Text version
0011779905
Project Title: Renovate Building No. 460 w ith demolition of six (6) Quonset buildings, Camp Casey Project No.: 267235
a. This is a Non-Work Plan Task Order Request for Proposal (RFP) for Multiple Aw ard task Order Contract (MATOC) Local Contractors Only.
Only proposals for this requirement are being solicited from the MATOC local Contractors for the follow ing MATOC contracts issued by the 411th Contracting support Brigade (CSB) , Korea. Proposals from offerors other than these MATOC local Contractors w ill not be considered for aw ard.
MATOC Number: W91QVN-18-D-0027, 0028, 0042, 0044, 0046 and 0050.
b. Site Visit: Offerors w ho intend to propose on this solicitation are strongly encouraged to attend site visit. See site visit clause FAR 52.236-27 in Section L.
c. Submission of Proposals: See Section L for details.
The proposals shall be submitted by 1300 hours (Korean Standard Time) on the closing date of the RFP via Email to kw ison.pak.ln@army.mil and tondra.r.madison.civ@army.mil If the Contractor is unable to submit the proposal in response to this RFP, the Contractor shall submit the “No-offer letter” by closing date and time specif ied in the solicitation via Email.
MS. PAK, KWI-SON 315-755-3369
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS
NEGOTIATED
08-Jul-2022
(RFP)
(IFB)
X
CALL:
B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)
See Item 7
2. TYPE OF SOLICITATION
SEALED BID
3. DATE ISSUED
9. FOR INFORMATION A. NAME
SOLICITATION
NSN 7540-01-155-3212 1442-101 STANDARD FORM 1442 (REV. 4-85)
Prescribed by GSA
FAR (48 CFR) 53.236-1(e)
11. The Contractor shall begin performance w ithin _______10 calendar days and complete it w ithin ________210 calendar days after receiving aw ard, X notice to proceed. This performance period is X mandatory, negotiable. (See _________________________ Section F
12 A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
(If "YES," indicate within how many calendar days after award in Item 12B.)
YES X NO
13. ADDITIONAL SOLICITATION REQUIREMENTS:
A. Sealed offers in original and __________1 copies to perform the w ork required are due at the place specified in Item 8 by ___________ local time ______________21 Jul 2022 (date). If this is a sealed bid solicitation, offers must be publicly opened at that time.
shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.
B. An offer guarantee is, X is not required.
C. All offers are subject to the (1) w ork requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
D. Offers providing less than _______210 calendar days for Government acceptance after the date offers are due w ill not be considered and w ill be rejected.
SOLICITATION, OFFER,
AND AWARD
(Construction, Alteration, or Repair)
1. SOLICITATION NO.
IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.
4. CONTRACT NO.
7. ISSUED BY CODE
411TH CONTRACTING SUPPORT BRIGADE, KOREA
HUMPHREYS CONTRACTING DIVISION
UNIT 15289
APO AP 96271-5584
UNITED STATES
W91QVN
PAGE OF PAGES
1 OF
CODE
(Title, identifying no., date):
12B. CALENDAR DAYS
01:00 PM (hour)
Sealed envelopes containing offers
5. REQUISITION/PURCHASE REQUEST NO. 6. PROJECT NO.
8. ADDRESS OFFER TO (If Other Than Item 7)
FAX:TEL: TEL: FAX:
W91QVN22R0131 39
20B. SIGNATURE
(REV. 4-85)STANDARD FORM 1442 BACK
TO SIGN
NSN 7540-01-155-3212
SOLICITATION, OFFER, AND AWARD (Continued) (Construction, Alteration, or Repair)
CODE FACILITY CODE
17. The offeror agrees to perform the w ork required at the prices specif ied below in strict accordance w ith the terms of this solicitation, if this offer is accepted by the Government in w riting w ithin ________ calendar days after the date offers are due.
the minimum requirements stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.)
AMOUNTS SEE SCHEDULE OF PRICES
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)
AMENDMENT NO.
DATE
20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN
OFFER (Type or print)
AWARD (To be completed by Government)
21. ITEMS ACCEPTED:
22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA
24. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM
(4 copies unless otherwise specified)
CODE
(Insert any number equal to or greater than
20C. OFFER DATE
25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO
10 U.S.C. 2304(c) 41 U.S.C. 253(c)
CODE27. PAYMENT WILL BE MADE BY:26. ADMINISTERED BY
(Include ZIP Code)14. NAME AND ADDRESS OF OFFEROR 15. TELEPHONE NO. (Include area code)
See Item 14
(Include only if different than Item 14)16. REMITTANCE ADDRESS
30B. SIGNATURE
29. AWARD (Contractor is not required to sign this document.)
document and return _______ copies to issuing office.) Contractor agrees Your of f er on this solicitation, is hereby accepted as to the items listed. This award con-to f urnish and deliv er all items or perf orm all work, requisitions identif ied summates the contract, which consists of (a) the Gov ernment solicitation and on this f orm and any continuation sheets f or the consideration stated in this y our of f er, and (b) this contract award. No f urther contractual document is contract. The rights and obligations of the parties to this contract shall be necessary .
gov erned by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certif ications, and specif ications or incorporated by ref er-ence in or attached to this contract.
30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31A. NAME OF CONTRACTING OFFICER (Type or print)
30C. DATE
(Type or print)
TEL: EMAIL:
31B. UNITED STATES OF AMERICA 31C. AWARD DATE
BY
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
(Contractor is required to sign this28. NEGOTIATED AGREEMENT
(M ust be fully completed by offeror)OFFER
W91QVN22R0131
Section B - Supplies or Services and Prices
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0001 1 Job
Repair "K" Work
FFP
Renovate Building No. 460 with Demolition of six (6) Quonset Buildings, Camp Casey. The contractor shall provide all labor, tools, equipment, supplies and any other resources necessary to accomplish the scope of work contained herein as indicated in the drawings and in accordance with the specifications FOB: Destination
PURCHASE REQUEST NUMBER: 0011779905
PSC CD: Z2EA
NET AMT
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0002 1 Job
Construction "L" Work
FFP
Renovate Building No. 460 with Demolition of six (6) Quonset Buildings, Camp Casey. The contractor shall provide all labor, tools, equipment, supplies and any other resources necessary to accomplish the scope of work contained herein as indicated in the drawings and in accordance with the specifications.
FOB: Destination
PURCHASE REQUEST NUMBER: 0011779905
PSC CD: Z2EA
NET AMT
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
War Hazard
FFP
War Hazard Expected Losses from War Hazard are Zero (0).
FOB: Destination
PSC CD: Z2EA
NET AMT
Section C - Descriptions and Specifications
NON‐WORK PLAN TASK ORDER OF W91QVN‐22‐R‐0131
Renovate Building No. 460 With Demolition of six (6) Quonset Buildings
Camp Casey, Korea
TECHNICAL PROVISIONS - I
STATEMENT OF WORK
PROJECT NO TITLE LOCATION
267235 Renovate building No. 460 Camp Casey with demolition of six (6) Quonset buildings
1. DESCRIPTION: The work to be performed to renovate building No. 460 with demolition of six (6) Quonset buildings is described below and executed by one or more of the groups.
1.1. Work by Contractor: The contractor shall provide all labor, tools, equipment, supplies and any other resources necessary to accomplish the scope of work contained herein as indicated in the drawings and in accordance with the specifications.
1.2. Work by In-House Labor: Not applicable to this project.
1.3. Work by Troop Labor: Not applicable to this project.
2. PRINCIPAL FEATURES: This project includes the following principal features:
2.1. Schedule #I, Repair (K): All work shall be in accordance with the attached drawings and specifications.
2.1.1. Civil Work
2.1.1.1. Replace concrete sidewalk.
2.1.1.2. Replace and regrade Asphalt Concrete (AC) pavement.
2.1.1.3. Replace concrete curb with 0.2m width granite curb.
2.1.1.4. Replace one (1) 8.0m x 6.0m open shed with four (4) movable picnic tables.
2.1.1.5. Paint road edge line and parking line with 150mm thickness reflective white.
2.1.1.6. Replace chain link fence and one (1) single gate.
2.1.1.7. Replace basketball court, line marking, basketball goal post, and sloping for surface drainage.
2.1.1.8. Restore carpet sodding with top soil.
2.1.1.9. Replace 0.3m w steel grating cover ditch.
2.1.1.10. Replace steel grating ditch with 500mm diameter Reinforced Concrete Pipe (RCP) and one
(1) surface inlet (0.7m x 0.7m).
2.1.1.11. Replace 150mm diameter Polyvinyl Chloride (PVC) sewer line and concrete encasement.
2.1.1.12. Upgrade drainage system with 300mm diameter RCP, five (5) surface inlet (0.5m x 0.5m) and one (1) 1.2m x 1.2m drain manhole.
2.1.1.13. Connect existing water line to the building.
2.1.1.14. Plant Zelkova tree.
2.1.1.15. Plant cherry blossom.
2.2. Schedule #II, New Construction (L): All work shall be in accordance with the attached drawings and specifications.
2.2.1. Civil Work
2.2.1.1. Install 0.2m width granite curb.
2.2.1.2. Construct one (1) 4.6m width concrete step with handrail.
2.2.1.3. Construct one (1) 1.5m width concrete step with handrail.
2.2.1.4. Construct high land free standing wall block (Inoblock or approved equal).
2.2.1.5. Construct 3.6m x 2.4m trash bin.
2.2.1.6. Connect existing water line to the building for sprinkler system.
2.2.1.7. Install water line marking on sodding, pavement area, and curved spot.
2.2.2. Architectural Work
2.2.2.1. Floor work
2.2.2.1.1. Install new Polyvinyl Chloride Tile (PVCT) including Vinyl Cove Base (VCB) and Wood Base (WB) as shown on new floor plan and interior finish schedule.
2.2.2.1.2. Install new marble tile as shown on floor plans and interior finish schedule.
2.2.2.1.3. Install Floor Ceramic Tile (FCT) including cement bond coat, waterproof membrane, and mortar bed as shown on floor plans, section, and details drawings.
2.2.2.1.4. Apply epoxy coating with non-slip grits on existing floors as shown on floor plan and interior finish schedule.
2.2.2.2. Interior and exterior wall work
2.2.2.2.1. Install new Gypsum Wall Board (GWB) wall (Normal, water resistant or 'X' type) including metal studs as shown on floor plans, sections, and detail drawings.
2.2.2.2.2. Paint and texture coat for all existing interior walls including as shown on floor plan, detail drawings interior finish schedule.
2.2.2.2.3. Install new Exterior Insulation and Finish System (EIFS) and face bricks as shown on floor plan, elevations, sections, and detail drawings.
2.2.2.2.4. Install new Sound Absorption Wall Panel (SAWP) at mechanical room as shown on floor plan and interior finish schedule.
2.2.2.2.5. Install new Glazed Ceramic Wall Tile (GCWT) including cement bond coats, waterproof membrane, plastering with metal lath and waterproof GWB as shown on floor plans and sections.
2.2.2.2.6. Install new wooden panel and Solid Surface Material Wall (SSMW) as shown on floor plan and interior finish schedule.
2.2.2.2.7. Install new Marble Composition Panel (MCP) at Vest-1 as shown on floor plan and interior finish schedule.
2.2.2.3. Interior and exterior ceiling and roof work
2.2.2.3.1. Install new acoustical ceiling tiles including metal suspension systems as shown on floor plans and interior finish schedule.
2.2.2.3.2. Install new GWB (Normal, water resistant or 'X' type) ceiling including ceiling suspension system as shown on floor plans and finish schedule.
2.2.2.3.3. Paint all interior ceiling surfaces as shown on interior finish schedule and section.
2.2.2.3.4. Install new standing seam metal roof as shown on floor plan, roof plan, elevations, and details.
2.2.2.3.5. Install new rain gutters and downspouts as shown on floor plans and elevations.
2.1.2.4. Miscellaneous work
2.2.2.4.1. Install doors and door frames including new hardware sets as shown on new floor plan and door schedule.
2.2.2.4.2. Install new aluminum thermal breaker, blast type windows including insect screen including glass as shown on floor plans, elevations, and window schedule.
2.2.2.4.3. Install new window horizontal mini blinds, fireproof type.
2.2.2.4.4. Install new wooden head, jam and sill for all windows as shown on door/window schedule.
(Natural color, oak)
2.2.2.4.5. Install new aluminum louver as shown on floor plans and louver schedule.
2.2.2.4.6. Install new Fire Extinguishers Cabinets (FEC) as shown on floor plans and detail drawing.
2.2.2.4.7. Install all new toilet accessories as shown on floor plans and detail drawings.
2.2.2.4.8. Install new interior and exterior signages as shown on floor plan, elevations, and signage schedule.
2.2.2.4.9. Install new metal shelf with mop rack with new in janitor room.
2.2.2.4.10. Install new aluminum grating, Stainless Steel (SST) handrail and SST boot scraper as shown on floor plan and detail drawing.
2.2.2.4.11. Install TA-50 lockers (2 tier) including lockset as shown on floor plan and detail drawing.
2.2.2.4.12. Install new 100mm deep gravel bed including granite curb around building as shown on floor plan and detail drawing.
2.2.2.4.13. Install new bulletin board as shown on floor plan, detail drawing and signage schedule.
2.2.2.4.14. Install new wooden chair rails, wooden wall rails and ceiling molding at conference as shown on floor plans and detail drawings.
2.2.2.4.15. Install new concrete stoops and concrete steps as shown on floor plan.
2.2.2.4.16. Install woven wires and frame including gates and lockset as shown on floor plan and detail drawings.
2.2.2.4.17. Install new projection screen and projector mount new as shown on floor plans, detail drawings and interior finish schedule.
2.2.2.4.18. Install new access doors on wall and ceiling as required.
2.2.3. Mechanical Work
2.2.3.1. Install heating and cooling system by installing new Variable Refrigerant Flow (VRF) duct-free split heat pump indoor and outdoor units, DX type air handling unit, split air conditioning outdoor and indoor unit, electric unit heaters, electric wall heaters, pipes, valves, controller, insulations, controls, access doors, equipment support (concrete pad) and all associated accessories for heating and cooling system as shown on drawings. Remote controller indicators and labels shall be in English.
2.2.3.2. Install ventilation system by installing new exhaust fans, energy recovery ventilators, dehumidifier, controller, CO2 sensor, Heating, Ventilating, and Air Conditioning (HVAC) emergency shutdown switch, controls, diffusers, grilles, louvers, dampers, ducts, insulations, access doors, equipment support, and all associated accessories for ventilation system as shown on drawings.
2.2.3.3. Perform Duct Air Leakage Test (DALT) and Testing, Adjusting, and Balancing (T.A.B) after construction to verify that the HVAC system works properly.
2.2.3.4. Install plumbing system by installing new domestic cold and hot water piping system, sewer and vent piping system including plumbing fixtures, instantaneous water heaters, electric water cooler, valves, water hammer arresters, control, access doors, and all associated accessories as shown on drawings.
2.2.3.5. Install sprinkler system by installing new automatic fire protection wet sprinkler system, spare sprinkler head cabinet with spare sprinkler head (6ea) as shown on drawings.
2.2.3.6. The contractor shall inspect and test the fire protection system. The work inspection and test shall be performed by the Fire Protection Professional Engineer (FPE).
2.2.4. Electrical Work
2.2.4.1. Install new interior and exterior lighting fixtures, exit lights, toggle switches, 3-way switches, dimming switch, lighting contactors, photocell, wires and conduit.
2.2.4.2. Install new watt-hour meter, panelboards, receptacles with cover plates associated wiring and conduit.
2.2.4.3. Install new safety switches, motor controllers, junction boxes, control/power wires and conduit for mechanical systems.
2.2.4.4. Install new addressable fire alarm control and mass notification system panel, manual pull station, smoke detector and relay module, antenna, visual/signal strobes (15 or 75 candela), microphone, speaker device, fire alarm building transmitter, and associated wiring and conduit.
2.2.4.5. Install new telecommunication system including telephone terminal board, telephone/data outlets with cover plates, terminal blocks, equipment rack, and associated wire and conduit.
2.2.4.6. Install CATV distribution cabinet, pull boxes, CATV outlets, and associated wiring and conduit.
2.2.4.7. Install new exterior underground telecommunication line and accessories.
2.2.4.8. Install new exterior power distribution system including pad mounted transformer.
2.2.5. Structural Work
2.2.5.1. Construct new concrete spread footing.
2.2.5.2. Construct 150mm thickness concrete slab.
2.2.5.3. Construct 200mm thickness concrete wall and foundation.
2.2.5.4. Construct steel column and foundation and roof framing.
2.2.5.5. Construct concrete stoop and canopy.
TECHNICAL PROVISIONS - II
TECHNICAL DETAIL SPECIFICATIONS
with demolition of six (6) Quonset buildings
GENERAL: The specification sections listed below are applicable to this project. The specifications are from the “Standard Technical Specifications for O&MA Projects, Korea, Revision 1” (2014 OMA SPECS, REVISION 1), dated 20151030, located on the http://www.usfk.mil/Portals/105/Documents/Contracting/NewContract/2014-OMA-SPECS_REVISION- 1.pdf. The electronic version of the specifications is Acrobat® PDF format and can be read with the Acrobat Reader® software.
The Standard Technical Detail Specifications:
The work shall conform to the most current version of the listed standards/specifications below.
DIVISION 01 – GENERAL REQUIREMENTS
01 30 00 ADMINISTRATIVE REQUIREMENTS
01 32 01.00 10 PROJECT SCHEDULE
01 33 00 SUBMITTAL PROCEDURES
01 35 26 GOVERNMENTAL SAFETY REQUIREMENTS
01 45 00.00 10 QUALITY CONTROL
01 50 00 TEMPORARY CONSTRUCTION FACILITIES AND CONTROLS
01 58 00 PROJECT IDENTIFICATION
01 78 00 CLOSEOUT SUBMITTALS
01 78 23 OPERATION AND MAINTENANCE DATA
DIVISION 02 - EXISTING CONDITIONS
02 41 00 DEMOLITION AND DECONSTRUCTION
02 61 13 EXCAVATION AND HANDLING OF CONTAMINATED
MATERIAL
02 65 00 UNDERGROUND STORAGE TANK REMOVAL
02 81 00 TRANSPORTATION AND DISPOSAL OF HAZARDOUS
MATERIALS
02 82 14.00 10 ASBESTOS HAZARD CONTROL ACTIVITIES
02 83 19.00 10 LEAD BASED PAINT HAZARD ABATEMENT, TARGET
HOUSING & CHILD OCCUPIED FACILITIES
DIVISION 03 – CONCRETE
03 11 13.00 10 STRUCTURAL CAST-IN-PLACE CONCRETE FORMING
03 15 00.00 10 CONCRETE ACCESSORIES
03 20 00.00 10 CONCRETE REINFORCING
03 30 00 CAST-IN-PLACE CONCRETE
DIVISION 05 – METALS
05 05 23 WELDING, STRUCTURAL
05 12 00 STRUCTURAL STEEL
05 50 13 MISCELLANEOUS METAL FABRICATIONS
DIVISION 06 - WOOD, PLASTICS, AND COMPOSITES
06 10 00 ROUGH CARPENTRY
06 20 00 FINISH CARPENTRY
DIVISION 07 - THERMAL AND MOISTURE PROTECTION
07 24 00 EXTERIOR INSULATION AND FINISH SYSTEMS
07 60 00 FLASHING AND SHEET METAL
07 92 00 JOINT SEALANTS
DIVISION 08 – OPENINGS
08 11 13 STEEL DOORS AND FRAMES
08 14 00 WOOD DOORS
08 51 13 ALUMINUM WINDOWS
08 71 00 DOOR HARDWARE
08 81 00 GLAZING
08 91 00 METAL WALL AND DOOR LOUVERS
DIVISION 09 – FINISHES
09 22 00 SUPPORTS FOR PLASTER AND GYPSUM BOARD
09 22 36 LATH
09 29 00 GYPSUM BOARD
09 30 00 CERAMIC TILE, QUARRY TILE, AND PAVER TILE
09 51 00 ACOUSTICAL CEILINGS
09 65 00 RESILIENT FLOORING
09 90 00 PAINTS AND COATINGS
DIVISION 10 – SPECIALTIES
10 14 01 EXTERIOR SIGNAGE
10 14 02 INTERIOR SIGNAGE
10 21 13 TOILET COMPARTMENTS
10 28 13 TOILET ACCESSORIES
DIVISION 12 – FURNISHINGS
12 21 00 WINDOW BLINDS
12 32 00 MANUFACTURED WOOD CASEWORK
12 36 00 COUNTERTOPS
DIVISION 21 - FIRE SUPPRESSION
21 13 13.00 10 WET PIPE SPRINKLER SYSTEM, FIRE PROTECTION
DIVISION 22 – PLUMBING
22 00 00 PLUMBING, GENERAL PURPOSE
DIVISION 23 - HEATING, VENTILATING, AND AIR CONDITIONING
23 00 00 AIR SUPPLY, DISTRIBUTION, VENTILATION, AND EXHAUST SYSTEMS
23 05 93 TESTING, ADJUSTING, AND BALANCING FOR HVAC
23 07 00 THERMAL INSULATION FOR MECHANICAL SYSTEMS
23 09 53.00 20 SPACE TEMPERATURE CONTROL SYSTEMS
23 82 02.00 10 UNITARY HEATING AND COOLING EQUIPMENT
DIVISION 26 – ELECTRICAL
26 00 00.00 20 BASIC ELECTRICAL MATERIALS AND METHODS
26 08 00 APPARATUS INSPECTION AND TESTING
26 20 00 INTERIOR DISTRIBUTION SYSTEM
26 51 00 INTERIOR LIGHTING
26 56 00 EXTERIOR LIGHTING
DIVISION 27 – COMMUNICATIONS
27 10 00 BUILDING TELECOMMUNICATIONS CABLING SYSTEM
27 54 00.00 20 COMMUNITY ANTENNA TELEVISION (CATV) SYSTEMS
DIVISION 28 - ELECTRONIC SAFETY AND SECURITY
28 31 33.00 10 FIRE ALARM REPORTING SYSTEM, RADIO TYPE
28 31 64.00 10 FIRE DETECTION AND ALARM SYSTEM, ADDRESSABLE
28 31 76 INTERIOR FIRE ALARM AND MASS NOTIFICATION SYSTEM
DIVISION 31 – EARTHWORK
31 00 00 EARTHWORK
DIVISION 32 – EXTERIOR IMPROVEMENTS
32 05 33 LANDSCAPE ESTABLISHMENT
32 11 16.16 BASE COURSE FOR RIGID AND SUBBASE COURSE FOR
PERVIOUS PAVING
32 11 16 SUBBASES FOR FLEXIBLE PAVING
32 12 10 BITUMINOUS TACK AND PRIME COATS
32 13 17 COMPRESSION JOINT SEAL FOR CONCRETE PAVEMENTS
32 16 13 CONCRETE SIDEWALK AND CURBS AND GUTTERS
32 31 13 CHAIN LINK FENCES AND GATES
32 92 23 SODDING
DIVISION 33 - UTILITIES
33 11 00 WATER DISTRIBUTION
33 30 00 SANITARY SEWERS
33 70 02.00 10 ELECTRICAL DISTRIBUTION SYSTEM, UNDERGROUND
33 82 00 TELECOMMUNICATIONS OUTSIDE PLANT (OSP)
TECHNICAL PROVISIONS - III
SPECIAL CONDITIONS
with demolition of six (6) Quonset buildings
1. Material Approval Submittal:
(1) The contractor shall submit a shop drawing submittal schedule and the material approval request with all supporting documents to the COR within 7 days after receipt of NTP.
(2) Attached list of materials in Appendix “B” shall be included in the shop drawing submittal schedule and material approval request.
2. Extended warranty - FAR 52.246-21
2.1. Extended warranty list
No. Warranty Item Description Warranty
Period (Yrs) Certification (Yes / No)
Warranty Tag (Yes / No)
Repair Time after call
1 High land stone free standing Product 5
2 Metal roof panel Installer 10
3 VRF Heat Pump Outdoor Unit Product 3 Y Y 24 Hrs
VRF Heat Pump Indoor Unit, various capacity Product 3 Y Y 24 Hrs
5 Air Handling Unit Product 3 Y Y 24 Hrs
6 Energy Recovery Ventilator Product 3 Y Y 24 Hrs
Split Air Conditioning Outdoor
& Indoor Unit Product 3 Y Y 24 Hrs
8 LED light Product 10 Y Y 7 Days
2.2. Contractor shall submit to COR the Warranty Certification with 4025 for the listed items.
2.3. Contractor shall submit to COR Warranty management plan and approve it before 30 days of pre-warranty conference. (OMA Sec 01 78 00)
2.4. Contractor shall have the Pre-Warranty Conference before Contract Close Date. (OMA Sec 01 78)
2.5. Warranty Information and Data
2.5.1. Contractor shall submit Warranty tag design, COR shall review and approve it for the listed and shall install it for the listed items. (OMA Sec 01 78 00)
2.5.2. Submit the O&M Manual with Manufacturer’s instruction for DPW training. (OMA Sec 01 78 00)
3. The contractor shall have personnel on site for the sprinkler work and the fire alarm work upon Government's direction, who are certified by the National Institute for Certification in Engineering Technologies (NICET) Level III or equivalent. Equivalent Certificates in Korea are the followings which are issued by the Human Resource Development Service of Korea. If the contractor does not have personnel who are certified by NICET, the contractor shall have two personnel that one is certified for (1) and the other for (2) below.
(1) Engineer Fire Fighting Facilities - Electrical (소방설비기사 -전기)
(2) Engineer Fire Fighting Facilities - Mechanical (소방설비기사 -기계)
4. Environmental Requirements in Contract
The Contractor shall perform work consistent with the relevant policy and objectives identified in Installation’s Environmental Management System (EMS). The Contractor shall perform work in a manner that conforms to all appropriate Environmental Management Programs and Operational Controls identified by Installation’s EMS, including pollution prevention, waste reduction, energy use, and natural resource protection. The Contractor shall provide monitoring and measurement information as necessary for the organization to address environmental performance relative to the environmental, energy, and transportation management goals. In addition, the Contractor shall advise their employees of their roles and responsibilities identified by the EMS and how these requirements affect their work performed under this contract. The Contractor is responsible for ensuring that the Contractor and any persons involved in the supervision or performance of the contract complete all required Environmental training.
In the event of any environmental nonconformance or noncompliance associated with the contracted services, the contractor shall take corrective and/or preventative actions. In the event of any noncompliance with any federal, state, or local environmental law, regulation or requirement, the Contractor shall immediately respond by taking all appropriate corrective actions and notifying the Contracting Officer’s Representative (COR) and the Environmental Office. For any nonconformance with the EMS, the Contractor shall take corrective action and initiate further preventative action, as required by the Environmental Office.
All on-site contractor personnel shall complete necessary safety and environmental training specified for the type of work conducted on-site. Upon contract award, the COR will notify the EMS Manager to arrange Environmental training for appropriate staff.
Additionally, when ordering supplies for use on Installation, all contractor personnel must favor energy-efficient, recycled or reclaimed material whenever practicable.
The responsibilities of all contractor personnel include:
(1) Comply with all applicable environmental laws, regulations and installation environmental policies.
(2) Control and prevent spills or hazardous substances releases IAW installation Spill Prevention Plan.
(3) Ensure dust, debris, materials, trash, etc., do not become air borne and travel off the project site.
(4) Do not remove, cut, deface, injure, or destroy land resources including trees, shrubs, vines, topsoil and land forms without approval, except in areas indicated on the drawings or specified to be cleared.
(5) Monitor all water areas affected by construction activities to prevent pollution of surface and ground waters. Do not apply toxic or hazardous chemicals to soil or vegetation unless otherwise indicated.
(6) Open burning is prohibited on the Government premises IAW installation environmental policy.
(7) Participate in installation’s recycling program.
(8) Reducing the amount of hazardous material and/or solvent used by purchasing fewer hazardous materials and by increasing the use of products with recycled content. Spills of hazardous or toxic materials must be immediately reported to the Contracting Officer and the Environmental Office.
Storage, describing, packaging, labeling, marking and placarding of hazardous waste and hazardous material IAW applicable environmental laws, regulations and local environmental policies. Transport hazardous waste off Government property and dispose of it in compliance with National, Provincial, and/or Local requirements for solid waste disposal.
(9) Reducing the amount of solid waste from construction and demolition debris, and scrap metal sent to municipal and rubble landfills by reducing, reusing, and recycling. Handling, storage, and disposal of solid waste must be conducted to prevent contamination. Transport solid waste off Government property and dispose of it in compliance with National, Provincial, and/or Local requirements for solid waste disposal.
(10) Conserving energy and water usage by turning off lights and equipment when not in use and using only the necessary amount of water needed to complete the required tasks. Continuous conservation of our natural resources is a must.
(11) When potential cultural or historic items are inadvertently found during construction activities, immediately cease activities in the vicinity of the discovery and report the findings to the Environmental Office.
(12) Participate in installation’s Integrated Pest Management (IPM) program whenever practicable.
(13) Minimize interference with disturbance to, and damage to fish, wildlife, and plants including their habitat.
3. CONTRACT REQUIREMENTS PACKAGE ANTITERRORISM/OPERATIONS SECURITY REVIEW
COVER SHEET
After Notice to process is issued, COR shall take following action, Section IV. Standard Contract Language/Contract Clause Applicability and/or Additional SOW Language.
A. AT Level I training. This standard language is for contractor employees with an area of performance within as Army controlled installation, facility or area. All contractor employees, including subcontractor employees, requiring access to Army installations, facilities, and controlled-access areas shall complete AT Level I awareness training within 30 calendar days after the contract start date or effective date of incorporation of this requirement into the contract, whichever is applicable. The contractor shall submit certificates of completion for each affected contractor employee and subcontractor employee, to the COR or to the contracting officer, if a COR is not assigned, within 05 calendar days after completion of training by all employees and subcontractor personnel. AT Level I awareness training is available at the following website: http://jko.jten.mil
B. Access and general protection/security policy and procedures. This standard language is for contractor employees with an area of performance within Army controlled installation, facility, or area.
Contractor and all associated sub-contractors employees shall provide all information required for background checks to meet installation access requirements to be accomplished by installation Provost Marshal Office, Director of Emergency Services or Security Office. Contractor workforce must comply with all personal identity verification requirements (FAR clause 52.204-9, Personal Identity Verification of Contractor Personnel) as directed by DOD, HQDA and/or local policy. In addition to the changes otherwise authorized by the changes clause of this contract, should the Force Protection Condition (FPCON) at any individual facility or installation change, the Government may require changes in contractor security matters or processes.
B-a. For contractors that do not require CAC, but require access to a DoD facility or installation. Contractor and all associated sub-contractors employees shall comply with adjudication standards and procedures using the National Crime Information Center Interstate Identification Index (NCIC-III) and Terrorist Screening Database (TSDB) (Army Directive 2014-05/AR 190-13), applicable installation, facility and area commander installation/facility access and local security policies and procedures (provided by government representative), or, at OCONUS locations, in accordance with status of forces agreements and other theater regulations.
C. iWATCH Training. The contractor and all associated sub-contractors shall brief all employees on the local iWATCH program (training standards provided by the requiring activity ATO). This local developed training will be used to inform employees of the types of behavior to watch for and instruct employees to report suspicious activity to the COR. This training shall be completed within 30 calendar days of contract award and within 05 calendar days of new employees commencing performance with the results reported to the COR NLT 30 calendar days after contract award.
D. For contracts that require OPSEC Training. Per AR 530-1 Operations Security, the contractor employees must complete Level I OPSEC Awareness training. New employees must be trained within 30 calendar days of their reporting for duty and annually thereafter.
APPENDIX "A"
LIST OF APPLICABLE CONTRACT DRAWINGS
See Section J ‐ List of Documents, Exhibits and Other Attachments
APPENDIX "B"
List of materials for Material Approval Submittal with demolition of six (6) quonset buildings
Submittal Identification
Description of Submittal
LC-1 Ready mixed concrete, S/12cm, 240 kg/cm2
LC-2 Hot mixed Asphalt Concrete #67
LC-3 Gravel for Base Course
LC-4 Sand for Subbase Course
LC-5 Prime Coat MC-1
LC-6 Tack Coat RC-3
LC-7 Form lumber
LC-8 Reinforcing steel bar
LC-9 Expansion joint
LC-10 Wire mesh
LC-11 Granite Curb 200x300
LC-12 Post fence steel pipe galv. 3" dia x 10' w/ conc. footing
LC-13 Brace rail, steel pipe galv. 1 5/8" dia x 10' w/ cap
LC-14 Top rail steel pipe galv. 1 5/8" dia x 20' w/ coupling
LC-15 Chain link #9-2"x2"
LC-16 Coat Basketball court including labor cost
LC-17 Basketball Goal post
LC-18 ZELKOVA TREE (4.0H X 12.0R)
LC-19 CHERRY BLOSSOM (4.0H X 12.0B)
LC-20 Steel grating 300mm x 995mm w/ angle
LC-21 500mm DIA RCP
LC-22 300mm DIA RCP
LC-23 PVC Pipe 50mm dia for Water Line
LC-24 50mm 1/4 Bend
LC-25 Carpet Sodding
LC-26 0.5m X 0.5m Surface inlet w/ steel grating cover
LC-27 Manhole w/ Cover
LC-28 Shade shelter (8.0M x 6.0M)
Description of Submittal
LC-29 PVC Pipe 150mm dia for Water Line
LC-30 150mm 1/4 Bend
LC-31 38mm steel pipe for handrail
LC-32 Water line marking including labor cost
LC-33 High land stone free standing (W150~450, H150, D225)
LC-34 Trash bin
OC-1 50MM TAPPING SADDLE
OC-2 50MM GATE VALVE W/ BOX
OC-3 150MM TAPPING VALVE
OC-4 150X150X150MM TAPPING SLEVE
LS-1 Ready Mixed Conc. 280kg/cm2
LS-2 FORM
LS-3 #8-150x150 WWF
LS-4 REBAR D13
LS-5 REBAR D16
LS-6 REBAR D19
LS-7 H-346x174x6x9
LS-8 H-350x175x7x11
LS-9 H-150x150x7x10
LS-10 H-344x348x10x16
LS-11 L-50x50x6
LS-12 Purlin-200x75x25x4.5
LS-13 L-150x90x9
LS-14 VAPOR BARRIER(P.E. FILM, 0.1MM, 2PLY)
LS-15 M20 A.B.(350LG)
LS-16 M12 BOLT
LS-17 16DIA ROD BAR
LS-18 TURN BUCKLE
LA-1 Granite curb stone, 200Wx300Dx1,000L
LA-2 Ready mixed concrete, 210kg/CM, slump 12
LA-3 Wooven Wire welding fabric, 150x150, #8 x #8 incl. gate
LA-4 Vapor barrier, 0.1mm
LA-5
EIFS, PB System incl. meshes, EPS board, base/finish coat and control joint
LA-6 Waterproofing (bath room floor)
LA-7 Anodized AL blast door w/ AL frame & glasses, HDW, 1900 x 2150
LA-8 Anodized AL door w/ AL frame & glasses, HDW, 1900 x 2150
Description of Submittal
LA-9
Steel thermal insulated blast double door w/steel frame door size: 1,714 W X 2150 H X
44.5 Thk.
LA-10
Steel insulated thermal blast door with steel frame door size; 915W. X 2133H. X 44.5 Thk. 100 X 600 insulated glass
LA-11 Steel thermal insulated door w/steel frame door size: 915W X 2133 H X 44.5 Thk.
LA-12
Steel thermal double door w/steel frame door size: 1,714 W X 2133 H X 44.5 Thk., 1hrs fire rated
LA-13 Steel hollow core single door w/frame door size; 915W X 2133H. X 44.5 Thk.
LA-14 Wood solid door w/frame door size; 915W. X 2133H. X 44.5 Thk.
LA-15 Door closer, C02021
LA-16 Door closer, C02011
LA-17 Hinge, butt, A5111, 114 x 114 (NRP)
LA-18 Hinge, butt, A5112, 114 x 114 (NRP)
LA-19 Door stop and holder, Exterior type w/Conc, H9", 3"x3"
LA-20 Door stop , L02161
LA-21 Door stop , L02141
LA-22 Push plate, J302
LA-23 Pull plate, J405
LA-24 Kick plate, J102
LA-25 Threshold, aluminum, 150W, SGL, J39150
LA-26 Threshold, aluminum, 150W, SGL, J32100
LA-27 Marble SSM threshold 150mm W
LA-28 Key box, E8351
LA-29
Aluminum blast window thermal break type, fixed & tilting window, 1600x900, 26.75thk Low-e insulated glass, insect screen
LA-30 AL louver 500 X 400 with Insect Screen & Bird Screen
LA-31 Metal stud, 0.8 mm x 45 mm x200 mm W/expansion bolt
LA-32 Metal stud, 0.8 mm x 45 mm x90 mm W/expansion bolt
LA-33 Metal runner, 0.8 mm x 45 mm x202 mm W/expansion bolt
LA-34 Metal runner, 0.8 mm x 45 mm x92 mm W/expansion bolt
LA-35 Metal ceiling suspension system for GWB
LA-36 Acoustical ceiling suspension system, aluminum
LA-37 Gypsum board, 15mm thk x1,200 x2,400, normal
LA-38 Gypsum board, 15mm thk x1,200 x2,400, water resistant or X
LA-39 Gypsum board, 15mm thk x1,200 x2,400, fire resistant or X
LA-40 Acoustical tile, 600x600x16mm thk.
LA-41 Cement board with nail and adhesive, 12THK
LA-42 Floor ceramic tile
Description of Submittal
LA-43 Epoxy joint grout motor for 300 x 300 CMT
LA-44 Glazed ceramic wall tile with accessories
LA-45 Epoxy joint grout motor for 300 x 600 GCWT
LA-46 Marble tile with mortar bed
LA-47 PVC tile, KCC Neo Sense, 450 x 450 x 3Thk
LA-48 Vinyl cove base w/adhesive
LA-49 Paint, Anti-mold and mildew, latex, interior, KCC Supro home & wellbeing, EX8816
LA-50 Paint, MPI 54, latex, interior
LA-51 Paint, MPI 47, enamel, interior
LA-52 Paint, MPI 94, enamel, exterior
LA-53 Paint, MPI 79, primer for metal
LA-54 Texture coat, terracotta 25kg w/finish coat
LA-55
Noroo Paint, MPI 77, Epoxy Epoxy Paint Include Surface Preparation Base, Cleanpoxy3100, MPI77, 0.175L/M2 Mid, Cleanpoxy3100, MPI77,0.15L/M2 Top, Cleanpoxy3100, MPI77,0.15L/M2
LA-56 Toilet partition 1600 x 900
LA-57 Grab bar 915mm x 30D toilet
LA-58 Urinal partition, 1200 x 430
LA-59 Toilet tissue dispenser, Double Roll, Horizontal Type
LA-60 Paper towel dispenser with receptacle
LA-61 Mirror, 1050 x 850 with plywood back board
LA-62 Soap dispenser, liquid, wall type, SST
LA-63 Mop rack with STS shelf
LA-64 Signage, interior room, Misc BB3
LA-65 Toilet signage
LA-66 Signage, exterior
LA-67 Building identification, exterior, brass with back light
LA-68 Bulletin board, 1200 x 900, oak trim, tan nucork
LA-69 Vanity cabinet, 700x650MM size, laminated counter top
LA-70 Window trim, oak, 110W x 90W x 18Thk
LA-71 Wooden hanging rail, oak, 100W x 40Thk
LA-72 Wooden chair rail, oak, 90W x 20Thk
LA-73 Wood base board, oak, 100W x 20Thk
LA-74 Solid sufrace material (SSM) 12T W/plywood, sub-panel
LA-75 Marble composition panel W/plywood, sub-panel
LA-76 Locker, 2 tier, 600 x 750 x 1800H x 100H base, Coated steel locker
Description of Submittal
LA-77 Handrail, sst
LA-78 Boots Scraper
LA-79 Fire extinguish cabinet
LA-80 Access door, 450x450
LA-81 Projector electric screen, Grand Veiw GEC-180HI, 4,474(W) x 2,621(H)
LA-82 Projector bracket
LA-83 STL Plate Trench Cover with welding type hinge, 13 mm Thk
LA-84 SSMR roof panel only with ridge & hip
LA-85 Fiber glass, blanket w/VB. FG. 24K. 205mmThk
LA-86 Vapor retarder 1.8m x 45m 0.15mm Thk
LA-87 Protected metal liner panel #28GA
LA-88 Rain gutter, protect MET, 150 x 100H, 24GA W/accessories
LA-89 Downspout, protect MET, 100 x 75, 24GA W/accessories
LA-90
Metal canopy w/protected metal roof, lining, rain gutter w/flashing.
Wall hung type (C-100x50x20x3.2, GALV. STL & EXP. Bolt 12DIA)
OA-1 GSA class 5-A armory door, door size 78"H x 40"W w/ mechanical dial lock FF-L- 2937
OA-2 Exit device, type 1, F-01, lever type
OA-3 Exit device, type 1, F-08
OA-4 Lockset, 1000-1, F-01, lever type
OA-5 Lockset, 1000-1, F-07, lever type
OA-6 Lockset, 1000-1, F-08, lever type
OA-7 Lockset, 4000-1, F-76
OA-8 Lockset, 4000-1, F-82
OA-9 Floor Closer, C06041 with offset pivot
OA-10 Flush bolt, L04081
OA-11 Adjustable astragal R0Y824
OA-12 Weather proof seal R0Y165 for head and jamb.
OA-13 Sound absorption wall panel
LM-1 VRF Heat Pump Outdoor Unit, various size
LM-2 VRF Heat Pump Indoor Unit, various size
LM-3 Air Handling Unit
LM-4 Energy Recovery Ventilator
LM-5 Split Air Conditioning Outdoor & Indoor Unit
LM-6 Y-joint, various size
LM-7 Diffusers, various size
LM-8 Registers, various size
LM-9 Duct w/accessories, various sizes
Description of Submittal
LM-10 Duct insulation w/accessories, various size
LM-11 Pipe flexible connector
LM-12 Water closets
LM-13 Lavatories w/ faucet
LM-14 Water hammer arrester, various size
LM-15 Galvanized steel pipe with fittings & hangers, various size
LM-16 Copper tube water line, including fittings & pipe hangers, various size
LM-17 Vent thru roof
LM-18 Cast iron soil pipe with coupling incl accessories, various size
LM-19 P-trap, cast iron soil pipe, various size
LM-20 Floor cleanouts, various size
LM-21 Floor drains
OM-1 Dehumidifier
OM-2 Electric Unit Heater
OM-3 Electric Wall Heater
OM-4 Wall Exhaust Fan
OM-5 Roof Exhaust Fan, various size
OM-6 Water Meter
OM-7 Electric Water Cooler
OM-8 Instantaneous Water Heater, various size
OM-9 HVAC Emergency Shutdown Switch
OM-10 Backflow Preventer
OM-11 Pressure Reducing Valve
OM-12 Non-freeze WALL Hydrant
OM-13 Trap Primer
OM-14 Service Sink
OM-15 Alarm check valve
OM-16 Backflow preventer
OM-17 OS & Y valves, various size
OM-18 Tamper switch
OM-19 Ball valve switch
OM-20 Pressure switch
OM-21 Water motor alarm bell
OM-22 Check valve
OM-23 Fire department connection
OM-24 Ball drip valve
OM-25 Test header
Description of Submittal
OM-26 Hose valve w/cap & chain
OM-27 Test valve
OM-28 Water flow switch
OM-29 Sight glass
OM-30 Smooth bore corrosion resistant
OM-31 Spare sprinkler head cabinet
OM-32 Quick response pendent sprinkler head, various size
OM-33 Quick response up-right sprinkler head, various size
OM-34 Quick response dry sidewall sprinkler head
LE-1
LED lighting fixture, 1/25 Watt w/lamp, recessed mounted, type "NS-4b", power unit (AC to DC) and emergency power pack
LE-2
LED lighting fixture, 1/45 Watt w/lamp, recessed mounted, type "NS-5a", power unit (AC to DC)
LE-3
LED lighting fixture, 1/45 Watt w/lamp, recessed mounted ,type "NS-5b", power unit (AC to DC) and emergency power pack
LE-4
LED lighting fixture, 1/50 Watt w/lamp, recessed mounted ,type "NS-6a", power unit (AC to DC)
LE-5
LED lighting fixture, 1/50 Watt w/lamp, recessed mounted, type "NS-6b", power unit (AC to DC) and emergency power pack
LE-6
LED lighting fixture, 1/45 Watt w/lamp, surface mounted, type "NS-7a", power unit (AC to DC)
LE-7
LED lighting fixture, 1/45 Watt w/lamp, surface mounted, type "NS-7b", power unit (AC to DC) and emergency power pack
LE-8 LED lighting fixture, 18 Watt ,wall mounted, Mirror top "NS-8"
LE-9
LED lighting fixture, 18 Watt ,Surface mounted, type "NS-9",power unit (AC to DC), wet location
LE-10 LED lighting fixture, wall mount, 22 Watts, wet location, Type "NS-10"
LE-11 LED lighting fixture, wall mount,15 Watts, arm room, Type "NS-11"
LE-12 Lighting fixture, exit sign stencil face, LED, red Lamp, type "NS-3"
LE-13 Parking lot Lighting pole, 100W, LED, concrete foundation
LE-14 Sports lighting pole, 4-300W, LED, concrete foundation
LE-15 Pad mounted transformer, oil filled radial type. 150KVA, Pri: 22.9KV, Sec.:120/208V.
LE-16 Termination kits for 24KV cable
LE-17 Termination kits for 600V cable
LE-18 Fuse cut-out switch, 18KV
LE-19 Lightning arrester, 18KV
LE-20 Fiber optic cable, 12 core
LE-21 Telephone cable, 25 pair
Description of Submittal
LE-22 Dual Jack Outlet for "Telephone/LAN" system
LE-23 Quad Jack Outlet for "Telephone/LAN" system
LE-24 UTP telephone cable, CAT6
LE-25 Cable tray
LE-26 Coaxial Cable, RG11/U
LE-27 Coaxial Cable, RG6/U
LE-28 Pullbox w/ 8-way tap off and locking device
LE-29 Junction box
LE-30 Elec wire (various size)
LE-31 Conduit (various size)
LE-32 Shop drawing fire alarm system
OE-1 Toggle switch, w/plate, 1P-20A-120VAC
OE-2 3-way toggle switch, w/plate, 1P-20A-120VAC
OE-3 Dimming switch
OE-4 Photoelectric control , 1P-120V, 2000 Watt max.
OE-5 Lighting contactor "LC1"
OE-6 Lighting contactor "LC2"
OE-7 Duplex receptacle, w/plate, 2P-20A-125 VAC, gnd. Type
OE-8 Quadplex receptacle, w/plate, 2P-20A-125 VAC, gnd. Type
OE-9 Duplex receptacle, w/plate, 2P-20A-125 VAC, GFCI Type
OE-10 Duplex receptacle, w/plate, 2P-20A-125 VAC, GFCI Type "WP"
OE-11 Single receptacle, w/plate, 2P-20A-4W-250 VAC, gnd. Type
OE-12 TRANSIENT VOLTAGE SURGE SUPPRESSOR
OE-13 Safety switch-A, 3PST-200A-240V, with non-fusible, NEMA 3R, Encl
OE-14 Safety switch-B, 3PST- 60A-240V, with non-fusible, NEMA 3R, Encl
OE-15 Safety switch-C,E DPST-30A-240V, with non-fusible, NEMA 1, Encl
OE-16 Safety switch-D, DPST- 30A-240V, Non-fusible, NEMA 3R, Encl
OE-17 Combination type magnetic motor starter-MA
OE-18 Magnetic motor starter-a
OE-19 Panelboard "P1"
OE-20 Panelboard "P2"
OE-21 Panelboard "C"
OE-22 Panelboard "MDP"
OE-23 Smart watt hour meter w/ current transformer (CT's 400:5A)
OE-24 Addressable fire alarm/mass notification control panel
OE-25 Fire alarm building transmitter, BT-XM
OE-26 Combination fire alarm & MNS Speaker/Strobe
Description of Submittal
OE-27 Combination fire alarm & MNS Speaker "WP"
OE-28 Addressable smoke detector
OE-29 Addressable module
OE-30 Addressable manual pull station
OE-31 VHF-FM Antenna, BSA-1 type, Coaxial cable, w/connector, type 1 &ii, lightning arrester
OE-32 Equipment rack
OE-33 Wall MTD Telephone terminal Board
OE-34 Splice kits
OE-35 Fabric inner duct, 3"X4
Section F - Deliveries or Performance
DELIVERY INFORMATION
CLIN DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC /
CAGE
0001 210 dys. ANP 1 W1FD USA GARRISON RED CLOUD
W1FD USA GARRISON RED CLOUD
CAMP RED CLOUD
UIJEONGBU 11770
011-82-53-470-65
W582LE
0002 210 dys. ANP 1 (SAME AS PREVIOUS LOCATION)
W582LE
0003 N/A N/A N/A N/A
CLAUSES INCORPORATED BY FULL TEXT
52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR 1984)
The Contractor shall be required to (a) commence work under this contract 10 calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than 210 calendar days including 150 days for procurement of US origin material after Notice to Proceed is issued.
The time stated for completion shall include final cleanup of the premises.
(End of clause)
Section G - Contract Administration Data
Section I - Contract Clauses
CLAUSES INCORPORATED BY REFERENCE
52.232-18 Availability Of Funds APR 1984 52.229-12 Tax on Certain Foreign Procurements FEB 2021
Section J - List of Documents, Exhibits and Other Attachments
LIST OF APPLICABLE CONTRACT DRAWINGS
with demolition of six (6) Quonset buildings
GENERAL: The work shall conform to the following contract drawings and OMA standard detail drawings, 2014 (dated 30 November 2015), issued by the Department of the Army, Installation Management Agency, Korea Region Office and located on http://www.usfk.mil/Portals/105/Documents/Contracting/NewContract/STANDARD-DETAIL-DRAWINGS- FOR-OMA-PROJECTS-KOREA_20151130.pdf, all of which form a part of the specifications.
Ring No. Sheet No. Description Date
1 T-1 TITLE SHEET-1 11 APR 22
2 T-2 TITLE SHEET-2 11 APR 22
CIVIL
3 C-1 LOCATION PLAN 11 APR 22
4 C-2 REMOVAL PLAN 11 APR 22
5 C-3 SITE LAYOUT PLAN AND SCOPE OF WORK 11 APR 22
6 C-4 UTILITY PLAN 11 APR 22
7 C-5 PLANT TREE PLAN 11 APR 22
8 C-6 GRADING SECTION 11 APR 22
9 C-7 BASKETBALL COURT PLAN 11 APR 22
10 C-8 BASKETBALL GOAL POST DETAIL 11 APR 22
11 C-9 OPEN SHED TYPICAL SECTION AND DETAILS - 1 11 APR 22
12 C-10 OPEN SHED TYPICAL SECTION AND DETAILS 2 11 APR 22
13 C-11 OPEN SHED FOUNDATION, RAMP AND FLOOR
DETAIL
11 APR 22
14 C-12 MISC. DETAILS - 1 11 APR 22
15 C-13 MISC. DETAILS - 2 11 APR 22
16 C-14 MISC. DETAILS - 3 11 APR 22
17 C-15 MISC. DETAILS - 4 11 APR 22
18 C-16 MISC. DETAILS - 5 11 APR 22
19 C-17 TRASH BIN - 1 11 APR 22
20 C-18 TRASH BIN - 2 11 APR 22
21 C-19 TRASH BIN - 3 11 APR 22
22 C-20 TRASH BIN - 4 11 APR 22
23 C-21 CHAIN LINK FABRIC FENCE - 1 11 APR 22
24 C-22 CHAIN LINK FABRIC FENCE - 2 11 APR 22
STRUCTURAL
25 S-1 GENERAL NOTES, DESIGN DATA & TYPICAL DETAILS 11 APR 22
26 S-2 FOUNDATION/GROUND FLOOR PLAN 11 APR 22
27 S-3 ROOF FRAMING PLAN 11 APR 22
28 S-4 WALL SECTION 11 APR 22
29 S-5 DETAILS 11 APR 22
ARCHITECTURAL
30 A-1 GENERAL NOTES, SCOPE OF WORKS & ACM NOTES 11 APR 22
31 A-2 NEW GROUND FLOOR PLAN 11 APR 22
32 A-3 NEW ROOF PLAN 11 APR 22
33 A-4 ELEVATIONS-1 11 APR 22
34 A-5 ELEVATIONS-2 11 APR 22
35 A-6 GENERAL SECTIONS AN DETAIL 11 APR 22
36 A-7 EXTERIOR WALL SECTIONS-1 11 APR 22
37 A-8 EXTERIOR WALL SECTIONS-1 11 APR 22
38 A-9 TYP EXTERIOR WALL DETAILS 11 APR 22
39 A-10 ENLARGED PARTIAL FLOOR PLAN-1 11 APR 22
40 A-11 ENLARGED PARTIAL FLOOR PLAN-2 11 APR 22
41 A-12 ENLARGED FLOOR PLANS AND TYPICAL
ELEAVATIONS
11 APR 22
42 A-13 INTERIOR WALL SECTION - 1 11 APR 22
43 A-14 INTERIOR WALL SECTION - 2 11 APR 22
44 A-15 ROOF DETAILS 11 APR 22
45 A-16 MISC DETAILS - 1 11 APR 22
46 A-17 MISC DETAILS - 2 11 APR 22
47 A-18 MISC DETAILS - 3 11 APR 22
48 A-19 MISC DETAILS - 4 11 APR 22
49 A-20 MISC DETAILS - 5 11 APR 22
50 A-21 MISC DETAILS - 6 11 APR 22
51 A-22 INTERIOR, EXTERIOR FINISH SCHEDULE & FINISH
SCHEDULE NOTES
11 APR 22
52 A-23 MATERIAL & COLOR SCHEDULE 11 APR 22
53 A-24 DOOR / WINDOW SCHEDULE, ELEVATIONS AND
DETAIL
11 APR 22
54 A-25 HARDWARE SCHEDULE & DOOR / WINDOW NOTE 11 APR 22
55 A-26 SIGNAGE PLAN, SCHEDULE & DETAILS 11 APR 22
MECHANICAL
56 M-1 LEGEND & ABBREVIATION 11 APR 22
57 M-2 GENERAL NOTES & SCOPE OF WORK 11 APR 22
58 M-3 EQUIPMENT SCHEDULE - 1 11 APR 22
59 M-4 EQUIPMENT SCHEDULE - 2 11 APR 22
60 M-5 NEW H.V.A.C PIPING ENLARGED PLAN (SECTOR “A”) 11 APR 22
61 M-6 NEW H.V.A.C PIPING ENLARGED PLAN (SECTOR “B”) 11 APR 22
62 M-7 NEW H.V.A.C ENLARGED PLAN, SECTION AND
DETAIL (SECTOR “A”)
11 APR 22
63 M-8 NEW H.V.A.C ENLARGED PLAN (SECTOR “B”) 11 APR 22
64 M-9 NEW DOMESTIC WATER PIPING ENLARGED PLAN
(SECTOR “A”)
11 APR 22
65 M-10 NEW DOMESTIC WATER PIPING ENLARGED PLAN
(SECTOR “B”)
11 APR 22
66 M-11 NEW SEWER & VENT PIPING ENLARGED PLAN
(SECTOR “B”)
11 APR 22
67 M-12 AUTOMATIC FIRE SUPPRESSION(S) GENERAL NOTE,
SPRINKLER Q'TY LIST AND FIRE PROTECTION
REQUIREMENTS
11 APR 22
68 M-13 NEW FIRE PROTECTION PIPING ENLARGED PLAN
(SECTOR “A”)
11 APR 22
69 M-14 NEW FIRE PROTECTION PIPING ENLARGED PLAN
(SECTOR “B”)
11 APR 22
70 M-15 CONTROL DIAGRAMS 11 APR 22
71 M-16 MECH. DETAILS - 1 11 APR 22
72 M-17 MECH. DETAILS - 2 11 APR 22
73 M-18 MECH. DETAILS - 3 11 APR 22
74 M-19 FIRE DETAILS - 1 11 APR 22
75 M-20 FIRE DETAILS - 2 11 APR 22
ELECTRICAL
76 E-1 LEGEND, GENERAL NOTES AND SCOPE OF WORK 11 APR 22
77 E-2 NEW GROUND FL LIGHTING PLAN & LIGHTING
CONTACTOR "LC" DIAGRAM
11 APR 22
78 E-3 LIGHTING FIXTURE DETAILS 11 APR 22
79 E-4 LIGHT FIXTURE SCHEDULE 11 APR 22
80 E-5 NEW GROUND FL POWER PLAN 11 APR 22
81 E-6 NEW GROUND FL POWER/CONTROL PLAN FOR
MECHANICAL SYSTEM
11 APR 22
82 E-7 EXIST/NEW POWER ONE-LINE DIAGRAM & NEW
PANELBOARD "MDP" LOAD SCHEDULE
11 APR 22
83 E-8 NEW PANELBOARD "P1", "P2" &"C" LOAD SCHEDULE 11 APR 22
84 E-9 NEW GROUND FL FIRE ALARM AND MASS
NOTIFICATION SYSTEM PLAN
11 APR 22
85 E-10 NEW FIRE ALARM/MASS NOTIFICATION SYSTEM
DIAGRAM
11 APR 22
86 E-11 NEW…
This is the start of the file's text. The full file is on GovTribe.