B08_Price_Schedule.pdf
PDF 227 KB Posted
- Attached to
- Replace Housing Components, Lake Mead National Rec Federal contract opportunity
- Solicitation number
- 140P8122R0001
About this file
This price schedule outlines labor, equipment, and materials costs for renovating and upgrading multiple housing units at Lake Mead National Recreation Area. The schedule provides 64 cost line items to replace and install kitchen appliances and fixtures, bathroom fixtures, flooring, doors, lighting, and HVAC components across four housing units. It also includes optional line items for HVAC replacement, retaining walls, landscaping, and irrigation. The total proposed cost is to be based on the sum of line items 1 through 64 plus any exercised optional line items. The solicitation seeks a firm fixed price contract for the work to be awarded as a lump sum.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| B08_Invoice_Payment_Request.docx | DOCX document | |
| B08_Transmittal.pdf | ||
| B03_General_Decision_NV21210042.pdf | ||
| A06_Asbestos_and_Lead_Report_Qtrs_410.pdf | ||
| B08_Release_of_Claims.pdf | ||
| A04_Scope_of_Work_553A__504__410_Rehab.pdf | ||
| Sol_140P8122R0001.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Price Schedule
CLIN CLIN Description
QTY Total ($) 1 (Quarters 553A) All labor, equipment & materials for -
Kitchen Counter Tops
1 EA
2 (Quarters 553A) All labor, equipment & materials for - Kitchen Sink/Faucet
1 EA
3 (Quarters 553A) All labor, equipment & materials for - Kitchen Light
1 EA
4 (Quarters 553A) All labor, equipment & materials for - Bi-fold Doors
1 EA
5 (Quarters 553A) All labor, equipment & materials for - Mixing values in Laundry Room-
1 EA
6 (Quarters 553A) All labor, equipment & materials for – Ceiling/Swamp Cooler Vent
1 EA
7 (Quarters 553A) All labor, equipment & materials for – Closet Doors
1 EA
8 (Quarters 553A) All labor, equipment & materials for – Replace Bathroom, Bedroom, closet doors
9 (Quarters 553A) All labor, equipment & materials for – Interior Walls
1 EA
10 (Quarters 553A) All labor, equipment & materials for – Baseboards
1 EA
11 (Quarters 553A) All labor, equipment & materials for – Flooring
1 EA
12 (Quarters 553A) All labor, equipment & materials for – Bathroom Sinks, Countertop, Faucets and Drains
1 EA
13 (Quarters 553A) All labor, equipment & materials for – Celling Fans
1 EA
14 (Quarters 553A) All labor, equipment & materials for – Dining Room Light
1 EA
15 (Quarters 553A) All labor, equipment & materials for – Toilets
1 EA
16 (Quarters 553A) All labor, equipment & materials for – Kitchen Range Hood
1 EA
17 (Quarters 553A) All labor, equipment & materials for – Bathroom Exhaust Vents
18 (Quarters 553A) All labor, equipment & materials for – Smoke Alarms
1 EA
19 (Quarters 553A) All labor, equipment & materials for – Blinds
1 EA
20 (Quarters 553A) All labor, equipment & materials for – Upper cabinets in kitchen removed
1 EA
21 (Quarters 553A) All labor, equipment & materials for – Dishwasher
1 EA
22 (Quarters 553A) All labor, equipment & materials for – Water Heater
1 EA
23 (Quarters 553A) All labor, equipment & materials for – Replace Oven and Refrigerator Appliances
1 EA
24 (Quarters 504) All labor, equipment & materials for – Kitchen Counter Tops
1 EA
25 (Quarters 504) All labor, equipment & materials for – Kitchen Sink/Faucet
1 EA
26 (Quarters 504) All labor, equipment & materials for – Kitchen Light
1 EA
27 (Quarters 504) All labor, equipment & materials for – Mixing values in Laundry Room
1 EA
28 (Quarters 504) All labor, equipment & materials for – Closet Doors
29 (Quarters 504) All labor, equipment & materials for – Replace Bathroom, Bedroom, closet doors
1 EA
30 (Quarters 504) All labor, equipment & materials for – Interior Walls
31 (Quarters 504) All labor, equipment & materials for – Baseboards
1 EA
32 (Quarters 504) All labor, equipment & materials for – Flooring
1 EA
33 (Quarters 504) All labor, equipment & materials for – Bathroom Sinks, Countertop, Faucets and Drains
1 EA
34 (Quarters 504) All labor, equipment & materials for – Toilets
35 (Quarters 504) All labor, equipment & materials for – Kitchen Range Hood
1 EA
36 (Quarters 504) All labor, equipment & materials for – Bathroom Exhaust Vents
1 EA
37 (Quarters 504) All labor, equipment & materials for – Smoke Alarms
1 EA
38 (Quarters 504) All labor, equipment & materials for – Blinds
1 EA
39 (Quarters 504) All labor, equipment & materials for – Upper cabinets in kitchen removed
1 EA
40 (Quarters 504) All labor, equipment & materials for – Dishwasher
1 EA
41 (Quarters 504) All labor, equipment & materials for – Water Heater
1 EA
42 (Quarters 504) All labor, equipment & materials for – Garage Door Motor and Weather Seals
1 EA
43 (Quarters 504) All labor, equipment & materials for – Sliding Glass Patio Door
1 EA
44 (Quarters 504) All labor, equipment & materials for – Backyard
1 EA
45 (Quarters 504) All labor, equipment & materials for – Exterior Wall
1 EA
46 (Quarters 504) All labor, equipment & materials for – Exterior Light Fixtures
1 EA
47 (Quarters 504) All labor, equipment & materials for – Exterior Solar Screen Windows
1 EA
48 (Quarters 410) All labor, equipment & materials for – DEMO/REMOVE/Asbestos
1 EA
49 (Quarters 410) All labor, equipment & materials for –
ELECTRICAL
1 EA
50 (Quarters 410) All labor, equipment & materials for –
PLUMBING
51 (Quarters 410) All labor, equipment & materials for – FIRE SPRINKLER SYSTEM and Smoke Alarms
52 (Quarters 410) All labor, equipment & materials for – Drywall, Texture, Insulation, and Paint
1 EA
53 (Quarters 410) All labor, equipment & materials for – Generic Furnishings
1 EA
54 (Quarters 410) All labor, equipment & materials for – Install new baseboards
1 EA
55 (Quarters 410) All labor, equipment & materials for – Doors
56 (Quarters 410) All labor, equipment & materials for – Remove Old Dog Cage and Tree in Backyard
1 EA
57 (Quarters 410) All labor, equipment & materials for – Exterior Doors:
1 EA
58 (Quarters 410) All labor, equipment & materials for – Concrete Patio (Front/back Area)
1 EA
59 (Quarters 410) All labor, equipment & materials for – NEW Flooring
1 EA
Total CLINs 1-59 $
60 (Quarters 410) (Option Line) All labor, equipment & materials for – HVAC Replacement
1 EA
61 (Quarters 410) (Option Line) All labor, equipment & materials for – Retaining Wall
1 EA
62 (Quarters 410) (Option Line) All labor, equipment & materials for – Landscape Material Backyard
1 EA
63 (Quarters 410) (Option Line) All labor, equipment & materials for – Irrigation System Front/backyards
1 EA
64 (Quarters 410) (Option Line) All labor, equipment & materials for – INSTALL NEW CHICKEN WIRE MESH)
1 EA
Total CLINs 1-64 $
This is a firm fixed price requirement. All costs associated to perform the work in accordance to the Statement of Work shall be included. It is anticipated that award will be made as a lump sum.
For price evaluation purposes, price reasonableness will be based on the total sum of CLIN's 1‐64 plus the option line CLINs 60 and 64. The option lines may be exercised at time of award. However, this does not obligate the Government to exercise the option line items.
| Total ($) |
| QTY |
| CLIN Description |
| CLIN |
| 1 EA |
| (Quarters 553A) All labor, equipment & materials for - Kitchen Counter Tops |
| 1 |
| 1 EA |
| (Quarters 553A) All labor, equipment & materials for - Kitchen Sink/Faucet |
| 2 |
| 1 EA |
| (Quarters 553A) All labor, equipment & materials for - Kitchen Light |
| 3 |
| 1 EA |
| (Quarters 553A) All labor, equipment & materials for - Bi-fold Doors |
| 4 |
| 1 EA |
| (Quarters 553A) All labor, equipment & materials for - Mixing values in Laundry Room- |
| 5 |
| 1 EA |
| (Quarters 553A) All labor, equipment & materials for – Ceiling/Swamp Cooler Vent |
| 6 |
| 1 EA |
| (Quarters 553A) All labor, equipment & materials for – Closet Doors |
| 7 |
| 1 EA |
| (Quarters 553A) All labor, equipment & materials for – Replace Bathroom, Bedroom, closet doors |
| 8 |
| 1 EA |
| (Quarters 553A) All labor, equipment & materials for – Interior Walls |
| 9 |
| 1 EA |
| (Quarters 553A) All labor, equipment & materials for – Baseboards |
| 10 |
| 1 EA |
| (Quarters 553A) All labor, equipment & materials for – Flooring |
| 11 |
| 1 EA |
| (Quarters 553A) All labor, equipment & materials for – Bathroom Sinks, Countertop, Faucets and Drains |
| 12 |
| 1 EA |
| (Quarters 553A) All labor, equipment & materials for – Celling Fans |
| 13 |
| 1 EA |
| (Quarters 553A) All labor, equipment & materials for – Dining Room Light |
| 14 |
| 1 EA |
| (Quarters 553A) All labor, equipment & materials for – Toilets |
| 15 |
| 1 EA |
| (Quarters 553A) All labor, equipment & materials for – Kitchen Range Hood |
| 16 |
| 1 EA |
| (Quarters 553A) All labor, equipment & materials for – Bathroom Exhaust Vents |
| 17 |
| 1 EA |
| (Quarters 553A) All labor, equipment & materials for – Smoke Alarms |
| 18 |
| 1 EA |
| (Quarters 553A) All labor, equipment & materials for – Blinds |
| 19 |
| 1 EA |
| (Quarters 553A) All labor, equipment & materials for – Upper cabinets in kitchen removed |
| 20 |
| 1 EA |
| (Quarters 553A) All labor, equipment & materials for – Dishwasher |
| 21 |
| 1 EA |
| (Quarters 553A) All labor, equipment & materials for – Water Heater |
| 22 |
| 1 EA |
| (Quarters 553A) All labor, equipment & materials for – Replace Oven and Refrigerator Appliances |
| 23 |
| 1 EA |
| (Quarters 504) All labor, equipment & materials for – Kitchen Counter Tops |
| 24 |
| 1 EA |
| (Quarters 504) All labor, equipment & materials for – Kitchen Sink/Faucet |
| 25 |
| 1 EA |
| (Quarters 504) All labor, equipment & materials for – Kitchen Light |
| 26 |
| 1 EA |
| (Quarters 504) All labor, equipment & materials for – Mixing values in Laundry Room |
| 27 |
| 1 EA |
| (Quarters 504) All labor, equipment & materials for – Closet Doors |
| 28 |
| 1 EA |
| (Quarters 504) All labor, equipment & materials for – Replace Bathroom, Bedroom, closet doors |
| 29 |
| 1 EA |
| (Quarters 504) All labor, equipment & materials for – Interior Walls |
| 30 |
| 1 EA |
| (Quarters 504) All labor, equipment & materials for – Baseboards |
| 31 |
| 1 EA |
| (Quarters 504) All labor, equipment & materials for – Flooring |
| 32 |
| 1 EA |
| (Quarters 504) All labor, equipment & materials for – Bathroom Sinks, Countertop, Faucets and Drains |
| 33 |
| 1 EA |
| (Quarters 504) All labor, equipment & materials for – Toilets |
| 34 |
| 1 EA |
| (Quarters 504) All labor, equipment & materials for – Kitchen Range Hood |
| 35 |
| 1 EA |
| (Quarters 504) All labor, equipment & materials for – Bathroom Exhaust Vents |
| 36 |
| 1 EA |
| (Quarters 504) All labor, equipment & materials for – Smoke Alarms |
| 37 |
| 1 EA |
| (Quarters 504) All labor, equipment & materials for – Blinds |
| 38 |
| 1 EA |
| (Quarters 504) All labor, equipment & materials for – Upper cabinets in kitchen removed |
| 39 |
| 1 EA |
| (Quarters 504) All labor, equipment & materials for – Dishwasher |
| 40 |
| 1 EA |
| (Quarters 504) All labor, equipment & materials for – Water Heater |
| 41 |
| 1 EA |
| (Quarters 504) All labor, equipment & materials for – Garage Door Motor and Weather Seals |
| 42 |
| 1 EA |
| (Quarters 504) All labor, equipment & materials for – Sliding Glass Patio Door |
| 43 |
| 1 EA |
| (Quarters 504) All labor, equipment & materials for – Backyard |
| 44 |
| 1 EA |
| (Quarters 504) All labor, equipment & materials for – Exterior Wall |
| 45 |
| 1 EA |
| (Quarters 504) All labor, equipment & materials for – Exterior Light Fixtures |
| 46 |
| 1 EA |
| (Quarters 504) All labor, equipment & materials for – Exterior Solar Screen Windows |
| 47 |
| 1 EA |
| (Quarters 410) All labor, equipment & materials for – DEMO/REMOVE/Asbestos |
| 48 |
| 1 EA |
| (Quarters 410) All labor, equipment & materials for – ELECTRICAL |
| 49 |
| 1 EA |
| (Quarters 410) All labor, equipment & materials for – PLUMBING |
| 50 |
| 1 EA |
| (Quarters 410) All labor, equipment & materials for – FIRE SPRINKLER SYSTEM and Smoke Alarms |
| 51 |
| 1 EA |
| (Quarters 410) All labor, equipment & materials for – Drywall, Texture, Insulation, and Paint |
| 52 |
| 1 EA |
| (Quarters 410) All labor, equipment & materials for – Generic Furnishings |
| 53 |
| 1 EA |
| (Quarters 410) All labor, equipment & materials for – Install new baseboards |
| 54 |
| 1 EA |
| (Quarters 410) All labor, equipment & materials for – Doors |
| 55 |
| 1 EA |
| (Quarters 410) All labor, equipment & materials for – Remove Old Dog Cage and Tree in Backyard |
| 56 |
| 1 EA |
| (Quarters 410) All labor, equipment & materials for – Exterior Doors: |
| 57 |
| 1 EA |
| (Quarters 410) All labor, equipment & materials for – Concrete Patio (Front/back Area) |
| 58 |
| 1 EA |
| (Quarters 410) All labor, equipment & materials for – NEW Flooring |
| 59 |
| $ |
| Total CLINs 1-59 |
| 1 EA |
| (Quarters 410) (Option Line) All labor, equipment & materials for – HVAC Replacement |
| 60 |
| 1 EA |
| (Quarters 410) (Option Line) All labor, equipment & materials for – Retaining Wall |
| 61 |
| 1 EA |
| (Quarters 410) (Option Line) All labor, equipment & materials for – Landscape Material Backyard |
| 62 |
| 1 EA |
| (Quarters 410) (Option Line) All labor, equipment & materials for – Irrigation System Front/backyards |
| 63 |
| 1 EA |
| (Quarters 410) (Option Line) All labor, equipment & materials for – INSTALL NEW CHICKEN WIRE MESH) |
| 64 |
| $ |
| Total CLINs 1-64 |
| This is a firm fixed price requirement. All costs associated to perform the work in accordance to the Statement of Work shall be included. It is anticipated that award will be made as a lump sum. |
| For price evaluation purposes, price reasonableness will be based on the total sum of CLIN's 1‐64 plus the option line CLINs 60 and 64. The option lines may be exercised at time of award. However, this does not obligate the Government to exercise the option line items. |
File details come from the government source that posted it. Updated .