BEP-RFP-16-0473_Solicitation_for_Rigging.pdf

PDF 341 KB Posted

Attached to
Rigging and Crane Services for COPE 48 Storage and Installation Federal contract opportunity
Solicitation number
BEP-RFP-16-0473
Issued by
Department of the Treasury Office of the Comptroller of the Currency

About this file

Solicitation

View the file

Other files for this federal contract opportunity

Other files attached to Rigging and Crane Services for COPE 48 Storage and Installation, newest first.
File Type Posted
BEP-RFP-16-0473_Amendment_1.PDF PDF
Past_Performance_Questionnaire_Crane_and_Rigging.xml XML file
PWS_7-28-2016_for_the_COPEs.xml XML file

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS

OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, & 30

1. REQUISITION NUMBER PAGE 1 OF

2. CONTRACT NO. 3. AWARD/EFFECTIVE

DATE

4. ORDER NUMBER 5. SOLICITATION NUMBER 6. SOLICITATION ISSUE

DATE

7. FOR SOLICITATION

INFORMATION CALL:

a. NAME b. TELEPHONE NUMBER (No collect calls)

8. OFFER DUE DATE/

LOCAL TIME

9. ISSUED BY

13b. RATING

14. METHOD OF SOLICITATION

CODE

15. DELIVER TO 16. ADMINISTERED BY CODE

18a. PAYMENT WILL BE MADE BY CODE17a. CONTRACTOR/

OFFEROR

CODE

FACILITY

CODE

CODE

TELEPHONE NO.

17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT SUCH ADDRESS IN

OFFER

18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a UNLESS BLOCK

BELOW IS CHECKED

RFQ IFB RFP

SEE ADDENDUM

19.

ITEM NO.

20.

SCHEDULE OF SUPPLIES/SERVICES

21.

QUANTITY

22.

UNIT

23.

UNIT PRICE

24.

AMOUNT

(Use Reverse and/or Attach Additional Sheets as Necessary)

25. ACCOUNTING AND APPROPRIATION DATA 26. TOTAL AWARD AMOUNT (For Govt. Use Only)

28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN

COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND

DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY

ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED

29. AWARD OF CONTRACT: REF. OFFER

DATED . . YOUR OFFER ON SOLICITATION

(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE

SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:

30a. SIGNATURE OF OFFEROR/CONTRACTOR

30b. NAME AND TITLE OF SIGNER (Type or print) 30c. DATE SIGNED

31a. UNITED STATES OF AMERICA (SIGNATURE OF CONTRACTING OFFICER)

31b. NAME OF CONTRACTING OFFICER (Type or print) 31c. DATE SIGNED

AUTHORIZED FOR LOCAL REPRODUCTION

PREVIOUS EDITION IS NOT USABLE

STANDARD FORM 1449 (REV. 2/2012)

Prescribed by GSA - FAR (48 CFR) 53.212

10. THIS ACQUISITION IS UNRESTRICTED OR

NAICS:

SIZE STANDARD:

13a. THIS CONTRACT IS A

RATED ORDER UNDER

DPAS (15 CFR 700)

SET ASIDE: % FOR:

11. DELIVERY FOR FOB DESTINA-

TION UNLESS BLOCK IS

MARKED

SEE SCHEDULE

12. DISCOUNT TERMS

ARE ARE NOT ATTACHED

ARE ARE NOT ATTACHED

27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1, 52.212-4. FAR 52.212-3 AND 52.212-5 ARE ATTACHED. ADDENDA

27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA

8 (A)

EDWOSB

WOMEN-OWNED SMALL BUSINESS

(WOSB) ELIGIBLE UNDER THE WOMEN-OWNED

SMALL BUSINESS PROGRAM

SERVICE-DISABLED

VETERAN-OWNED

SMALL BUSINESS

HUBZONE SMALL

BUSINESS

SMALL BUSINESS

STANDARD FORM 1449 (REV. 2/2012) BACK

19.

ITEM NO.

20.

SCHEDULE OF SUPPLIES/SERVICES

21.

QUANTITY

22.

UNIT

23.

UNIT PRICE

24.

AMOUNT

32a. QUANTITY IN COLUMN 21 HAS BEEN

RECEIVED INSPECTED ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED:

41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT

32b. SIGNATURE OF AUTHORIZED GOVERNMENT

REPRESENTATIVE

32c. DATE

41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER 41c. DATE

42a. RECEIVED BY (Print)

42b. RECEIVED AT (Location)

42c. DATE REC'D (YY/MM/DD) 42d. TOTAL CONTAINERS

40. PAID BY

32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT

REPRESENTATIVE

32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE 32f. TELPHONE NUMBER OF AUTHORZED GOVERNMENT REPRESENTATIVE

32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE

33. SHIP NUMBER 34. VOUCHER NUMBER 35. AMOUNT VERIFIED

CORRECT FOR

PARTIAL FINAL

37. CHECK NUMBER

38. S/R ACCOUNT NO. 39. S/R VOUCHER NUMBER

36. PAYMENT

COMPLETE PARTIAL FINAL

BEP-RFP-16-0473

TABLE OF CONTENTS:

Listing of Incorporated Purchase Requisitions Section B - Supplies or Services and Prices/Costs Section C - Description/Specifications/Work Statement Section D - Packaging and Marking Section E - Inspection and Acceptance Terms Section F - Delivery or Performance Section G - Contract Administration Data Section H - Special Contract Requirements Section I - Contract Clauses Section J - List of Documents, Exhibits, and other Attachments Section K - Representations, Certifications, and Other Statements of Offerors Section L - Instructions, Conditions and Notices to Offerors Section M - Evaluation Factors for Award

Listing of Incorporated Purchase Requisitions

Incorporated Purchase Requisition Numbers:

Section B - Supplies or Services and Prices/Costs

Item Number Base Item Number

Supplies/Services Quantity Unit

0001 Rigging and Cranes Services 1 MON Contract Type:Firm Fixed Price

Unit Price Extended Price

Description:

BEP is in need of services to dismantle two (2) COPEs equipment within the facility, as well as relocating a COPE from our Western facility and installing it in the Washington facility. COPE #11 and COPE #12 located in Room #150M of the Main Building will be dismantled and replaced with COPE #48 (which is being delivered from WCF). The Government will identify and remove any sensitive components/devices off of COPEs #11 and #12 before disposal.

Purchase Requisitions

FSC Codes: N099 INSTALLATION OF EQUIPMENT- MISCELLANEOUS NAICS Code: 238290 Other Building Equipment Contractors

Section C - Description/Specifications/Work Statement

Performance Work Statement

PERFORMANCE WORK STATEMENT (PWS)

Rigging & Crane Services

PART 1

GENERAL INFORMATION

The contractor shall provide all equipment, tools, materials, vehicles, personnel, labor, supervision, and management to dismantle two (2) Currency Overprinting Processing Equipment (COPE)s from Room #150M (located between A and B) of the Main Building and COPE #48 will be installed in their place. This work shall be accomplished in three phases:

a. Phase I: COPE #48 will be shipped from BEP's Western Currency Facility to the contractor's storage facility for storage. The Bureau of Engraving and Printing shall provide the contractor with a packing slip (includes weights, sizes, etc.) of COPE #48 components. The contractor shall be responsible for providing a storage facility to protect COPE #48's components from damage (including weather, water, condensation, moisture, direct sunlight, etc.). COPE #48 will be installed in room 150M of the Washington DC facility Main Building.

b. Phase II: The contractor shall dismantle COPE #11 and COPE #12 and remove for scrap value. All proceeds from the scrap value shall be returned to the government.

c. Phase II: After completing Phase II, The contractor shall deliver all components of COPE #48 to the BEP Washington DC facility. All components of the COPE #48 will be rigged and placed into Room #150M of the Main Building. The COR will coordinate with the contractor to identify each component of COPE #48 and verify each component's location within room #150M.

1. General: This is a non-personnel services contract to provide Rigging & Crane Services. The Government shall not exercise any supervision or control over the contract service providers performing the services herein. Such contract service providers shall be accountable solely to the Contractor who, in turn is responsible to the Government.

1.1 Description of Services/Introduction: The contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items and non-personal services necessary to perform Rigging & Crane Services as defined in this Performance Work Statement except for those items specified as government furnished property and services. The contractor shall perform to the standards in this contract.

1.2 Background: BEP is in need of services to dismantle two (2) COPEs equipment within the facility, as well as relocating a COPE from our Western facility and installing it in the Washington facility. COPE #11 and COPE #12 located in Room #150M of the Main Building will be dismantled and replaced with COPE #48 (which is being delivered from WCF). The Government will identify and remove any sensitive components/devices off of COPEs #11 and #12 before disposal.

1.3 Objectives: The contractor will:

• Receive and store COPE #48 until room #150M is ready to receive it.

• Reassemble COPE #48 in room #150M of the main building.

• Dismantle COPEs #11 and #12 located in room # 150M of the main building and haul away.

1.4 Scope: Before installing COPE #48 in room #150M of the Main Building, the contractor must provide rigging plan(s) (thirty (30) days after contract award) for BEP's approval. The rigging drawing(s) must show the entire rigging system required to remove and relocate the COPEs as stated in section 1.1 of the SOW. All rigging drawing(s) must be certified by a DC licensed structural engineer. Also, with consultation with the contractor, BEP will determine which windows will need to be removed to allow for the removal of the equipment. All work associated with the removal/security of the window(s) will be done by others.

After the contractor completes all the work associated with COPE #11 and #12 and BEP has received the air permit documents from DC, the contractor shall deliver/rig all components associated with COPE #48 in Room #150M of the Main Building. The COR will coordinate with the contractor to identify each of COPE #48's components and where they need to be located within the Room #150M.

1.4.1 Contractor Arrival on BEP: The contractor shall contact the designated Contracting Officer's Representative (COR) each time the contractor arrives on BEP to perform the requested services.

1.4.2 Disassembled COPE #48 will be delivered to the contractor by others and the contractor shall be responsible for all of COPE #48's components as stated in sections 1.1 of the SOW. COPEs #11 and #12 will be dismantled and hauled away by the contractor.

1.4.3 Disruptions: The contractor shall coordinate disruptions with the BEP COR prior to starting work, and provide notification at least five working days prior to disruption (e.g., power outage, blocked access, inspection process).

Disruptions shall be coordinated to provide the least amount of customer inconvenience/disruption. The contractor shall notify the BEP COR within 24-hours of expected downtime due to disruption.

1.4.4 COPE Hauling: The contractor shall provide Department of Transportation permits, licenses, equipment, and vehicles to haul the disassembled COPEs. The contractor shall ensure that loads are transported in accordance with all local, state, and federal regulations. The contractor shall immediately clean up any material spilled along the haul route, including mud tracked on the road by the contractor's equipment.

1.4.5 Debris Disposal: The contractor shall separate, load, transport and dispose of all non-recyclable debris at a State certified/licensed off-base disposal site in accordance with existing local, state, and federal regulations. The contractor shall obtain all permits and pay tipping fees associated with the use of off-base disposal locations at the contractor's expense. The contractor shall not dispose of any debris on BEP. Contractor shall provide dump receipts.

1.4.6 Scrap Metal: The contractor shall provide for the marketing, transport, and direct sales of scrap metal at a scrap metal processing center, with 100 percent of the revenues generated by the resale of scrap metals to be retained by the Government. The contractor shall separate metal for scrap from other debris and the scrap metal will be documented by the contractor in poundage. A copy of the final documentation will be submitted to the CO and COR for approval within 10 days. The contractor is expected to obtain the best prices possible for scrap materials.

1.4.7 Heavy Equipment: Heavy equipment (cranes or lifts) use on BEP premises must be cleared through the BEP Security Office at least one week prior to its use. The contractor shall submit a list of heavy equipment that will be used to perform services to the CO and COR for approval. The contractor shall not perform any cleaning, repairing, or other maintenance of equipment or vehicles on BEP.

1.4.8 Work Hours: To minimize and/or eliminate any disruption in productivity, the contractor shall remove the COPEs during the normal work week. The contractor will be allowed to work from 7:00 a.m. – 4:00 p.m., Monday through Friday, excluding Federal Holidays. If the contractor wants to work outside of these days/hours, then the contractor shall submit the request in writing to the COR/BEP Acquisition Office at least one week in advance. The contractor is advised that requests are subject to disapproval.

1.4.10 Government Escort: BEP is a controlled area; therefore contractor employees may require a Government escort.

The contractor shall coordinate all work hours in advance with the COR so if escorts are required they can be arranged.

1.4.11 Mission Requirements: The contractor is cautioned that due to mission requirements there may be occasions when the contractor must immediately cease all work, vacate BEP, and remove all contractor vehicles and equipment. The COR/ BEP Acquisition Office will notify the contractor when work can be resumed.

1.5 Period of Performance: The period of performance for this contract including receiving and storing COPE #48 is 6-months. The anticipated period of performance is 21 September 2016 to 31 March 2017.

1.6 General Information

1.6.1 Quality Control : Quality Control is the responsibility of the contractor. The contractor is responsible for the delivery of quality services/supplies to the Government (see FAR 52.246-1, Contractor Inspection Requirements).

The Contractor shall develop, implement and maintain an effective Quality Control System which includes a written Quality Control Plan (QCP). The QCP shall implement standardized procedure/methodology for monitoring and documenting contract performance to ensure all contract requirements are met. The Contractors' QCP must contain a systematic approach to monitor operations to ensure acceptable services/products are provided to the Government. The QCP, as a minimum, shall address continuous process improvement; procedures for scheduling, conducting and documentation of inspection;

discrepancy identification and correction; corrective action procedures to include procedures for addressing Government discovered non-conformances; procedures for root cause analysis to identify the root cause and root cause corrective action to prevent re-occurrence of discrepancies; procedures for trend analysis; procedures for collecting and addressing customer feedback/complaints. The contractor shall upon request provide to the Government their quality control documentation.

After acceptance of the quality control plan the contractor shall receive the Contracting Officer's acceptance in writing of any proposed change to their QC system.

1.6.2 Quality Assurance: The government shall evaluate the contractor's performance under this contract in accordance with the Quality Assurance Surveillance Plan. This plan is a Government only document primarily focused on what the Government must do to assure that the contractor has performed in accordance with the requirements of the contract.

1.6.3 Federal Government Holidays: The contractor is not required to perform services on holidays.

New Years Day 1st day of January

Martin Luther King Jr.'s Birthday 3rd Monday of January

Presidents Day 3rd Monday of February

Memorial Day Last Monday of May

Independence Day 4th day of July

Labor Day 1st Monday of September

Columbus Day 2nd Monday of October

Veterans Day 11th day of November

Thanksgiving Day 4th Thursday of November

Christmas Day 25th day of December

1.6.4 Hours of Operation: The contractor is responsible for conducting business, between the hours of 6:30AM to 3:00PM Monday thru Friday except Federal holidays or when the Government facility is closed due to local or national emergencies, administrative closings, or similar Government directed facility closings. The contract shall coordinate with the government regarding hour of operation for BEP Year End Shut Down. For other than firm fixed price contracts, the contractor will not be reimbursed when the government facility is closed for the above reasons. The Contractor must at all times maintain an adequate workforce for the uninterrupted performance of all tasks defined within this PWS when the Government facility is not closed for the above reasons. When hiring personnel, the Contractor shall keep in mind that the stability and continuity of the workforce are essential.

1.6.5 Place of Performance: The work to be performed under this contract will be performed at COPE #48 will be received and stored at the contractor's facility until room 150M is ready to receive it. The remaining task defined within this PWS will be performed at BEP's Washington DC facility in Room 150M of the Main Building.

1.6.6 Type of Contract: The government will award a Firm Fixed Price Contract

1.6.7 Security Requirements: Contractor personnel (to include subcontractors) must wear a BEP's issued security badge at time while performing work on BEP's facility and must maintain the level of security required for the life of the contract.

1.6.7.1 Physical Security: The Contractor shall be responsible for safeguarding all government equipment, information and property provided for Contractor use under this Contract. This Contract requires access into the Controlled Industrial Area of the BEP. The Contractor personnel shall recognize that BEP deals with sensitive information and other proprietary information, which are valuable, special, and unique assets. All information pertinent to BEP's information technology resources is highly sensitive and may not be released to third parties without the express, written consent of BEP. This information requires strict control procedures to preclude unauthorized disclosure or dissemination. Information pertinent to personnel is protected from unauthorized disclosure under the provisions of the Privacy Act of 1974 (5 U.S.C. 552a).

Contractor personnel shall not divulge, disclose, or communicate in any manner, any information to any third party without prior written consent of the BEP. Contractor personnel shall protect information and treat it as strictly confidential and will abide by the security requirements of BEP. A violation of this paragraph shall be a material violation of this Contract.

Should the Contractor receive or suspect they have learned of sensitive or classified information, the Contractor shall identify and report suspicions to the COR. Contractor personnel performing work under this Contract shall be subjects of background investigations, conducted by BEP's Office of Personnel Security, prior to start of work under this Contract. Each Contractor employee performing under this Contract must successfully complete the Government required background check form at time of the proposal submission, and must maintain the level of security required for the life of the Contract.

1.6.7.2 Key Control The Contractor shall establish and implement methods of making sure all keys/key cards issued to the Contractor by the Government are not lost or misplaced and are not used by unauthorized persons. NOTE: All references to keys include key cards. No keys issued to the Contractor by the Government shall be duplicated. The Contractor shall develop procedures covering key control that shall be included in the Quality Control Plan. Such procedures shall include turn-in of any issued keys by personnel who no longer require access to locked areas. The Contractor shall immediately report any occurrences of lost or duplicate keys/key cards to the Contracting Officer.

1.6.7.2.1. In the event keys, other than master keys, are lost or duplicated, the Contractor shall, upon direction of the Contracting Officer, re-key or replace the affected lock or locks; however, the Government, at its option, may replace the affected lock or locks or perform re-keying. When the replacement of locks or re-keying is performed by the Government, the total cost of re-keying or the replacement of the lock or locks shall be deducted from the monthly payment due the Contractor. In the event a master key is lost or duplicated, all locks and keys for that system shall be replaced by the Government and the total cost deducted from the monthly payment due the Contractor.

1.6.7.2.2. The Contractor shall prohibit the use of Government issued keys/key cards by any persons other than the Contractor's employees. The Contractor shall prohibit the opening of locked areas by Contractor employees to permit entrance of persons other than Contractor employees engaged in the performance of assigned work in those areas, or personnel authorized entrance by the Contracting Officer.

1.6.9 Post Award Conference/Periodic Progress Meetings: The Contractor agrees to attend any post award conference convened by the contracting activity or contract administration office in accordance with Federal Acquisition Regulation Subpart 42.5, Post Award Orientation. The Contracting Officer, COR, and other Government personnel, as appropriate, may meet periodically with the contractor to review the contractor's performance. At these meetings the Contracting Officer will apprise the contractor of how the government views the contractor's performance and the contractor will apprise the Government of problems, if any, being experienced. Appropriate action shall be taken to resolve outstanding issues. These meetings shall be at no additional cost to the Government.

1.6.10 Contracting Officer Representative (COR): The COR will be identified by separate letter by the CO. The COR monitors all technical aspects of the contract and assists in contract administration. The COR is authorized to perform the following functions: assure that the Contractor performs the technical requirements of the contract; perform inspections necessary in connection with contract performance; maintain written and oral communications with the Contractor concerning technical aspects of the contract; issue written interpretations of technical requirements, including Government drawings, designs, and specifications; monitor Contractor's performance and notify both the Contracting Officer and Contractor of any deficiencies; coordinate availability of government furnished property; and provide site entry of Contractor personnel. A letter of designation issued to the COR, a copy of which is sent to the Contractor, states the responsibilities and limitations of the COR, especially with regard to changes in cost or price, estimates or changes in delivery dates. The COR is not authorized to change any of the terms and conditions of the resulting order.

1.6.11 Key Personnel: The follow personnel are considered key personnel by the government: Contract manager/Alternate contract manager and Supervisor/Alternate Supervisor. The contractor shall provide a contract manager who shall be responsible for the performance of the work. The name of this person and an alternate who shall act for the contractor when the manager is absent shall be designated in writing to the contracting officer. The contract manager or alternate shall have full authority to act for the contractor on all contract matters relating to daily operation of this contract. The contract manager or alternate shall be available between 6:30 AM to 4:00PM, Monday thru Friday except Federal holidays or when the government facility is closed for administrative reasons. Qualifications for all key personnel are listed below: Contract Manager and Alternate, The Contract Manager and Alternate must have no less than 10 years of rigging & crane services.

Supervisor and Alternate Supervisor must have no less than 10 years of rigging & crane services.

1.6.12 Identification of Contractor Employees: All contract personnel (to include subcontractors) attending meetings, answering Government telephones, and working in other situations where their Contractor status is not obvious to third parties are required to identify themselves as such to avoid creating an impression in the minds of members of the public that they are Government officials. They must also ensure that all documents or reports produced by Contractors are suitably marked as Contractor products or that Contractor participation is appropriately disclosed. All Contractor personnel shall clearly identify themselves as a Contractor and shall be required to wear identification (ID) badges in a visible location on the front of exterior clothing, above the waist, (except when safety or health reasons prevent such placement). ID badges shall be worn at all times when performing work. ID badges shall have an identification picture, and shall state the name of the individual and the company they represent. A listing of issued identification cards shall be furnished to the Contracting Officer prior to the contract performance date and updated as needed to reflect Contractor and Subcontractor personnel changes. Contractor personnel are prohibited from possessing weapons, firearms or ammunition, on themselves or within their Contractor-owned or privately owned vehicle while on BEP premises.

1.6.13. Supervision of Contractor Employees: The Government will not exercise any supervision or control over Contractor or subcontractor employees while performing work under the contract. Such employees shall be accountable solely to the Contractor, not the Government. The Contractor, in turn, shall be accountable to the Government for Contractor or subcontractor employees.

1.6.14 Data Rights: The Government has unlimited rights to all documents/material produced under this contract. All documents and materials, to include the source codes of any software, produced under this contract shall be Government owned and are the property of the Government with all rights and privileges of ownership/copyright belonging exclusively to the Government. These documents and materials may not be used or sold by the contractor without written permission from the Contracting Officer. All materials supplied to the Government shall be the sole property of the Government and may not be used for any other purpose. This right does not abrogate any other Government rights.

1.6.15 Organizational Conflict of Interest: Contractor and subcontractor personnel performing work under this contract may receive, have access to or participate in the development of proprietary or source selection information (e.g., cost or pricing information, budget information or analyses, specifications or work statements, etc.) or perform evaluation services which may create a current or subsequent Organizational Conflict of Interests (OCI) as defined in FAR Subpart 9.5. The Contractor shall notify the Contracting Officer immediately whenever it becomes aware that such access or participation may result in any actual or potential OCI and shall promptly submit a plan to the Contracting Officer to avoid or mitigate any such OCI.

The Contractor's mitigation plan will be determined to be acceptable solely at the discretion of the Contracting Officer and in the event the Contracting Officer unilaterally determines that any such OCI cannot be satisfactorily avoided or mitigated, the Contracting Officer may affect other remedies as he or she deems necessary, including prohibiting the Contractor from participation in subsequent contracted requirements which may be affected by the OCI.

PART 2

DEFINITIONS & ACRONYMS

2. DEFINITIONS AND ACRONYMS:

2.1. DEFINITIONS:

2.1.1. CONTRACT SPECIALIST. The official Government representative delegated authority by the Contracting Officer to administer a contract. This individual is normally a member of the appropriate Contracting/Procurement career field and advises on all technical contractual matters.

2.1.2. CONTRACTOR. A supplier or vendor awarded a contract to provide specific supplies or services to the government.

The term used in this contract refers to the prime.

2.1.3. CONTRACTING OFFICER. A person with authority to enter into, administer, and/or terminate contracts, and make related determinations and findings on behalf of the government. Note: The only individual who can legally bind the government.

2.1.4. CONTRACTING OFFICER'S REPRESENTATIVE (COR). An employee of the U.S. Government appointed by the contracting officer to administer the contract. Such appointment shall be in writing and shall state the scope of authority and limitations. This individual has authority to provide technical direction to the Contractor as long as that direction is within the scope of the contract, does not constitute a change, and has no funding implications. This individual does NOT have authority to change the terms and conditions of the contract.

2.1.5. DEFECTIVE SERVICE. A service output that does not meet the standard of performance associated with the Performance Work Statement.

2.1.6. DELIVERABLE. Anything that can be physically delivered, but may include non-manufactured things such as meeting minutes or reports.

2.1.7. GOVERNMENT-FURNISHED PROPERTY (GFP) OR GOVERNMENT PROPERTY (GP). Property in the possession of, or directly acquired by, the Government and subsequently made available to the Contractor.

2.1.8. KEY PERSONNEL. Contractor personnel that are evaluated in a source selection process and that may be required to be used in the performance of a contract by the Key Personnel listed in the PWS. When key personnel are used as an evaluation factor in best value procurement, an offer can be rejected if it does not have a firm commitment from the persons that are listed in the proposal.

2.1.9. PHYSICAL SECURITY. Actions that prevent the loss or damage of Government property.

2.1.10. QUALITY ASSURANCE. The government procedures to verify that services being performed by the Contractor are acceptable in accordance with established standards and requirements of this contract.

2.1.11. QUALITY ASSURANCE SPECIALIST. An official Government representative concerned with matters pertaining to the contract administration process and quality assurance/quality control. Acts as technical advisor to the Contracting Officer in these areas.

2.1.12. QUALITY ASSURANCE SURVEILLANCE PLAN (QASP). An organized written document specifying the surveillance methodology to be used for surveillance of contractor performance.

2.1.13. QUALITY CONTROL. All necessary measures taken by the Contractor to assure that the quality of an end product or service shall meet contract requirements.

2.1.14. SUBCONTRACTOR. One that enters into a contract with a prime contractor. The Government does not have privity of contract with the subcontractor.

2.1.15. WORK DAY. The number of hours per day the Contractor provides services in accordance with the contract.

2.1.16. WORK WEEK. Monday through Friday, except for Federal holidays unless specified otherwise.

2.2. ACRONYMS:

ACOR Alternate Contracting Officer's Representative

BEP Bureau of Engraving and Printing

CONUS Continental United States (excludes Alaska and Hawaii)

COR Contracting Officer Representative

COTS Commercial-Off-the-Shelf

FAR Federal Acquisition Regulation

HIPAA Health Insurance Portability and Accountability Act of 1996

CO Contracting Officer

OCI Organizational Conflict of Interest

OCONUS Outside Continental United States (includes Alaska and Hawaii)

ODC Other Direct Costs

PIPO Phase In/Phase Out

POC Point of Contact

PRS Performance Requirements Summary

PWS Performance Work Statement

QA Quality Assurance

QAP Quality Assurance Program

QASP Quality Assurance Surveillance Plan

QC Quality Control

QCP Quality Control Plan

TE Technical Exhibit

PART 3

GOVERNMENT FURNISHED PROPERTY, EQUIPMENT, AND SERVICES

3. GOVERNMENT FURNISHED ITEMS AND SERVICES:

3.1. Services: The Government will provide personnel to assist with equipment inventory and equipment set-up.

3.2 Facilities: The Government will provide the necessary workspace for the contractor staff to provide the support outlined in the PWS excluding desk space, telephones, computers, and other items necessary to maintain an office environment.

3.3 Utilities: The Government will provide the utilities in the facility will be available for the contractor's use in performance of tasks outlined in this PWS. The Contractor (to include subcontractors) shall instruct employees in utilities conservation practices. The contractor shall be responsible for operating under conditions that preclude the waste of utilities, which include turning off the water faucets or valves after using the required amount to accomplish cleaning vehicles and equipment.

3.4 Equipment: The Government will provide will ship (crates) all of COPE #48's components to the contractor for storage.

3.5 Materials: The Government will provide a copy of COPE #48 packing list with case numbers, weight, dimensions, etc.

PART 4

CONTRACTOR FURNISHED ITEMS AND SERVICES

4. CONTRACTOR FURNISHED ITEMS AND RESPONSIBILITIES:

4.1 General: The Contractor shall furnish all supplies, equipment, facilities and services required to perform work under this contract that are not listed under Section 3 of this PWS.

4.2 Materials: The Contractor shall furnish all materials, supplies, and equipment necessary to meet the requirements under this PWS.

4.3 Equipment: The Contractor shall furnish all equipment to meet the requirements under this PWS.

PART 5

SPECIFIC TASKS

• Receive and store COPE #48 until room #150M is ready to receive it

• Reassemble COPE #48 in room #150M of the main building.

• Dismantle COPEs #11 and #12 located in room # 150M of the main building and haul away.

PART 6

APPLICABLE PUBLICATIONS

6. APPLICABLE PUBLICATIONS (CURRENT EDITIONS)

PART 7 – ATTACHMENT/TECHNICAL EXHIBIT LISING

Attachment/Technical Exhibit List:

Attachment 1/Technical Exhibit 1 – Performance Requirements Summary

Attachment 2/Technical Exhibit 2 – Deliverables Schedule

TECHNICAL EXHIBIT 1 - PERFORMANCE REQUIREMENTS SUMMARY

The Contractor tasks requirements summarizes the performance objectives that relate directly to mission essential items. The performance threshold briefly describes the minimum acceptable levels of work required for each requirement. These thresholds are critical to mission success.

Performance Objective Standard Performan ce Threshold

Method of Surveillance

Incentive (positive or negative)

Performance Objective Standard Performan ce Threshold

Method of Surveillance

Incentive (positive or negative)

Conduct structural disassembly, removal and disposal of COPE

In accordance with specifications, procedures, industry, standards, or best practices.

No major non-conformances

The contractor is expected to obtain the best prices possible for scrap materials

NA

TECHNICAL EXHIBIT 2 – DELIVERABLES

This Technical exhibit lists any reports or documentation that is required as deliverable to include the frequency, # of copies, medium/format and who/where it is to be submitted. A deliverable is anything that can be physically delivered but may include non-physical things such as meeting minutes. Note: All PWS deliverables should be included in this exhibit.

Deliverable Frequency # of Copies Medium/Format Submit to

Scrap Metal Report

PWS Para 1.4.6

Contractor shall submit a scrap metal report documented in poundage within 10 calendar days after the dismantling of COPEs #11 and #12 for BEP's approval and acceptance.

2 Microsoft Word 2003 (or higher) format

CO

COR

Version 01/21/2016

Section D - Packaging and Marking

Section E - Inspection and Acceptance Terms

Inspection and Acceptance

SECTION E- INSPECTION/ACCEPTANCE

E.2 INSPECTION AND ACCEPTANCE

All work hereunder shall be subject to review by the Government. The COR specified in the COR appointment letter(s) is responsible for inspection and acceptance of all incoming shipments, documents, and services unless otherwise specified.

E.3 ACCEPTANCE CRITERIA

Certification by the Government of satisfactory services provided is contingent upon the Contractor performing in accordance with the terms and conditions of the contract and all modifications.

E.4 GOVERNMENT ACCEPTANCE PERIOD

Unless stated elsewhere in this requirement, the COR will have seven (7) calendar days to review draft deliverables and make comments. The Contractor shall have seven (7) workdays to make corrections and return the corrected deliverable to the government.

Upon receipt of the final deliverables, the COR will have seven (7) workdays for final review prior to acceptance or providing documented reasons for non-acceptance.

Section F - Delivery or Performance

Line Item: 0001 Period Of Performance Start Date Period Of Performance End

Date Period Of Performance Address

9/21/16 3/31/17 BEP-ECF

14th and C Streets, S.W.

Washington DC 20228-0001

US

Deliveries or Performances

F.2 PERIOD OF PERFORMANCE

The period of performance of this Firm Fixed Price Contract shall not to exceed six (6) months from the date of award.

There are no option periods under the contract.

F.3 METHOD OF DELIVERY

Electronic copies shall be delivered using Microsoft Office suite of tools (for example, MS WORD, MS EXCEL, MS POWERPOINT, MS PROJECT, or MS ACCESS format), unless otherwise specified by the COR. Electronic submission shall be made via email, unless otherwise agreed to by the COR.

F.4 PLACE OF PERFORMANCE

All work associated with this requirement shall be performed at the following address:

Bureau of Engraving and Printing – Washington DC Currency Facility (DCF)

14th and C Streets SW

Washington, DC 20228

Section G - Contract Administration Data

Requesting Office Address

BEP-OFS

Bureau of Engraving and Printing Office of Facilities Support 301 14th Street SW Washington DC 20228-0001 Phone: Fax:

Contact Details:

COLVIN, JAMES T

JAMES.COLVIN@BEP.GOV

COTR Office Address

BEP-OFS

Bureau of Engraving and Printing Office of Facilities Support 301 14th Street SW Washington DC 20228-0001 Phone: Fax:

Contact Details:

Issuing Office Address

BEP-ACQUISITION

Bureau of Engraving and Printing Office of Acquisition 301 14th Street SW Washington DC 20228-0001 Phone: Fax:

Contact Details:

Contract Administration Data

SECTION G -CONTRACT ADMINISTRATION DATA

G.1 CONTRACT ADMINISTRATION DATA

(a) This Contract will be administered by:

Bureau of Engraving and Printing-Office of Acquisition

14th and C Streets SW, Office 708

Washington, DC 20228

The Contractor shall provide sufficient management to ensure that this contract is performed efficiently, accurately, on time, and in compliance with the requirements of this document. Specifically, the Contractor shall designate a single manager to oversee this contract and supervise staff assigned to this contract.

G.2 CONTRACTING OFFICER'S AUTHORITY

The Contracting Officer is the only person authorized to make or approve any changes in any of the requirements of this contract, and, notwithstanding any provisions contained elsewhere in this contract, the said authority remains solely in the Contracting Officer. In the event the Contractor makes any changes at the direction of any person other than the Contracting Officer, the change will be considered to have been made without authority and no adjustment will be made in the contract terms and conditions, including price.

G.3 CONTRACTING OFFICER'S REPRESENTATIVE (COR)

(a) The Contracting Officer's Representative (COR) may be changed at any time by the Government without prior notice to the contractor by unilateral notice or unilateral modification to the contract. The COR is located at:

* The name and address of the COR will be designated at the time of contract award.

(b) The responsibilities and limitations of the COR are as follows:

A COR—

(1) Shall be a Government employee, unless otherwise authorized in agency regulations;

(2) Shall be certified and maintain certification in accordance with the current Office of Management and Budget memorandum on the Federal Acquisition Certification for Contracting Officer Representatives (FAC-COR) guidance, or for DoD, in accordance with the current applicable DoD policy guidance;

(3) Shall be qualified by training and experience commensurate with the responsibilities to be delegated in accordance with agency procedures;

(4) May not be delegated responsibility to perform functions that have been delegated under 42.202 to a contract administration office, but may be assigned some duties at 42.302 by the contracting officer;

(5) Has no authority to make any commitments or changes that affect price, quality, quantity, delivery, or other terms and conditions of the contract; and

(6) Shall be designated in writing, with copies furnished to the contractor and the contract administration office-

(i) Specifying the extent of the COR's authority to act on behalf of the contracting officer;

(ii) Identifying the limitations on the COR's authority;

(iii) Specifying the period covered by the designation;

(iv) Stating the authority is not redelegable; and

(v) Stating that the COR may be personally liable for unauthorized acts.

G.4 – Invoice and Payment Provision

All invoices shall be prepared in accordance with FAR 52.232-35, Prompt Payment (JUL 2014) and be submitted as instructed below:

ELECTRONIC INVOICING AND PAYMENT REQUIREMENTS –INVOICE PAYMENT PLATFORM (IPP)

The vendor is hereby permitted to invoice once per month.

Payment requests must be submitted electronically through the U.S. Department of the Treasury's Invoice Payment Platform

System (IPP). "Payment request" means any request for contract financing payment or invoice payment by the Contractor.

To constitute a proper invoice, the payment request must comply with the requirements identified in FAR 32.905 (b), " Payment documentation and process" and the applicable Prompt Payment clause included in this contract (see section I below). The IPP website address is https://www.ipp.gov.

Under this Contract, the following documents are required to be submitted as an attachment to the IPP invoices NONE

The Contractor must use the IPP website to enroll, access, and use IPP for submitting requests for payment. Contractor assistance with enrollment can be obtained by contacting the IPP Production Helpdesk via email ippgroup@bos.frb.org or phone (866) 973-3131. If the Contractor is unable to comply with the requirement to use IPP for submitting invoices for payment, the Contractor must submit a waiver request in writing to the CO.

G.5 KEY PERSONNEL

(a) The personnel as specified below are considered essential to the work being performed under this contract and may, with the consent of the contracting parties, be changed from time to time during the course of the contract by adding or deleting personnel, as appropriate. A formal contract modification, signed by both parties will be required.

(b) Before removing, replacing, or diverting any of the specified individuals, the Contractor shall notify the CO, in writing, before the change becomes effective. The Contractor shall submit information to support the proposed action to the CO. The Contractor shall not remove or replace personnel under this contract until the CO has had a chance to review and comment on the proposed change.

The following individuals are designated as Key Personnel under this contract:

Position Staff Member

TBD

Section H - Special Contract Requirements

Special Contract Clauses

H-1 USE OF GOVERNMENT FACILITIES ON A NO-CHARGE BASIS

The contractor is authorized to use on a no-charge basis, in the performance of the contract, the Government-owned facilities as identified below:

1. Bureau Canteen (At the Contractor's Expense)

2. Rest Rooms

3. Utility lines

4. Space for storage of materials and equipment as authorized by the COR.

All hose extension, wiring, etc., required for connection for utility lines shall be furnished by the Contractor.

H-2 SECURITY REQUIREMENTS

Contractor personnel (to include subcontractors) must wear a BEP's issued security badge at time while performing work on BEP's facility and must maintain the level of security required for the life of the contract.

H.3 NON-PERSONAL SERVICES CONTRACT

This contract is a "non-personal services contract" as defined in the FAR Subpart 37.101. It is understood and agreed that the Contractor and/or Contractor's employees, consultants and Subcontractors:

(a) Shall perform the services specified herein as independent Contractors, not as employees of the Government.

(b) Shall be responsible for their own management and administration of the work required, and bear sole responsibility for complying with any and all technical, schedule, or financial requirements or constraints attendant to the performance of this contract.

(c) Shall be free from any direct or indirect supervision or control by any Government employee with respect to the manner or method of performance of the services specified; however,

(d) Shall, pursuant to the government rights under contract clauses such as "Inspection," and "Key Personnel" comply with such general direction of authorized Government employees as is necessary and appropriate to ensure accomplishment of the contract requirements and objectives.

H.4 POST-AWARD EVALUATION OF CONTRACTOR PERFORMANCE

Contractor Performance Evaluations

a. Interim and final evaluations of Contractor performance will be prepared on this contract in accordance with FAR 42.1503. The final performance evaluations will be prepared at the time of completion of work.

b. The Contractor can elect to review the evaluation and submit additional information or a rebuttal statement. The Contractor will be permitted 30 calendar days to respond. Contractor response is voluntary. If the Contractor does not respond within 30 days, the Government will presume that the Contractor has no comment. Any disagreement between the parties regarding an evaluation will be referred to an individual at a level above the Contracting Officer, whose decision is final.

c. Copies of the evaluations, Contractor responses, and review comments, if any, will be retained as part of the contract file, and may be used to support future award decisions.

Bureau of Engraving and Printing utilizes the Contractor Performance Assessment Reporting System (CPARS), Federal Awarded Performance and Integrity Information System (FAPIIS), Architect-Engineer Contract Administration Support System (ACASS) or Construction Contractor appraisal Support System (CCASS) to record and maintain past performance information. The past performance systems hosts a suite of web-enabled applications that are used to document Contractor performance information that is required by Federal Regulations.

The CPARS module assesses performance on contracts for Systems, Services, Information Technology, and Operations Support, Architect-Engineer contracts and performance on Construction contracts. CPARS reference material can be accessed at

Federal Awarded Performance and Integrity Information System (FAPIIS) http://www.fapiis.gov/fapiis/govt/datareports.jsp

The registration process requires the Contractor to identify an individual that will serve as a primary contact. This individual will be authorized access to the evaluation for review and comment. In addition, the Contractor is encouraged to identify a secondary contact in the event the primary contact is unavailable to process the evaluation within the required 30-day time period. After the BEP Contract Specialist registers the contract in one of the systems listed above, the Contractor will receive a system generated e-mail notifying him/her that the contract is registered. A system generated e-mail will also provide the Contractor with a User ID if the person does not already have a system User ID.

Once a performance evaluation has been prepared and is ready for comment, the Contractor representative will receive a system generated e-mail notification that the performance evaluation is electronically available for review and comment.

The Contractor representative will receive an automated e-mail whenever an assessment is completed and can subsequently retrieve the completed assessment from system.

Contractors may access evaluations at one of the website listed above for review and comment in CPARS.

H.6 PROPRIETARY RIGHTS IN REPORTS

All property rights, including publication rights, in progress reports and final reports produced by the Contractor in connection with this contract provided for hereunder shall rest in the Government.

H.7 LIABILITY

The Contractor shall protect, defend, indemnify, save, and hold harmless the United States Government and its employees or agents, from and against any and all claims, demands, expenses, causes of action, judgments and liability arising out of, or in connection with, any fault, negligence, or wrongful acts or omissions of the Contractor, its agents, subcontractors, employees, assignees, or anyone for whom the Contractor may be responsible. The Contractor shall also be liable for any and all costs, expenses and attorney's fees incurred as a result of any such claim, demand, cause of action, judgment or liability, including those costs, expenses, and attorneys' fees incurred by the United States Government and its employees or agents. The Contractor's liability shall not be limited by any provision or limits of insurance set forth in the resulting contract.

H.8 DISSEMINATION OF CONTRACT INFORMATION

The Contractor shall not publish, permit to be published, or distribute information, oral or written, concerning the results or conclusions made pursuant to the performance of this contract, except within and between the Contractor and any Subcontractors or specified Integrated Product/Process Team (IPT) members who have a need to know, of information developed under this contract or contained in the reports to be furnished pursuant to this contract, without the prior written consent of the Contracting Officer. The COR and the Contracting Officer shall be afforded the opportunity to review all Contractor communications and/or correspondence with the media regarding this effort at least 72 hours prior to public release. An electronic copy of any material proposed to be published or distributed shall be submitted to the Contracting Officer, and the COR. FHWA approval for publication will require protection of intellectual property and patent rights of both FHWA and the Contractor.

H.12 DISCLOSURE OF CONFLICTS OF INTEREST

It is the Bureau of Engraving and Printing (BEP) policy to award contracts to only those offerors whose objectivity is not impaired because of any related past, present, or planned interest, financial or otherwise, in organizations regulated by BEP or in organizations whose interests may be substantially affected by Departmental…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .