These project specifications detail the irrigation system rehabilitation for the John Muir National Historic Site in Martinez, California. The project involves installing a new irrigation system to replace an existing system that is 15-30 years old and failing, covering 9 acres of historic landscape including orchards, gardens, and landscaped areas around the historic John Muir House. The new system will utilize two existing water meters - one at the park entrance and another near the Martinez Adobe - and will reconnect two historic hand-dug, rock-lined wells.

The irrigation system specifications outline comprehensive requirements for equipment, installation, testing, and documentation, including specific technical details about pipe materials, control valves, controllers, wiring, and installation techniques. The project requires a contractor with landscape irrigation installation experience, certified irrigation technicians, and adherence to multiple industry standards and codes. The work includes precise installation procedures, quality control testing (including hydrostatic pressure tests), backfilling, and final system demonstration to National Park Service maintenance personnel. The project will use Hunter irrigation equipment, including a two-wire controller, WiFi module, remote control kit, and wireless weather sensor.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

JOHN MUIR NATIONAL HISTORIC SITE

IRRIGATION SYSTEM REHABILITATION

PMIS #316899

PROJECT SPECIFICATIONS

National Park Service

January 20, 2025

JOMU – PMIS 316899

SECTION 00 01 10

TABLE OF CONTENTS

TABLE OF CONTENTS

DIVISION 0 – PROCUREMENT AND CONTRACTING REQUIREMENTS

000110 Table of Contents

DIVISION 1 - GENERAL REQUIREMENTS

011100 Summary of Work

012700 Definition of CLINs

011140 Work Restrictions

013100 Project Management

013323 Submittal Procedures

013523 Safety Requirements

014000 Quality Requirements

015000 Temporary Facilities and Controls

017340 Execution

017700 Closeout Procedures

DIVISION 31 – EARTHWORK

311100 Site Preparation

DIVISION 32 – SITE IMPROVEMENTS

328400 Irrigation

DIVISION 01

GENERAL REQUIREMENTS - 1

JOHN MUIR NATIONAL HISTORIC SITE

IRRIGATION SYSTEM REHABILITATION

PMIS #316899

PROJECT SPECIFICATIONS

GENERAL REQUIREMENTS

PART 1 – SUMMARY OF WORK (SECTION 01 11 00) & DEFINITION OF CLINs (01 27 00)

1.1 WORK COVERED BY CONTRACT DOCUMENTS

A. General: All work outlined below will be performed under a single contract.

B. Project Location: This project is located at the John Muir National Historic Site, on federally owned land managed by the National Park Service. The park preserves the historic John Muir House, landscaped grounds, and historic orchards. The site is on Alhambra Avenue off of Highway 4 in Martinez, California, and the delivery address is the park visitor center at 4202 Alhambra Ave., Martinez CA 94553.

C. Project Background: The irrigation system at John Muir NHS is critical to the health and maintenance of 9 acres of historic landscape around the John Muir House. This project will install a new irrigation system to replace the existing system, which is 15 to 30 years old and failing from age and breakage.

The existing irrigation system supports the site’s historic landscape of mature ornamental trees and restored orchards and gardens. It serves a one-acre area of trees and landscaping around the historic house, which sits on a hill at the south side of the site. It also irrigates a one-acre apple orchard downhill to the east, and a one-acre peach orchard to the north. The new system will extend irrigation to a one-acre vineyard/orchard planted west of the house and a two-acre orchard west of the creek.

The existing irrigation water source is supplied by domestic city water via a meter at the park entrance (4202 Alhambra Ave). The POC will be the domestic 5/8” water meter located in an unpaved planter bed adjacent to the park entrance at 4202 Alhambra Ave. An additional water meter located on the NW side of the site (near the Martinez Adobe) will supply water to irrigation lines on the West side of the site. All irrigation parts downstream of the meter/POC will be replaced unless indicated otherwise on the the Plans.

Two existing historic hand-dug, rock-lined wells are also connected to the existing irrigation system and shall be reconnected to the new irrigation system. The existing well infrastructure including pumps, captive air tanks and backflow preventers shall be retained.

D. Project Scope of Work / Definition of Contract Line Items: The Work consists of the following:

GENERAL REQUIREMENTS - 2

1. Contract Line Item No. 00010: This item shall consist of: Complete installation of the automatic sprinkler irrigation system, fully functioning in accordance with the Drawings and Specifications. The contractor shall provide all materials, equipment, tools, labor, supervision and qualified personnel necessary for the work.

E. Work Phases: The work shall be conducted in one phase.

1.2 REFERENCE DOCUMENTS / REPORTS

A. General: The following reference documents / reports are attached or available upon request to supplement the information in the specifications:

1. NPS Forms (RFI, CM-16, and QC Daily Report).

2. Site Location Map.

1.3 CODES, STANDARDS, & REGULATIONS

A. General: The Contractor shall complete all work in accordance with the latest versions of applicable codes, standards, and regulations. Work on NPS lands is subject to the National Historic Preservation Act (NHPA) and National Environmental Policy Act (NEPA). NPS has reviewed and approved the proposed work under these regulations.

1.4 PERMITS

A. General: The Contractor shall obtain all applicable permits associated with the Work and/or comply with all permit conditions furnished by the NPS. A general building permit is not required for work on NPS land; however, the Contractor must still comply with state and local building code provisions. Contractor shall obtain all necessary permits for electrical connections to conform with applicable local codes.

1.5 PUBLIC / STAFF USE OF THE SITE

A. General: The project site will be open to the public and staff during construction. The

Contractor shall at all times conduct operations to ensure the least inconvenience to the public and staff. Temporary closures may be permitted upon specific written approval of the Contracting Officer.

a. Other Contracts, Work, and Events: During the contract performance period, there may be other contracts, work, or events occurring in the park or within the project area limits that may affect the Contractor’s operations. The Contractor shall conduct operations in consideration of these other activities. If the other activities are affecting the critical path of the construction schedule, the Contractor shall document the issue in the daily reports and report the issue to the Contracting Officer. Construction will not be allowed to take place during the following planned event:

• April 21-26, 2025 – Birthday/Earth Day event.

1.6 CONTRACTOR USE OF SITE

A. General: Limit construction operations to the project area limits as outlined on the attached

Site Map.

GENERAL REQUIREMENTS - 3

B. Park Regulations: Ensure all personnel (contractors, subcontractors, and vendors) entering or working in the park are familiar with and obey all park regulations. Law enforcement rangers will intervene if they perceive any unsafe or unlawful activity.

C. Working Hours: Regular work hours shall be limited to daylight hours from 7:00 a.m. until 5:00 p.m. Monday through Friday. No night, weekend, or federal holiday work will be permitted without advance approval from the Contracting Officer.

D. Site Access: The contractor shall access the project site as outlined on the attached Site Map.

There is no entry fee to this park.

1. All vehicles and heavy equipment will comply with posted traffic regulations, including speed limits and double-yellow center lane markings.

2. Do not drive vehicles off road or access non-project areas without permission from the

Contracting Officer.

3. Keep driveways and entrances serving the premises clear and available to the government, government employees, and emergency vehicles at all times.

E. Parking: Contractor vehicles should be identifiable and park in locations approved by the Contracting Officer. Contractor parking is not allowed in the Visitor Center parking lot.

Public street parking is available in neighborhood across from Visitor Center (Walnut St.) or behind the park along Canyon Way west of park boundary (see map) and contractor should encourage carpooling to the site.

F. Staging and Storage: Stage equipment and store materials in areas shown on the provided Site Map Exhibit or defined at the preconstruction meeting. The Contractor is responsible for the security of its equipment and materials at the jobsite. Obtain encroachment permits from the City of Martinez for any storage and staging outside park boundaries. Provide the Contracting Officer with a listing of anticipated deliveries for each week.

G. Property Damage: The Contractor is required to report missing, lost, stolen, or damaged property occurring within the park. This report must be made to a Law Enforcement Ranger or Golden Gate Park Dispatch at the first available opportunity at: 1-415-561-5505.

H. No Smoking Policy: Smoking is prohibited inside or outside within 25 feet of any buildings in the park. Smoking is permitted in the Visitor Center parking lot, but preferably off-site or across the street. This applies to existing buildings and buildings under construction or renovation. Discarding of tobacco products or debris anywhere other than into designated tobacco receptacles is considered littering and subject to fines.

1.8 CONTRACTOR RECORD DRAWINGS

A. Maintain one complete full-size set of contract drawings and one full-size set of vendor-supplied drawings. Clearly mark changes, deletions, and additions using National Park Service (NPS) drafting standards to show actual construction conditions. Show additions in red, deletions in green and special instructions in blue.

B. Keep record drawings current. Make record drawings available to Contracting Officer (CO) for inspection at the time of progress payment requests. If project record drawings are not current, Contracting Officer may retain an appropriate amount of progress payment.

GENERAL REQUIREMENTS - 4

C. Submit complete record drawings on completion of total project for acceptance by Owner’s Representative. Record drawings shall be submitted in accordance with 9.2(B).

PART 2 – WORK RESTRICTIONS (SECTION 01 11 40)

2.1 VEHICLES / HEAVY EQUIPMENT

A. Vehicle Exhaust: All vehicles will be properly maintained to ensure that the exhaust produced is within legal limits.

B. Leaks: Equipment shall be inspected before entering the park, and weekly thereafter, for hydraulic and oil leaks.

C. Maintenance and refueling: Allowed only in areas designated by the Contracting Officer, and a minimum of 100 feet from waterways, drainages and wetlands.

D. Spills: The Contractor must immediately notify Park Dispatch of any spills. The Contractor shall be responsible for any cleanup efforts required in accordance with all applicable federal and state environmental quality laws regarding disposal and cleanup of hazardous / industrial wastes.

E. DOT Compliance: All vehicles are to comply with all DOT requirements including but not limited to driver with appropriate license class, medical examiner card as appropriate with license class, carrying three (3) triangles or three (3) flares, mounted fire extinguisher, and valid DOT safety sticker.

F. Slow Vehicles: The Contractor is to notify the Contracting Officer of slow vehicles that may cause traffic delays or extended traffic lines.

G. Oversized Vehicles: Vehicles or loads that exceed one lane in width (i.e., beyond the center line of the paved road) are considered oversized and must be escorted. The Contractor shall notify the Contracting Officer of oversized vehicle arrival dates and times, and identify the vehicle escort (e.g., police, contractor, etc.).

H. Tracked Equipment: Heavy equipment with rubber tires is preferred. Heavy equipment with metal tracks will not be allowed on paved asphalt or concrete roads without adequate protection to prevent permanent track marks, spalling, and other damage. The method of protection (such as secured plywood or metal plates) shall also not damage the roads.

Tracked vehicles will be allowed on non-paved surfaces as long as the terrain is restored to preconstruction condition. All damage created by tracked equipment shall be repaired / restored at no additional expense to the government.

I. Road & Weight Restrictions: All vehicle load, weight, and size limitations, as established by State law, apply to vehicles operated on park roads (36 CFR § 4.11). No loads heavier than the current load rating for park roads and bridges will be permitted.

2.2 RESOURCE PROTECTION

GENERAL REQUIREMENTS - 5

A. General: The Contractor shall protect park resources, including natural, cultural and physical resources, and make every effort to minimize the risk of damage from construction operations. Contractor shall comply with all applicable Federal, State, and local environmental laws and regulations pertaining to water, air, solid waste, chemical waste, sanitary waste, hazardous materials, sediment, light and noise pollution. Contractor shall ensure that subcontractors comply with all requirements of this section.

B. Preservation of Natural Features: Contractor shall not remove, cut, deface, injure, or destroy natural features of the park including vegetation, topsoil, rock and landforms without prior approval by the Contracting Officer. Avoid unnecessary soil compaction, disturbance of ground cover, and creation of wheel ruts.

C. Vegetation:

1. Do not attach ropes, wires, guy lines, cables, or chains to trees or vegetation.

2. Do not store equipment or materials within the dripline of trees, unless the tree is designated to be removed. If grading, trenching or excavating within the dripline is necessary, obtain procedures from park staff for minimizing root damage to trees.

3. Do not prune trees unless approved in advance by the Contracting Officer and supervised by a licensed arborist. Sterilize pruning tools before use to prevent spread of disease.

4. Restore damaged areas and replace damaged trees, vegetation, and grass with plants and seeds approved by park natural and cultural resources staff, at no additional expense to the Government.

D. Invasive Species Prevention:

1. Inform personnel, subcontractors, and vendors to thoroughly clean vehicles, equipment, tools, supplies, and materials prior to packing / loading for transport into the park.

2. Vehicles entering the site shall be 100% weed free, with no evidence of soil or plant matter anywhere on the equipment. Vehicles failing inspection will be turned away. The park natural resource manager will inspect vehicles prior to entering the site. Arrange for inspections through the Contracting Officer at least 3 days in advance of park entry or delivery.

