B2B4348B-BF4B-4CF0-85C9-637CAAD8B60F.pdf
PDF 2 MB Posted
- Attached to
- CN NE|80-3-3293
- Contract number
- 80-3-3293
- Issued by
- Nebraska
About this file
This document is a Contract for Services (Contract #PSC-4353) between the Board of Trustees of the Nebraska State Colleges, which includes Peru State College, Chadron State College, and Wayne State Colleges, and Midwest Floor Covering, Inc., a commercial flooring contractor. The contract is for carpet installation in four locker rooms within the Al Wheeler Activities Center (AWAC) at Peru State College, located in Peru, Nebraska.
The contract specifies a total payment of $20,077.00 to the contractor, with payment to be made within 45 days of completion, in accordance with the Nebraska Prompt Payment Act. The project is scheduled to commence on August 4, 2025, and must be completed by August 31, 2025. The carpet specification is Mohawk Side Stripe in color 965 Westpoint, with a Burke 4" Cove in 217 Charcoal. The contractor's original proposal dated July 8, 2025, detailed the scope of work at $11,499.00, with an additional $8,578.00 for demo of existing VCT flooring, bringing the total potential cost to $20,077.00.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .