B09_Solicitation_Amendment_2_Attach_1_Question_and_Answers_0002.docx

DOCX document 15 KB Posted

Attached to
SOUTH UNIT POTABLE WATER RENOVATION Federal contract opportunity
Solicitation number
140P6324B0008
Issued by
Department of the Interior National Park Service Midwest Region

About this file

This document is a set of questions and answers related to a solicitation for the South Unit Potable Water Renovation project at Badlands National Park. The solicitation requires the contractor to furnish and install various sized water meters, with the Mueller 500 Series (Bronze) or equal being acceptable. Meter pit sizes and types, service pipe material, and valves are also specified. The solicitation number is 140P6324B0008, and it was issued by the Department of the Interior National Park Service Midwest Region. The document provides clarification on acceptable product substitutions and installation requirements for the water system renovation project.

View the file

Other files for this federal contract opportunity

Show all 11

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

South Unite Water Questions

#
Questions
Answer
1
This job appears to have 2 – 1” meters in meter pits, 1 – 1-1/2” meter in a meter pit, and 1 – 2” meter in a meter pit. The specs call out for the meters to be Mueller 500 Series (Bronze) and that they will need to be furnished by the contractor. Would any meters be allowed from any other manufacturer? Like potentially Sensus or will they have to be from Mueller?

Mueller 500 series (Bronze) or equal series would be acceptable at submittal

2
The Mueller Series 500 (Bronze) is showing the sizes available as being only 1-1/2” and 2”. What should be used instead for the 2 – 1” sized meters?

435 series (bronze) would be an acceptable Mueller brand substate or equal

3
The EZ-Vault meter pits are only available for 1-1/2” and 2” meters. Can the meter pits for the 1” meters be the Mueller Thermal Coils? If so, should the size be 15” or 18”
Yes this would be considered
4
The meter pit detail shows an angle ball valve on the inlet side of the meter, but nothing on the outlet side. I wanted to verify that this is correct and no type of additional valve is needed on the outlet side.
Yes this is correct
5
Would Ford meter pits be allowed or must these also be from Mueller?

Or equals would be considered at submittal time

6
Is the service pipe able to be SIDR7 IPS Poly or DR11 HDPE Fusible polyethylene pipe?
DR 11 HDPE would be an acceptable service pipe.

SIDR7 IPS would not be an acceptable service pipe.