B08_Solicitation_Attach_6__Submittal_List.pdf
PDF 84 KB Posted
- Attached to
- REHABILITATE ASPHALT PULLOUTS ON LOOP RD Federal contract opportunity
- Solicitation number
- 140P6323B0005
About this file
This document is a submittal list for a construction project to rehabilitate asphalt pullouts along a loop road in Badlands National Park. The project involves repairing eight pullouts and includes specifications for demolition, earthwork, paving, signage, landscaping, and erosion control. The submittal list requires the contractor to provide plans, samples, test reports, manufacturer data and instructions, and certifications demonstrating compliance with requirements for various materials and work. It estimates the review time needed from architects, engineers and other specialists for each submittal. The related federal contract opportunity is solicitation number 140P6323B0005 from the National Park Service Midwest Region within the Department of the Interior to rehabilitate the asphalt pullouts on the loop road.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Sol_140P6323B0005_Amd_0004.pdf | ||
| Sol_140P6323B0005_Amd_0003.pdf | ||
| B09_Solicitation_Amendment_Amd_2_Questions___Answers_0002.pdf | ||
| Sol_140P6323B0005_Amd_0002.pdf | ||
| B09_Solicitation_Amendment_Amd_1_Attach_1_Bid_Schedule_language_removed_from_SF1442_0001.pdf | ||
| Sol_140P6323B0005_Amd_0001.pdf | ||
| B08_Solicitation_Attach_1_Bid_Schedule.xlsx | XLSX spreadsheet | |
| B08_Solicitation_Attach_8_Wage_Determintation_SD20230032.pdf | ||
| B08_Solicitation_Attach_3_Specifications.pdf | ||
| B08_Solicitation_Attach_5_Specifications_Geotechinical_report.pdf | ||
| B08_Solicitation_Attach_2__Drawings.pdf | ||
| B08_Solicitation_Attach_7_Limitations_on_Subcontracting_Report.xlsx | XLSX spreadsheet | |
| Sol_140P6323B0005.pdf | ||
| B08_Solicitation_Attach_4_Specifications_SDDOT_Specs.pdf |
Show all 14
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Submittal List with Review Estimate National Park Service (NPS) - Denver Service Center (DSC) | 1-27-21
SUBMITTAL LIST ACTION SUBMITTAL
REVIEW ESTIMATE
Park Acronym/Project Management Information System (PMIS) Number: BADL/245016 (Complete this portion for Architect / Engineer (A/E)
Project Title:
construction service task order negotiation.)
SUBMITTAL REQUIREMENTS ARCHITECT / ENGINEER REVIEW TIME
(Indicate with X) (Indicate in whole or partial hours.)
INFORMATIONAL ACTION
S P
E C
IF
IC
A T
IO
N
S E
C T
IO
N
P A
R A
G R
A P
H N
U M
B E
R
DESCRIPTION
C E
R T
IF
IC
A T
IO
N
S O
R
L A
B O
R A
T O
R Y
T E
S T
S
R E
P O
R T
S O
R C
A L C
U L A
T
IO
N S
O R
P L A
N
M A
N U
F A
C T
U R
E R
D A
T A
A N
D I N
S T
R U
C T
IO
N
S
O T
H E
R
S A
M P
L E
S
S H
O P
D R
A W
IN
G
S
M A
N U
F A
C T
U R
E R
D A
T A
A N
D I N
S T
R U
C T
IO
N
S
O T
H E
R
A R
C H
IT
E
C T
C
IV
IL
E
N G
IN
E
E R
S T
R U
C T
U R
A L E
N G
IN
E
E R
M E
C H
A N
IC
A
L E
N G
IN
E
E R
E L E
C T
R
IC
A L E
N G
IN
E
E R
P R
O J E
C T
M A
N A
G E
C
O R
D
IN
A T
IO
N
L A
N D
S C
A P
E A
R C
H
IT
E C
T
011000 7.2 Accident Prevention Plan (APP) X
011000 9.1.C Preconstruction Conference Submittals
Letter Designating Project Superintendent X
Construction Schedule X
Schedule of Values X
Accident Prevention (Safety) Plan X
List of Subcontractors X
Subcontractor Certification of Labor Compliance X
Quality Control Plan X
SWPPP X
024100 1.4.A.1
Demolition and Removal Plan: Not less than ten days prior to starting demolition Work, submit acceptable plan for demolition and removal Work
X X X
1.4.A.2 Notification of Intended Demolition Start X
312300 1.4.A.1.a Contractor shall submit (for COR approval) all data necessary to demonstrate compliance with all specified requirements.
X X
1.4.A.1.b Manufacturer's installation instructions. X X X
1.4.B.1 Coordinate samples and testing for approval of off-site materials with the COR.
X
1.4.B.2.a Report and certification of aggregate fill and drainage fill. X X
1.4.B.2.b Test reports on borrow material. X X
1.4.B.2.c Field reports; in-place soil density and moisture tests. X X
Rehabilitate Asphalt Pullouts for Wildlife Viewing and Visitor Enjoyment Along the Loop Road
Submittal List with Review Estimate Template | National Park Service (NPS) - Denver Service Center (DSC) page 1 of 4
SUBMITTAL LIST ACTION SUBMITTAL
REVIEW ESTIMATE
Park Acronym/Project Management Information System (PMIS) Number: BADL/245016 (Complete this portion for Architect / Engineer (A/E)
Project Title:
construction service task order negotiation.)
SUBMITTAL REQUIREMENTS ARCHITECT / ENGINEER REVIEW TIME
(Indicate with X) (Indicate in whole or partial hours.)
INFORMATIONAL ACTION
S P
E C
IF
IC
A T
IO
N
S E
C T
IO
N
P A
R A
G R
A P
H N
U M
B E
R
DESCRIPTION
C E
R T
IF
IC
A T
IO
N
S
B O
R A
T O
R Y
T E
S T
S
R E
P O
R T
S O
R C
A L C
U L A
T
IO
N S
O R
P L A
N
M A
N U
F A
C T
U R
E R
D A
T A
A N
D I N
S T
R U
C T
IO
N
S
O T
H E
R
S A
M P
L E
S
S H
O P
D R
A W
IN
G
S
M A
N U
F A
C T
U R
E R
D A
T A
A N
D I N
S T
R U
C T
IO
N
S
O T
H E
R
A R
C H
IT
E
C T
C
IV
IL
E
N G
IN
E
E R
S T
R U
C T
U R
A L E
N G
IN
E
E R
M E
C H
A N
IC
A
L E
N G
IN
E
E R
E L E
C T
R
IC
A L E
N G
IN
E
E R
P R
O J E
C T
M A
N A
G
O R
D
IN
A T
IO
N
L A
N D
S C
A P
E A
R C
H
IT
E C
T
Rehabilitate Asphalt Pullouts for Wildlife Viewing and Visitor Enjoyment Along the Loop Road
1.4.B.2.d One optimum moisture-maximum density curve for each type of soil encountered.
X X
313219 1.4.A.1 Manufacturer's certification that raw materials and roll materials comply with required geogrid physical properties.
X
1.4.A.2 Manufacturer quality control manuals. X
1.4.A.3 Original test results for resins and roll material at frequency specified in respective quality control manuals.
X X
1.4.A.4 Documentation of Partial Factors of Safety in accordance with GRI
GG-4.
X
1.4.A.5 Geogrid layout plan with proposed size, number, position and sequencing of geogrid rolls and direction of all field joints.
X X
1.4.A.6 Proposed details of anchor trench if different than included in the
Contract Drawings.
X X
1.4.A.7 Manufacturer’s certification of Base Course
Improvement/Reduction Factor of 1.3 or higher.
X
1.4.A.8 Proposed method of placing protective cover soil on side slopes. X X
321216 1.3.A.1.a Contractor shall submit (for COR approval) all data necessary to demonstrate compliance with all specified requirements.
X X
1.3.A.1.b Manufacturer's installation instructions. X X
1.3.A.1.c Asphalt design mix. X X
321540 1.3.A.1 Contractor shall submit (for COR approval) all data necessary to demonstrate compliance with all specified requirements.
X X
1.3.A.2 Sieve analysis reports on all granular materials. X X
1.3.A.3 Source tests: submit certified test reports and service records to determine acceptability and application of stone materials.
X X
321613 1.3.A.1.a Contractor shall submit (for COR approval) all data necessary to demonstrate compliance with all specified requirements.
X X
Submittal List with Review Estimate Template | National Park Service (NPS) - Denver Service Center (DSC) page 2 of 4
Park Acronym/Project Management Information System (PMIS) Number: BADL/245016 (Complete this portion for Architect / Engineer (A/E)
Project Title:
construction service task order negotiation.)
SUBMITTAL REQUIREMENTS ARCHITECT / ENGINEER REVIEW TIME
(Indicate with X) (Indicate in whole or partial hours.)
INFORMATIONAL ACTION
S P
E C
IF
IC
A T
IO
N
S E
C T
IO
N
P A
R A
G R
A P
H N
U M
B E
R
DESCRIPTION
C E
R T
IF
IC
A T
IO
N
S
B O
R A
T O
R Y
T E
S T
S
R E
P O
R T
S O
R C
A L C
U L A
T
IO
N S
O R
P L A
N
M A
N U
F A
C T
U R
E R
D A
T A
A N
D I N
S T
R U
C T
IO
N
S
O T
H E
R
S A
M P
L E
S
S H
O P
D R
A W
IN
G
S
M A
N U
F A
C T
U R
E R
D A
T A
A N
D I N
S T
R U
C T
IO
N
S
O T
H E
R
A R
C H
IT
E
C T
C
IV
IL
E
N G
IN
E
E R
S T
R U
C T
U R
A L E
N G
IN
E
E R
M E
C H
A N
IC
A
L E
N G
IN
E
E R
E L E
C T
R
IC
A L E
N G
IN
E
E R
P R
O J E
C T
M A
N A
G
O R
D
IN
A T
IO
N
L A
N D
S C
A P
E A
R C
H
IT
E C
T
Rehabilitate Asphalt Pullouts for Wildlife Viewing and Visitor Enjoyment Along the Loop Road
1.3.A.2 Mix design(s) in accordance with SDDOT Standard Specifications for Roads and Bridges, Class M6.
X X
1.3.A.3 Drawings detailing all reinforcing. X X
1.3.A.4.a Concrete cylinder test results from field quality control. X X
1.3.B.1 Samples of fabricated jointing materials and devices. X
329113 1.2.A.1 Project Data: Test reports for contractor furnished topsoil. X X
329219.23 1.3.A.1.a Contractor shall submit (for COR approval) all data necessary to demonstrate compliance with all specified requirements.
X X
1.3.A.1.b Manufacturer's installation instructions. X
1.3.A.1.c
Signed copies of vendor's statement for seed mixture required, stating botanical and common name, place of origin, strain, percentage of purity, percentage of germination, and amount of
Pure Live Seed (PLS) per bag.
X X
1.3.A.1.d Type of herbicide to be used during first growing season to contain annual weeds and application rate.
X X
1.3.A.2
Certification that each container of seed delivered will be labeled in accordance with Federal and State Seed Laws and equals or exceeds Specification requirements.
X X
1.3.B.1 Copies of invoices for fertilizer used on Project showing grade furnished, along with certification of quality and warranty.
X
1.3.B.2
Copies of seed bills for seed mix used on Project as well as invoices showing seed mix furnished with certification of quality and warranty.
X X
Drawings Proposed Wood Bollards Layout X
Proposed Wood Bollards Material Information X X
Proposed Wood Bollards Installation Method X X
Proposed Wood Bollards Sample X
Submittal List with Review Estimate Template | National Park Service (NPS) - Denver Service Center (DSC) page 3 of 4
Park Acronym/Project Management Information System (PMIS) Number: BADL/245016 (Complete this portion for Architect / Engineer (A/E)
Project Title:
construction service task order negotiation.)
SUBMITTAL REQUIREMENTS ARCHITECT / ENGINEER REVIEW TIME
(Indicate with X) (Indicate in whole or partial hours.)
INFORMATIONAL ACTION
S P
E C
IF
IC
A T
IO
N
S E
C T
IO
N
P A
R A
G R
A P
H N
U M
B E
R
DESCRIPTION
C E
R T
IF
IC
A T
IO
N
S
B O
R A
T O
R Y
T E
S T
S
R E
P O
R T
S O
R C
A L C
U L A
T
IO
N S
O R
P L A
N
M A
N U
F A
C T
U R
E R
D A
T A
A N
D I N
S T
R U
C T
IO
N
S
O T
H E
R
S A
M P
L E
S
S H
O P
D R
A W
IN
G
S
M A
N U
F A
C T
U R
E R
D A
T A
A N
D I N
S T
R U
C T
IO
N
S
O T
H E
R
A R
C H
IT
E
C T
C
IV
IL
E
N G
IN
E
E R
S T
R U
C T
U R
A L E
N G
IN
E
E R
M E
C H
A N
IC
A
L E
N G
IN
E
E R
E L E
C T
R
IC
A L E
N G
IN
E
E R
P R
O J E
C T
M A
N A
G
O R
D
IN
A T
IO
N
L A
N D
S C
A P
E A
R C
H
IT
E C
T
Rehabilitate Asphalt Pullouts for Wildlife Viewing and Visitor Enjoyment Along the Loop Road
Total: 0 0 0 0 0 0 0
Submittal List with Review Estimate Template | National Park Service (NPS) - Denver Service Center (DSC) page 4 of 4
File details come from the government source that posted it. Updated .