E. Imported Earth Materials:

1. Imported rock, sand, gravel, earth, and natural materials shall be from sources approved by the Contracting Officer to avoid importing weeds, pathogens and contaminants into the park. The park maintains a list of approved clean, local sources.

2. Store imported materials in clean staging areas, with covers to protect from contamination by windblown weed seeds or other contaminants.

F. Endangered Species: No threatened or endangered species are known at this work site.

insert endangered species precautions from natural resources, if any.

G. Cultural Resources: Cultural resources are surface and subsurface archeological resources, historic structures and buildings, cultural landscapes, and Native American traditional cultural resources. Cultural resources typically found at this National Historic Site or at the project site will be identified and discussed at the preconstruction meeting.

1. The project area may contain archeological resources. Park staff will identify archaeologically sensitive areas at the preconstruction meeting.

GENERAL REQUIREMENTS - 6

2. The Contractor’s Project Superintendent, or designee, will observe all ground-disturbing activities in archaeologically sensitive areas.

3. If the Contractor discovers resources, the Contractor shall stop work or relocate to a non-sensitive area and notify the Contracting Officer immediately. The Park may also have an Archaeological Monitor at the jobsite who is authorized to stop work upon discovery of archaeological resources.

H. Soundscape / Noise: The Contractor shall minimize noise levels at the project site to protect the soundscape of the park. Perform operations to minimize noise and/or perform noise-producing work in less sensitive hours of the day or week as directed by the Contracting Officer. Do not exceed 70 dB(A) at a distance of 50 feet for more than 12 minutes in any hour.

2.3 SITE HOUSEKEEPING

A. General: Keep project neat, orderly, and in a safe condition at all times. Store and use equipment, tools, and materials in a manner that does not present a hazard. Immediately remove all hazardous rubbish.

B. Waste management:

1. All garbage must be disposed of in approved, animal-proof bins with lids that are secured at the end of each workday. Empty at frequent intervals during progress of work. DO

NOT MIX GARBAGE AND GREEN WASTE WITH CONSTRUCTION DEBRIS.

2. Provide enough containers for collecting construction debris and construction materials to be recycled. Construction debris may be stored in unlidded dumpsters.

3. Provide marked containers for recycling personal items, such as aluminum cans, newspapers, glass, plastic, corrugated cardboard. These items are to be recycled by the Contractor.

4. Dispose of waste materials legally at public or private dumping areas outside the park.

Do not bury refuse inside the park. Unless otherwise specified, all removed material becomes the property of the Contractor and shall be disposed of outside the park.

C. Pollution control: Contractor shall implement construction BMPs per the approved Pollution Prevention Plan (SWPPP or UPPP). Do not dispose of volatile wastes or oils in storm or sanitary drains. Do not allow waste materials to be washed into streams or bodies of water.

D. Dust control: Wet down dry materials and rubbish to prevent blowing dust. Use excavated material as soon as possible. Cover stockpiles as required by the SWPPP or UPPP.

E. Hazardous Materials: Hazardous or flammable chemicals may not be stored on the job site unless identified in the Site-specific Safety and Health Plan and approved by the Contracting Officer and Fire Marshal.

PART 3 – PROJECT MANAGEMENT (SECTION 01 31 00)

3.1 SUBMITTALS

A. Division 01 Submittal Documents: Contractor shall submit the following documents at least one week before the Preconstruction Meeting. If all documents have not been received by one week before the scheduled date, the meeting will be cancelled and the Notice to Proceed

GENERAL REQUIREMENTS - 7

(NTP) will not be issued. Work shall not commence until written Notice to Proceed (NTP) has been issued.

1. Letter designating the Project Superintendent.

2. Construction Schedule:

a. Start date, end date, major work activities and durations.

b. Estimated pre-final inspection date and other major milestones.

c. Specify that updates to baseline schedule will be provided as needed / requested during construction.

3. Schedule of Values:

a. List work activities for which progress payments will be requested.

b. The total costs for the work activities shall equal the total contract price.

c. Include columns for each activity indicating Total Value, Percent of Work

Completed to Date, $ Amount Completed This Period, $ Amount Previously Completed, $ Total Completed.

4. Site Specific Health and Safety Plan: describe safety procedures for this specific project and scope of work. Refer also to PART 5 Safety Requirements. