Attachment_1-_SOO_RDH-1_TA1_Transition11.16.15.docx
DOCX document 34 KB Posted
- Attached to
- RDH-1 CALL 0003: HPEM Transitions
- Solicitation number
- BAA-RVKD-2014-0003_CALL_0003
About this file
RDH-1 CALL 0003 Attachment 1 Statement of Objectives
View the file
Other files
| File | Type | Posted |
|---|---|---|
| QAs_3_Mar_16_2.docx | DOCX document | |
| CALL_0003_1_Mar_16_Ammendment_2.docx | DOCX document | |
| Q As_18_Feb_16.docx | DOCX document | |
| Attachment_1-_SOO_RDH-1Transition02.10.16.docx | DOCX document | |
| Q As_10_Feb_16.docx | DOCX document | |
| CALL_0003_9_Feb_16.docx | DOCX document | |
| CALL_0003_4_Feb_16.docx | DOCX document | |
| Attachment_5-Cost_Proposal_Instructions_(Non-APC).docx | DOCX document | |
| Attachment_6_Representations_and_Certifications_(Section_K).docx | DOCX document | |
| Attachment_3-_DD254_RDH-1_Call_3_Transition.pdf | ||
| Attachment_2_CDRLS_APPROVED.docx | DOCX document | |
| Attachment_4_-_Proposal_Content_Checklist.docx | DOCX document |
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
BAA-RVKD-2014-0003 CALL 0003
High Power Electromagnetics (HPEM) Research Program Statement of Objectives (SOO) 21 November 2015
1.0 GENERAL DESCRIPTION OF WORK TO BE PERFORMED:
Applicable Technical Areas from BAA-RVKD-2014-0003:
Technical Area 1- HPEM Transition
The HPEM Transition Program is interested in existing and emerging HPEM technologies that can be integrated into existing and future platforms. The focus is on the planning capability concepts (PCCs) that will describe the technology and the integrated platform capabilities/performance. Based on the PCCs, the contractor shall perform operational utility assessments to determine the effectiveness and impact of the concept to mission operations. The HPEM concept assessment and technical studies shall determine the technical areas that need to be further developed and risk mitigation efforts that need to be pursued in order to demonstrate the technical capability. This includes developing and demonstrating the advanced technology by producing and testing brass board components to achieve technology readiness levels 4-5.
2.0 OBJECTIVES OF WORK TO BE PERFORMED:
Objectives for the IDIQ:
· The offeror shall assess existing and emerging HPEM technologies that can be integrated into existing and future platforms.
· The offeror shall focus on the PCCs that describe the technology and the integrated platform capabilities and performance.
· The offeror shall perform operational utility assessments to determine the effectiveness and impact of each of the concepts to mission operations.
· The offeror shall develop and demonstrate advanced technology concepts by producing and testing brass board components.
Objectives for Task Order 1- “Size, Weight and Power Analysis for Planning Capability Concepts”:
· The offeror shall focus on the PCCs that describe the technology and the integrated platform capabilities and performance.
· The offeror shall perform operational utility assessments to determine the effectiveness and impact of each of the concepts to mission operations.
· The assessments and studies shall address the following major areas:
· Concept of employment
· Size, Weight, and Power (SWaP) analysis – results will identify technologies that will have to be advanced to enable system integration
· Battle Damage Indication/Assessment (BDI/A)
· Life cycle cost analyst
· DOTMLPF (Doctrine, Organization, Training, Material, Leadership, Personnel, and Facilities).
3.0 RESEARCH SCHEDULE AND REQUIRED DELIVERABLES
| Start Work: | Date of Award (DOA) |
| End of Technical Effort (ETE): | DOA + 36 Months |
| End of Effort | DOA + 39 Months |
CDRL A001: Presentation Material Monthly CDRL A002: Status Report Monthly
| CDRL A003: Final Scientific and Technical Report | DOA + 37 Months |
| CDRL A004: Development Design Drawing and | As required |
| Associated Lists | |
| CDRL A005: Test Plan | 30 days before test |
| CDRL A006: Computer Program End Item | As required |
Documentation
| CDRL A007: Software User’s Manual | As required | |
| CDRL A009: Computer Software | DOA + 12 Months & | |
| Product End Items | DOA + 24 Months | |
| CDRL A010: System Safety Hazard Analysis | Annually |
Report (SSHA) CDRL A014: Contractor Acquired Property (CAP) As required
4.0 OPERATIONS SECURITY CONSIDERATIONS
The Security Classification Guide (SCG) for Counter-Electronics High Power Microwave Program (CE HPM) dated 15 February 2012 will apply to this effort and can be provided upon request. All applicable health, safety, and environmental regulations will also apply.
Program security classification for this effort is TOP SECRET. A Contract Security Classification Specification (DD Form 254) will be applicable to any resulting award.
5.0 CONTRACT HOLIDAYS:
Contract Holidays: The prices/costs include holiday observances; accordingly, the Government will not be billed for such holidays, except when services are required by the Government and are actually performed on a holiday.
6.0 PROGRAM MANAGER
Primary: Mr. Pete Finlay, AFRL/RDHA, (505) 846-8386, DSN 246-8386 Alternate: Maj. Ouail Albairat, AFRL/RDHA, (505) 846-1776, DSN 246-1776
BAA-RVKD-2014-0003
CALL 0003 - SOO
File details come from the government source that posted it. Updated .