This is an Engineer's Specifications and Project Manual document for the City of La Porte, Texas, issued for competitive sealed proposals regarding the renovation of Fire Station One located at 125 S Third Street, La Porte, Texas 77571. The project scope encompasses comprehensive facility renovations including structural, mechanical, electrical, plumbing, HVAC, fire suppression, and interior finishes work. The project involves multiple divisions of work spanning general requirements, concrete, metals, carpentry, thermal and moisture protection, openings, finishes, specialties, equipment, furnishings, fire suppression, plumbing, HVAC, electrical, communications, and electronic safety systems. Proposals are due by 2:00 PM on Thursday, July 30, 2026, at the City of La Porte offices, with the proposal opening to occur publicly thereafter. The contract time for substantial completion is 240 calendar days from receipt of the Notice to Proceed. No bidders' conference date is specified in the documents. Site visits are encouraged, and prospective offerors must obtain complete sets of plans and project manuals from Joiner Architects, Inc. upon deposit of $150.00 per set.

The project budget is $2,500,000.00, with contract award based on a best-value evaluation incorporating multiple criteria: price (25 points), experience (25 points), quality and experience of proposed personnel (15 points), ability to close out projects timely (15 points), past performance (15 points), and other factors (5 points). All proposals must be accompanied by a proposal bond equal to 10 percent of the proposal amount, with performance and payment bonds each required at 100 percent of the contract sum upon award. The selected contractor must complete all bonding and insurance requirements within specified timeframes following notification of award. The prevailing wage rates of Texas apply to all work, and general contractors are required to submit contractor qualification statements (AIA Document A305), project team resumes, construction schedules, subcontractor lists, and various affidavits and certifications including non-discrimination, non-collusion, residency, conflict of interest questionnaires, and asbestos-free material affidavits with their proposals. The contract will be executed using the 2017 Edition of AIA Document A101 with AIA Document A201 General Conditions and Supplementary Conditions as specified herein.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FIRE STATION ONE

RENOVATIONS

CITY OF LA PORTE, TEXAS

LA PORTE, TEXAS

PROJECT MANUAL

JA Project No. 25009

09/02/26

ISSUE FOR BIDDING

09/02/26

FIRE STATION ONE RENOVATIONS

City of La Porte, Texas

September 2, 2026

JA Project No.: 25009

ISSUE FOR BIDDING

Consultants:

Matrix Structural Engineers Structural Engineer 5177 Richmond Avenue, Suite 670 (713) 664-0130 Houston, Texas 77056

DBR Engineering Consultants, Inc. MEPT Engineer 9990 Richmond Avenue, Suite 300 (713) 914-0888 Houston, Texas 77042

Joiner Architects Page TOC - 1 TABLE OF CONTENTS

FIRE STATION ONE RENOVATIONS City of La Porte, Texas

TABLE OF CONTENTS

PROCUREMENT AND CONTRACTING REQUIREMENTS GROUP

DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS

Document 00 00 01 – Title Page

Document 00 00 02 – Table of Contents

Document 00 11 19 – Request for Competitive Sealed Proposals

Document 00 21 16 – Instructions to Offerors

Document 00 21 17 - Proposal Submission Checklist

Document 00 42 12 – Competitive Sealed Proposal Form

Document 00 42 14.10 – Proposal Bond

Document 00 42 14.30 – Affidavit of Non-Discriminatory Employment

Document 00 42 14.40 – List of Subcontractors

Document 00 42 14.50 – Propose to Provide and Statement of Non-Collusion

Document 00 42 14.60 – Texas Residency Certificate Document 00 42 14.70 – Request for Taxpayer Identification Number

Document – 00 42 14.80 – Proposal Evaluation Waiver Document – 00 42 15.40 – Form HB 1295 Disclosure

Document – 00 42 15.70 – Proposer Offeror Conduct

Document 00 42 15.80 – Exceptions and Conditions of the Proposer

Document 00 42 16.10 – Conflict of Interest Questionnaire

Document 00 45 23 - Affidavit of Non-Asbestos, Lead, and PCB Use in Project (Project Close- Out)

Document 00 45 25 - Statutory Lien Waiver Forms

Joiner Architects Page TOC - 2 TABLE OF CONTENTS

Document 00 61 00 - Insurance and Bonds

Document 00 61 10 - Contract Documents

Document 00 61 13.13 – Texas Statutory Performance Bond

Document 00 61 13.16 – Texas Payment Bond

Document 00 72 00 - General Conditions

Document 00 73 00 - Supplementary Conditions

Document 00 73 43 - Prevailing Wage Rates

SPECIFICATIONS

DIVISION 01 - GENERAL REQUIREMENTS

Section 01 11 00 - Summary of Work

Section 01 13 00 - Mechanical and Electrical Coordination

Section 01 19 00 - Codes, Regulations and Standards

Section 01 20 00 - Project Meetings

Section 01 21 00 - Allowances

Section 01 25 00 - Applications for Payment

Section 01 26 00 - Contract Modification Procedures

Section 01 26 13 - Request for Interpretation

Section 01 29 00 – Payment Procedures

Section 01 29 73 – Schedule of Values

Section 01 31 00 - Project Management and Coordination

Section 01 31 06 – Coordination Drawings

Section 01 32 00 - Construction Progress Documentation

Section 01 33 00 - Submittal Procedures

Appendix A – Electronic Drawing File Transfer Agreement Form

Section 01 40 00 - Quality Requirements

Section 01 42 00 - Definitions and Abbreviations

Joiner Architects Page TOC - 3 TABLE OF CONTENTS

Section 01 42 10 - References

Section 01 45 00 - Testing Laboratory Services

Section 01 50 00 - Temporary Facilities and Controls

Section 01 60 00 - Product Requirements

Section 01 63 10 - Substitution Request Form

Section 01 71 23 - Field Engineering

Section 01 73 00 - Execution

Section 01 73 29 – Cutting & Patching

Section 01 74 00 - Warranties

Section 01 74 10 - Construction Waste Management and Disposal

Section 01 77 00 - Closeout Procedures

DIVISION 02 - EXISTING CONDITIONS – (Not Used)

DIVISION 03 - CONCRETE

Section 03 30 10 – Cast-In-Place Concrete

DIVISION 04 – MASONRY ( Not Used)

DIVISION 05 - METALS

Section 05 41 00 - Cold-Formed Metal Framing

Section 05 50 00 - Miscellaneous Metals

Section 05 51 33 – Metal Ladders

DIVISION 06 - WOOD, PLASTICS, AND COMPOSITES

Section 06 10 00 - Rough Carpentry

DIVISION 07 - THERMAL AND MOISTURE PROTECTION

Section 07 10 50 - Under-Slab Vapor Retarder

Section 07 13 10 - Shower Stall Waterproofing

Section 07 21 00 – Building Insulation

Section 07 27 20 - Self-Adhering Flexible Flashing

Section 07 63 00 –Roof Related Sheet Metal TPO

Joiner Architects Page TOC - 4 TABLE OF CONTENTS

Section 07 72 00 – Roof Accessories

Section 07 81 00 – Sprayed Fire Resistive Materials

Section 07 84 13 - Penetration Firestopping

Section 07 92 00 - Joint Sealants

DIVISION 08 - OPENINGS

Section 08 11 13 - Hollow Metal Doors and Frames

Section 08 14 16 – Flush Wood Doors

Section 08 31 00 - Access Doors

Section 08 71 00 - Door Hardware

Section 08 80 00 - Glazing

Section 08 83 00 - Mirrors

Section 08 91 00 - Metal Louvers

DIVISION 09 - FINISHES

Section 09 25 00 - Gypsum Board Assemblies

Section 09 30 13 - Ceramic Tiling

Section 09 51 13 - Acoustical Panel Ceilings

Section 09 65 13 – Resilient Base and Accessories

Section 09 65 19 – Resilient Tile Flooring

Section 09 79 50 - Concrete Floor Sealer

Section 09 91 00 - Painting

DIVISIONS 10 - SPECIALTIES

Section 10 21 13 – Toilet Compartments

Section 10 28 13 - Toilet Accessories

Section 10 43 00 – Exterior Signage

Section 10 44 00 - Interior Signage

Section 10 52 00 - Fire Protection Specialties

Joiner Architects Page TOC - 5 TABLE OF CONTENTS

DIVISIONS 11 THROUGH - EQUIPMENT

Section 11 23 26 – Commercial Laundry Equipment

Section 11 23 27 - Saunas

Section 11 30 00 - Residential Appliances

DIVISION 12 – FURNISHINGS

Section 12 30 00 - Manufactured Casework

Section 12 36 61 – Quartz Countertops

Section 12 49 40 – Window Shades

DIVISION 13 - SPECIAL CONSTRUCTION (Not Used)

DIVISION 14 - CONVEYING EQUIPMENT – (Not Used)

DIVISION 21 - FIRE SUPPRESSION

Section 21 00 00 – Fire Protection

Section 21 05 29 - Hangers and Supports for Fire Suppression Piping and Equipment

Section 21 13 13 - Wet Pipe Sprinkler System

DIVISION 22 - PLUMBING

Section 22 02 00 – Basic Materials and Methods for Plumbing

Section 22 03 00 – Plumbing Demolition for Remodeling

Section 22 05 16 - Expansion Fittings and Loops for Plumbing Piping

Section 22 05 29 - Hangers and Supports for Plumbing Piping and Equipment

Section 22 05 48 – Vibration and Seismic Controls for Plumbing Piping

Section 22 05 53 - Identification for Plumbing Piping Equipment

Section 22 07 16 – Plumbing Equipment Insulation

Section 22 07 19 - Plumbing Piping Insulation

Section 22 10 00 - Plumbing Piping

Joiner Architects Page TOC - 6 TABLE OF CONTENTS

Section 22 11 19 - Plumbing Specialties

Section 22 11 21 - Natural Gas Piping Systems

Section 22 30 00 - Plumbing Equipment

Section 22 40 00 - Plumbing Fixtures

DIVISION 23 - HEATING, VENTILATION, AND AIR CONDITIONING (HVAC)

Section 23 02 00 - Basic Materials and Methods

Section 23 03 00 – Mechanical Demolition for Remodeling

Section 23 05 13 – Common Motor Requirements for HVAC Equipment

Section 23 05 29 - Hangers and Supports for Piping and Equipment for HVAC

Section 23 05 48 - Vibration and Seismic Controls for HVAC Piping and Equipment

Section 23 05 53 – Identification for HVAC Piping and Equipment

Section 23 05 93 - Testing, Adjusting, and Balancing

Section 23 07 13 - Duct Insulation

Section 23 07 19 - HVAC Piping Insulation

Section 23 21 13 – Above Ground Hydronic Piping

Section 23 23 00 - Refrigerant Piping

Section 23 31 13 - Metal Ductwork

Section 23 33 00 - Ductwork Accessories

Section 23 34 00 - HVAC Fans

Section 23 37 13 - Air Distribution Devices

Section 23 37 23 – HVAC Gravity Ventilators

Section 23 41 00 - Air Filters

Section 23 74 33 – 100% Outside Air Rooftop Unit with Gas Heat

Section 23 81 26 – Split System Air Conditioners

Section 23 81 29 – Variable Refrigerant Flow HVAC Systems

DIVISIONS 24 AND 25 ( Not Used)

Joiner Architects Page TOC - 7 TABLE OF CONTENTS

DIVISION 26 - ELECTRICAL

Section 26 02 00 - Basic Materials and Methods

Section 26 03 00 – Demolition Work

Section 26 03 13 – Electrical Demolition for Remodeling

Section 26 05 19 - Wire, Cable, and Related Materials

Section 26 05 26 - Grounding

Section 26 05 33 - Raceways

Section 26 09 36 – Lighting Controls (Stand-Alone)

Section 26 27 26 - Wiring Devices

Section 26 28 16 - Safety and Disconnect Switches

Section 26 29 01 – Motors and Starters

Section 26 29 26 - Miscellaneous Electrical Controls and Wiring

Section 26 33 53 – Uninterruptible Power Supply (UPS) Section 26 51 19 - Lighting Fixtures (LED)

DIVISIONS 27 – COMMUNICATIONS

Section 27 02 00 – Basic Materials and Methods for Communication Systems

Section 27 05 28 – Pathways for Communications Systems

Section 27 05 43 – Underground Ducts and Raceways for Communications Systems

Section 27 15 00 – Communications Horizontal Cabling

DIVISIONS 28 - ELECTRONIC SAFETY AND SECURITY

Section 28 02 00 – Basic Materials and Methods for Safety and Security Systems

Section 28 05 00 – Basic Materials and Methods for Fire Alarm

Section 28 10 00 – Access Control System

Section 28 20 00 – Video Survellance System

Section 28 46 00 - Fire Alarm with Electronic Audio and Visual Devices

DIVISIONS 31 THROUGH 48 (Not Used)

END OF TABLE OF CONTENTS

Joiner Architects 00 11 19 - 1 REQUEST FOR

COMPETITIVE SEALED PROPOSALS

SECTION 00 11 19

REQUEST FOR COMPETITIVE SEALED

PROPOSALS

Competitive Sealed Proposals for the work identified below in accordance with Proposal Documents and addenda as may be issued prior to date of the proposal opening will be received by City of La Porte, Texas, until proposal closing date and time, as identified below. Proposals from Offerors will then be opened in public and read aloud.

OWNER: City of La Porte, Texas 604 W Fairmont Parkway La Porte, Texas 77571

Representative: Mr. Jameson Appel

PROJECT: Fire Station One Renovations

LOCATION: 125 S Third Street

BUDGET: The budget for this project is $2,500,000.00

PROPOSAL

DATE AND TIME: Thursday, July 30, 2026, 2:00 PM

LOCATION OF City of La Porte, Texas

PROPOSAL 604 W Fairmont Parkway OPENING: La Porte, Texas 77571

ARCHITECT: Joiner Architects, Inc.

700 Rockmead, Suite 265 Kingwood, Texas 77339

Qualified Offerors (General Contractors) may obtain two (2) sets of plans and Project Manuals at place identified below upon deposit of $150.00 per set with check made payable to Joiner Architects, Inc. The deposit will be refunded when the plans and Project manuals are returned promptly and in good condition.

Proposal documents may be obtained from the following address:

Joiner Architects, Inc.

700 Rockmead, Suite 265 Kingwood, Texas 77339

(281) 359-6401 Office Hours are 8:00 AM to 5:00 PM

FULL REFUND: Deposits will be returned provided all Contract Documents and addenda are returned to the Architect complete with all sheets bound in their original order within ten (10) days of proposal.

FORFEIT OF DEPOSIT: When the Documents are not returned under the conditions specified, none of the

Joiner Architects 00 11 19 - 2 REQUEST FOR

COMPETITIVE SEALED PROPOSALS

deposit will be returned. However, the Documents shall remain the property of the Owner and must be returned.

All proposals must be in the hands of the Owner no later than the time specified above. Please seal all proposals in duplicate in an envelope with the following information on the face of the envelope.

Fire Station One Renovations

Name of Offeror (General Contractor)

Attn: Mr. Jameson Appel

The Owner reserves the right to reject any and all proposals and to waive any irregularities in the Competitive Sealed Proposal process.

No proposal shall be withdrawn within 60 days after the proposal opening without the specific consent of the Owner.

PROPOSAL BOND: A Proposal Bond from a bonding company acceptable to the Owner or a certified check in an amount equal to 10% of the greatest amount proposal must accompany each Offeror’s proposal.

PAYMENT BOND AND PERFORMANCE BOND: A Payment Bond and Performance Bond, each in an amount equal to 100% of the Contract Sum conditioned upon the faithful performance of the Contract will be required.

Please note that all bonding companies presented must be acceptable to the Owner.

The prevailing rates of wages are the minimums that must be paid in conformance with all applicable laws of the State of Texas.

All Offerors submitting a proposal are encouraged to visit the site.

Subcontractors and Suppliers intending to submit proposals to General Construction Offerors are required to prepare their proposals based on a complete set of proposal documents. If after reviewing the complete set of proposal documents, Subcontractors and Supplier Offerors desire to purchase individual drawings and specification sections for their proposal convenience, they may do so by ordering the specific drawings and specifications directly from the reproduction company. Each Offeror purchasing a partial set of proposal documents is responsible for determining exactly which documents he requires and is responsible for all costs associated with printing and delivery.

Subcontractors and Suppliers exercising this option must agree to do so on the basis that 1) all documents shall be returned to the Architect, without refund, after submitting a proposal and 2) documents shall not be used on other construction projects. Successful Subcontractors and Supplier Offerors may retain their Proposal Documents until completion of the construction.

END OF SECTION 00 11 19

Joiner Architects 00 21 16 - 1 INSTRUCTIONS TO OFFERORS

SECTION 00 21 16

INSTRUCTIONS TO OFFERORS

1.1 QUALIFIED OFFERORS

A. Competitive Sealed Proposals will be accepted from qualified Offerors (General Contractors) only for the entire scope of work described in the Contract Documents. As a prerequisite to an Offeror’s qualifying for the award of contract on this work, the Offeror must complete each item of the Contractor’s Qualification Statement (AIA Document A305) and supplemental information per Section 1.4, I. The AIA Document A305 may be obtained from the Houston Chapter of the American Institute of Architects, 315 Capitol, Suite 120, Houston, Texas 77002, (713) 520-0155. In addition to the information contained in the AIA Document A305 form, Offerors shall also address the selection criteria issues listed under the paragraph below for Determination of Successful Respondent and Award of Contract. The AIA Document A305 and other requested information shall be submitted on with propopsal with three (3) copies, two (2) for the Owner and one (1) for the Architect. Qualification statements submitted by FAX transmission or email will not be accepted.

B. The primary purposes of the evaluation process will be to:

1. Gather information for the Owner’s evaluation procedure.

2. Enable the Owner and/or Architect to evaluate the Offeror’s qualifications.

C. After review of Proposals and Contractor’s qualifications evaluation, the Owner will make his decision and each Offeror will be notified once the Owner has approved the recommended Offeror.

D. In arriving at his opinion concerning the Offeror’s qualification, the Architect will use the same criteria that the Owner will use in determination of the successful Offeror as detailed hereinafter.

E. In the event a proposed Offeror fails to submit the specified Contractor’s Qualification Statement at time of receipt for Proposals, such noncompliance shall be considered by both the Owner and Architect as a negative factor in the determination of the successful Offeror.

1.2 OFFEROR’S PRESENTATION

A. Each Offeror by making his Proposal represents that:

1. He has read and understands the Proposal Documents and his Proposal is made in accordance therewith.

2. He has thoroughly familiarized themselves with Division 01 General Requirements as they are applicable to subsequent specification sections.

3. He has visited the site, has familiarized himself with the local conditions under which the work is to be performed and has correlated his observations with the requirements of the proposed Contract Documents.

4. He agrees to comply with the requirements of the following paragraph. Any Offeror who subsequently does not agree to comply with these requirements will automatically disqualify himself from proposing or receiving award of the contract.

B. He Agrees that:

1. Work on the project will begin immediately upon receipt of properly executed Notice to Proceed or properly executed contract.

2. Offeror will participate as a team member in cooperation with the Project Architect, Engineers, Joiner Architects 00 21 16 - 2 INSTRUCTIONS TO OFFERORS and Owner’s agents and/or consultants.

3. The Offeror will assign a competent superintendent, to the project, and that superintendent shall be maintained on the project for the duration of the project.

4. The Offeror will furnish and pay for a proposal bond in the amount of ten percent (10%) of the contract amount.

5. If awarded, the Offeror shall furnish and pay for a Performance Bond and a Payment Bond each in the full contract amount.

6. Offeror shall carry and keep in full force for the duration of the Project, insurance coverage for builder’s risk, workmen’s compensation, comprehensive general liability, and automobile liability as required by the General Conditions and/or Supplementary General Conditions of the Specifications.

7. Each Offeror by making his Proposal represents that his Proposal includes only material and equipment specified in the Proposal Documents and supplemented, if necessary, for a complete and operating system.

8. Where subcontract work is involved and where Acceptable Subcontractors are designated for particular sections or phases of the Work, each Offeror by making his Proposal represents that his Proposal includes only firms designated as Acceptable Subcontractors.

9. That no asbestos PCB’s or lead building materials shall be used, and that each Offeror (and sub-offeror or supplier submitting a proposal to on Offeror) shall submit an affidavit at Project Close-out stating that no asbestos, PCB’s or lead building materials has been used on the Project.

1.3 PROPOSAL DOCUMENTS

A. Proposal Documents include the Request for Competitive Sealed Proposals, Instructions to Offerors, the

Proposal Form, and the proposed Contract Documents, including any Addenda issued prior to receipt of proposals, and Owner required forms.

B. Contract Documents for the Work consist of the Owner-Contractor Agreement, the Conditions of the

Contract (General, Supplementary and other Conditions), the Drawings, the Specifications, and all Addenda issued prior to receipt of proposals.

1.4 PROPOSAL PROCEDURES

A. A proposal is invalid if it has not been received at the designated location prior to the time and date for receipt of proposals indicated in the Request for Competitive Sealed Proposals, or prior to any extension thereof issued to the Offerors by Addenda.

B. Prior to the receipt of Proposals, Addenda will be forwarded by the Architect and will be available for inspection wherever the proposal documents are kept available for that purpose.

C. Proposals will be received in duplicate only on the Owner’s Form of Proposal for the work as indicated by the Proposal Documents, filled in, and enclosed in a sealed envelope addressed as follows:

Name of Offeror (General Contractor)

Fire Station One Renovations

Attn: Mr. Jameson Appel

D. Each Base Proposal Form must be accompanied by Proposal Bond or Certified Check in the amount of 10% of the proposal.

Joiner Architects 00 21 16 - 3 INSTRUCTIONS TO OFFERORS

E. All proposals must be delivered sealed to the following address at or before the time and date set. Proposals will be received at no other place. If Proposal is sent by U.S. Mail, it must be sent Registered Mail.

City of La Porte, Texas 604 W Fairmont Parkway

La Porte, Texas 77571 F. A proposal may be withdrawn only upon request by the Offeror or his duly authorized representative, provided such request is received by the Owner at the place designated for receipt of proposals and prior to the time fixed for the opening of proposals. A withdrawal of a proposal shall not be effective unless a written confirmation of the withdrawal is received by the Owner at said place within 48 hours before the time fixed for the opening of proposals. The Proposal Bond will be returned with the proposals if withdrawn in accordance with the above. The withdrawal of a proposal does not prejudice the right of the Offeror to file a new proposal at the time and place stated. No proposal may be withdrawn after the time fixed for the opening of proposals for a period of 60 days.

G. The Proposal Form must be accompanied by resumes of the Offeror's proposed project team, including the superintendent and project manager.

H. The AIA Document A305 must be accompanied by a listing of the Offeror's projects of similar size and scope during the past five (5) years. The listing shall include the project name, address, building area, contract sum, contract date, contract completion date(s), substantial completion date(s}, Owner representative's name and telephone number, e-mail address, and the names of the Contractor's project staff assigned to the project. In addition, the General Contractor shall include in this submission the following information regarding the Contractor's Proposed Project Team (as applicable).

1. Name of the Proposed Project Executive.

2. Name of the Proposed Project Manager.

3. Names of Proposed Assistant Project Managers or Project Engineers.

4. Name of Proposed Project Superintendent.

5. Name of Proposed Assistant Project Superintendent.

6. Name of Proposed Field Engineer.

7. Names of any proposed project support staff.

8. The General Contractor shall include a resume of qualifications for each of the project personnel proposed.

9. In addition, include a written summary describing the roles each person will have on the project team and what percentage of time each person will dedicate to this project on a weekly basis. In addition, the contractor shall indicate where each staff member will office (onsite or main office).

I. The Proposal Form must be accompanied with a bar chart construction schedule for this project with projected milestone dates and respective phasing as described by the contract documents.

J. The Contract shall be awarded to the Contractor offering the "best value" to the Owner, in addition to the purchase price, based on the published selection criteria and on its ranking evaluation.

1.5 INTERPRETATION OF PROPOSAL DOCUMENTS

A. Offerors and sub-offerors requiring clarification or interpretation of the Proposal Documents shall make a written or verbal request which shall reach the Architect at least ten (10) days prior to the date for receipt of proposals.

B. Any interpretation, correction or change of the Proposal Documents will be made by Addendum.

Interpretations, corrections or changes of the Proposal Documents made in any other manner will not be binding.

Joiner Architects 00 21 16 - 4 INSTRUCTIONS TO OFFERORS

C. With submission of Proposal by Offerors, agrees to selection process as set forth by the Owner’s process.

1.6 SUBSTITUTIONS OF MATERIALS AND EQUIPMENT

A. The materials, products and equipment described in the Proposal Documents establish a standard of required function, dimension, appearance and quality to be met by any proposed substitution. The materials and equipment named in, and the procedures covered by these specifications have been selected as a standard because of quality, particular suitability or record of satisfactory performance. It is not intended to preclude the use of equal or better materials or equipment provided that same meets the requirements of the particular project and is approved in an addendum as a substitution prior to the submission of proposals.

B. No substitution will be considered prior to receipt of proposals. Each such request thereafter, shall include the name of the material or equipment for which it is to be substituted and a complete description of the proposed substitute including drawings, cuts, performance and test data and any other information necessary for an evaluation. The Architect’s decision of approval or disapproval of a proposed substitution shall be final.

1.7 REJECTION OF PROPOSALS

A. The owner shall have the right to reject any or all proposals and to reject a proposal not accompanied by any required proposal security, or by other data required by the Proposal Documents, or to reject a proposal which is in any way incomplete or irregular.

B. The Owner reserves the right to reject any or all proposals and to waive any formalities or irregularities and to make the award of the contract in the best interest of the Owner.

C. The Owner reserves the right to reject any proposal if the evidence submitted by, or investigation of, such Offeror fails to satisfy the Owner that such Offeror is properly qualified to carry out the obligations of the contract and to complete the Work therein. Award may be made to other that the low-dollar Offeror and given the one offering the “best value” to the Owner, in addition to the purchased price, based on the published selection criteria and on its ranking evaluation.

D. Do not submit voluntary alternates. The Owner reserves the right to reject any proposal which is accompanied by conditional or qualifying statements, or “voluntary alternates”.

1.8 INSURANCE

A. Each Offeror shall include in this proposal the complete cost and shall carry and keep in full force for the duration of the project, insurance coverage required under the General Conditions and Section 00 73 00 – Supplementary Conditions.

1.9 PERFORMANCE BOND AND PAYMENT BOND

A. Each Offeror shall include in this proposal the premium costs for 100% Performance Bond and 100% Payment Bond. These bonds shall cover the faithful performance of the contract and payment of all obligations arising hereunder in such form as the Owner. The selected Offeror shall deliver the required bonds to the Owner not later than the date of execution of the Contract.

1.10 PROPOSAL SECURITY

A. No proposal will be considered unless it is accompanied by a Certified or Cashier’s Check or Proposal

Joiner Architects 00 21 16 - 5 INSTRUCTIONS TO OFFERORS

Bond executed on the form attached. In either case the amount shall be not less than ten percent (10%) of the greatest amount proposed (considering alternates, if any). The proposal security shall insure the execution of the contract and the furnishing of an acceptable Performance Bond and Payment Bond by the successful Offeror within ten (10) days after notification of award to such Offeror and that this proposal will not be withdrawn within 60 days after date of opening of proposals without the consent of the Owner. Proposal Bond shall be prepared in the identical form of AIA Document A310 or Document 00 42 14.10 attached.

1.11 SUBMISSION OF POST PROPOSAL INFORMATION

A. The apparent Selected Offeror shall within three (3) days after proposals are received submit the following:

1. A designation of the work to be performed by the Offeror with his own forces.

2. An experience profile of the selected Offeror’s superintendent scheduled to work on this project.

In addition, the apparent selected Offeror shall cooperate with the Owner, supplying requested information to substantiate the qualifications of the superintendent. If, in the opinion of the Owner, the superintendent does not qualify, the Owner may request the submission of another superintendent and more information. The Owner reserves the right to reject the apparent selected Offeror if an acceptable superintendent is not presented.

B. The Selected Offeror shall within five (5) days thereafter submit the following:

1. A statement of costs for each major item of work included in the proposal as described in Section

01 29 00 - Payment Procedures for each section of specifications will be considered a major item of work and shall be shown as a separate cost item.

1.12 AWARD OF CONTRACT

A. The Offeror to whom the award is made will be promptly notified. If an Offeror (a) withdraws his proposal within 60 days after the date of time fixed for the opening of proposals in the Request for Competitive Sealed Proposals, or (b) fails or refuses to execute the Agreement, or other required forms within ten (10) days after the same are presented to him for signature, or (c) fails or refuses to furnish properly executed Performance Bond and Certification of Required Insurance within fifteen (15) calendar days of execution date of the Agreement, the Owner may award the Work to another Offeror or Offerors or may call for new proposals.

B. The Offeror will be required to (a) submit his Proposal and Proposal Bond, (b) execute Contract and

Performance and Payment Bonds, and (c) submit Certification of required insurances, all using the Owner’s own forms for such respective purposed.

C. Proposal Bond is forfeited if proposal is withdrawn after the proposal opening, or Contract Documents are not executed in accordance with the above.

1.13 NOTICE TO PROCEED

A. The Offeror shall not commence work under this Contract until he receives a properly executed contract or

Notice to Proceed.

1.14 COMPLETION TIME

A. Offerors shall familiarize themselves with the Owners requirements concerning the project schedule as described in Section 01 32 16 of this Project Manual.

Joiner Architects 00 21 16 - 6 INSTRUCTIONS TO OFFERORS

B. Having thoroughly familiarized himself with the conditions as they exist at the building site and acquainted him with the labor supply and the material market, the Offeror will state in his proposal that he agrees to be substantially complete with the Work by the date stated elsewhere.

C. It is therefore expressly agreed as a part of the consideration inducing the Owner to execute this contract that the Owner may deduct liquidated damages from the final payment made to the Contractor for each and every calendar day beyond the agreed date which the Contractor shall require for Substantial Completion of the Work included in this contract. It is expressly understood that the said sum per day is agreed upon as a fair estimate of the pecuniary damages which will be sustained by the Owner in the event that the Work is not completed within the agreed time, or within the legally extended time, if any, otherwise provided for herein. Said sum shall be considered as liquidated damages only and in no sense shall be considered a penalty, said damage being caused by additional compensation to personnel, for loss of interest on money and other miscellaneous increased costs, all of which are difficult of exact ascertainment. Also, any disruption of Owner’s use of the existing facilities or newly completed facilities will also be subject to liquidated damages. Refer to Document 00 73 00 - Supplementary Conditions for additional requirements.

Delays, disruption of use, failures to complete, and liquidated damages are fully described under Article

8.3 of the Supplementary Conditions. The definition of Substantial Completion is found in Article 9.8.1 of the AIA General Conditions and Supplementary Conditions bound herein.

1.15 AFFIDAVIT OF NON-DISCRIMINATORY EMPLOYMENT

A. The Offeror, and sub-offerors, shall agree to refrain from discrimination in terms and conditions of employment to the basis of race, color, religion, sex, or national origin, and agrees to take affirmative action as required by Federal Statutes and Rules and Regulations issued in order to maintain and insure non-discriminatory employment practices.

B. The Offerors must execute Document 00 42 14.30, Affidavit of Non-Discriminatory Employment and submit with Proposal. The sub-offerors shall execute Document 00 42 14.30, Affidavit of Non- Discriminatory Employment before commencing work on the Project. Offerors and sub-offerors who have not executed this document will not be eligible to work on this project.

1.16 LIST OF SUBCONTRACTORS

A. The Offeror shall supply a list of the following major subcontractors:

1. Masonry

2. Electrical

3. Roofing

4. Mechanical

5. Plumbing

6. Flooring

7. Low Voltage

8. Ceiling Systems

9. Gypsum Board

10. Any other prudent subcontractor

B. The Offeror must execute Section 00 42 14.40, List of Subcontractors and submit with their Proposal.

1.17 AFFIDAVIT OF NON-ASBESTOS, LEAD, AND PCB USE IN PROJECT

A. The use of any construction process or the installation of any asbestos, lead and PCB’s or material containing asbestos, lead and PCB’s is strictly prohibited for this Project.

Joiner Architects 00 21 16 - 7 INSTRUCTIONS TO OFFERORS

B. Prior to submitting a proposal, Offerors shall notify the Architect, in writing, of any materials in these specifications which are known to contain or are likely to contain asbestos, lead or PCB’s.

C. The Offeror, and sub-offerors shall agree to refrain from using products which are known to contain asbestos, lead, and PCB containing materials as applicable to the project. They shall also affirm that lead or lead bearing materials have not been incorporated into potable water systems, and that lead sheet flashing used in through roof plumbing penetration applications is the only lead on the Project.

D. The Selected Offeror (Contractor) must execute Document 00 45 23, Affidavit of Non-Asbestos, Lead, and PCB Use and submit at Project Closeout. The Subcontractors to the Contractor must execute Close-out Form, attached to Section 01 77 00, Closeout.

1.18 CONFLICT OF INTEREST QUESTIONNAIRE

A. According to Local Government Code, Chapter 176, a person or an agent of a person who contracts or seeks to contract for the sale or purchase of property, goods, or services with any government agency must file a completed Conflict of Interest Questionnaire with the records administrator of the local government not later than the seventh (7th) business day after the date that the person begins contract discussions or negotiations with the Owner or submits to the Owner an application, response to a request for proposals or bids, correspondence, or another writing related to a potential agreement with the Owner.

B. All Offeror’s and sub-offeror’s proposing to do work with the Owner must execute Document 00 42 16.10, Conflict of Interest Questionnaire and submit with proposal. This requirement will be waived if the offeror or sub-offeror has previously submitted such document to the Owner within the last year. In such case, provide written notification and attach to the Proposal.

1.19 PROPOSAL EVALUATION WAIVER

A. By submitting a proposal, each Offeror agrees to waive any claim it has or may have against the Owner and its respective employees, the program Manager and their respective employees, the Architect/Engineer and consultants, and their respective employees, arising out of or in connection with the administration, evaluation, or recommendation of any proposal; waiver of any requirements under the Proposal Documents, acceptance or rejection of any proposals; and award of the contract.

B. All Offeror’s must execute Document 00 42 14.80, Proposal Evaluation Waiver and submit with their

Proposal.

1.20 NON-COLLUSION AFFADAVIT

A. All Offeror’s must execute Document 00 42 14.50 Affidavit of Non-Collusion and submit with their

1.21 CERTIFICATE OF RESIDENCY

A. All Offeror’s must execute Document 00 42 14.60 Texas Certificate of Residency and submit with their

1.22 REQUEST FOR TAX PAYER IDENTIFICATION NUMBER

A. All Offeror’s must execute Document 00 42 14.70 Request for Tax Payer Identification Number and

Certification and submit with their Proposal.

1.23 AVAILABILITY OF MATERIALS AND SYSTEMS

Joiner Architects 00 21 16 - 8 INSTRUCTIONS TO OFFERORS

A. A serious effort has been made to select only materials that are systems that are readily available. As far as is known at proposal time all items are either available “off the shelf” or within a relatively short period of time. If during the proposal period, an Offeror becomes aware of an availability or delivery problem with any of the specified systems or material, he should notify the Architect immediately. The Architect will promptly explore possibilities for selecting other systems or materials which would circumvent the problem and notify Offerors of any changes in an addendum, otherwise it will be understood that only specified systems and materials that are readily available are included in the proposals.

1.24 DETERMINATION OF SUCCESSFUL RESPONDENT AND AWARD OF CONTRACT

A. In determining the Selected Offeror, the Owner will evaluate the information derived from the Offeror’s

(Contractor’s) Qualification Statement required herein, the information submitted on the Proposal Form, and other selection criteria including, but not limited to the following:

1. Price…………………………………..…………………………………………… 25 points

2. Experience…………………………………………………………………………. 25 points

(Experience in successful completion of projects of similar size and scope in the State of Texas)

3. Quality and Experience of Proposed Personnel………………………………… 15 points

4. Ability to Close-Out Projects in a Timely Manner ……………………………. 15 points

5. Past Performance…………………………………………………………………. 15 points

6. Other Factors………………………………………………………………………. 5 points

7. Total…………………………...…………………………………………………… 100 points

B. The Selection Committee consisting of Owner’s Representatives, architects, consultants and other staff will make an initial evaluation of the proposals. Its recommendation will be considered by the Owner.

The final decision-making authority on the proposals rests with the Owner. Decision-making authority has not been delegated to any person or entity other than the Owner.

C. By submitting a proposal, each Offeror agrees to waive any claim it has or may have against the Owner and its respective employees, the Architect/Engineer and consultants, and their respective employees, arising out of or in connection with the administration, evaluation, or recommendation of any proposal;

waiver of any requirements under the Proposal Documents, acceptance or rejection of any proposals;

and award of the contract.

D. The Owner will make such investigations as it deems necessary to determine the ability of the Offeror to perform the Work, and the Offeror shall furnish all such information and data for this purpose as may be requested. The Owner reserves the right to reject any proposal if the evidence submitted by, or investigation of, such Offeror fails to satisfy the Owner that such Offeror is properly qualified to carry out the obligations of the Contract and to complete the Work contemplated therein.

E. The Owner reserves the right to reject any or all proposals and to waive any formalities or irregularities and to make the award of the contract in the best interest of the Owner.

F. A decision regarding determination of the successful Offeror will be made by the Owner as soon as practical.

1.25 USE OF ASBESTOS FREE MATERIALS, PRODUCTS AND SYSTEMS

A. The Offeror is reminded to refer to the Paragraph above for requirements during the Proposal period and the following requirements during performance of the Work regarding the use of asbestos free materials, products and systems in the Project.

Joiner Architects 00 21 16 - 9 INSTRUCTIONS TO OFFERORS

1. Since many materials, products and systems are proprietary, it is not possible to know all of the materials or components which go into producing such material, product or system without the manufacturer divulging trade secrets or patent information. Every effort has been made to specify materials, products or systems, which either as an “off the shelf” material, products or system or as a custom material, product or system do not contain asbestos.

2. It is the Contractor’s responsibility to submit an affidavit from the manufacturer to ascertain that every material, product or system used in the Project does not contain asbestos. In the event the material, product or system is found to contain asbestos, the Contractor shall offer for the Architect’s consideration a substitution which he knows does not contain asbestos.

3. Even though a material, product or system is specified or a specification is based on a particular material, product or system, the Contractor will not be relieved from the responsibility to ascertain that materials, products and systems used in the Project do not contain asbestos. Under no circumstances shall a material, product or system which is known, suspected or found to contain asbestos be used on the Project.

4. If a material, product or system containing asbestos is used, the Contractor shall remove and replace the material, product or systems with one which is asbestos free at no additional expense to the Owner, including removal and replacement of other materials affected by the removal of the asbestos bearing material, product or system, i.e. gypsum wallboard removed, replaced, and repainted on account of insulation being removed, etc.

END OF SECTION 00 21 16

Joiner Architects 00 21 17 - 1 PROPOSAL SUBMISSION CHECKLIST

SECTION 00 21 17

PROPOSAL SUBMISSION CHECKLIST

The following items must be included in a sealed envelope for Base Proposal with the following information on the face of the envelope.

Name of Offeror

City of La Porte Fire Station One Renovations

ITEM 1: □ Document 00 42 12, Competitive Sealed Proposal Form

ITEM 2: □ Document 00 42 14.10, Proposal Bond

ITEM 3: □ Document 00 42 14.30, Affidavit of Non-Discriminatory Employment

ITEM 4: □ Document 00 42 14.40, List of Sub-Contractors

ITEM 5: □ Document 00 42 14.50, Statement of Non-Collusion

ITEM 6: □ Document 00 42 14.60, Texas Residency Certification

ITEM 7: □ Document 00 42 14.70, Request for Taxpayer Identification Number

ITEM 8: □ Document 00 42 14.80, Proposal Evaluation Waiver

ITEM 9: □ Document 00 42 15.40, Form HB 1295 Disclosure

ITEM 10: □ Document 00 42 15.70, Proposer/Offeror Conduct

ITEM 11: □ Document 00 42 15.80, Exceptions and Conditions of the Proposer

ITEM 12: □ Document 00 42 16.10, Conflict of Interest Questionnaire & Exhibit

END OF SECTION 00 21 17

Joiner Architects 00 42 12 - 1 COMPETITIVE SEALED

PROPOSAL FORM

DOCUMENT 00 42 12

COMPETITIVE SEALED PROPOSAL FORM – BASE PROPOSAL

CITY OF LA PORTE FIRE STATION ONE RENOVATIONS

Submitted by:

Date: Phone No.:

To: City of La Porte, Texas 604 W Fairmont Parkway

Having examined Proposal and Contract Documents prepared by Joiner Architects, Inc., dated July 1, 2026, and having examined site conditions, the undersigned proposes to furnish all labor, equipment and materials and perform all work for the completion of the above-named project for the sum indicated below.

In submitting his Proposal, the undersigned agrees to the following:

1. Hold proposal open for acceptance 60 days.

2. Accept right of Owner to reject any or all proposals, to waive formalities and to accept proposal which Owner considers most advantageous.

3. Enter into and execute the contract, if awarded, for the Proposal.

4. Complete work in accordance with the Contract Documents within the stipulated contract time.

5. By signing, the undersigned affirms that, to the best of his knowledge, the

Proposals have been arrived at independently and is submitted without collusion with anyone to obtain information or gain any favoritism that would in any way limit competition or give an unfair advantage over respondents in the award of this

I. PROPOSAL

Undersigned agrees to complete the Work for the lump sum amount of:

(Amount written in words governs)

(Amount in figures)

II. ALLOWANCES

Undersigned certifies that the specified allowances are included in the Base Proposal and agrees that unexpended balance of allowance sums will revert to Owner in the final settlement of the contract.

Joiner Architects 00 42 12 - 2 COMPETITIVE SEALED

III. CONTRACT TIME

Undersigned agrees to begin Work upon Notice to Proceed and be Substantially Complete within 240 days.

IV. ADDENDA

Undersigned acknowledges receipt of:

Addenda Number: Dated:

V. CHANGES IN THE WORK

Undersigned understands that changes in the work shall be performed in accordance with the Supplementary Conditions.

Joiner Architects 00 42 12 - 3 COMPETITIVE SEALED

VI. LIQUIDATED DAMAGES

Undersigned understands that liquidated damages as defined in the Supplementary Conditions will be included in the form of Agreement between Owner and Contractor and that the Contractor will be bound thereto.

Authorized Signature

Title (Seal, if a Corporation) State whether Corporation, Partnership or Individual Name of Contracting Firm

Address

Telephone

Date

END OF DOCUMENT 00 42 12

NOTE: THIS DOCUMENT MUST BE SUBMITTED BY 2:00 PM ON JULY 30, 2026

Joiner Architects 00 42 14.10 - 1 PROPOSAL BOND

DOCUMENT 00 42 14.10

PROPOSAL BOND

KNOW ALL MEN BY THESE PRESENTS, that we , as Principal, and , as Surety, are held and firmly bound unto City of La Porte, Texas, hereinafter called the Owner, in the penal sum of _____ Dollars ($ ) lawful money of the United States, for the payment of which sum well and truly to be made, we bind ourselves, our heirs, executors, administrators and successors jointly and severally, firmly by these presents.

THE CONDITION OF THIS OBLIGATION IS SUCH, that whereas the Principal has submitted the accompanying Proposal, dated , being for the Fire Station One Renovations, the kind and extent of work involved being set forth in detail in the proposed Contract Documents cites herein.

NOW THEREFORE, if the Principal shall not withdraw the accompanying proposal within 60 days after the date set for opening thereof, and shall within ten (10) days after the prescribed forms are presented to him for signature, enter into a written contract with the owner in accordance with the Proposal as accepted; and give Bond and good and sufficient surety for the faithful performance and proper fulfillment of such contract including payment of all persons supplying labor or materials therefore, or in the event of the withdrawal of said proposal within the period specified, or the failure to enter into such contract and give such bond within the time specified, if the Principal shall pay to the Owner the difference between the aggregate amount for which the Owner may enter into a contract for the same work with another Respondent; if the latter amount be in excess of the former, then the above obligation shall be void and of no effect, otherwise to remain in full force and virtue.

IN WITNESS WHEREOF, the above bonded parties have executed this instrument under their several seals this of , 2026, the name and Corporate Seal of each corporate party hereto affixed and these presents duly signed by its undersigned representatives, pursuant to authority of its governing body.

Business Address Individual Principal

Business Address Individual Principal

ATTEST:

Secretary President

BY:

Business Address Corporate Surety

ATTEST: BY:

END OF DOCUMENT 00 42 14.10

NOTE: THIS DOCUMENT MUST BE EXECUTED AND SUBMITTED WITH PROPOSAL

Joiner Architects 00 42 14.30 - 1 AFFIDAVIT OF NON-

DISCRIMINATORY EMPLOYMENT

DOCUMENT 00 42 14.30

AFFIDAVIT OF NON-DISCRIMINATORY EMPLOYMENT

AFFIDAVIT OF NON-DISCRIMINATORY EMPLOYMENT:

This company, Contractor, or Subcontractor agrees to refrain from discrimination in terms and conditions of employment on the basis of race, color, religion, sex, or national origin, and agrees to take affirmative action as required by Federal Statutes and rules and regulations issued pursuant thereto in order to maintain and insure non-discriminatory employment practices.

Company Authorized Representative (Print)

Signature Date

END OF DOCUMENT 00 42 14.30

Joiner Architects 00 42 14.40 - 1 LIST OF

SUBCONTRACTORS

DOCUMENT 00 42 14.40

LIST OF SUBCONTRACTORS

PROJECT: ARCHITECT:

Fire Station One Renovations Joiner Architects, Inc.

700 Rockmead, Suite 265 Kingwood, Texas 77339

ARCHITECT’S PROJECT NO. 25009

TO: {Contractor Name} DATE:

{Street} {City, State Zip}

List Subcontractors and others proposed to be employed on the above Project as required by the Proposal Documents

(To be filled out by the Contractor and returned to the Architect) Work/ Division Firm Address Phone Fax E-Mail Representative

(Provide additional sheets as required.)

END OF DOCUMENT 00 42 14.40

Joiner Architects 00 42 14.50 - 1 PROPOSE TO PROVIDE AND

STATEMENT OF NON-COLLUSION

DOCUMENT 00 42 14.50

PROPOSE TO PROVIDE AND STATEMENT OF NON-COLLUSION

PROPOSE TO PROVIDE AND STATEMENT OF NON-COLLUSION:

I/We propose to provide the merchandise and services proposed within this document and if awarded the proposal, do agree to abide by all conditions of the proposal. Furthermore, the undersigned affirms that they are truly authorized to execute this contract, that this company, corporation, firm, partnership or individual has not prepared this proposal in collusion with any other vendor, and that the contents of this proposal as to prices, terms or conditions of said proposal have not been communicated by the undersigned nor by an employee or agent to any other person engaged in this type of business prior to the official opening of this proposal.

END OF DOCUMENT 00 42 14.50

Joiner Architects 00 42 14.60 - 1 TEXAS RESIDENCY

CERTIFICATION

DOCUMENT 00 42 14.60

TEXAS RESIDENCY CERTIFICATION

TEXAS RESIDENCY CERTIFICATION:

In accordance with Article 601g. as adopted by the 1985 Texas Legislature, the following will apply.

The pertinent portion of the Act has been extracted and is as follows:

(A) Article 601g. State of Political Contracts for Construction, Supplies, Services, Bids by Nonresident, Section (a) in this Act:

(1) “Government agency of the state” means:

an incorporated city or town, a county, a public school district, a special-purpose district or authority, or a district, county, or justice of the peace court;

(2) “Non-resident bidder” means a bidder whose principal place of business is not in this state, but excludes a contractor whose ultimate parent company or majority owner has its principal place of business in this state.

(3) “Texas residential bidder” means a bidder whose principal place of business is in this state, and includes a contractor whose ultimate parent company or majority owner has its principal place of business in this state.

(B) The state or governmental agency of the state may not award a contract for general construction, improvements, services, or public works projects or purchase of supplies, material, or equipment to a nonresident bidder unless the non-residents bid is lower than the lowest bid submitted by a responsible Texas resident bidder by the same amount that a Texas resident bidder would be required to underbid the nonresident bidder to obtain a comparable contract in the state in which the non-resident’s principal place of business is located.

I certify that as defined in Article 601g. that:

COMPANY NAME:

Yes, I am a Texas Resident Bidder.

No, I am Non-resident bidder.

END…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .