B08_Price_Schedule.pdf

PDF 227 KB Posted

Attached to
Replace Housing Components, Lake Mead National Rec Federal contract opportunity
Solicitation number
140P8122R0001
Issued by
Department of the Interior National Park Service Pacific West Region

About this file

This price schedule outlines labor, equipment, and materials costs for renovating and upgrading multiple housing units at Lake Mead National Recreation Area. The schedule provides 64 cost line items to replace and install kitchen appliances and fixtures, bathroom fixtures, flooring, doors, lighting, and HVAC components across four housing units. It also includes optional line items for HVAC replacement, retaining walls, landscaping, and irrigation. The total proposed cost is to be based on the sum of line items 1 through 64 plus any exercised optional line items. The solicitation seeks a firm fixed price contract for the work to be awarded as a lump sum.

View the file

Other files for this federal contract opportunity

Other files attached to Replace Housing Components, Lake Mead National Rec, newest first.
File Type Posted
B08_Invoice_Payment_Request.docx DOCX document
B08_Transmittal.pdf PDF
B03_General_Decision_NV21210042.pdf PDF
A06_Asbestos_and_Lead_Report_Qtrs_410.pdf PDF
B08_Release_of_Claims.pdf PDF
A04_Scope_of_Work_553A__504__410_Rehab.pdf PDF
Sol_140P8122R0001.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Price Schedule

CLIN CLIN Description

QTY Total ($) 1 (Quarters 553A) All labor, equipment & materials for -

Kitchen Counter Tops

1 EA

2 (Quarters 553A) All labor, equipment & materials for - Kitchen Sink/Faucet

1 EA

3 (Quarters 553A) All labor, equipment & materials for - Kitchen Light

1 EA

4 (Quarters 553A) All labor, equipment & materials for - Bi-fold Doors

1 EA

5 (Quarters 553A) All labor, equipment & materials for - Mixing values in Laundry Room-

1 EA

6 (Quarters 553A) All labor, equipment & materials for – Ceiling/Swamp Cooler Vent

1 EA

7 (Quarters 553A) All labor, equipment & materials for – Closet Doors

1 EA

8 (Quarters 553A) All labor, equipment & materials for – Replace Bathroom, Bedroom, closet doors

9 (Quarters 553A) All labor, equipment & materials for – Interior Walls

1 EA

10 (Quarters 553A) All labor, equipment & materials for – Baseboards

1 EA

11 (Quarters 553A) All labor, equipment & materials for – Flooring

1 EA

12 (Quarters 553A) All labor, equipment & materials for – Bathroom Sinks, Countertop, Faucets and Drains

1 EA

13 (Quarters 553A) All labor, equipment & materials for – Celling Fans

1 EA

14 (Quarters 553A) All labor, equipment & materials for – Dining Room Light

1 EA

15 (Quarters 553A) All labor, equipment & materials for – Toilets

1 EA

16 (Quarters 553A) All labor, equipment & materials for – Kitchen Range Hood

1 EA

17 (Quarters 553A) All labor, equipment & materials for – Bathroom Exhaust Vents

18 (Quarters 553A) All labor, equipment & materials for – Smoke Alarms

1 EA

19 (Quarters 553A) All labor, equipment & materials for – Blinds

1 EA

20 (Quarters 553A) All labor, equipment & materials for – Upper cabinets in kitchen removed

1 EA

21 (Quarters 553A) All labor, equipment & materials for – Dishwasher

1 EA

22 (Quarters 553A) All labor, equipment & materials for – Water Heater

1 EA

23 (Quarters 553A) All labor, equipment & materials for – Replace Oven and Refrigerator Appliances

1 EA

24 (Quarters 504) All labor, equipment & materials for – Kitchen Counter Tops

1 EA

25 (Quarters 504) All labor, equipment & materials for – Kitchen Sink/Faucet

1 EA

26 (Quarters 504) All labor, equipment & materials for – Kitchen Light

1 EA

27 (Quarters 504) All labor, equipment & materials for – Mixing values in Laundry Room

1 EA

28 (Quarters 504) All labor, equipment & materials for – Closet Doors

29 (Quarters 504) All labor, equipment & materials for – Replace Bathroom, Bedroom, closet doors

1 EA

30 (Quarters 504) All labor, equipment & materials for – Interior Walls

31 (Quarters 504) All labor, equipment & materials for – Baseboards

1 EA

32 (Quarters 504) All labor, equipment & materials for – Flooring

1 EA

33 (Quarters 504) All labor, equipment & materials for – Bathroom Sinks, Countertop, Faucets and Drains

1 EA

34 (Quarters 504) All labor, equipment & materials for – Toilets

35 (Quarters 504) All labor, equipment & materials for – Kitchen Range Hood

1 EA

36 (Quarters 504) All labor, equipment & materials for – Bathroom Exhaust Vents

1 EA

37 (Quarters 504) All labor, equipment & materials for – Smoke Alarms

1 EA

38 (Quarters 504) All labor, equipment & materials for – Blinds

1 EA

39 (Quarters 504) All labor, equipment & materials for – Upper cabinets in kitchen removed

1 EA

40 (Quarters 504) All labor, equipment & materials for – Dishwasher

1 EA

41 (Quarters 504) All labor, equipment & materials for – Water Heater

1 EA

42 (Quarters 504) All labor, equipment & materials for – Garage Door Motor and Weather Seals

1 EA

43 (Quarters 504) All labor, equipment & materials for – Sliding Glass Patio Door

1 EA

44 (Quarters 504) All labor, equipment & materials for – Backyard

1 EA

45 (Quarters 504) All labor, equipment & materials for – Exterior Wall

1 EA

46 (Quarters 504) All labor, equipment & materials for – Exterior Light Fixtures

1 EA

47 (Quarters 504) All labor, equipment & materials for – Exterior Solar Screen Windows

1 EA

48 (Quarters 410) All labor, equipment & materials for – DEMO/REMOVE/Asbestos

1 EA

49 (Quarters 410) All labor, equipment & materials for –

ELECTRICAL

1 EA

50 (Quarters 410) All labor, equipment & materials for –

PLUMBING

51 (Quarters 410) All labor, equipment & materials for – FIRE SPRINKLER SYSTEM and Smoke Alarms

52 (Quarters 410) All labor, equipment & materials for – Drywall, Texture, Insulation, and Paint

1 EA

53 (Quarters 410) All labor, equipment & materials for – Generic Furnishings

1 EA

54 (Quarters 410) All labor, equipment & materials for – Install new baseboards

1 EA

55 (Quarters 410) All labor, equipment & materials for – Doors

56 (Quarters 410) All labor, equipment & materials for – Remove Old Dog Cage and Tree in Backyard

1 EA

57 (Quarters 410) All labor, equipment & materials for – Exterior Doors:

1 EA

58 (Quarters 410) All labor, equipment & materials for – Concrete Patio (Front/back Area)

1 EA

59 (Quarters 410) All labor, equipment & materials for – NEW Flooring

1 EA

Total CLINs 1-59 $

60 (Quarters 410) (Option Line) All labor, equipment & materials for – HVAC Replacement

1 EA

61 (Quarters 410) (Option Line) All labor, equipment & materials for – Retaining Wall

1 EA

62 (Quarters 410) (Option Line) All labor, equipment & materials for – Landscape Material Backyard

1 EA

63 (Quarters 410) (Option Line) All labor, equipment & materials for – Irrigation System Front/backyards

1 EA

64 (Quarters 410) (Option Line) All labor, equipment & materials for – INSTALL NEW CHICKEN WIRE MESH)

1 EA

Total CLINs 1-64 $

This is a firm fixed price requirement. All costs associated to perform the work in accordance to the Statement of Work shall be included. It is anticipated that award will be made as a lump sum.

For price evaluation purposes, price reasonableness will be based on the total sum of CLIN's 1‐64 plus the option line CLINs 60 and 64. The option lines may be exercised at time of award. However, this does not obligate the Government to exercise the option line items.

Total ($)
QTY
CLIN Description
CLIN
1 EA
(Quarters 553A) All labor, equipment & materials for - Kitchen Counter Tops
1
1 EA
(Quarters 553A) All labor, equipment & materials for - Kitchen Sink/Faucet
2
1 EA
(Quarters 553A) All labor, equipment & materials for - Kitchen Light
3
1 EA
(Quarters 553A) All labor, equipment & materials for - Bi-fold Doors
4
1 EA
(Quarters 553A) All labor, equipment & materials for - Mixing values in Laundry Room-
5
1 EA
(Quarters 553A) All labor, equipment & materials for – Ceiling/Swamp Cooler Vent
6
1 EA
(Quarters 553A) All labor, equipment & materials for – Closet Doors
7
1 EA
(Quarters 553A) All labor, equipment & materials for – Replace Bathroom, Bedroom, closet doors
8
1 EA
(Quarters 553A) All labor, equipment & materials for – Interior Walls
9
1 EA
(Quarters 553A) All labor, equipment & materials for – Baseboards
10
1 EA
(Quarters 553A) All labor, equipment & materials for – Flooring
11
1 EA
(Quarters 553A) All labor, equipment & materials for – Bathroom Sinks, Countertop, Faucets and Drains
12
1 EA
(Quarters 553A) All labor, equipment & materials for – Celling Fans
13
1 EA
(Quarters 553A) All labor, equipment & materials for – Dining Room Light
14
1 EA
(Quarters 553A) All labor, equipment & materials for – Toilets
15
1 EA
(Quarters 553A) All labor, equipment & materials for – Kitchen Range Hood
16
1 EA
(Quarters 553A) All labor, equipment & materials for – Bathroom Exhaust Vents
17
1 EA
(Quarters 553A) All labor, equipment & materials for – Smoke Alarms
18
1 EA
(Quarters 553A) All labor, equipment & materials for – Blinds
19
1 EA
(Quarters 553A) All labor, equipment & materials for – Upper cabinets in kitchen removed
20
1 EA
(Quarters 553A) All labor, equipment & materials for – Dishwasher
21
1 EA
(Quarters 553A) All labor, equipment & materials for – Water Heater
22
1 EA
(Quarters 553A) All labor, equipment & materials for – Replace Oven and Refrigerator Appliances
23
1 EA
(Quarters 504) All labor, equipment & materials for – Kitchen Counter Tops
24
1 EA
(Quarters 504) All labor, equipment & materials for – Kitchen Sink/Faucet
25
1 EA
(Quarters 504) All labor, equipment & materials for – Kitchen Light
26
1 EA
(Quarters 504) All labor, equipment & materials for – Mixing values in Laundry Room
27
1 EA
(Quarters 504) All labor, equipment & materials for – Closet Doors
28
1 EA
(Quarters 504) All labor, equipment & materials for – Replace Bathroom, Bedroom, closet doors
29
1 EA
(Quarters 504) All labor, equipment & materials for – Interior Walls
30
1 EA
(Quarters 504) All labor, equipment & materials for – Baseboards
31
1 EA
(Quarters 504) All labor, equipment & materials for – Flooring
32
1 EA
(Quarters 504) All labor, equipment & materials for – Bathroom Sinks, Countertop, Faucets and Drains
33
1 EA
(Quarters 504) All labor, equipment & materials for – Toilets
34
1 EA
(Quarters 504) All labor, equipment & materials for – Kitchen Range Hood
35
1 EA
(Quarters 504) All labor, equipment & materials for – Bathroom Exhaust Vents
36
1 EA
(Quarters 504) All labor, equipment & materials for – Smoke Alarms
37
1 EA
(Quarters 504) All labor, equipment & materials for – Blinds
38
1 EA
(Quarters 504) All labor, equipment & materials for – Upper cabinets in kitchen removed
39
1 EA
(Quarters 504) All labor, equipment & materials for – Dishwasher
40
1 EA
(Quarters 504) All labor, equipment & materials for – Water Heater
41
1 EA
(Quarters 504) All labor, equipment & materials for – Garage Door Motor and Weather Seals
42
1 EA
(Quarters 504) All labor, equipment & materials for – Sliding Glass Patio Door
43
1 EA
(Quarters 504) All labor, equipment & materials for – Backyard
44
1 EA
(Quarters 504) All labor, equipment & materials for – Exterior Wall
45
1 EA
(Quarters 504) All labor, equipment & materials for – Exterior Light Fixtures
46
1 EA
(Quarters 504) All labor, equipment & materials for – Exterior Solar Screen Windows
47
1 EA
(Quarters 410) All labor, equipment & materials for – DEMO/REMOVE/Asbestos
48
1 EA
(Quarters 410) All labor, equipment & materials for – ELECTRICAL
49
1 EA
(Quarters 410) All labor, equipment & materials for – PLUMBING
50
1 EA
(Quarters 410) All labor, equipment & materials for – FIRE SPRINKLER SYSTEM and Smoke Alarms
51
1 EA
(Quarters 410) All labor, equipment & materials for – Drywall, Texture, Insulation, and Paint
52
1 EA
(Quarters 410) All labor, equipment & materials for – Generic Furnishings
53
1 EA
(Quarters 410) All labor, equipment & materials for – Install new baseboards
54
1 EA
(Quarters 410) All labor, equipment & materials for – Doors
55
1 EA
(Quarters 410) All labor, equipment & materials for – Remove Old Dog Cage and Tree in Backyard
56
1 EA
(Quarters 410) All labor, equipment & materials for – Exterior Doors:
57
1 EA
(Quarters 410) All labor, equipment & materials for – Concrete Patio (Front/back Area)
58
1 EA
(Quarters 410) All labor, equipment & materials for – NEW Flooring
59
$
Total CLINs 1-59
1 EA
(Quarters 410) (Option Line) All labor, equipment & materials for – HVAC Replacement
60
1 EA
(Quarters 410) (Option Line) All labor, equipment & materials for – Retaining Wall
61
1 EA
(Quarters 410) (Option Line) All labor, equipment & materials for – Landscape Material Backyard
62
1 EA
(Quarters 410) (Option Line) All labor, equipment & materials for – Irrigation System Front/backyards
63
1 EA
(Quarters 410) (Option Line) All labor, equipment & materials for – INSTALL NEW CHICKEN WIRE MESH)
64
$
Total CLINs 1-64
This is a firm fixed price requirement. All costs associated to perform the work in accordance to the Statement of Work shall be included. It is anticipated that award will be made as a lump sum.
For price evaluation purposes, price reasonableness will be based on the total sum of CLIN's 1‐64 plus the option line CLINs 60 and 64. The option lines may be exercised at time of award. However, this does not obligate the Government to exercise the option line items.