B08 Solicitation W25G1V21Q0004.pdf

PDF 1 MB Posted

Attached to
WOOD COMPACTOR SUPPY & INSTALL Federal contract opportunity
Solicitation number
W25G1V21Q0004
Issued by
Department of the Army Materiel Command Army Contracting Command Aberdeen Proving Ground

View the file

Other files for this federal contract opportunity

Other files attached to WOOD COMPACTOR SUPPY & INSTALL, newest first.
File Type Posted
B08 Solicitation Amendment W25G1V21Q0004-0002.pdf PDF
B08 Solicitation Amendment W25G1V21Q0004-0001.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SEE ADDENDUM

(No Collect Calls)

W25G1V21Q0004 06-Oct-2020

b. TELEPHONE NUMBER

570 615 7066

8. OFFER DUE DATE/LOCAL TIME

05:00 PM 20 Oct 2020

5. SOLICITATION NUMBER 6. SOLICITATION ISSUE DATE

AUTHORIZED FOR LOCAL REPRODUCTION

PREVIOUS EDITION IS NOT USABLE

STANDARD FORM 1449 (REV. 2/2012)

Prescribed by GSA – FAR (48 CFR) 53.212

(TYPE OR PRINT)

(SIGNATURE OF CONTRACTING OFFICER)

ADDENDA ARE

26. TOTAL AWARD AMOUNT (For Gov t. Use Only )

23.

CODE 10. THIS ACQUISITION IS

SUCH ADDRESS IN OFFER

17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT

BELOW IS CHECKED

TELEPHONE NO.

W25G1V9. ISSUED BY

18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a. UNLESS BLOCK

7. FOR SOLICITATION

INFORMATION CALL:

a. NAME

KIMBERLY M JURKIEWICZ

2. CONTRACT NO. 3. AWARD/EFFECTIVE DATE 4. ORDER NUMBER

(TYPE OR PRINT)

30b. NAME AND TITLE OF SIGNER 30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER

30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a.UNITED STATES OF AMERICA

0 27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1. 52.212-4. FAR 52.212-3. 52.212-5 ARE ATTACHED.

25. ACCOUNTING AND APPROPRIATION DATA

1. REQUISITION NUMBER

20.

ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED.

OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, AND 30

SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS

W25G1V0230009K

ARE NOT ATTACHED

27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA ARE ARE NOT ATTACHED

(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE

SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:

. YOUR OFFER ON SOLICITATION

28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN

% FOR:SET ASIDE:UNRESTRICTED OR X

SMALL BUSINESSX

17a.CONTRACTOR/ CODE FACILITY

OFFEROR CODE

ACC-APG, TOBYHANNA DIVISION

11 HAP ARNOLD BLVD

TOBYHANNA PA 18466-5100

18a. PAYMENT WILL BE MADE BY CODE

RATED ORDER UNDER

DPAS (15 CFR 700)

13a. THIS CONTRACT IS A

13b. RATING

CODE15. DELIVER TO CODE W25G1V 16. ADMINISTERED BY

12. DISCOUNT TERMS11. DELIVERY FOR FOB DESTINA-

TION UNLESS BLOCK IS

MARKED

SEE SCHEDULE

14. METHOD OF SOLICITATION

RFQ IFB RFPX

TOBYHANNA ARMY DEPOT

ASARS RECEIVING

BUILDING 1 C 6

INSERT PO NUMBER

11 HAP ARNOLD BLVD

TOBYHANNA PA 18466-5091

TEL: FAX:

FAX:

TEL: SERVICE-DISABLED

VETERAN-OWNED

SMALL BUSINESS

8(A)

HUBZONE SMALL

BUSINESS

SIZE STANDARD:

NAICS:

333243

X

OFFER DATED

29. AWARD OF CONTRACT: REF.

DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY

COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND

EMAIL:

TEL:

31c. DATE SIGNED

SEE SCHEDULE

SCHEDULE OF SUPPLIES/ SERVICESITEM NO. QUANTITY UNIT UNIT PRICE AMOUNT

24.22.21.19.

WOMEN-OWNED SMALL BUSINESS (WOSB)

ELIGIBLE UNDER THE WOMEN-OWNED

SMALL BUSINESS PROGRAM

EDWOSB

32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE

SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS

(CONTINUED)

PAGE 2 OF41

ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED: ______________________________________________________

32a. QUANTITY IN COLUMN 21 HAS BEEN

RECEIVED INSPECTED

32b. SIGNATURE OF AUTHORIZED GOVERNMENT

REPRESENTATIVE

32c. DATE 32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT

REPRESENTATIVE

32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE 32f . TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT REPRESENTATIVE

37. CHECK NUMBER

FINALPARTIALCOMPLETE

36. PAYMENT35. AMOUNT VERIFIED

CORRECT FOR

34. VOUCHER NUMBER

FINAL

33. SHIP NUMBER

PARTIAL

38. S/R ACCOUNT NUMBER 39. S/R VOUCHER NUMBER 40. PAID BY

41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT

41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER 41c. DATE

42a. RECEIVED BY (Print)

42b. RECEIVED AT (Location)

42c. DATE REC'D (YY/MM/DD) 42d. TOTAL CONTAINERS

STANDARD FORM 1449 (REV. 2/2012) BACK

Prescribed by GSA – FAR (48 CFR) 53.212

AUTHORIZED FOR LOCAL REPRODUCTION

PREVIOUS EDITION IS NOT USABLE

SEE SCHEDULE

20.

SCHEDULE OF SUPPLIES/ SERVICES

21.

QUANTITY UNIT

22. 23.

UNIT PRICE

24.

AMOUNT

19.

ITEM NO.

W25G1V21Q0004

Section SF 1449 - CONTINUATION SHEET

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0001 1 Each

WOOD COMPACTOR

FFP

WOOD COMPACTOR, HEAVY DUTY INDUSTRIAL;

60HP WITH TURN KEY INSTALLATION;

THIS AWARD WILL BE FOR THE TURN KEY DESIGN, SUPPLY,

DELIVERY, ASSEMBLY, INSTALLATION, AND ALL TRAINING

ASSOCIATED WITH THE WOOD COMPACTOR.

*PLEASE REFER TO ATTACHED STATEMENT OF WORK FOR SPECIFIC

SCOPE OF WORK DETAILS AND FOR WOOD COMPACTOR MINIMUM

SPECIFICATIONS.

THE AWARD WILL BE BASED ON THE LOWEST PRICE THAT MEETS OR

EXCEEDS ALL MINIMUM SPECIFICATIONS LISTED AS PER THE

ATTACHED STATEMENT OF WORK.

**NOTE TO OFFERORS: All Contractor Proposal Requirements to the Solicitation must be submitted with proposal in order for proposals to be considered. (See the section titled Contractor Proposal Requirements to the Solicitation in the attached Statement of Work).

ITEM IS BRAND NAME OR EQUAL. IF QUOTING EQUAL, VENDOR MUST

PROVIDE FULL SPECIFICATION PACKAGE FOR BID TO BE

CONSIDERED.

POINT OF CONTACT: MATT ARGUST, PHONE: 570-615-6594;

EMAIL: MATTHEW.J.ARGUST.CIV@MAIL.MIL

DELIVERY INSTRUCTIONS LOACTED IN THE CLAUSE SECTION OF

THIS SOLICITATION.

FOB: Destination

NSN: EM-60W:3D5H5

MILSTRIP: W25G1V0230009K

PURCHASE REQUEST NUMBER: W25G1V0230009K

PSC CD: 4540

NET AMT

STATEMENT OF WORK

Statement of Work Wood Compactor

General Scope

This Statement of Work (SOW) is for the turn-key design, supply, delivery, assembly, installation and training of Wood Compactor to include the supply, delivery, installation, documentation and personnel training for a Wood

Compactor. The machine will be located at Bldg. 66 at Tobyhanna Army Depot (TYAD) and shall meet or exceed all applicable industrial, Federal, State, and Local standards and codes. The Contractor shall provide on-site machine training for TYAD operator personnel and maintenance personnel.

ACCESS TO INSTALLATION SITE (Bldg. 66): The site location for the compactor will be outside of Bldg. 66 in the Recycling Yard at Tobyhanna Army Depot.

SITE VISIT: Interested Contractors shall request a site visit prior to submitting a proposal, (see the section in this SOW titled Contractor Proposal Requirements to the Solicitation for this and the other proposal submission requirements.

Site visit must be requested by email to: MATTHEW.J.ARGUST.CIV@MAIL.MIL OR

KIMBERLY.M.JURKIEWICZ.CIV@MAIL.MIL

Any site visit requests must be submitted via email request to the above email(s) by no later than, Tuesday, Oct 13, 2020.

Wood Compactor Machine Specifications, Characteristics and Features

1. The compactor should be able to fit with accompanying container on 10’x 40’ concrete pad.

2. The machine must be fully capable of sitting outside in the open without any cover.

3. The machine must have a processing capacity of at least 8 Tons/hour.

4. The machine must be able to accept pallets of up to 60” x 96”in dimension, crates at least 48” x 48” x 60” in dimension and wood spools of up to 60” in diameter.

5. The machine must not directly use fossil fuels.

6. The machine should allow it to be fed primarily by forklift truck.

General Requirements

Delivery, Assembly, and Installation

1. It shall be the responsibility of the Contractor to contact the TYAD Fire Department to obtain a Burn

Permit prior to conducting welding, torch cutting, or soldering.

2. The Contractor shall be responsible to supply all labor, materials, supervision, tools and equipment to deliver, off-load, locate and place into position, and anchor all component pieces, materials and supplies necessary for the turn-key assembly and installation of the wood compactor. The Contractor shall be responsible to uncrate and unpack all supplied equipment. The Contractor shall be responsible to remove from TYAD all packing, packaging and crating materials.

3. All equipment, tools, materials, supplies and component pieces shall be delivered concurrently; no partial deliveries are acceptable.

4. The Contractor can perform all post-delivery work during normal 1st-shift hours: Monday—Friday, 7:00 AM—4:00 PM, but shall not interfere with normal production. Deliveries shall be coordinated by the Contractor with the COR 10 working days, minimum, in advance of delivery.

5. The Contractor shall adhere to all TYAD Environmental, Safety, and Fire standards, codes and regulations.

Furnishing of personal protective equipment (PPE) to Contractor personnel shall be the responsibility of the Contractor.

6. It shall be the Contractor’s responsibility to supply and deliver a dumpster for waste collection. Location for a dumpster shall be coordinated with the COR prior to its arrival. The Contractor shall remove the dumpster within 3 calendar days of work completion.

7. For all Contractor-owned electrical equipment that requires battery recharging it shall be the responsibility of the Contractor to supply his own battery-charging equipment. Connection of Contractor-supplied battery-charging equipment to TYAD power shall be the responsibility of the Contractor.

8. The Contractor shall ensure all wiring is in accordance with NEC and OSHA standards. The Contractor shall ensure that installed equipment meets NEC and OSHA standards.

9. The Contractor shall have 180 days ARO to install the wood compactor and complete all operator and maintenance personnel training. The Contractor shall commence installation of wood compactor within 3 working days of arrival of the equipment.

10. The Contractor shall submit to the COR a project time line 10 working days ARO.

11. The Contractor shall be responsible for start-up and verification of system.

Warranty

1. The Contractor shall warrant wood compactor, all ancillary pieces of equipment, and installation parts and workmanship for a period of 4 calendar years following final acceptance by the COR. During this warranty period all parts costs, labor costs, transportation and shipping costs, travel costs, tool costs and per diem for all Contractor personnel shall be the responsibility of the Contractor. The Contractor field repair technician shall arrive on-site within 24 hours after being contacted by TYAD personnel to make warranty repairs during the warranty period. The Contractor field repair technician shall arrive on-site within 24 hours after being contacted by TYAD personnel to make repairs for the life of the machine at TYAD. The Contractor shall supply Contact Telephone Numbers and Points of Contact (POCs) for use by TYAD personnel to contact the Contractor for warranty, operation and maintenance questions and support.

2. All pieces of equipment that have a manufacturer’s warranty that exceeds the 4 year warranty period such warranties shall be provided by the Contractor to the Government at the expiration of the 4 year warranty period at which time it will become the responsibility of the Government to submit warranty claims.

Documentation

1. The Contractor shall provide to the COR 3 hardcopies each of the Operation and Maintenance (O&M)

Manuals and 3 hardcopies each of the Parts Manual. The Parts Manual shall include a list of parts— including consumables—that are recommended by the manufacturers to be kept on-hand at all times.

These parts shall be identified by nomenclature, part number, quantity, and pricing. The O&M manuals shall contain complete detailed instructions and schedules for system PM. All documentation shall be provided to the COR prior to final acceptance being given. O&M manuals shall contain a detailed description of the lock-out/tag-out procedures needed to bring the wood compactor to a zero mechanical state for maintenance and servicing. Procedures for returning the wood compactor to full operational capability shall also be provided.

Training

1. The Contractor shall provide machine operator training for 4 TYAD Environmental Branch personnel.

Training shall be conducted by the Contractor’s qualified training representative. Training shall be done on-site and personnel shall be trained in the full operation and operator-recommended maintenance.

2. The Contractor shall provide maintenance training for 2 TYAD Logistics Support Division (LSD) personnel. Training shall be conducted by the Contractor’s qualified training representative. LSD personnel shall be trained in the full maintenance and PM of the wood compactor. LSD personnel training shall occur prior to installation of the wood compactor.

3. All materials and documentation used in the training of operator personnel and LSD personnel shall become the property of the Government.

General Acceptance

1. Upon completion by the Contractor of the installation of the wood compactor shall be the responsibility of the Contractor to verify and show the wood compactor, all ancillary components are operating within manufacturers’ specified parameters and specifications.

2. The Contractor or his qualified representative shall demonstrate the functioning of the wood compactor and ancillary components by successfully shredding/compacting a pallets of 60” x 96”in dimension, a crate at least 48” x 48” x 60” in dimension and a wood spool of 60” in diameter. The demonstration will be witnessed by Environmental Branch operators; the Environmental Branch supervisor; the COR; and a technical representative of the COR’s choosing. Demonstration shall be coordinated with the COR so as to permit all necessary personnel to be present. All defects encountered prior to or during the demonstration shall be immediately corrected by the Contractor. Only upon correction of the defect will the demonstration be allowed to continue.

3. Only following the successful demonstration of the wood compactor; conclusion of maintenance personnel and operator personnel training and furnishing of all manuals to the COR will general acceptance be granted to the Contractor.

Final Acceptance

1. Final acceptance will occur upon acceptance in Wide Area Workflow (WAWF) of the Contractor’s submitted invoice by the COR. The warranty periods associated with the wood compactor and ancillary components will begin on the date of final acceptance. Final acceptance will be granted only after general acceptance has been given to the Contractor.

Contractor Proposal Requirements to the Solicitation A Contractor’s submittal to the solicitation shall contain explanatory descriptions to all aspects listed below and these descriptions will be used by the Government for technical review and evaluation of the submitted proposal. A single statement of Contractor compliance will not be accepted in lieu of an explanatory description and shall disqualify the Contractor for contract award consideration. A Contractor’s submittal not in compliance with all aspects of the Contractor Proposal Requirements to the Solicitation will not be considered and will result in the Contractor being disqualified from consideration for contract award.

1. A Contractor considering submission of a proposal to the solicitation shall schedule a site visit. All dimensions and dimension verifications are the responsibility of the Contractor.

2. The Contractor proposal shall indicate the training that will be provided for operator personnel and maintenance personnel as well as the training durations. The Contractor shall provide a detailed description of maintenance personnel and machine operator personnel training programs.

3. The Contractor proposal shall include 3 references of prior projects of similar scope and complexity along with points of contact (POCs) for each project and their telephone numbers.

4. A rough time line shall accompany the Contractor proposal.

5. The Contractor shall provide a detailed description of the means by which the Contractor plans to support maintenance calls; repair calls; manufacturer recalls, modifications and upgrades; manufacturer software revisions and upgrades.

6. The Contractor shall provide a machine drawing with the following:

a. Dimensions

b. Elevation

c. Plan view

d. Foundation design with material specifications

e. Layout drawing

a. The Contractor shall provide machine and ancillary component utility requirements to include electrical requirements (voltage/phase/cycle/amps).

7. The Contractor shall describe the customer maintenance support structure including location and distance of the nearest response personnel to conduct machine maintenance.

ENVIRONMENTAL REQUIREMENTS

Environmental Requirements

Standard Specifications for Projects Under the National Environmental Policy Act in Accordance with 32 CFR 651

Proponent ELTY-ISR-E

****Spill Response Procedures 1-2-3****

1. Stop work

2. Call 911

3. Evacuate Area

*********Damaged Asbestos?********* Call Environmental Branch (EB) at 615-7098

*******Environmental Questions?******

Call EB 615-7098

1. Air Pollution Control The contractor must control fugitive emissions, including dust, during the course of their contract. The contractor must obtain approval from the Environmental Branch (EB) prior to exhausting equipment to the outside. The contractor must not allow any pollutant or particulate matter to be released to the atmosphere at levels that are visible from outside of Tobyhanna Army Depot (TYAD). The contractor must not perform work that will release pollutants or particulate matter to the atmosphere when the wind speed exceeds ten miles per hour and will result in adverse effects to the surrounding areas. TYAD will monitor the wind speed; it is the contractor’s responsibility to obtain wind speed information through the Contracting Officer Representative (COR).

2. Asbestos The contractor must ensure that all materials used in the performance of this contract are asbestos-free.

3. Backflow The contractor shall have a backflow prevention device installed on all contractor equipment that is connected to Tobyhanna Army Depot’s (TYAD) water distribution system. The contractor shall have a water meter installed to monitor water consumption during all phases of the contract. Water use will be reported monthly to the Environmental Branch.

4. Burning The contractor must not burn refuse and debris anywhere on TYAD.

5. Buy Recycled-Content Materials The Contractor must comply with Resource Conservation and Recovery Act (RCRA) Section 6002 (42 U.S.C. 6962, Federal Procurement) in the acquisition of materials with recycled content to meet the standards of Executive Order 13693, Planning for Federal Sustainability in the Next Decade; March 19, 2015. Specific designated items in this contract for which recycled content standards have been established have been set forth in the specification (e.g., insulation, roofing materials, carpet, carpet pad, paint, floor tiles, shower and restroom dividers). Recovered Material Certification: As required by the RCRA, the contractor must certify that the percentage of recovered materials to be used in the performance of the contract will be at least the amount required by the applicable contract specifications (see Federal Acquisition Regulation (FAR) Provision 52.223-4, Recovered Material Certification).

Prior to application for final payment, the contractor must provide a report in accordance with FAR Clause 52.223- 9, Estimate of Percentage of Recovered Material Content for Environmental Protection Agency (EPA) Designated Items, to the Contracting Office. Compliance with this program does not relieve the contractor from meeting all other specification requirements.

6. Cultural Resources: N/A.

7. Demolition Notification: N/A

8. Drinking Water The contractor must not perform any work on the TYAD potable water system prior to obtaining approval from the EB and the Division of Public Works certified operator through the COR. If a permit is required due to construction or proposed chemical feed changes, it will be the responsibility of the contractor to obtain all permits associated with the project. Permit applications will first be reviewed and approved by the Environmental Branch before being submitted to regulatory authorities. Any piping or additions added to the TYAD water system must be disinfected following American Water Works Association circular C651-14 "Disinfecting Water Mains." Construction will be kept outside of drinking water wellhead protection zones when feasible. All new buildings and remodeled buildings will be equipped with a water meter that can easily be read from the exterior of the building.

9. Endangered Species The contractor is responsible for meeting requirements of the Endangered Species Act of 1973. The contractor must not disturb any endangered species, their habitat or offspring during the implementation of this contract.

10. Emergency/Spills All emergencies and spills must be reported to the TYAD Fire Department by calling 911 from a TYAD phone or

(570) 615-7300. If a 911 call is placed on a cell phone, the call will go to the Monroe County Emergency Office.

Notify the Monroe County Emergency Office that you are at TYAD and the call will be forwarded to TYADs Fire Department. The contractor must ensure all personnel working on site are trained in the proper procedure according to 29 CFR 1910.120 (if applicable) to initiate a spill response to handle the hazardous substances they are working with. The contractor will take the necessary actions to prevent and contain spills of hazardous materials.

11. Energy Efficiency The Energy Policy Act of 2005 section 109 and the Energy Independence and Security Act of 2007 require all new construction at federal facilities to be 30% better than ASHRAE 90.1. Energy Policy Act of 2005 section 104 and the Energy Independence and Security Act of 2007 require all new equipment to be Energy Star qualified when available. This is applicable to heating, ventilation and air conditioning equipment, plumbing, building materials, lighting, commercial food service equipment and appliances.

12. Environmental Automation and Control Systems: N/A

13. Erosion and Sedimentation Control The contractor shall protect streams, lakes and wetlands from sediment discharges caused by the contractor's activities. The contractor shall also provide (where applicable) an erosion and sedimentation control plan in compliance with state and local laws and regulations, to the COR for approval prior to executing any soil-disturbing activities. The contractor must submit a National Pollutant Discharge Elimination System Permit to the Pennsylvania Department of Environmental Protection (PADEP) prior to any construction activity that encompasses more than one acre. All permits must be reviewed and approved by the EB prior to being sent to any regulatory authority. The contractor shall not disturb any wetlands. Contractor will remove all silt fencing and other temporary control measures once the site is stabilized. Contractor will remove all spoils from TYAD unless a previously approved disposal site has been established. The contract COR will be responsible for management and control of the spoils disposal site.

14. Fluorescent and Mercury-Bearing Lamps: N/A

15. Hazardous Materials Stored and Labeled The contractor must ensure all hazardous materials (HM) at the work site are properly stored and labeled. The contractor must not leave any HM behind at the completion of the job for any reason. HM must not be stored outside without adequate secondary containment and shelter.

16. Hazardous Waste The contractor must ensure that all hazardous wastes (HW) at the work site are properly stored and labeled in a pre-approved location designated by the EB. The contractor must provide copies of any shipping documents for HW/Universal Waste/Toxic Substances Control Act waste. If the TYAD EPA number is being used for shipping purposes, only EB is authorized to sign a manifest and the manifest (or copy) must be supplied prior to the day of shipment for review. The EB will keep originals. If HW or waste requiring special handling (e.g., asbestos) is being turned over to the government for disposal, the contactor must notify the EB through the COR when the waste is ready to be moved.

17. ISO 14001

TYAD is an ISO 14001 certified facility. All contractor and subcontractor employees on site must comply with TYAD Regulation 200-5, “Environmental Management System (EMS).” The contractor may obtain these regulations through the project COR.

18. Limit of Disturbance The contractor must confine the limit of disturbance of the project to the smallest area possible.

19. Mercury-Bearing Equipment The contractor must not install any equipment, switches, or devices (including thermostats) that contain mercury or lead.

20. Safety Data Sheets (SDSs) The contractor must submit SDSs for all hazardous materials proposed for use, including paints, solvents, adhesives, etc., to the EB through the COR five working days prior to material being brought on post. The contractor must keep a copy of all SDSs required for the project at the jobsite.

21. Migratory Bird Protection The contractor is responsible for meeting requirements of the Migratory Bird Treaty Act of 1918 (as amended). The contractor must not disturb any migratory bird, their nesting area or offspring during the implementation of this contract.

22. National Pollutant Discharge Elimination System (NPDES) Permits: N/A

23. Net Zero Water: N/A

24. Noise The contractor must not allow the noise level to exceed 65 decibels at any point outside TYAD property. If noise levels exceed 65 decibels, a plan must be prepared by the contractor to mitigate the noise levels and submit to the EB for approval through the COR. The contractor will monitor the fence line to confirm this limit.

25. Ozone Depleting Substances (ODS) The contractor must be responsible for ensuring that all personnel who perform maintenance and repair activities on refrigeration equipment have been trained and certified by an EPA-approved Section 608 program. The contractor must not use Class I or Class II ODS or install equipment that contains Class I or II ODS.

25. Paints The contractor must not use paints containing zinc chromate or strontium chromate pigments and paints containing lead in excess of 0.06 percent by weight of the total nonvolatile content (calculated as lead metal).

26. Pest Management At no time during the execution of this contract must the contractor provide a food source or harborage for any pests. The contractor must coordinate through the COR to the EB prior to application any pesticide usage.

Pesticides are required to be approved by the EB. The contractor must report all usage of pesticides through the COR to the EB. After completion of the contract, the contractor must ensure there is no passage for pests to enter facilities or structures related to work performed by the contractor.

27. Polychlorinated Biphenyls (PCBs): N/A

28. Recycling

The contractor must comply with TYADs general recycling plan for recyclable materials such as aluminum, steel, cardboard, paper, plastic and wood. The contractor should contact the EB for additional information on the recycling of materials through the COR. The COR will coordinate with EB to have the contractor recycle metals, cardboard, etc., through TYADs recycling program. All Construction and Demolition (C&D) material transferred from a construction project into the TYAD recycling program must be segregated and material type and weights submitted to the project COR for consolidation. Any material entering the TYAD recycling program that is not documented and properly reported will be absorbed into the TYAD recycling program and not count towards the C&D requirement of the project. Clean wood shall be recycled by the contractor off TYAD property.

29. Refuse and Construction Demolition Debris Removal and Disposal During the performance of all construction, renovation and demolition projects, a minimum of 60 percent of all non-hazardous construction demolition debris shall be diverted from the landfill for reuse or recycling. The contractor shall provide written certification to the COR of the type and tonnage of debris reused or recycled from the contract.

All refuse and the construction demolition debris not recovered for reuse or recycling shall be disposed of at a PADEP permitted and Monroe County Municipal Waste Management Authority authorized facility. The contractor shall comply with the Monroe County Solid Waste Management Plan and PA Act 90, including all licensing requirements. Monroe County has specific landfills that is must be transported to per Monroe County guidance which is available on the county website (http://www.thewasteauthority.com) and any contractors can call the Monroe County Municipal Waste Management Authority at (570) 643-6100. The contractor shall provide a disposal certificate or landfill weight slip to the COR for all solid waste disposed of during the performance of this contract. The COR will then provide copies of the disposal certificate or landfill weight slips with the quarterly consolidated C&D report from The Installation Planning and Maintenance Division to EB.

30. Removal Materials The contractor must remove from the site prior to the acceptance of work by the Government, all materials not identified to remain in place, including excess paints, building materials and equipment purchased by the contractor for the execution of this project.

31. Site Preservation and Restoration The contractor must ensure that the land resources associated under this contract be preserved in their present condition, or be restored to a like condition after completion of construction. This post construction appearance will appear to be natural and not detract from the appearance of the project.

32. Trees and Shrubs Protection: N/A

33. Unexploded Ordnance (UXO): N/A

34. Water Quality The contractor shall not pollute streams, lakes or reservoirs. All work under this contract shall be performed in such a manner that pollution will not be created in streams, surface waters or underground water located within, or adjacent to the project area. The contractor shall not spill, emit, dump or otherwise discharge any hazardous, toxic, harmful or unauthorized pollutant, substance or material, including petroleum products, cleaning agents or paints, onto the ground, into the air or into any waters or nearby storm drain. The contractor shall execute any preventative measures required to prevent any hazardous, toxic or harmful material stored or used on the project site from entering any stormwater drain. Nothing shall be allowed to spill, emit, dump or otherwise discharge any hazardous, toxic or harmful material or pollutant into any sink, toilet, drain, utility or receptacle without written permission from the EB through the COR. The contractor shall protect streams, lakes and wetlands from sediment discharges caused by his activities.

CONTRACTOR SAFETY STANDARDS

CONTRACTOR SAFETY STANDARDS FOR TYAD - June 2018

Below are the contractor requirements for any work done on Tobyhanna Army Depot (TYAD). It is the responsibility of the contractor to enforce the below requirements. Failure to enforce safety requirements on the depot can result in termination of the contract.

Important Phone Numbers Emergency: 911 Security: 570-615-7550 Fire Department – (Non-Emergency): 570-615-7300 Safety: 570-615-7027

S.10.0 THE CONTRACTOR IS SOLELY RESPONSIBLE AND LIABLE FOR JOB-SITE SAFETY.

Review of the project plans and other documents by the Tobyhanna Safety Office does not constitute an acceptance of Federal responsibility or liability for the adequacy of the safety measures identified for the job or for the Contractor's compliance with OSHA rules and regulations. The Contractor remains solely responsible and liable for job-site safety at all times during the term of the contract.

Contractors shall comply with the following:

1. Tobyhanna Army depot has restrictions on the use of fossil fuels in all buildings. The contractor must follow the TYAD fossil fuel memorandum of understanding.

2 All direct construction supervision including subcontractors must have completed the OSHA 10 hour safety course for construction. These certificates must be submitted with the site safety plan BEFORE construction starts.

3. Red card program - Tobyhanna Army Depot utilizes a program to allow employees to stop an action which is considered unsafe. Employees carry small red cards that can be thrown down when the employee sees an action they consider unsafe. Work ceases until TYAD management can decide if it is safe or not. Contractors are required to comply with this. If a Tobyhanna employee presents his red card to a contractor, the contractor must stop working until the COR and the safety office can determine if there is a safety hazard or not.

S 10.1 CODE COMPLIANCE

Tobyhanna Army Depot requires full contractor compliance with all safety regulations and standards. The Contractor is responsible for maintaining, monitoring and enforcing all rules, regulations and codes, by ALL personnel working for the contractor including all subcontractors. These codes include:

Title 29 Code of Federal Regulations-1910 (OSHA General Industry Standards), Title 29 Code of Federal Regulations-1926 (Construction Industry Standards), National Fire Protection Association Codes, Uniform Facilities Code, Other codes as required to maintain safety standards.

S.10.2 JOB HAZARD ANALYSIS (JHA)

Prior to the start of work, the contractor shall prepare a JHA for each phase of work that will be done under the contract. A phase is any operations involving a certain type of work. Examples include demolition, excavation, masonry work, concrete pouring, roofing, and electrical wiring. Work done by each subcontractor is also a phase.

The JHA will:

1. List the activity being performed and identify the sequence of work steps

2. List the hazards associated with each step, and the procedures and training required to eliminate or reduce the risk to an acceptable level.

S.10.3 SAFETY PLAN

Contractors will submit a written Contractor Safety Plan prior to beginning construction. The plan must follow the guidelines in OSHA 1926.

1. Who will implement the plan, including who is responsible for safety and accident prevention.

2. A means for coordinating and controlling subcontractors and suppliers.

3. Safety training.

4. Who will investigate accidents.

5. Emergency response.

6. Job site cleanup and safe access.

7. Public safety requirements such as signs and barricades.

S.10.4 FALL PROTECTION

1. Personnel performing any work on elevated surfaces, six (6) feet or more above a lower level, shall comply with 29 CFR §§ 1926.500 through 1926.503.

2. There are no certified anchorage points or permanent guardrail systems on any TYAD roof. Most roofs of the depot are more than 20 feet high.

3. Contractors and their employees must be protected from falling off the edge of the roof, regardless of how briefly the employees are at the edge of the roof.

S.10.5 ELECTRICAL SAFETY

Follow the current Tobyhanna Army Depot standard. This standard is based on NFPA 70E.

S.10.6 DEPOT REQUIRED PERMITS/APPROVALS

Permits are required for:

1. Excavation: Contractors must utilize the PA 1 Call system and coordinate with contracting officer representative (COR) for excavations prior to any groundbreaking including digging, drilling and stake driving. See appendix L for permitting details.

2. Trenching: Contractors must obtain approval from the TYAD Safety and Occupational Health Office (SOHO) before any trenching deeper than 5 feet. The contractor must have a trenching plan and the appropriate safety equipment. The contractor is to request approval from the (SOHO) by e-mail through the contracting officer representative.

3. Confined space: Contractors must obtain approval from the TYAD Safety and Occupational Health Office (SOHO) before entering any confined space. The contractor must have a confined space plan and the appropriate safety equipment. The contractor is to request approval from the (SOHO) by e-mail through the contracting officer representative.

4. Burning/fire: Hot work permits must be obtained daily from the Fire Department.

5. Cranes: Use of cranes on the depot: See S.10.13

6. Army Radiation Permits: Non-Army agencies (including other military Services, vendors, and civilian contractors) require an Army Radiation Permit (ARP) to use, store, or possess ionizing radiation sources on TYAD (see 32 CFR 655). Non-Army applicants will apply by letter with supporting documentation to the Depot Commander. The letter should be submitted so that the Depot Commander receives the application at least 30 days before the requested start date of the permit. The ARP application will specify start and stop dates for the ARP and describe the intended use of the radioactive material.

For sealed sources of radiation, i.e. Moisture Soil Density Gauges, the application must include a valid Nuclear Regulatory Commission (NRC) Radioactive Materials License that allows the applicant to use the source as specified in the ARP application, current leak test certificates, operator training records and calibration certificates for any equipment that may be utilized at TYAD.

For machine produced ionizing radiation sources, i.e. X-ray Equipment, the application must include the appropriate state authorization that allows the applicant to use the source as specified in the ARP application along with operator training records and calibration certificates for any equipment that may be utilized at TYAD.

ARPs will not be issued for more than 12 months at a time.

S.10.7 CONFINED SPACES

1. All Confined Spaces at TYAD are considered as Permit-Required Confined Spaces.

2. Contractors must fully comply with all OSHA regulations for Confined Space Operations, including on-site use and availability of a Confined Space Entry Permit / Checklist.

3. The contractor must request access from the TYAD SOHO before entering any confined space area. The contractor is to request approval from the SOHO through the Contracting Officer Representative (COR). The Contractor or COR will also notify the Fire and Emergency Services Branch of the Confined Space Entry.

4. Upon completion, the contractor will notify the SOHO and discuss whether any new hazards were added to the Confined Space, and will submit the completed Confined Space Entry Permit / Checklist.

S.10.8 LOCKOUT/TAGOUT PROCEDURE

1. The Contractor shall perform this work in accordance with 29 CFR § 1910.147, The Control of Hazardous Energy.

2. The Contractor shall notify the COR that a lockout/tagout system is going to be used.

3. The contractor is to request the COR to notify them if TYAD is using any lockouts/tag outs in the construction area.

4. The Contractor shall locate and identify all isolating devices.

5. The Contractor shall shut down the equipment normally.

6. The Contractor shall isolate all energy using appropriate methodology.

7. After all work is complete, the Contractor shall remove the energy isolating device and restore the equipment to service.

8. The Contractor shall notify the COR that energy is again restored.

S.10.9 PROTECTION TO THE DRINKING WATER SYSTEM

The contractor will not perform any work on the depot potable water system until prior approval is obtained from the Environmental Branch and the certified operator through the Directorate, Installation Services COR.

S.10.10 PROTECTION OF PERSONNEL

At no time is any depot employee to be put at risk to illness or injury.

No construction actions are exempt from this requirement.

1. Where pedestrian and driver safety is endangered, use appropriate traffic barricades. Use anchor barricades to prevent displacement by wind. Notify the COR prior to beginning such work.

2. Where demolition is required, continuously evaluate the condition of the structure being demolished and take action to protect personnel working around the project site. No structural element will be left standing without sufficient support to prevent collapse.

3. Personal Protective Equipment for visitors: three complete sets of personal protective equipment shall be available to visitors for entry to the regulated area. Visitors shall be provided with training equivalent to that provided to Contractor employees in the use of Personal Protective Equipment and the site safety and health requirements.

4. Subcontractors are the responsibility of the prime contractor and must follow the same regulations the prime contractor does.

S.10.11 FIRE AND EMERGENCY SERVICES

Hot Work Permits will be issued by Fire Department upon request. HWP requests must be made at least thirty (30) minutes prior to the expected start time by contacting the fire department.

1. Contractors are required to have fully charged and operable contractor provided fire extinguisher(s) that are appropriate for the type of possible fire. Fire extinguisher shall be immediately available for inspection by the fire department upon an inspection of the work site and remain at the work site. At a minimum, a ten (10) pound class 4A: 60B: C multi-purpose dry-chemical fire extinguisher or equivalent shall be provided. Contractors shall provide an appropriate number of fire extinguishers.

2. A fire watch must be in place during the hot work and for 30 minutes after the HWP operation. Upon completion of the thirty (30) minute, post hot work fire watch, the contractor shall contact the fire department to report the work is complete.

The fire department will be notified when flammable or hazardous materials are used.

3. Use of a plasma torch will require special approval by the fire department.

4. Any fire, even one that is extinguished, must be reported to the fire department.

5. Ambulance services are provided at a cost to contractors. The contracted ambulance service provider will transport to the nearest hospital. Advanced Life Support, helicopter transport, etc. is all at the contractor's expense.

6. The fire department will respond to all fire, ambulance, hazmat and confined space incidents.

S.10.12 IF AN INCIDENT HAPPENS

1. Any serious injury or medical emergency:

a. Dial 911 and give accurate location and nature of emergency. Make sure to tell the operator that you are calling from Tobyhanna Army Depot.

b. Send someone to the nearest exit to assist responders.

c. Treat victims to the best of your ability.

d. Call the work order desk at 570-615-7805 if there is any blood or body fluids that must be cleaned up.

2. In the event of the smell of natural gas:

a. Call dial 911.

b. Have all personnel evacuate the area if the smell is significant.

c. Assist the fire company to determine the leak as appropriate.

3. In the case of a fire:

a. If the fire is small, use a fire extinguisher and call 911.

b. Otherwise, dial 911 and pull the fire alarm.

c. Evacuate the building.

S.10.13 CRANE LIFT OPERATIONS AT TOBYHANNA ARMY DEPOT

A Lift Plan for Crane Operations will be submitted to the SOHO at least five business days prior to a lift operation.

It shall include:

1. A description of the operation to be performed, specific personnel assignments (Lift Director, Safety Coordinator, Operator, rigger, etc.) and signaling and any other details pertaining to activities during the lift.

2. A drawn Site Plan with specifications including work zone, support equipment locations, evacuation area, traffic control, electrical power line clearances (if applicable), lift path, surface conditions at crane location, etc.

3. Training/Certifications (scans) for crane operator and other lift-team members included in the lift operation.

4. Equipment nomenclature and a certificate of comprehensive annual inspection records, including any deficiencies and corrective action.

5. Load chart for crane, with target capacities specific to the crane/boom configuration and lift details clearly marked.

6. Lift calculations, including rigging components and configuration.

7. Weather conditions are always part of the ongoing safety assessment and may result in rescheduling of the lift.

8. Only approved operators are allowed to operate or move the crane for any reason.

A Production Lift Plan pertains to repetitive lifts within a work project and may be outlined with one lift plan depicting the nomenclature and general capacities of the equipment to be utilized. Besides the eight items above, the plan will also include how often the crane will be used and how traffic and personnel safety will be handled.

S.10.14 APPLICATION OF ANY ODOR PRODUCING MATERIAL

Any application of any paint, epoxy, adhesive or anything else that produces an offensive odor must be coordinated with the COR or POC before starting. This is particularly true of the construction work in a building occupied by Tobyhanna employees.

IN ANY CONFLICT BETWEEN STANDARDS, THE STRICTER OF THE TWO SHALL APPLY. IF UNSURE

CONTACT THE TYAD SOHO AT 570-615-7027

INSURANCE REQUIREMENTS

INSURANCE REQUIREMENTS - CONTRACTING OFFICER'S NOTICE

The contractor shall procure and maintain during the entire period of his performance under this contract the following minimum insurance:

(a) WORKER'S COMPENSATION AND EMPLOYER'S LIABILITY. Contractors are required to comply with applicable Federal and State Worker's Compensation and Occupational Disease Statutes. If the Employer's liability section of the insurance policy, except then contract operations are so commingled with a contractor's commercial operations that it would not be practical to require this coverage. Employer's liability coverage of at least $100,000 shall be required, except in states with exclusive or monopolistic funds that do not permit Worker's Compensation to be written by private carriers.

(b) GENERAL LIABILITY. Bodily Injury Liability Insurance Coverage written on the comprehensive form of policy of at least $500,000 per occurrence shall be required. Property Damage Liability Insurance is not normally required.

(c) AUTOMOBILE LIABILITY. Automobile Liability Insurance written on the comprehensive form of policy is required. The policy shall provide for Bodily Injury and Property Damage Liability covering the operation of all automobiles used in connection with performing the contract. Policies covering automobiles operated in the United States shall provide coverage of at least $200,000 per person and $500,000 per occurrence for Bodily Injury and $20,000 per occurrence for Property Damage. The amount of liability coverage on other policies shall be commensurate with any legal requirements of the locality and sufficient to meet normal and customary claims.

TYAD ONSITE CONTRACTORS

TOBYHANNA ARMY DEPOT ON-SITE CONTRACTOR WORKFORCE AND VISITOR

RESTRICTIONS

1. NON-RESIDENT/NON-IMMIGRANT ALIENS

a. All non-resident/non-immigrant aliens must have approval prior to being permitted access to Tobyhanna Army Depot (TYAD). Such approval must be obtained by requesting access through the following: apply at the alien-resident's embassy; proceed to the U.S. Embassy; proceed to the Department of the Army; proceed to Army Materiel Command; proceed to U.S. Communications-Electronics Command; proceed to TYAD.

b. All non-resident/non-immigrant aliens granted access to TYAD are required to be escorted by Government personnel. One Government escort can accommodate a maximum of two non-resident/non-immigrant aliens.

c. Due to limited availability of Government personnel, contractors shall not be permitted to employ non-resident/non-immigrant aliens as part of the contractor's on-site workforce. Limited exceptions to this restriction may be considered on a case-by-case basis. Such exceptions shall only be considered where a specialized skill or trade is not otherwise available, and even under such circumstances would only be considered for very limited duration, e.g., a few hours/days. However, even if limited exception is considered, access may still be denied. Contractors whose personnel are either denied entry to TYAD or permitted limited entry to TYAD due to the security requirements pertaining to non-resident aliens/non-immigrants are not relieved of their obligation to provide the required contract performance and must do so at no additional cost to the Government. Any contractor failing to perform or that fails to perform in a timely manner under such circumstances may be terminated for default or other contractual remedies as appropriate.

d. Due to limited availability of Government personnel, visitors requiring escort may not be permitted access, or access may be limited to a certain time and duration.

2. FOR THE PURPOSE OF FORMAL ESCORTED SITE VISITS

Resident aliens (immigrants) in possession of a valid Form I-551, Alien Registration Receipt Card ("Green Card"), are not required to obtain approval as set forth in paragraph 1.a. above (but see paragraph 5, below). Such individuals must have proper identification in addition to a valid form I-551 in their physical possession at all times while at TYAD. Individuals lacking proper identification and valid form I-555 will be denied access to TYAD.

3. SECURITY SEARCHES, IN-PROCESSING, AND SECURITY SCREENING

All persons seeking entrance to TYAD must submit to and comply with all security standards and requirements in force at the time such persons are seeking entry. All visitors and contractors, regardless of resident status or citizenship, will be subject to vehicle search and intense in-processing by TYAD Security personnel prior to being granted access to TYAD. This security screening process may be time consuming and access may be delayed or denied.

Any Contractors who will be working on site, company representatives who will be visiting periodically, and any companies or contractors requesting or requiring TYAD badges for other business reasons must submit a completed TYAD form 648-C to their contract or depot point of contact. The completed form must be submitted at least five (5) workdays in advance of on-site performance for each employee intended for onsite performance or five (5) workdays in advance of visits or other business at the depot. Any contractor employee

(s) already on site who have not been screened, will be subject to security screening. This requirement is inclusive of on-site supervisory or managerial personnel and sub-contractor personnel that the Contractor anticipates will be performing work or visiting on-site. This security screening does not relieve the contractor of any responsibilities to conduct thorough pre-employment background checks and drug screening. Contractor workers will not be granted access to the work site until security screening is completed and access is approved.