B12_-_AFTC__Proposal_Schedule.xlsx

XLSX spreadsheet 13 KB Posted

Attached to
WA-ABERNATHY FTC ELECTRICAL DIST SYS REH Federal contract opportunity
Solicitation number
140F0321Q0057
Issued by
Department of the Interior Fish and Wildlife Service

View the file

Other files for this federal contract opportunity

Other files attached to WA-ABERNATHY FTC ELECTRICAL DIST SYS REH, newest first.
File Type Posted
Sol_140F0321Q0057_Amd_0001.pdf PDF
B12_Pre-Work_Safety_Checklist_(2).pdf PDF
B12_Pre-Offer_Bid_Meeting.pdf PDF
B12_Fault_Current_Analysis.pdf PDF
B12_BCE_Fault_Current_Analysis.pdf PDF
A06_AFTC__Electrical_Assessment_Site_Plan_for_Repairs__Drawing_Page.pdf PDF
A06_Technical_Requirements.pdf PDF
Sol_140F0321Q0057.pdf PDF
B03_Construction_Wage_Rates_Cowlitz_County.pdf PDF
B12_AFTC__Subcontract_List.docx DOCX document
A04_AFTC__Statement_of_Work_2021.pdf PDF
Show all 11

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Bid Form Schedule

ABERNATHY FISH TECHNOLOGY CENTER
Repair Electrical Distribution System
and All Associated Appurtenances

PROPOSAL SCHEDULE

INSTRUCTIONS:
The Offeror shall edit this Proposal Schedule and may provide a detailed breakdown of their
Proposal (including support documentation) and all associated line item pricing. It is the
responsibility of the Offeror to ensure all requirements are met and all support documentation
is provided. The purpose of the Proposal Schedule Document is to organize Base Bid Tasks
and Option Bid Tasks for U.S. Fish and Wildlife Service Price Evaluation. Contractor
shall show pricing for items. Failure to provide pricing for all items may result in bid not being
considered for award.

Services - Base and Option Tasks:

TASK

(Base or

Option)DescriptionAmount
1
(Base)Field Verification Site Visit. Review of Existing Site Features and Existing Site Conditions. Document Review, Planning, Development, Preparation, and Submittal of Project Documents.

To include but not be limited to:

Incidentals.

All Associated Electronic and Hard Copy Deliverables.

2
(Base)Permitting.

To include but not be limited to:

Incidentals.

All Associated Electronic and Hard Copy Deliverables.

3
(Base)Mobilization and De-Mobilization.

To include but not be limited to:

Incidentals.

All Associated Electronic and Hard Copy Deliverables.

4
(Base)Construction and Installation of Electrical Repairs and All Associated Appurtenances.

To include but not be limited to:

Incidentals.

All Associated Electronic and Hard Copy Deliverables.

Total (Base TASKS) $0.00

The Offeror may provide a detailed breakdown of their bid and all associated line item pricing.
The above Proposal Schedule Description column is not intended to be comprehensive.
It is the responsiblilty of the Offeror to ensure all requirements are met.
As part of the Proposal Schedule, and at the Offeror's discretion, Prepare and
Submit Back-Up Documents for the Proposal Schedule including Number of Labor Categories,
Labor Rates, Number of Labor Hours, Material Quantities, Equipment Quantities,
Equipment Rates, and Required Tools. Include All Items Required and Anticipated
to successfully deliver the Project.
As the Contractor is preparing their Proposal, Material Quantities require Contractor assumptions.
The Contractor may submit their assumptions about Material Quantities as part of their Offer.
Whether the Contractor chooses to submit their assumptions about Material Quantities to USFWS
for review and as part of their Offer is at the discretion of the Contractor.

Incomplete Bids Will Not Be Considered.

Name of Bidder and Company:

Address (Include Zip Code):