and use taxes pursuant to Texas Tax Code § 151.309 as a political subdivision of the State of Texas. Owner shall provide Contractor, if requested by Contractor in writing, with a completed Texas Sales and Use Tax Exemption Certification as evidence of the applicability of such exemption, as limited by applicable statute. In addition, Contractor, and all subcontractors to Contractor (i) must not include any provision for Texas sales and use taxes with respect to such exempt items in any Bid or the Contract Price, and (ii) must pass on to the Owner cost savings due to the exempt status of such exempt items. Contractor’s contracts with all subcontractors to Contractor must include the foregoing provision regarding the exemption from Texas sales and use taxes. Contractor must pay taxes on items that are not exempt.

16. NUMBER OF SIGNED SETS OF DOCUMENTS. The Contract Documents will be prepared in at least two (2) original sets for signature, one (1) for delivery to the successful bidder. Owner will furnish the successful bidder six (6) sets of Plans and Technical Specifications free of charge, and additional sets may be obtained from Engineer at Engineer’s reproduction rates.

17. ELECTRONIC COUNTERPARTS; FORM OF BONDS TO BE PROVIDED TO OWNER. The Contract Documents may be executed and delivered in any number of counterparts, each of which so executed and delivered will be deemed to be an original and all of which will constitute one and the same instrument. Electronic Signatures, as defined by and in accordance with the Owner’s Order Adopting Electronic Signature Rules for Construction Contracts, will be deemed original signatures for purposes of the Contract Documents and all matters related thereto, with such Electronic Signatures having the same legal effect as physical, wet-ink signatures. Owner; Engineer; Contractor; and Developer, if there is a Special Conditions of the Contract Part B, agree that the Contract Documents may be accepted, executed, or agreed to using an Electronic Signature. Any document accepted, executed, or agreed to in conformity with such Order is binding on Owner, Engineer, Contractor, and Developer, if applicable, the same as if it were physically executed, and Owner, Engineer, Contractor, and Developer, if applicable, each hereby consent to the use of any third-party electronic signature capture service provider that may be chosen by Owner or Engineer. Notwithstanding the foregoing, all Bonds must be provided to Owner either as a physical, wet-ink original, or in the form of a certified and complete copy of such Bond, which may be provided to Owner in electronic form, such as a .pdf file.

18. INSURANCE. See section entitled “INSURANCE REQUIREMENTS” attached to and incorporated into the General Conditions of the Contract as Attachment A to the General Conditions of the Contract and Special Conditions of the Contract Part B, if attached.

https://www.lawinsider.com/clause/counterparts-and-electronic-signatures

7 of 7 APRIL 2026

19. SOILS REPORT. If a soils investigation has been made for this Project, the soils report and log of borings is available for bidder’s information only. The report is not a warranty of subsurface conditions, nor is it a part of the Contract Documents. Bidders are expected to examine the Site and such reports and then decide for themselves the soils or conditions that may be encountered.

Owner, Engineer, and Developer, if applicable, disclaim any responsibility for the accuracy, true location and extent of the surface and subsurface investigations that have been prepared by others. Owner, Engineer, and Developer, if applicable, further disclaim responsibility for interpretation of that data by bidder, e.g., projecting soil-bearing values, rock profiles, soil stability and the presence, level and extent of underground water or other underground facilities or utilities.

20. LABOR CLASSIFICATION AND MINIMUM WAGE SCALE.

(A) General: Chapter 2258 of the Texas Government Code provides that any political subdivision of the State of Texas shall determine the general prevailing wage rate received by the classes of workers employed on projects similar to this Project and shall specify in the call for bids and in the Contract Documents the minimum wage rates which must be paid for each type of worker. This statute further provides that the Contractor or subcontractors must pay, as penalty to Owner, Sixty Dollars ($60.00) for each worker employed for each calendar day or part of the day that the worker is paid less than the wage rates stipulated in the Contract. Owner is authorized to withhold from the Contractor the amount of this penalty from any payment due under the Contract Documents.

The statute likewise requires that the Contractor and subcontractors keep an accurate record of the names and occupations of all persons employed by them on the construction of the Project and to show the actual per diem wages paid to each worker. These records are open to the inspection of Owner.

(B) The minimum wage rates that apply to this Contract are specified in Attachment B to the General Conditions of the Contract. Contractor and subcontractors must review and ascertain such wage rates and pay at least such minimum rates.

21. ECONOMIC DISINCENTIVES. The Contractor and the Owner agree that time is of the essence of this Contract. The Contractor and the Owner agree that a breach of this Contract by failure to complete the Work in the specified time will cause harm to the Owner. Therefore, the Contractor and the Owner agree that for each and every calendar day the Work or any portion thereof shall remain uncompleted after the expiration of the time limit(s) set in the Contract, or as extended under the provisions of these General Conditions (including, without limitation, due to a delay caused by Contractor’s failure to comply with the Contract Documents or due to Owner’s termination of Contractor for default under the Contract Documents), Contractor shall be liable to Owner for economic disincentives under Section 49.271(e) of Texas Water Code, in the amount of $1,000 for each such calendar day. The Owner shall have the option to deduct and withhold said amount from any monies that the Owner owes the Contractor or its sureties or to recover such amount from the Contractor or the sureties on the Contractor’s bond.

Revised June, 2012

PROPOSAL TO

HARRIS COUNTY MUNICIPAL UTILITY DISTRICT NO. 583

FOR

PAVING TO SERVE QUARRY ON GRANT SEC 1 AND LEFT TURN LANE AT QUARRY SPRINGS BOULEVARD

Project No. 0909-172-00, Contract No. 1

The undersigned, as bidder, declares that the only person or parties interested in this proposal as principals are those named herein, that this proposal is made without collusion with any other person, firm or corporation; that he has carefully examined the form of contract, instructions to bidders, specifications and plans, and has carefully examined the locations, conditions, and classes of materials of the proposed work; and agrees that he will provide all the necessary labor, machinery, tools, apparatus, and other items incidental to construction, and will do all the work and furnish all the materials called for in the contract and specifications in the manner prescribed therein, and for the prices set forth in the attached bid sheets.

It is understood that the work to be done will be paid for at the bid unit price or bid lump sum price as hereinafter established for each item subject to the provisions of the General or Special Conditions governing increases or decreases of bid quantities.

It is further understood and agreed that the work is to be completed in full within _____ calendar days after notification to proceed, and that the undersigned proposes to begin work promptly after notification to proceed.

CONTRACTOR

Signature:____________________________________ Attest:

Printed Name:______________________________

______________________________ Date:_______________________________________

Address:_____________________________________

SEAL

Phone No. ___________________________________

(Certification if Bidder is a Corporation) Email Address:_________________________________

I,______________________________, certify that I am the secretary of the corporation herein termed CONTRACTOR; and that the person whose name appears above was and is _______________________________(TITLE) of said corporation; and that this Contract was duly signed for and in behalf of said corporation by authority of its governing body, and such contract is within the scope of its corporate powers.

Signed:______________________________________

(Corporate Seal)

BID SHEET

PAVING TO SERVE

QUARRY ON GRANT SEC 1 AND LEFT TURN LANE AT QUARRY SPRINGS BOULEVARD

HARRIS COUNTY, TEXAS

PROJECT NO. 0909-172-00, CONTRACT NO. 1

Item

No. Qty. Unit

Description of Item with

Unit Price Written in Words

Unit

Price

Total

Cost

EARTHWORK ITEMS (QUARRY ON GRANT SEC 1):

1 17.2 AC. Roadway and Lot Stripping Including On-site Stockpiling, equipment and labor, Complete in Place:

Per Acre

2 9,885 C.Y. Roadway and Lot Excavation, including on-site placement of suitable material, equipment and labor, Complete in Place:

Per Cubic Yard

3 51 LOT Grade lots in accordance with Lot Grading Plan, using Fill from Roadway Excavation and On-site Material as needed. Spread lot and roadway strippings on final graded lots, Complete in Place:

Per Lot

SUBTOTAL EARTHWORK ITEMS (QUARRY ON GRANT SEC 1): $

PAVING ITEMS (QUARRY ON GRANT SEC 1):

4 6,450 S.Y. Prepare and Stabilize 6" Subgrade, Including Equipment and Labor, Complete in Place:

Per Square Yard

Bid Sheet Must Be Initialed By Same Person As Proposal (_____) Page 1 of 9

Item

No. Qty. Unit

Description of Item with

Unit Price Written in Words

Unit

Price

Total

Cost

5 10,083 S.Y. Prepare and Stabilize 8" Subgrade, Including Equipment and Labor, Complete in Place:

Per Square Yard

6 206 TON Furnish Lime for Subgrade Stabilization, Including all Material, Complete in Place:

Per Ton

7 412 TON Furnish Fly Ash for Subgrade Stabilization, including all Material, Complete in Place:

Per Ton

8 6,114 S.Y. Furnish and Install 6-Inch Reinforced Concrete Pavement, including Reinforcing Steel, Concrete, Labor and Appurtenances, Complete in Place:

Per Square Yard

9 9,475 S.Y. Furnish and Install 7-Inch Reinforced Concrete Pavement, including Reinforcing Steel, Concrete, Labor and Appurtenances, Complete in Place:

Per Square Yard

10 2,235 L.F. Furnish and Install 4-Inch Concrete Curb, including Transitions, Reinforcing Steel, Concrete, Labor and Appurtenances, Complete in Place:

Per Linear Foot

Bid Sheet Must Be Initialed By Same Person As Proposal (_____) Page 2 of 9

Description of Item with

Unit Price Written in Words

Unit

Price

Total

Cost

11 6,260 L.F. Furnish and Install 6-Inch Reinforced Concrete Curb, including Reinforcing Steel, Concrete, Labor, and Appurtenances, Complete in Place:

Per Linear Foot

12 8 EA. Furnish and Install Wheel Chair Ramp per Plans and Specifications, Complete in Place:

Per Each

13 144 L.F. Furnish and Install Harris County Load Transfer Device, including reinforcing steel, concrete, labor, and appurtenances, Complete in Place:

Per Linear Foot

14 1 EA. Furnish and Install all Traffic Buttons and Roadway Striping, Complete in Place:

Per Each

15 9 EA. Furnish and Install Traffic and Street Signs, per Detail shown in plans, including all Material and Labor, Complete in Place:

Per Each

16 4 EA. Furnish and Install Standard City of Houston Type III Barricade, Complete in Place:

Per Each

Bid Sheet Must Be Initialed By Same Person As Proposal (_____) Page 3 of 9

Description of Item with

Unit Price Written in Words

Unit

Price

Total

Cost

17 611 S.Y. Furnish and Install Asphalt Driveway Including 2-Inch Type D HMAC, Tack Coat, and 10-Inch Type A Grade 2 - Flexible Base, on 6-Inch Lime Stabilized Sugrade, Labor, Equipment, and Materials, Complete in Place:

Per Square Yard

SUBTOTAL PAVING ITEMS (QUARRY ON GRANT SEC 1): $

EROSION CONTROL ITEMS (QUARRY ON GRANT SEC 1):

18 1 L.S. Pollution Prevention Implementation including Permitting, including submittal of NOI 7 days prior to start of construction and NOT using the TCEQ e-permitting system (STEERS), providing copy of the NOI and receipt of submittal to TCEQ, Inspections, and Reporting for all Pollution Prevention Measures, Complete in Place:

Per Lump Sum

SUBTOTAL EROSION CONTROL ITEMS (QUARRY ON GRANT SEC 1): $

MISCELLANEOUS ITEMS (QUARRY ON GRANT SEC 1):

19 2 DAY Dress Up After Dry Utilities, Complete in Place:

Per Day

SUBTOTAL MISCELLANEOUS ITEMS (QUARRY ON GRANT SEC 1): $

EXTRA WORK ITEMS (QUARRY ON GRANT SEC 1):

20 500 C.Y. Import, Place, and Compact Fill material for use in Lot Grading, Complete in Place:

Per Cubic Yard

($8.00 )*

21 300 C.Y. Furnish and Install Cement Stabilized Sand, Complete in Place:

Per Cubic Yard

($22.00 )*

Bid Sheet Must Be Initialed By Same Person As Proposal (_____) Page 4 of 9

Description of Item with

Unit Price Written in Words

Unit

Price

Total

Cost

22 500 C.Y. Furnish and Install Class "A" Concrete, Complete in Place:

Per Cubic Yard

($250.00 )*

23 3,000 LBS. Furnish and Install Reinforcing Steel; Complete in Place:

Per Pound

($0.50 )*

SUBTOTAL EXTRA WORK ITEMS (QUARRY ON GRANT SEC 1): $

EARTHWORK ITEMS (LEFT TURN LANE AT QUARRY SPRINGS BOULEVARD):

24 813 L.F. Regrade Roadside Ditch, Complete in Place:

Per Linear foot

25 1 L.S. Restore Roadside Ditch and All Disturbed Areas to Original Condition or Better, Including but not limited to Irrigation, Hydromulch Seeding, Sod and Water Trucks to Establish Growth for the Duration of the Contract, Complete in Place:

Per Lump Sum

SUBTOTAL EARTHWORK ITEMS (LEFT TURN LANE AT QUARRY SPRINGS BOULEVARD): $

PAVING ITEMS (LEFT TURN LANE AT QUARRY SPRINGS BOULEVARD):

26 1 L.S. Furnish and Install Roadway Striping Within Harris County Right-of-Way, Complete in Place:

Per Lump Sum

27 2,067 S.Y. Mill and Overlay Existing Asphalt Pavement, Complete in Place:

Per Square Yard

Bid Sheet Must Be Initialed By Same Person As Proposal (_____) Page 5 of 9

Description of Item with

Unit Price Written in Words

Unit

Price

Total

Cost

28 941 S.Y. Furnish and Install Asphalt Left Turn Lane Including 2- Inch Type D HMAC, Tack Coat, and 10-Inch Type A Grade 2 - Flexible Base on 6-Inch Lime Stabilized Subgrade, Labor, Equipment, and Materials, Complete in Place:

Per Square Yard

SUBTOTAL PAVING ITEMS (LEFT TURN LANE AT QUARRY SPRINGS BOULEVARD): $

EROSION CONTROL ITEMS (LEFT TURN LANE AT QUARRY SPRINGS BOULEVARD):

29 1 L.S. Pollution Prevention Implementation including Permitting, including submittal of NOI 7 days prior to start of construction and NOT using the TCEQ e-permitting system (STEERS), providing copy of the NOI and receipt of submittal to TCEQ, Inspections, and Reporting for all Pollution Prevention Measures, Complete in Place:

Per Lump Sum

SUBTOTAL EROSION CONTROL ITEMS (LEFT TURN LANE AT QUARRY SPRINGS BOULEVARD): $

MISCELLANEOUS ITEMS (LEFT TURN LANE AT QUARRY SPRINGS BOULEVARD):

30 142 L.F. Furnish and Install 24-Inch RCP, C-76 Class III Storm Sewer Culvert with 02317-03 bedding and backfill, Complete in Place:

Per Linear Foot

31 2 EA. Furnish and Install 6:1 Safety End Treatment on 24-Inch RCP Storm Sewer, Per Detail in Plans, Complete in Place:

Per Each

32 1 EA. Furnish and Install Standard City of Houston Type 'D' Inlet, Complete in Place:

Per Each

Bid Sheet Must Be Initialed By Same Person As Proposal (_____) Page 6 of 9

Description of Item with

Unit Price Written in Words

Unit

Price

Total

Cost

33 142 L.F. Furnish and Install Trench Safety System, Complete in Place:

Per Linear Foot

34 1 L.S. Haul, Spread, and Compact Suitable Excess Utility Spoil on Site at the Owner's Disposal Area as Described in Special Conditions to the Contract Part A, Including Stripping and Replacement of Topsoil, Complete in Place:

Per Lump Sum

SUBTOTAL MISCELLANEOUS ITEMS (LEFT TURN LANE AT QUARRY SPRINGS BOULEVARD): $

EXTRA WORK ITEMS (LEFT TURN LANE AT QUARRY SPRINGS BOULEVARD):

35 700 C.Y. Furnish and Install Cement Stabilized Sand, Complete in Place:

Per Cubic Yard

($22.00 )*

36 200 TON Furnish Lime for Subgrade Stabilization, Complete in Place:

Per Ton

($50.00 )*

SUBTOTAL EXTRA WORK ITEMS (LEFT TURN LANE AT QUARRY SPRINGS BOULEVARD): $

MISCELLANEOUS ITEMS:

37 1 L.S. Furnish Performance, Maintenance, and Payment Bonds in Accordance with the Contract Documents, Complete in Place:

Per Lump Sum

Bid Sheet Must Be Initialed By Same Person As Proposal (_____) Page 7 of 9

Description of Item with

Unit Price Written in Words

Unit

Price

Total

Cost

38 1 L.S. Construction Survey Services Provided by IDS Engineering Group, Complete in Place:

Per Lump Sum

@ $ $15,800.00 15,800.00

39 1 L.S. Furnish, Install, and Maintain Traffic Control Devices and Appurtenances in Accordance with Texas Manual of Uniform Traffic Control Devices (latest Edition) including all Material and Labor, Complete in Place:

Per Lump Sum

SUBTOTAL MISCELLANEOUS ITEMS: $

TOTAL AMOUNT: BASE BID

TOTAL AMOUNT FOR MATERIALS: BASE BID

TOTAL AMOUNT FOR SKILLS, LABOR, EQUIPMENT, ETC.: BASE BID

Bid Sheet Must Be Initialed By Same Person As Proposal (_____) Page 8 of 9

Description of Item with

Unit Price Written in Words

Unit

Price

Total

Cost

ALTERNATE BID ITEM (QUARRY ON GRANT SEC 1):

40 1 L.S. Haul Excess Roadway and Lot Excavation Spoil and Dispose Off-Site Legally, Complete in Place:

Per Lump Sum

SUBTOTAL ALTERNATE BID ITEM (QUARRY ON GRANT SEC 1): $

ALTERNATE BID ITEM (LEFT TURN LANE AT QUARRY SPRINGS BOULEVARD):

41 1 L.S. Haul Excess Utility Spoil and Dispose Off-Site Legally, Complete in Place:

Per Lump Sum

SUBTOTAL ALTERNATE BID ITEM (LEFT TURN LANE AT QUARRY SPRINGS BOULEVARD): $

The undersigned (Contractor) represents and warrants that (1) all tangible personal property identified as 'materials' in this Proposal will be incorporated into the Project, subject only to field adjustments as to quantities, (2) the prices of such material are exclusive of sales and use taxes, and (3) all sales and use taxes regarding tangible personal property not incorporated into the work are the sole responsibility of the Contractor and the Contractor has paid or will pay such taxes regarding such property.

Acknowledge Receipt of Addendum Nos. ____, ____, ____ (initial).

ALL BID PRICES SHALL INCLUDE ALL APPLICABLE SALES TAX.

*Minimum allowable bid price. Bidder may choose to quote a higher price.

Alternate Bid Item 40 replaces Base Bid Item No. 2 and Alternate Bid Item No. 41 replaces Base Bid Item No. 34. Total Alternate Bid shall be the Total Base Bid less bid amount for Base Bid Items No. 2 and 33 plus bid amount for Alternate Bid Items 40 and 41. This is a required bid item. Bid proposals which do not quote a price for this item will be considered unresponsive.

TOTAL AMOUNT: ALTERNATE BID

TOTAL AMOUNT FOR MATERIALS: ALTERNATE BID

TOTAL AMOUNT FOR SKILLS, LABOR, EQUIPMENT, ETC.: ALTERNATE BID

Bid Sheet Must Be Initialed By Same Person As Proposal (_____) Page 9 of 9

HARRIS COUNTY MUNICIPAL UTILITY DISTRICT NO. 583 CONTRACT

1 of 2 APRIL 2026

CONTRACT

STATE OF TEXAS }

COUNTY OF HARRIS }

THIS CONTRACT (“Contract”) is made and entered into effective as of the ____ day of ___________, 20__ (the “Effective Date”) by and between HARRIS COUNTY MUNICIPAL UTILITY DISTRICT NO. 583 (the “Owner”) c/o Allen Boone Humphries Robinson LLP, 3200 Southwest Freeway, Suite 2600, Houston, Texas 77027, of HARRIS COUNTY, Texas, and ____________________________, of the City of , County of ___, and State of _____________, hereinafter termed “Contractor.”

All capitalized terms used herein shall be given the meanings set forth in the General Conditions of the Contract. IDS Engineering Group shall be referred to herein as the “Engineer.”

For and in consideration of the mutual covenants hereinafter set forth, and under the conditions expressed in the Bonds bearing even date herewith, the Contractor and Owner hereby agree as follows:

Contractor shall commence and complete the Work generally described as follows:

PAVING TO SERVE QUARRY ON GRANT SEC 1 AND LEFT TURN LANE AT QUARRY SPRINGS BOULEVARD for HARRIS COUNTY MUNICIPAL UTILITY DISTRICT NO. 583, HARRIS COUNTY, Texas, according to those Plans and Technical Specifications prepared by Engineer in the initial Contract Price of $_______________ and all Extra Work in connection therewith, under the terms as stated in the Contract Documents, and, at Contractor’s own proper cost and expense, to furnish all the materials, supplies, machinery, equipment, tools, superintendence, labor, insurance, and other accessories and services necessary to complete the said Work, in accordance with the conditions and prices stated in the Bid attached hereto and in accordance with the Contract Documents. Contractor represents and warrants to the Owner that it has carefully examined this Contract and all Contract Documents and is thoroughly familiar therewith.

The Contractor hereby agrees to begin work within ten (10) calendar days after the written Notice to Proceed has been given by the Engineer. Contractor hereby also agrees to achieve Substantial Completion of the Work within _____ calendar days after the date of the written Notice to Proceed and to achieve Final Completion of the Work within 30 calendar days after Substantial Completion.

Owner agrees to pay Contractor for completion of the Work in accordance with the Contract Documents for the initial Contract Price of ______________________________ ($____________), plus or minus any increases or decreases to the initial Contract Price as provided by the Contract Documents.

Contractor will be paid in current funds for the performance of the Contract in accordance with the Bid submitted therefor, subject to additions and deductions as allowed by the Contract Documents and, if applicable, approved by Change Order under the Contract Documents, and to make payments on account

HARRIS COUNTY MUNICIPAL UTILITY DISTRICT NO. 583 CONTRACT

2 of 2 APRIL 2026 thereof as provided therein. If included as Special Conditions of the Contract Part B, the Developer shall act as “Owner” for the purposes of all payments.

IN WITNESS WHEREOF, the parties to these presents have executed this Contract on the Effective Date.

HARRIS COUNTY MUNICIPAL UTILITY DISTRICT NO. 583

Owner

By:

Name:

Title:

[CONTRACTOR]

Contractor

By:

Name:

Title:

ALL BIDDERS MUST SUBMIT THEIR TEC FORM 1295 WITH THEIR BID. THE OWNER WILL NOT AWARD THE CONTRACT WITHOUT THE COMPLETED TEC FORM 1295 NOTED IN THE INSTRUCTIONS TO BIDDERS.

The requirements of Subchapter J, Chapter 552, Government Code, may apply to this Contract and the Contractor agrees that the Contract can be terminated if the Contractor knowingly or intentionally fails to comply with a requirement of that subchapter.

HARRIS COUNTY MUNICIPAL UTILITY DISTRICT NO. 583 GENERAL CONDITIONS OF THE CONTRACT

Page 1 of 40 APRIL 2026

GENERAL CONDITIONS OF THE CONTRACT

TABLE OF CONTENTS

ARTICLE I. DEFINITIONS

ARTICLE II. CONTRACT DOCUMENTS

ARTICLE III. PRELIMINARY MATTERS

ARTICLE IV. SITE ACCESS/ CONDITIONS/ REFERENCE POINTS

ARTICLE V. CONTRACTOR’S RESPONSIBILITIES/INDEMNITIES

ARTICLE VI. ENGINEER’S STATUS DURING CONSTRUCTION

ARTICLE VII. EXTRA WORK/ CHANGE ORDERS/ CLAIMS

ARTICLE VIII. TESTS AND INSPECTIONS/ DEFECTIVE WORK/ WARRANTY

ARTICLE IX. MINIMUM WAGE RATE SCALE/PRICE FOR WORK/ PAYMENTS TO CONTRACTOR

ARTICLE X.

This is the start of the file's text. The full file is on GovTribe.