This is an Invitation to Bid (ITB) document issued by the City of Bellevue Parks and Community Services Department for sediment removal services at Wilburton Pond located at 12400 Main Street, Bellevue, Washington. The City seeks a contractor to remove approximately 222 cubic yards of contaminated sediment from the pond to meet National Pollutant Discharge Elimination System (NPDES) requirements. Work includes dewatering using sump or sewage pumps, sediment removal via excavator, dump truck, and vactor truck, thermal treatment (incineration) of sediment identified as containing high lubricating oil content, construction fencing along the soccer field and school district boundaries, safety and construction signage, wattles for sediment control, and tree protection installation as required by permit. A pre-bid optional site meeting is scheduled for August 13, 2026 at 9:00 a.m. at Wilburton Hill Community Park, with attendance confirmation required via email to hwolfe@bellevuewa.gov. Bids must be submitted through the City's eProcurement Public Purchase portal (www.publicpurchase.com) no later than August 20, 2026 at 2:00 p.m. PST. Work shall be completed by September 30, 2026, with commencement contingent upon receipt of Notice to Proceed from the Project Manager. Award shall be made to the lowest responsive responsible bidder, with the successful contractor required to submit all contract documents within three business days of award.
The project manager's estimate is $125,000, with payment to be issued in one lump sum upon project completion. Prevailing wages as determined by the Washington Department of Labor and Industries are required under Chapter 39.12 RCW, with contractors responsible for obtaining prevailing wage rulings and filing Statements of Intent to Pay Prevailing Wages prior to contract payment. Performance bonds, payment bonds, and retainage are required; bid bonds are not required. The successful bidder must obtain a City of Bellevue business license and Certificate of Insurance with specified coverage prior to contract execution. No grant money is involved in this project. All permits have been obtained and approved, including Clearing and Grading Permit (GK) and Noise Permit, with copies and supporting documentation attached. Soil sample testing results, conducted by OnSite Environmental Inc. in July 2026, confirmed the presence of lube oil content (ranging from 410 to 1500 mg/kg) requiring thermal treatment, with no detectable gasoline range organics or BTEX compounds present. The City reserves the right to reject any and all bids and waive irregularities in the bidding process, with no bid withdrawal permitted for sixty days following the bid opening date.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
City of Bellevue Bellevue, WA 98004
Small Public Works Invitation to Bid (ITB) For Projects Estimated Between $50,001-$350,000
Request for Proposals Information:
ITQ#:
Bid Submittal Delivery Method Options:
There will NOT be a formal public bid opening following the Bid deadline. Bid results will be available on the City of
Bellevue website at www.bellevuewa.gov, under "Find", "Bids, RFPs and RFQs", "Solicitation Board" or BXWA.com.
Send Bid (Contractor accepts responsibility for delivery method) to: Bids must be submitted to the City's eProcurement Public Purchase portal no later than August 20, 2026 at 2:00 pm PST. To register for the Public Purchase portal, go to www.publicpurchase.com.
Project Name:
Site Location:
Date Issued:
Bids Accepted Until:
Project Information:
Project Manager Estimate:
Project Manager:
Department:
Phone#:
Cell Phone#:
Website:
Grant Money Involved:
26089
R26-14 NPDES Sediment Removal
Wilburton Pond
12400 Main St. Bellevue, WA 98005 8/6/2026
8/20/2026 @ 2:00 pm
$125,000.00
Heather Wolfe
587 - Parks Administration
425-452-4164
425-324-5705 www.bellevuewa.gov, No
Within 10 ft. of Olympic Pipeline? No
1. SHARED PROCUREMENT PORTAL: Notice is hereby given that the sealed bids will be received by the City of Bellevue until the date and time located above. At that time such bids will be opened, publicly read and tabulated for submission to the City Council at a future council meeting.
2. REJECTION OF BIDS: The City of Bellevue reserves the right to reject any and all Bids and to waive irregularities and informalities in the bidding process. No Bid may be withdrawn until sixty (60) days after the date and time set for the opening thereof.
3. TIME OF COMPLETION: Work under this contract shall begin with Notice to Proceed from the City. Work shall be completed by 9/30/2026.
4. SUBSTANTIAL COMPLETION: N/A.
5. PRE-BID OPTIONAL SITE-MEETING: The pre-bid site-meeting will be at Wilburton Hill Community Park , 12400 Main St. Bellevue, WA 98005 on 8/13/2026 at 9:00 am. Email hwolfe@bellevuewa.gov to confirm attendance.
6. NOTICE TO PROCEED: Contractor shall not begin work until Project Manager gives them a Notice to Proceed.
7. WORKING HOURS: Working hours shall be limited to comply with Bellevue City Code: Chap. 9.18 - Noise
Control, construction and related activities shall be limited to between the hours of and . Other time restrictions may apply to in-street activities during peak hours. Variations will be considered on a case by case basis and must be approved by the Project Manager.
8. BONDS & RETAINAGE: Bid Bond is NOT REQUIRED for this project. Performance bond, Payment bond and retainage are required on this project.
http://www.bellevuewa.gov/
9. PERMITTING:
10. SUPPLEMENTAL BIDDER RESPONSIBILITY CRITERIA: This criteria will apply to this project, and are included in
"Attachment A". In a timely manner, Bidders may request, in writing, that the City modify or not modify any or all of the supplemental criteria in its discretion. The City reserves the right to modify any or all of the supplemental criteria. The City shall issue an Addendum, prior to the Bid Due Date, should it modify the supplemental criteria. The City shall not modify the supplemental criteria after the Bid Due Date, therefore, Bidders are encouraged to discuss with the project manager immediately and before the Bid Due Date the relevancy of the supplemental bidder criteria.
The bidder determined to be not responsible, based on these supplemental criteria, may appeal the City's determination by providing additional information to the City within 2 business days following receipt of the City's written determination that the bidder was determined not responsible.
11. CODE OF CONDUCT POLICY ON COMPETITIVE SOLICITATIONS:
Definitions:
Solicitations: method of acquiring goods, services, and construction for public use in which offers are made to the City between two or more sources. Typical documents used by the City are titled: Invitation to Quote, Invitation to Bid, Request for Proposals, Request for Qualifications Request for Information, or any other method of obtaining competitive offers.
Blackout Period: The period between the time a solicitation is issued by the City and the time the City awards the contract.
Lobbying: The attempt to persuade or influence any City employees, officials, or representatives responsible for reviewing, evaluating, ranking or awarding the work or contract for goods or services for or against any solicitation; provided, however, that lobbying shall not include the submission of required materials in direct response to the solicitation according to the instructions to respondents in such solicitation.
Conduct of Participants: After the issuance of any solicitation, all bidders, proposers, contractors, consultants or individuals acting on their behalf are hereby prohibited from lobbying any City employee, official or representative at any time during the blackout period.
Sanctions: The City may reject the submittal of any bidder, proposer, contractor and/or consultant who violates the policy set forth herein.
12. BID AWARD: Award shall be to the lowest responsive responsible bidder. Awarded Contractor shall have
3 business days to submit all required contract documents to the Project Manager. Contract documents shall include original Bidder Qualification Certificate, original Title VI Affidavit, original Invitation to Bid Form, performance & payment bond, retainage, and Certificate of Insurance. Failure to return these documents within this time period may deem Contractor's Bid as Non-Responsive.
13. STANDARD SPECIFICATIONS AND PLANS: Also incorporated into the contract documents by reference are and work shall be in accordance with: City of Bellevue Parks & Community Services General Conditions (hereafter referred to as “Standard Specifications”).
The Standard Specifications, as modified or supplemented by the Special Provisions and General Provisions, governs all Work. Deletion, amendment, alteration, or addition to any subsection or portion of the Standard
Specifications shall pertain only to that particular portion of the section, and the balance of the section shall continue to be in force. Contractor shall obtain copies of these publications, at Contractor’s own expense.
Standard Specifications can be found at the following website: http://www.bellevuewa.gov/bid-invitations.htm
14. PREVAILING WAGES & BENEFIT CODE KEY: Per the requirements of Chapter 39.12 RCW, this project is subject
All permits have been take care of for this project. Copies of Permits and backup documentation attached to the Scope of Work.
http://www.bellevuewa.gov/bid-invitations.htm to prevailing wages. No worker, laborer, or mechanic employed in the performance of any part of this contract shall be paid less than the prevailing rate of wage as determined by the Industrial Statistician. The schedule of prevailing rates for this contract is attached hereto and by reference is made a part of this contract as though fully set forth herein; see Attachment C.
Prior to making any payments under this contract, the City must receive a certified copy of the “Statement of
Intent to pay Prevailing Wages on Public Works Contracts” from the Prime Contractor, all sub-Contractors, and lower tier Contractors, along with the Department of Labor and Industries.
It is the Contractor’s responsibility to obtain and file the statement. The Contractor shall be responsible for all filing fees. Each invoice shall include a signed statement that prevailing wages have been paid by the Prime
Contractor, all subcontractors, and all lower tier Contractors. Following the final acceptance of services rendered, the Contractor shall submit an approved “Affidavit of Wages Paid”, which must be certified by the
Industrial Statistician of the Department of Labor and Industries.
15. BID FORM: All Bids shall be submitted on the Bid Proposal Form enclosed herein.
16. BID PRICE: The Bid shall include everything necessary for the prosecution and completion of the Contract including, but not limited to, overhead, furnishing all material, labor, equipment and Subcontractors, and other facilities and all management, superintendent’s labor and service, except as may be provided otherwise in the Contract documents. In the event of a discrepancy between the unit price and the total price, the unit price will govern. The Bellevue tax rate shall prevail over any calculated tax provided on the Invitation to Bid Form. If tax is calculated improperly, Bellevue shall utilize the Bellevue tax rate and calculate accordingly.
Prices set forth in the Bid will be reviewed by the City for mathematical accuracy. The City reserves the right to correct mathematical errors or complete mathematical calculations that are obvious on the face of the Bid. In the event of a discrepancy between a unit price and the extended amount for a Bid item, the unit price will control. The prices, corrected for mathematical errors, shall be used as the amount of the Bid items for evaluation and award purposes.
17. NEW OR USED: All equipment utilized shall be of new manufacture, unless otherwise specifically stated or called for in the Bid Documents.
18. SIGNATURES: Bids shall be signed by one of the legally authorized officers of said corporation. If awarded the contract, the Contract shall also be so executed. If a Bid or Contract is signed by an agent, the agent shall provide satisfactory evidence of authority to sign as legal representative of Bidder, upon request of Bellevue. An authorized partner of a co-partnership may sign the contract, subject to the approval of the attorney, who may at his discretion, require each and every member of the co-partnership to sign the contract.
19. INCURRED COSTS: Bellevue is not liable in any way for any costs incurred by respondents in replying to this request.
20. PAYMENT: The Contractor shall be paid within 30 days following the City’s receipt, and approval, of a detailed invoice for services rendered. The invoice must state the Company Name, Project Name, Services Rendered, Dates Rendered, and Location of work billed.
21. WAC RULE 458-20-171 (when applicable): Building, repairing or improving streets, roads, etc., which are owned by the City of Bellevue and which are used primarily for foot or vehicular traffic. According to WAC 458- 20-171 (Rule 171) the City of Bellevue assumes that construction, repair and maintenance of roads, walkways, and bike paths located in a city-owned park are considered public road construction and therefore, not subject to retail sales tax. This includes all related maintenance services, lighting, signage, fencing, irrigation, handrails and landscaping.
22. MOBILIZATION: Mobilization, Traffic Control, Property Restoration, disposal, and all other incidental charges shall be included in the Invitation to Bid Form.
23. PROSECUTION AND PROGRESS: Upon receipt of the Notice to Proceed, the Contractor shall submit a schedule indicating the dates and duration’s when this work will take place. The Contractor shall notify the Project Manager in advance of starting work and before each work day thereafter.
24. NON-COLLUSION: Submittal and signature of a Bid swears that the Bid is genuine and not a sham or collusive, and not made in the interest of any person not named, and that the Contractor has not induced or solicited others to submit a sham offer, or to refrain from proposing.
25. NON-SEGREGATED FACILITIES: Contractor agrees that the company does not maintain or provide for employees any segregated facilities, and that the Contractor does not allow employees to perform services at any such facility. Contractors agree that a breach of this shall constitute a Contract violation.
26. BUSINESS REGISTRATION & TAXATION: The Contractor awarded this contract will be subject to City of Bellevue business registration and business taxation as presented in Chapter 4.02 and 4.08 of the Bellevue City Code.
Every business operating in the City of Bellevue must be registered with the City's Treasury & Tax Division and file business and occupation (B&O) tax returns. This includes businesses located in the City limits of Bellevue and those coming into Bellevue to do business. Questions may be directed to the City's Treasury & Tax Division at
(425) 452-6851.
27. REJECTION OF BIDS: The City of Bellevue reserves the right to reject any and all Bids and to waive irregularities and informalities in the bidding process. No bidder may withdraw their bid for a period of sixty (60) days after the date and time set for the opening thereof.
28. LEGAL FEES: In any lawsuit between the parties with respect to the matters covered by the agreement, the prevailing party will be entitled to receive its reasonable attorney's fees and cost incurred in the lawsuit, in addition to any other relief it may be awarded.
29. FORCE ACCOUNT - A force account is a line item in a bid, and in the estimate, that has a fixed dollar amount. The terms of the contract, or of a change order, may call for work or material to be paid for by force account. If so, then the objective is to reimburse the Contractor for all costs associated with the work, including cost of labor, small tools, supplies, equipment, specialized services, materials, applicable taxes and overhead and to include a profit commensurate with these costs. The items included within this line item can only be used when the work has been pre-authorized by the City. The force account is only an estimate and is not a guarantee that the City will actually execute or utilize any or all of the force account dollars. The most popular items to use for a force account, from the WSDOT Standard Specifications, are “property restoration”, “roadside cleanup”, and
“potholing”.
30. INVASIVE SPECIES MANAGEMENT: If this project includes work done around lakes, streams, stream banks, or wetlands, the following protocols will apply:
New Zealand mudsnails (Potamoprygus antipodarum) have been detected in streams within the City of
Bellevue. To prevent the spread of this invasive species in accordance with RCW 77.135 and 77.15.811, all stream projects shall meet the following requirements:
Contractors shall ensure that all equipment is clean and decontaminated of any potential invasive species prior and after working in Bellevue streams. Equipment with mud or debris shall not be allowed to be deployed.
Workers shall follow the procedures in the Washington Department of Fish and Wildlife Invasive Species
Management Protocols. Version 2 - November 2012.
All equipment shall be quarantined in an area where mud, debris, or water cannot be tracked into other streams or storm drainage catch basins.
All equipment shall be brushed or sprayed on-site so no invasive species can be dislodged during transport prior to full decontamination. The on-site cleaning shall occur in a way that mud, debris, or water cannot be tracked into other streams or storm drainage catch basins. All equipment shall be decontaminated at a site that drains to wastewater (such as a commercial car wash) prior to use in other stream projects.
Additional information regarding New Zealand mudsnails can be found at the Washington Department of Fish and Wildlife website at http://wdfw.wa.gov/ais/ .
31. PAYMENT OPTIONS: The City of Bellevue encourages our vendors and suppliers to enroll in one of two automated payment options to optimize payment efficiency and reduce fraud. Go to www.bellevuewa.gov under "Find", "Bids, RFPs and RFQs" then Payment Options to see the options for automated payments.
32. SCREENING & SECURITY: Certain areas within Bellevue facilities such as the 911 Dispatch Center, Data Centers, Police Operations, Utility reservoirs and Pump Stations all have some level of security required. Because of these security needs, Contractors may be required to pass a background check and be issued a City identification badge before they can start work. Background checks may include fingerprinting. Failure to submit to, and/or have enough staff qualified to do the work pass this background check, may result in the Contractor being considered "Non Responsive".
http://wdfw.wa.gov/ais/
BIDDER'S CHECKLIST
The first Five (5) forms listed below, provided herein, must be executed by ALL BIDDERS and submitted at due date and time. Not submitting these forms at time of due date and time may deem your Bid as non-responsive
BIDDER'S QUALIFICATION CERTIFICATE
To be completed, signed and submitted. The City reserves the right to check all statements and to judge the adequacy of the bidder's qualifications.
BIDDER’S AFFIDAVIT OF TITLE VI COMPLIANCE
To be completed, signed and submitted.
BIDDER'S EQUAL OPPORTUNITY REQUIREMENTS
To be completed, signed and submitted.
INVITATION TO BID FORM & CERTIFICATION OF COMPLIANCE WITH WAGE PAYMENT STATUTES
To be completed, signed and submitted. When applicable, the unit prices must be shown in the spaces provided.
Bidders must bid on all items contained in the Invitation to Bid Form. The omission or deletion of any bid item will be considered non-responsive and shall be cause for rejection of the bid.
The following forms, provided herein, to be completed by the SUCCESSFUL bidder after award.
CERTIFICATE OF INSURANCE
Successful bidder shall be required to obtain and submit a certificate of insurance with coverage as required in this Invitation to Bid.
CITY OF BELLEVUE BUSINESS LICENSE
Successful bidder shall be required to obtain a City of Bellevue business license.
SMALL PUBLIC WORK CONTRACT- Sample Attached To be signed by the successful bidder. When a project is under $20,000 and of low risk the Project Manager may choose to issue a PO in lieu of executing a small public work contract with successful bidder.
PAYMENT BOND
To be executed by the successful bidder and their surety.
PERFORMANCE BOND
To be executed by the successful bidder and their surety.
RETAINAGE AGREEMENT
To be executed by the successful bidder and their surety.
INVITATION TO BID FORM
R26-14 NPDES Sediment Removal Wilburton Pond
ALL BIDDERS MUST COMPLETE AND SUBMIT THIS FORM
COMPANY NAME:
PROJECT NAME: R26-14 NPDES Sediment Removal Wilburton Pond
ADDENDA ACKNOWLEDGED: , , , , ,
Line Item
Unit Description Qty Unit Unit Price Extended Price
1 Sediment Removal 1 lump sum
Sum of line items:
10.3% Sales Tax:
Subtotal:
(Do not add sales tax to the Force Account if Rule 171 applies) - Force Account: % of Subtotal:
Schedule A Total: (Subtotal + Force Account):
ITB 26089
INVITATION TO BID FORM (Continued)
R26-14 NPDES Sediment Removal Wilburton Pond
Pursuant to and in compliance with your Invitation to Bid Form, and all other documents relating thereto, the undersigned hereby certifies that Contractor has examined the location(s) for the construction of in Bellevue, Washington, and that Contractor has read and thoroughly understands the terms of the contract and the cost to complete work at the place where the work is to be done, and that Contractor proposes and agrees to perform the contract, within the time stipulated, including all of its component parts, and to provide and furnish any and all labor, materials, tools, expendable equipment, intents and affidavits of prevailing wages paid, utility and transportation services necessary to perform the complete contract, in a workmanlike manner, and as required by and in strict conformance with the Standard Specifications, Addenda and Plans.
The Invitation to Bid Form must be signed.
Use ink and print legibly.
Unit prices are mandatory and shall control.
Initial and date any changes, erasures or cross-outs.
All Bidders must complete and submit this form
CERTIFICATION OF COMPLIANCE WITH WAGE PAYMENT STATUTES
The bidder hereby certifies that, within the three-year period immediately preceding the bid solicitation date, the bidder is not a “willful” violator, as defined in RCW 49.48.082, of any provision of chapters 49.46, 49.48, or 49.52 RCW, as determined by a final and binding citation and notice of assessment issued by the Department of Labor and Industries or through a civil judgment entered by a court of limited or general jurisdiction.
I certify under penalty of perjury under the laws of the State of Washington that the foregoing is true and correct.
Bidder’s Business Name
Signature of Authorized Official*
Printed Name
Title
Date City State
Check One:
Sole Proprietorship☐ Partnership ☐ Joint Venture ☐ Corporation ☐
State of Incorporation, or if not a corporation, State where business entity was formed:
If a co-partnership, give firm name under which business is transacted:
* If a corporation, proposal must be executed in the corporate name by the president or vice-president (or any other corporate officer accompanied by evidence of authority to sign). If a co-partnership, proposal must be executed by a partner.
Address:
Telephone:
Email:
Washington State Contractor License #:
Required prior to bid pursuant to RCW 18.27
City of Bellevue License #:
BIDDER'S QUALIFICATION CERTIFICATE
The undersigned hereby certifies and submits the following qualifications:
l. Name and Address
State of Washington Registration
2. UBI # Expires: / / mo day yr
3. Number of years in contracting business under present name:
4. City of Bellevue Business License # (required prior to start of contract).
5. Company Federal ID #.
6. State of Washington Contractor’s License #:
Required prior to bid pursuant to RCW 18.27
7. Particular types of construction work performed by your company:
8. List several recent construction projects performed:
Amount Type Owner Name Phone
9. Gross amount of contracts now in hand $
10. Bank Reference(s):
Name Address Account Type
By: Title:
(Authorized Signature)
11. Choose one of the following:
Bidder has industrial insurance coverage for employees working in Washington as required in Title 51
RCW: or
Bidder is not required to have industrial insurance coverage for employees working in Washington as required in Title 51 RCW:
12. Choose one of the following:
Bidder’s Washington Employment Security Department registration number is:
Bidder is not required to register with the Washington Employment Security Department pursuant to Title 50 RCW.
13. Choose one of the following:
Bidder’s Washington State Department of Revenue registration number is : ; or
Bidder is not required to register with the Washington State Department of Revenue pursuant to Title
82 RCW:
14. Bidder is not disqualified from bidding on any public works contact under RCW 39.06.010 or under RCW 36.12.065.
15. Bidder does not have a civil judgement entered by a court of limited or general jurisdiction of a willful violation, as defined by RCW 49.48.082, any provision of chapter 49.46, 49.48, or 49.52 RCW and no final and binding citation and notice of assessment issued by the Department of Labor and Industries (L&I).
16. Effective July 1, 2019: Bidder has received training, provided by the Department of Labor and Industries or by a provider whose curriculum has been approved by L&I, on the requirements related to public works and prevailing wages. However, bidders that have completed three or more public works projects and maintained a valid business license in Washington for at least three years are exempt from this requirement.
I am the (title of Bidder), have authority to bind Bidder, am over the age of 18 and have personal knowledge of the facts set forth above.
Dated this day of , 20 at
(City), Washington.
By:
Authorized Signature
Printed Name
CONTRACTOR SIGNATURE
All Bidders Must Complete and Sign In The Space Provided Above And Submit This Form.
AFFIDAVIT OF TITLE VI COMPLIANCE
TITLE VI - NON-DISCRIMINATION IN FEDERALLY ASSISTED PROGRAMS:
SEC. 601. No person in the United States shall, on the ground of race, color, or national origin, be excluded from participation in, be denied the benefits of, or be subjected to discrimination under any program or activity receiving Federal financial assistance.
SEC. 602. Each Federal department and agency which is empowered to extend Federal financial assistance to any program or activity, by way of grant, loan, or contract other than a contract of insurance or guaranty, is authorized and directed to effectuate the provisions of section 601 with respect to such program or activity by issuing rules, regulations, or orders of general applicability which shall be consistent with achievement of the objectives of the statute authorizing the financial assistance in connection with which the action is taken. No such rule, regulation, or order shall become effective unless and until approved by the President. Compliance with any requirement adopted pursuant to this section may be effected (1) by the termination of or refusal to grant or to continue assistance under such program or activity to any recipient as to whom there has been an express finding on the record, after opportunity for hearing, of a failure to comply with such requirement, but such termination or refusal shall be limited to the particular political entity, or part thereof, or other recipient as to whom such a finding has been made and, shall be limited in its effect to the particular program, or part thereof, in which such non-compliance has been so found, or (2) by any other means authorized by law:
Provided, however, That no such action shall be taken until the department or agency concerned has advised the appropriate person or persons of the failure to comply with the requirement and has determined that compliance cannot be secured by voluntary means. In the case of any action terminating, or refusing to grant or continue, assistance because of failure to comply with a requirement imposed pursuant to this section, the head of the federal department or agency shall file with the committees of the House and Senate having legislative jurisdiction over the program or activity involved a full written report of the circumstances and the grounds for such action. No such action shall become effective until thirty days have elapsed after the filing of such report.
SEC. 603. Any department or agency action taken pursuant to section 602 shall be subject to such judicial review as may otherwise be provided by law for similar action taken by such department or agency on other grounds. In the case of action, not otherwise subject to judicial review, terminating or refusing to grant or to continue financial assistance upon a finding of failure to comply with any requirement imposed pursuant to section 602, any person aggrieved (including any State or political subdivision thereof and any agency of either) may obtain judicial review of such action in accordance with section 10 of the Administrative Procedure Act, and such action shall not be deemed committed to unreviewable agency discretion within the meaning of that section.
SEC. 604. Nothing contained in this title shall be construed to authorize action under this title by any department or agency with respect to any employment practice of any employer, employment agency, or labor organization except where a primary objective of the Federal financial assistance is to provide employment.
SEC. 605. Nothing in this title shall add to or detract from any existing authority with respect to any program or activity under which Federal financial assistance is extended by way of a contract of insurance or guaranty.
PART 1 – TITLE VI PROCEDURAL INFORMATION
1. APPLICATIONS: The following materials pertain to the regulations relative to nondiscrimination of Federally assisted programs of the Department of Transportation, Title 49, Code of Federal Regulations, part 21, and as may be requested by the City. All contractors, subcontractors, consultants, suppliers and manufacturers who contract with the City must Comply with these requirements.
2. AFFIDAVIT: Before being considered for a contract, all contractors, etc. will be required to submit the Affidavit of Title VI Compliance as part of their proposal or upon request of the Procurement Services Manager.
3. COMPLIANCE: The City of Bellevue reserves the right to randomly select contractors, subcontractors, consultants, vendors or suppliers to be audited for compliance of the requirements listed. During this audit.
The contractors, etc. will be asked for a specific demonstration of compliance with the requirements.
4. NON-COMPLIANCE: A finding of non-compliance may be considered a breach of contract and suspension or termination of a contract may follow.
5. CITY CONTACT: The City’s Compliance Officer is the Procurement Services Manager, and specific questions pertaining to this section may be directed to the Procurement Services Manager at (425) 452-7876.
PART 2 – ASSURANCES FOR CONSULTANTS, CONTRACTORS, SUBCONTRACTORS, SUPPLIERS AND MANUFACTURERS
1. COMPLIANCE WITH REGULATIONS: The contractor shall comply with the Regulations relative to nondiscrimination in Federally assisted programs of the Department of Transportation (hereinafter DOT), Title
49, Code of Federal Regulations, part 21, as they may be amended from time to time, (hereinafter referred to as
Regulations), which are herein incorporated by reference and made part of this contract.
2. NONDISCRIMINATION: The contractor, with regard to the work performed during the contract, shall not discriminate on the grounds of race, color, sex, or national origin in the selection and retention of subcontractors, including procurement of materials and leases of equipment. The contractor shall not participate either directly or indirectly in the discrimination prohibited by Section 21.5 of the Regulations, including employment practices when the contract covers a program, set forth in Appendix B of the Regulations.
3. SOLICITATION FOR SUBCONTRACTORS, INCLUDING PROCUREMENT OF MATERIALS AND EQUIPMENT: In all solicitations either by competitive bidding or negotiations made by the contractor for the work to be performed under a subcontract, including procurement of materials or leases of equipment, each potential subcontractor or supplier shall be notified by the contractor’s obligations under this contract and the Regulations relative to the nondiscrimination on the ground of race, color, sex, or national origin.
4. INFORMATION AND REPORTS: The contractor shall provide all information and reports required by the
Regulations or directives issued pursuant thereto, and shall permit access to its books, records, accounts, other sources of information, and its facilities as may be determined by the City of Bellevue or the Washington State
Department of Transportation to be pertinent to ascertain compliance with such Regulations, orders and instructions. Where any information required of a contractor is an exclusive possession of another who fails or refuses to furnish this information, the contractor shall so certify to the City of Bellevue or the Washington State
Department of Transportation as appropriate, and shall set forth what efforts it has made to obtain the information.
5. SANCTIONS FOR NONCOMPLIANCES: In the event of the contractor’s noncompliance with the nondiscrimination provisions of this contract, the City of Bellevue and the Washington State Department of
Transportation shall impose such contract sanctions as it, or the Federal Highway Administration may determine to be appropriate, including, but not limited to:
a. Withholding of payments to the contractor under the contract until contractor complies, and/or;
b. Cancellation, termination, or suspension of the contract, in whole or in part.
6. INCORPORATION OF PROVISIONS: The contractor shall include in provisions of paragraphs (1) through (6) in every subcontract, including procurement of materials and leases of equipment, unless exempt by the
Regulations, or directives issued pursuant thereto. The contractor shall take such action with respect to any subcontractor or procurement as the City of Bellevue or the U.S. Department of Transportation, Federal
Highway Administration, may direct as a means of enforcing such provisions including sanctions for noncompliance. Provided, however, that in the event a contractor becomes involved in, or is threatened with, litigation with a subcontractor or supplier as a result of such direction, the contractor may request the City of
Bellevue enter into such litigation to protect the interests of the City and, in addition, the contractor may request the United States to enter into such litigation to protect the interests of the United States.
The Contractor hereby certifies that during the performance of this contract it agrees to comply with these assurances.
By:
Title:
Date:
(Authorized Signature)
END, AFFIDAVIT OF TITLE VI COMPLIANCE
EQUAL OPPORTUNITY REQUIREMENTS
General Instructions:
Applications: The following materials pertain to the Equal Opportunity Requirements of the City of Bellevue as set forth in Chapter 4.28.170 of the Bellevue City Code. All contractors, subcontractors, consultants, vendors and suppliers who contract with the City in a total amount of thirty-five thousand or more within any given year must comply with these requirements.
Affidavit: Before being considered for a contract of the magnitude listed above, all contractors will be required to submit the “Affidavit of Equal Opportunity Compliance” as part of their proposal/qualifications or upon the request of the Procurement Services Division.
Compliance: The City of Bellevue reserves the right to randomly select contractors, subcontractors, consultants, vendors or suppliers to be audited for compliance of the requirements listed. During this audit, the contractors, etc. will be asked for a specific demonstration of compliance with the requirements.
Noncompliance: A finding of a noncompliance may be considered a breach of contract and suspension or termination of the contract may follow.
City contact: The City’s Compliance Officer is the Procurement Services Division, and specific questions pertaining to this section may be directed to the Procurement Services Division at (425) 452-7876.
Bellevue City Code Excerpt:
Section 4.28.170 of the Bellevue City Code establishes the requirements for all contractual service providers:
“All contractors, subcontractors, consultants, vendors and suppliers who contract with the City of Bellevue in a total amount of thirty-five thousand or more within any given year, or as requested by the City, are required to take affirmative action and comply with the following requirements of this section. There shall be included in any contract between such contractual services provider and the City of Bellevue the following provisions:
1. Contractor shall make specific and constant recruitment efforts with minority and women’s organizations, schools, and training institutions. This shall be done by notifying relevant minority and women’s organizations.
2. Contractor shall seek out eligible minority and women contractors to receive subcontract awards. Appropriate minority and women contractors shall be notified in writing of any bids advertised for subcontract work.
3. Contractor shall provide a written statement to all new employees and subcontractors indicating commitment as an equal opportunity employer and the steps taken to equal treatment of all persons.
4. Contractor shall actively consider for promotion and advancement available minorities and women.
5. Contractor is encouraged to make specific efforts to encourage present minority and women employees to help recruit qualified members of protected groups.
6. Contractor is encouraged to provide traditional and nontraditional employment opportunities to female and minority youth through after school and summer employment.
7. Contractor is encouraged to assist in developing the skills of minorities and women by providing or sponsoring training programs.
Willful disregard of the City’s nondiscrimination and affirmative action requirements shall be considered breach of contract and suspension or termination of all or part of the contract may follow.
All contractors, subcontractors, vendors, consultants or suppliers of the City required to take affirmative action must sign the affidavit of compliance and submit with the bid proposal or upon the request of the Procurement Services Division. All documents related to compliance steps listed above shall be presented upon the request of the Procurement Services Division. The Procurement Services Manager shall serve as the compliance officer for the city and is authorized to develop and issue procedures for the administration of this section.”
Interpretations:
In order to more readily determine compliance with BCC 4.28.170, the following interpretations are provided:
Requirement 1. When a contractor needs to recruit, they must notify minority and women’s organizations, schools and training institutions. Such “notification” can be in the form of an advertisement in newspapers or trade journals of general circulation in the metropolitan Seattle area.
When the contractor hires through a union hiring hall, the contractor must be able to provide confirmation, upon request by the City, that the hiring hall has an equal opportunity policy.
Requirement 2. When a contractor intends to subcontract out any work they shall notify minority and women contractors for the subcontract work. The requirements to notify minority and women contractors of any bids can be satisfied by advertising in newspapers or trade journals that are of general circulation in the metropolitan Seattle area.
Requirement 3. If and when a contractor hires new employees or contracts with subcontractors, the contractor must alert such employees and subcontractors to the contractor’s commitment as an equal opportunity employer, etc. This requirement may be complied with by posting a notice of equal opportunity commitment at the job shack, or by the time clock.
Requirement 4. If and when a contractor promotes or advances employees, the contractor must consider all eligible employees.
The City of Bellevue reserves the right to audit all contractors for compliance with the requirements set forth in BCC 4.28.170.
The Contractor hereby certifies that during the performance of this contract it agrees to comply with these assurances.
By:
(Authorized Signature)
Title:
Date:
END, AFFIDAVIT OF EQUAL OPPORTUNITY COMPLIANCE
ATTACHMENT "A"
SCOPE OF WORK & SPECIFICATIONS R26-14 NPDES Sediment Removal Wilburton Pond
The location of the project is in the City of Bellevue, the property is located at Wilburton Hill Community Park 12400 Main St. Bellevue, WA 98005. The contractor will remove sediment material from the Wilburton Pond for the National Pollutant Discharge Elimination System (NPDES) correction
• Prevailing wages are required. Contractor is responsible for obtaining prevailing wage ruling from L&I.
• Payment will be issued in one lump sum at the completion of the project.
• The Wilburton Pond sediment must be removed by use of the following processes:
• Sump pump / sewage pump should be used to remove water.
• A combination of excavator, dump truck, and vactor truck to remove sediment roughly 222 cubic yards.
• The sediment test results indicated a high lube oils content. The sediment will need to be thermally treated (incinerated).
• Construction fencing must be erected to secure the work site along the soccer field and school district.
• Safety and construction signs must be used if a pedestrian path is compromised due to blockage of any type.
• This project should be completed by September 30, 2026.
• Wattles must be used for sediment control.
• Tree Protection must be installed if called out by the permit department.
• The City of Bellevue has acquired a Clear and Grade Permit that the contractor must follow. The contract hired must attend a per-con meeting with the City of Bellevue permit department.
• Please see additional support documents to aid in bid preparation.
City of
Bellevue
VERY IMPORTANT
A PRINTED COPY OF ALL APPROVED DOCUMENTS MUST REMAIN ON
THE JOB SITE AND BE AVAILABLE AT ALL TIMES FOR INSPECTORS.
Development Services
Noise Permit Cover Sheet
P E R
M I T
N U
M B
E R
P R
O J E C
T N
A M
E
S I T
E A
D D
R E
S S
LAND USE
Check Permit Status https://PermitSearch.MyBuilding
Permit.com
Take the Inspection Service Survey http://www.surveymonkey.com/s/
DS_Inspection_Survey
Request an Inspection
By phone: (425) 452-6875
On line: https://Inspection.MyBuildingPermit.com
Share your feedback!
On your plan review experience:
https://bellevuewa.gov/IssuedSurvey
On your inspection experience:
https://bellevuewa.gov/InspectionSurvey
BEFORE YOU START WORK
SCHEDULE YOUR PRECONSTRUCTION
MEETING WITH THE CLEARING & GRADING
INSPECTOR BY CALLING 425-452-6875 OR
LOG INTO www.mybuildingpermit.com.
(use “100 Precon/jobcon ” on the automated
IVR inspection request phone line)
CLEARING & GRADING
City of Bellevue 26 101994 GK Page 1 of 34
CITY OF BELLEVUE
DEVELOPMENT SERVICES
DEPARTMENT
LAND USE APPROVAL
APPROVED AS CORRECTED
OVERSIGHT OR VIOLATIONS OF CITY
ORDIANCES ARE NOT INCLUDED IN
THIS APPROVAL.
DATE APPROVED: 02/13/2026
APPROVED BY: David Wong Land Use DWong@bellevuewa.gov 425-452-4282
LAND USE CONDITION OF APPROVAL:
Any work occurring for facilities #2 and/or #19 and within the tree protection zone shall install tree prior any work occurring.
Tree protection zone is determined by taking the diameter of the tree in inches and extending a radium from the face of the tree at a ratio of 1 foot radius to 1 inch tree diameter.
Clearing and Grading Inspect shall confirm installation prior to conducting work.
Additional erosion control may be required by the Clearing and Grading Inspector
A log book must be maintained on-site that includes a record of the implementation of CSWPPP, and updates to the CSWPPP or ESC Plan, installation and maintenance of BMPs, site inspections, and the results of any stormwater quality monitoring.
CITY OF BELLEVUE
DEVELOPMENT SERVICES
DEPARTMENT
CLEARING & GRADING
PERMIT
APPROVED AS CORRECTED
Subject to field inspection. Oversight or violations of city ordinances are not included in this approval. Call (425)
452-6875 or log into www.mybuildingpermit.com before beginning construction to schedule required pre-construction conference.
Approval is for erosion control and Clearing & Grading provisions only.
Approved Date: 02/19/2026 Approved By: SUzunow
G
K C oB P
W ilb ur to n P on d
N P
D E
S
M ai n S t
Issued 02/20/2026 https://PermitSearch.MyBuildingPermit.com https://PermitSearch.MyBuildingPermit.com http://www.surveymonkey.com/s/DS_Inspection_Survey http://www.surveymonkey.com/s/DS_Inspection_Survey https://Inspection.MyBuildingPermit.com https://bellevuewa.gov/IssuedSurvey https://bellevuewa.gov/InspectionSurvey
City of
Bellevue Tree Protection Requirements
Clearing & Grading
Development Standards
BMP T101: Tree Protection Requirements
Purpose The section identifies management practices to employ at construction sites to guarantee successful tree and vegetation protection before, during, and through a lifetime of site use and maintenance. The City of Bellevue regulates and manages tree retention during development through the Land Use Code and the
Clearing and Grading Code. Trees and vegetation are preserved for several reasons:
To sustain both the function and value of vegetation assets
To enhance public safety by carefully maintaining the health of onsite vegetation and to reduce liability
To contain costs associated with site restoration
To reduce or avoid soil compaction and degradation
To avoid physical injury to existing trees
To avoid root injury to trees and other vegetation
To protect soils and hydraulic integrity of the entire site
To protect existing irrigation, utilities and underground drainage
To prevent sediment-laden and/or polluted runoff from entering drainage systems and water bodies (streams, wetlands, lakes).
Definitions Critical Root Zone (CRZ) - The circular area around the base of a tree calculated as the distance to the furthest extent to the tree’s dripline.
Development Project - Any construction activity including demolition, grading, drainage improvements, new construction of main house or accessory structures, added square footage to existing main house or accessory structures, site preparation and landscaping.
Diameter at Breast Height (DBH) - The diameter of the tree trunk at four and one-half feet (or 54 inches) above natural grade level. The diameter may be calculated by using the following formula: DBH= circumference at 4.5-feet x
3.14. To determine the DBH of multi-trunk trees or measuring trees on slopes, consult the current Guide for Plant Appraisal, published by the Council of Tree and Landscape Appraisers.
Drip line - The circular area around the base of a tree measured by the furthest lateral extent of the foliage.
Project Arborist - A qualified professional who is qualified to evaluate trees such as a Certified Arborist, a Registered Consulting Arborist, a Licensed
Landscape Architect or a Certified Forester. The project arborist is responsible for decisions related to vegetation on site before, during and after construction.
Tree Protection Requirements Page 231
City of Bellevue 26 101994 GK Page 2 of 34
Issued 02/20/2026
Tree Protection Requirements Page 232
Project Manager - The person assigned to the construction project by the department or the contractor who is responsible for managing the overall project.
Project management duties include schedule, budget, and related logistics, including construction site management.
Tree Protection Site Plan (Base Map) - A set of drawings that show existing site conditions and proposed landscape improvements, including trees to be removed, relocated or to be retained. Site plans shall include the following minimum information that may affect trees:
A. Surveyed location, species, size, drip line area of significant (including trees located on neighboring property that overhang the project site) and Street Trees within 30-feet of the project site.
B. Paving, concrete, trenching or grade change located within the Tree
Protection Zone (TPZ).
C. Existing and proposed utility pathways.
D. Surface and subsurface drainage and aeration systems to be used.
E. Walls, tree wells, retaining walls and grade change barriers, both temporary and permanent.
F. Landscaping, irrigation and lighting within TPZ of trees.
G. All of the final approved site plan sheets shall reference tree protection instructions.
Significant Tree - A healthy evergreen or deciduous tree, eight inches in diameter or greater at four feet above existing grade. (Land Use Code 20.50.046)
Street Tree - means any tree growing within the street right-of-way, outside of private property.
Tree Appraisal - means a method of determining the monetary value of a tree as it relates to the real estate value of the property, neighborhood, or community.
Tree Protection Plan (TPP) - A plan prepared by a certified arborist that outlines measures to protect and preserve trees.
Tree Protection Zone (TPZ) - The circular area around a tree calculated as one foot of radius for every inch of DBH, or at least 6 feet, whichever is greater that is required to be protected with a fenced enclosure.
Tree Protection Fencing - A temporary enclosure erected around a tree to be protected at the boundary of the tree protection zone. Tree protection fencing should consist of six 6 foot high chain link fence, mounted on two inch diameter metal posts, driven into the ground to a depth of at least 2-feet at no more than
10-foot spacing.
Warning Sign - A warning sign shall be prominently displayed on each fence.
The sign shall be a minimum of 8.5 x 11-inches and clearly state: “WARNING –
Tree Protection Zone - This fence shall not be removed and any injury to this or these trees is subject to penalty according to BCC 14.06.100.”
Conditions of Use Trees and vegetation can be impacted during construction in many ways and often times the damage is not seen for several months or even years after the construction is completed. Proper tree protection can benefit not only the tree by reducing stress during construction but also the developer and property owner by reducing long term costs associated with future maintenance. The cost of
City of Bellevue 26 101994 GK Page 3 of 34
Tree Protection Requirements Page 233 removing a tree killed by construction after development is usually greater than the cost of protecting the tree during construction.
Common types of tree injuries that occur during construction may include:
Mechanical injury to roots, trunk or branches
Compaction of soil by storing of materials or equipment, which degrades the functioning of roots, inhibits the development of new roots and restricts drainage.
Changes in existing grade which can cut or suffocate roots
Alteration of the water table - either raising or lowering
Changes in drainage patterns that promotes erosion or excessive accumulation of runoff
Sterile soil conditions associated with stripping off topsoil
Damage to roots from dumping of liquids or rinsing of construction equipment
Not all damage occurs to trees and vegetation during the actual construction of buildings or structures. Trees are often damage during the landscaping phase after the heavy equipment and workers have left. Installing irrigation, applying topsoil and turf installation also causes damage to trees. All construction-related impacts can produce long-term maintenance problems that can be avoided by following the BMPs set forth in the remainder of this chapter.
Planning & Permitting Phase
Inventory and evaluate all existing trees on the site and trees immediately adjacent with driplines or expected root zones extending onto the project site.
The inventory and evaluation shall include, but not be limited to the following information:
Tree species
Tree size in DBH and canopy spread
Tree condition or observed defects
Tree numbers that are included in an inventory table
A calculation of the total diameter inches of significant trees on the site along with an indication of the interior or perimeter location of the tree, if applicable to the proposed development type and tree retention.
Tree map showing the location of the existing significant trees on the site with numbers corresponding to the tree inventory table.
Submit a Tree Protection Plan (TPP) prepared by a Project Arborist that includes the following…