B08_Solicitation_Attach_6__Archeology_specification.pdf
PDF 72 KB Posted
- Attached to
- SOUTH UNIT POTABLE WATER RENOVATION Federal contract opportunity
- Solicitation number
- 140P6324B0008
About this file
This document contains an archeological protection specification for a construction project at Badlands National Park south unit potable water system renovation solicitation. The specification outlines requirements for protecting archeological resources that may be encountered during ground disturbing construction work. Contractors must submit a daily work schedule detailing activities in archeologically sensitive areas and meet with the contracting officer and archeological monitor before starting work to discuss protection methods. If resources are discovered, work must stop immediately and be relocated pending evaluation and mitigation planning. The archeological monitor will observe all work in sensitive areas and contractors must follow all protection requirements and stoppage directions.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Sol_140P6324B0008_Amd_0003.pdf | ||
| B09_Solicitation_Amendment_2_Attach_1_Question_and_Answers_0002.docx | DOCX document | |
| Sol_140P6324B0008_Amd_0002.pdf | ||
| Sol_140P6324B0008_Amd_0001.pdf | ||
| Sol_140P6324B0008.pdf | ||
| B08_Solicitation_Attach_3__Specs_Site_Plan.pdf | ||
| B08_Solicitation_Attach_7__TERO_Information.pdf | ||
| B08_Solicitation_Attach_1__Specifications.pdf | ||
| B08_Solicitation_Attach_2__Drawings.pdf | ||
| B08_Solicitation_Attach_4_Wage_Determintation_SD20230032.pdf | ||
| B08_Solicitation_Attach_5_Limitations_on_Subcontracting_Report.xlsx | XLSX spreadsheet |
Show all 11
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
BADL - 219536 01 35 13.22 - 1
031414 ARCHEOLOGICAL PROTECTION
SECTION 01 35 13.22 – ARCHEOLOGICAL PROTECTION
PART 1 - GENERAL
1.1 SUMMARY
A. The work of this section consists of protecting archeological resources contained in soil deposits.
1.2 DEFINITIONS
A. Archeological Resources: Archeological resources are the physical evidences of past human activity, including evidences of the effects of that activity on the environment. Archeological resources represent both prehistoric and historic time periods. They are found above and below ground and under water.
B. Archeologically Sensitive Areas: Areas that have the potential to contain significant (National Register eligible) archeological resources. If National Register eligible or listed archeological resources could not be avoided, an appropriate mitigation strategy would be developed in consultation with the state historic preservation officer and, if necessary, associated American Indian tribes.
C. Non-sensitive Areas: Areas with little, if any, potential of containing significant (National Register eligible) archeological resources.
D. Archeological Monitor: Representative of the Government designated to oversee construction activities that could disturb archeological resources.
E. Archeological Resources Protection Act (ARPA) of 1979 (P.L. 96-95; 93 Stat. 712): defines archeological resources as any material remains of past human life or activities that are of archeological interest and at least 100 years old; Section 4 of the statute describes the requirements that must be met before Federal authorities can issue a permit to excavate or remove any archeological resource on Federal or Indian lands; the curatorial requirements of artifacts, and other materials excavated or removed.
1.3 SUBMITTALS
A. Daily Work Schedule; Submit a Daily work Schedule detailing construction work in archeologically sensitive areas. Submit to Contracting Officer 2 days before start of ground disturbing site work.
1.4 QUALITY ASSURANCE
A. At least one week before on-site work begins, Contractor shall meet with Contracting Officer and Archeological Monitor to discuss Daily Work Schedule and equipment and special methods to be used in archeologically sensitive areas. Contractor shall ensure that approved Daily Work Schedule is followed throughout construction.
BADL - 219536 01 35 13.22 - 2
PART 2 - PRODUCTS
2.1 DAILY WORK SCHEDULE
A. A Daily Work Schedule is required for all work occurring within archeologically sensitive areas.
Include all work that is to occur within the area and key the schedule to the drawings to include the following:
1. Starting and ending dates of ground-disturbing construction.
2. Locations of temporary facilities, such as barriers, field offices, staging areas, sanitary facilities, borrow pits, and haul and access roads.
3. Types of construction, such as clearing, topsoil stripping, structure or trench excavation, landscaping, and post construction clean-up.
4. Methods and equipment used for each type of construction.
5. Plan for relocating work in the event of temporary work stoppages at each archeologically sensitive area
PART 3 - EXECUTION
3.1 BARRICADES
A. Comply with requirements specified in Division 01 Section “Temporary Facilities And Controls.”
3.2 ARCHEOLOGICAL INVESTIGATION BY NON-NPS PERSONNEL
A. A permit is required for any archeological investigations (e.g. excavation, shovel testing, coring, pedestrian survey, underwater archeology, rock art documentation, or other types of reconnaissance including the archaeological monitoring of construction) carried out on parklands by non-NPS personnel, unless carried out under a contract or a cooperative agreement specifically written for archeological investigations. Permits are issued under the Archaeological Resources Protection Act of 1979 (ARPA). The NPS does not issue a permit for archeological investigations carried out by NPS archeologists, or to archeologists working on NPS archeological projects under a contract or cooperative agreement.
B. Applicants should submit a Permit Application (DI Form 1926 (Rev Sept 2004) OMB No. 1024- 0037, approved through 1/31/2008 – the Permit Application form is available in pdf format) to the manager of the park in which they propose to work; or to the regional director, with a copy to the park manager.
3.3 OBSERVATION
A. Archeological Monitor will observe all ground-disturbing site work, including construction of temporary facilities, at all archeologically sensitive areas, from a safe location mutually agreed on by Contractor and Monitor. As new ground is broken, Monitor will examine excavated materials, using construction layout centerline and perimeter staking as a reference point to record locations of findings.
BADL - 219536 01 35 13.22 - 3
3.4 DISCOVERY OF RESOURCES
A. If Archeological Monitor discovers resources, immediate relocation of the work to a non-sensitive area may be required to allow Monitor to identify and document resources and, if necessary, develop an appropriate mitigation plan. While Archeological Monitor is documenting resources in sensitive areas, Contractor shall relocate work to non-sensitive areas where monitoring is not normally required.
B. If resources are discovered while Archeological Monitor is absent, stop work immediately and report the discovery to the Contracting Officer.
3.5 WORK STOPPAGE
A. The Contractor shall plan, schedule, and execute the work to prevent stoppages at one area from stopping all work at the construction site
END OF SECTION 01 35 13.22
File details come from the government source that posted it. Updated .