B09_Solicitation_amendment_1_attach_Q_and_A_0001.docx

DOCX document 14 KB Posted

Attached to
BLCA-REPAIR ELECTRICAL RV HOOK-UPS Federal contract opportunity
Solicitation number
140P6324Q0033
Issued by
Department of the Interior National Park Service Midwest Region

About this file

This document is a set of Questions and Answers regarding a solicitation for construction services to repair RV hook-ups at Black Canyon of the Gunnison National Park. The key details are:

The solicitation number is 140P6324Q0033 and the opportunity type is a Request for Quotation (RFQ) for the required construction services. The project needs to be completed prior to winter and by the end of October. All existing pedestals and wiring need to be replaced, with the option to reuse existing conduit. The project will require some asphalt and concrete repair work due to the construction. Directional boring under roads is acceptable. The agency issuing the solicitation is the Department of the Interior National Park Service Midwest Region.

View the file

Other files for this federal contract opportunity

Other files attached to BLCA-REPAIR ELECTRICAL RV HOOK-UPS, newest first.
File Type Posted
Sol_140P6324Q0033_Amd_0001.pdf PDF
B08_Solicitation_Attach_4_Spec_Photos__-_Loop_B_existing_electrical_.pdf PDF
B08_Solicitation_attach_6_Experience_Questionaire.xls XLS spreadsheet
B08_Solicitation_Attach_3_Drawings_.pdf PDF
B08_Solicitation_Attach_5__Submittal_List_-.pdf PDF
B08_Solicitation_Attach_1_SPEC_.pdf PDF
B08_Solicitation_Attach_2_SOW_.pdf PDF
Sol_140P6324Q0033.pdf PDF
B08_Solicitation_Attach_7_Wage_Determination.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Question
Answer
1
Is this project tax exempt?
Yes-
2
Are restrooms available for contractor use?
Campground pit toilets in loop B will be available
3
Is there another site visit available? a. Will the bid package due date be adjusted to compensate?
No not at this time.
4
Can we get a confirmation total of how many concrete pedestals need to be replaced and or reused base on condition? a. If new can pre-cast pedestals be used or must they be poured in place?
Pedestals aren’t concrete. All pedestals need to be replaced. This is one of the main focuses of the project since all existing pedestals are in poor condition and obsolete. Existing pedestals are not set in concrete but new should be per electrical code
5
Can we get a confirmation total of how many electrical pedestals need to be replace and or reused base on condition?
All pedestals in loop B need to be replaced (23) per SOW
6
SOW calls for new trenching and underground wire from new panelboards.
New trenching will only be necessary if existing conduit is unusable. There is no reason to believe it cannot be reused. New wire can be pulled through existing conduit.
7
Can we abandon in place?
Yes as applicable
8
Can existing conduit be re-used or should pricing reflect all new conduit including trench to all 23 RV pedestals?
Yes. New wire can be pulled through existing conduit
9
If new conduit is required, what are the requirements for the currently installed conduit?
N/A. Existing conduit can be reused
10
Is this SOW expected to be completed this year?
Yes. Needs to be completed prior to winter. By end of October
11
Is the existing loop B asphalt?
Yes
12
Is directional boring under roadway acceptable?
Yes
13
Please confirm all concrete and asphalt paving is strictly repair due to damage caused by contractor?
Patching and repair of any concrete or asphalt caused by contractor during completion of project will be repaired.

Question and Answers for Black Canyon Gunnison NP Repair RV Site