Text version

STATEMENT OF WORK

RECONDITION OPS, BATTLE CAB, WHITECELL

RAISED FLOOR TILE

BUILDING 700

EASTERN AIR DEFENSE SECTOR

GRIFFISS BUSINESS AND TECHNOLOGY PARK

BUILDING 700

366 OTIS STREET

ROME, NEW YORK 13441-4812

EADS PROJECT

GRCL-20-0001

30 Dec 2019

Table of contents

1. SCOPE OF WORK

2. AREA OF WORK

3. DESCRIPTION OF WORK

4. PERIOD OF PERFORMANCE

5. MATERIALS

6. GENERAL CONDITIONS

7. GOVERNMENT WORKING HOURS

8. UTILITIES

9. DISPOSAL OF MATERIALS AND CLEANUP

10. SECURITY

11. ESCORTS

12. SITE VISIT

13. POINT OF CONTACT

14. CONTRACT MANPOWER REPORTING

1. SCOPE OF WORK:

The contractor shall provide all personnel, equipment, tools, materials, supervision, transportation, and other items and services necessary to complete the work as described in this Performance Work Statement. Work location is at the Eastern Air Defense Sector (EADS), Building 700, 366 Otis Street, Rome, New York 13441-4812 on the Griffiss Business and Technology Park.

2. AREA OF WORK:

Contractor shall work only in the areas designated by the Engineer in Charge. Area of work is located in Building 700.

Contractor to verify all measurements and quantities at site visit.

3. DESCRIPTION OF WORK:

Contractor shall provide and install all labor and materials to complete the project as described in this Statement of Work.

· Pick up and recondition the extra floor tile on site at EADS

· Install Static Smart, Julie Industries, Galileo low static to the floor tiles on Room 101, 101A, 103 and Static Smart, Julie Industries, Columbus Blue on the raised floor in Room 101

· Remove existing floor tiles from the rooms and replace with the reconditioned tiles. Carpet must match existing.

· Take the removed tile back and install Static Smart, Julie Industries low static carpet to the floor tiles

· Continue this process until all the tiles have been reconditioned

· Crew will start in the Operations floor working through the Battle Cab and into the White cell.

· Crew shall adjust all floor tiles during install to keep them from moving when walked on.

· All molding and trim needed for this project shall be provided and installed by the contractor.

· Contractor shall provide and install TWO (2) carpet tile removal tools.

4. PERIOD OF PERFORMANCE:

Work must be completed in conjunction with the Mission Schedule without interruption of or interference with the function of the military personnel unless prescheduled prior to start of work. All work shall be completed in 120 days from NTP.

5. MATERIALS: All materials must be submitted on an AF Form 3000 prior to using for approval by Engineer. General contractor shall be on site to accept, unload and sign for all materials delivered to the work site. EADS shall have 5 business days to review and approve all material submittals.

6. GENERAL CONDITIONS:

Contractor and all personnel shall comply with the OSHA, NEC, NFPA, Standards. Contractor shall protect all government property (Personnel, Buildings, Foliage, Grounds) while work is in progress. Contractor shall work with the time line of EADS. Prime General Contractor shall be on site at all times with a site supervisor for all sub-contractors supervision. Low Price with best Technical Plan will be selected as bid winner. Technical plan shall consist of a general time line of project and a written narrative of how you plan on executing the actual work, what parts of the job will you sub contract out and what parts of the project your company will execute.

7. GOVERNMENT WORKING HOURS:

Work hours shall be Monday thru Friday 0700-1530 hours, with the exception of Federal holidays. Contractor must have prior approval in writing to work outside these guidelines.

8. UTILITIES:

The Government shall provide at no cost to the Contractor reasonable amounts of water and electricity to support the contract. Hook up will be to existing outlets and will be the contractor’s responsibility.

9. DISPOSAL OF MATERIALS AND CLEANUP:

The contractor shall dispose of all containment debris associated with this job off base and provide valid documentation of disposal. Contractor shall clean up after each work period and dispose of all debris at the close of each day.

· Contractor shall verify all site conditions, quantities, measurements, and project requirements before bidding or ordering materials.

· Contractor shall protect and barricade all work areas at all times to protect workers and the public from injury.

· Contractor shall protect all structures, utilities, vegetation, sidewalks and vehicles from damage at all times. Replace all damaged materials with new materials to the satisfaction of the Government, at no additional cost to the Government.

10. SECURITY:

· EADS Security Forces shall monitor the incoming and outgoing of work personnel during the duration of the project. All deliveries shall be coordinated with the Engineer to arrange for their entrance into the compound.

· The contractor shall submit a list of all personnel names, copy of valid driver’s license within one week after award of contract. Any personnel that will work onsite shall be vetted through EADS security. No one will work on site until a background check is completed and personnel cleared. If at any time the contractor submits additional names for clearance, EADS security will require at least 48 hours’ notice to clear individual.

· All Contractor personnel shall have a minimum of one (1) Form of Photo Identification with them at all times.

· OPSEC Training – Contractor will be briefed in Preconstruction conference.

11. ESCORTS:

The work area (B-700) is located in a secured compound. A security briefing will be conducted prior to the start of the contract.

12. SITE VISIT:

One (1) site visit will be scheduled with date and time determined when solicitation issued. Contractors will meet at EADS Building 703, 366 Otis St., Griffiss Business and Technology Park, Rome, New York 13441-4805. Call CMSgt Ashley Pace, (315) 233-2133, if you plan to attend site visit.

13. POINT OF CONTACT:

Mr. Daniel Melie, Chief, Engineering Services (315) 334-6142.

Mr. Gregory Hatzinger, CEE (315) 334-6731

14. CONTRACT MANPOWER REPORTING

The contractor shall report ALL contractor labor hours (including subcontractor labor hours) required for performance of services provided under this contract for the New York Air National Guard via a secure data collection site. The contractor is required to completely fill in all required data fields using the following web address: http://www.ecmra.mil/

Reporting inputs will be for the labor executed during the period of performance during each Government fiscal year (FY), which runs October 1 through September 30. While inputs may be reported any time during the FY, all data shall be reported no later than October 31 of each calendar year, beginning with 2013. Contractors may direct questions to the help desk at help desk at: http://www.ecmra.mil/