B08_Solicitation_Attach_5__Submittal_List_-.pdf
PDF 36 KB Posted
- Attached to
- BLCA-REPAIR ELECTRICAL RV HOOK-UPS Federal contract opportunity
- Solicitation number
- 140P6324Q0033
About this file
This document is a Submittal List for a federal construction contract opportunity. It outlines the specific submittals and documents required as part of the proposal, including a construction schedule, waste management plan, quality control plan, accident prevention plan, and various product data and shop drawings for items such as panelboards, circuit breakers, lighting fixtures, RV pedestals, and infrared heaters. The related federal contract opportunity is a request for quotation (RFQ) for construction services to repair RV hook-ups at Black Canyon of the Gunnison National Park, issued by the Department of the Interior National Park Service Midwest Region. The submittal requirements indicate the need for informational, action, certification/lab test report/calculation or plan, manufacturer data and instructions, and shop drawings for the listed products and project management documents.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Sol_140P6324Q0033_Amd_0001.pdf | ||
| B09_Solicitation_amendment_1_attach_Q_and_A_0001.docx | DOCX document | |
| B08_Solicitation_attach_6_Experience_Questionaire.xls | XLS spreadsheet | |
| B08_Solicitation_Attach_3_Drawings_.pdf | ||
| B08_Solicitation_Attach_4_Spec_Photos__-_Loop_B_existing_electrical_.pdf | ||
| B08_Solicitation_Attach_1_SPEC_.pdf | ||
| B08_Solicitation_Attach_2_SOW_.pdf | ||
| Sol_140P6324Q0033.pdf | ||
| B08_Solicitation_Attach_7_Wage_Determination.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SUBMITTAL LIST.
BRCA 330352 Replace Intrusion Detection/Alarm and Fire Alarm System
SUBMITTAL REQUIREMENTS (indicate with an "X")
Spec.
Sec.
Par.
No.
Description
INFORMATIONAL ACTION
C E
R T
L
A B
T E
S T
R
P O
R T
/C A
L C
O R
P L
A N
M fg
D
A
I N
S T
R U
C T
IO
O
H
R
H
O P
D R
A W
IN
G
M P
L
M fg
D
A
I N
S T
R U
C T
IO
2.1.5 Construction Schedule X
2.3.2 Waste Management Plan X
2.3.1 Schedule of Values X
2.3.5 Quality Control Plan X
2.3.10 Accident Prevention Plan X
? 1.3.A
Product Data (each type of product as listed)
- Panelboards & Meter Cabinets X
- Circuit Breakers X
Lighting Fixtures X
- RV Pedestals X
- Infrared heaters X
- Conduit and wiring, etc X
? 1.3.B Shop Drawings X
? 1.3.C Design Data
? 1.4.C Installer Qualifications X
28xxx? 1.5.A Operation & Maintenance Data X X
File details come from the government source that posted it. Updated .