This document is an IA Form 3000 V2 - Material Approval Submittal, which contractors use to submit materials, shop drawings, equipment data, manufacturer's literature, and samples to the government for approval on a federal contract.

The key details are:

  • This submittal is associated with Contract Number BB29FCC7B4DF4E39AD4A58A1BF9AC3D0 and Submittal Number 1.
  • The contractor is submitting materials for approval to the Project Engineer or Contracting Officer Representative.
  • The contractor certifies the materials comply with the contract specifications.
  • The government will review the submittal and either approve or disapprove the materials as indicated on the form.
  • Any applicable comments will be provided corresponding to the relevant item number.
  • Instructions are provided for properly completing and submitting the form.

The related federal contract opportunity is for a RETAINING WALL KCES solicitation (140A2324R0096) issued by the Department of the Interior Bureau of Indian Affairs and Indian Education.

View the file

Other files for this federal contract opportunity

Other files attached to RETAINING WALL KCES, newest first.
File Type Posted
Sol_140A2324R0096_Amd_0001.pdf PDF
B08_SF-1413_Statement_and_Acknowledgement_Form_(Subcontracting)_1.pdf PDF
Wage_Determination_AZ20240015_07-19-2024.pdf PDF
B08_Progress_Schedule.pdf PDF
B08_SF-24_Bid_Bond_Form.pdf PDF
Sol_140A2324R0096.pdf PDF
SF-25A_Payment_Bond_Form.pdf PDF
B08_BIA_FEDERAL_HEALTH_AND_SAFETY_CODES.pdf PDF
B08_SF-1413_Statement_and_Acknowledgement_Form_(Subcontracting).pdf PDF
A04_SOW_KCES_2_Retaining_Walls_(1).docx DOCX document
B08_Progress_Report.pdf PDF
B08_Questions_and_Answers_Log.xlsx XLSX spreadsheet
Show all 12

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

IA FORM 3000 V2

PREVIOUS EDITION IS OBSOLETE.

Department of the Interior, Indian Revised on Aug 11, 2021

MATERIAL APPROVAL SUBMITTAL

(See Instructions on Reverse)

TO: (Project Engineer or Contracting Officer Representative) FROM: (Contractor) DATE

CONTRACT NUMBER SUBMISSION NUMBER SUBMITTAL

NEW RESUBMITTAL

PREVIOUS SUBMISSION NUMBER PROJECT NUMBER

TO BE COMPLETED BY CONTRACTOR FOR GOVERNMENT USE ONLY

ITEM

NO.

SPECIFICATION SECTION/

PARA NO./DRAWING NO.

DESCRIPTION OF MATERIAL

(Include Type, Model Number, Catalog Number, Mfg., etc)

AP-

PROVED

DISAP-

PROVED

SEE

REVERSE INITIAL

BY COMPLETING THIS FORM, THE UNDERSIGNED CONTRACTOR CERTIFIES THAT

THE MATERIAL COMPLIES WITH ALL SPECIFICATIONS OF SUBJECT CONTRACT.

DATE TYPE OR PRINT NAME AND TITLE SIGNATURE

FOR GOVERNMENT USE ONLY

TO: (Project Engineer or Contracting Officer Representative)

RECOMMEND APPROVAL DISAPPROVAL AS INDICATED ABOVE AND SUBJECT TO ANY APPLICABLE COMMENTS ON THE

REVERSE

DATE TYPE OR PRINT NAME AND TITLE SIGNATURE

COMMENTS

(Number to correspond with applicable Item Number on reverse)

INSTRUCTIONS TO CONTRACTORS

1.The term “material” is defined as articles, supplies, raw materials, equipment, parts, components, and end items that are to be incorporated into the work required by the contract.

2.This form is to be used by contractors for submitting Shop Drawings, Equipment Data, Manufacturer’s Literature and Certificates and samples of Materials to the Government for approval in accordance with the provisions of this contract. Unless otherwise specified, it is to be prepared in 4 copies, signed, and provided to the contracting officer with appropriate attachments.

3.Item(s) to be approved will be clearly tabbed or identified. Data pertaining to item(s) to be approved will be clearly identified or tabbed, particularly where documents are voluminous, in order to properly evaluate the materials or articles to be incorporated in the work. Each attachment will be numbered to correspond with the item number shown on the face of this form.

4.Request submitted shall be numbered consecutively, by contract, in the space entitled “Submission No.”. This number, in addition to the Contract No., will be used to identify each Material Approval Submittal. Resubmissions will be indicated in the appropriate block and the insertion of previous submission number and data in addition to a new submission number. A single submission should be used for all work of a section of the specifications, but in NO instance should the submission include work for more than one (1) contract. Submittals requiring priority handling will be submitted by separate submittal using the form and so marked across the face of the form.

5.This material Approval Submittal is not valid unless it is signed by the contracting officer. This approval is required as called for by the contracting officer under the terms of this contract.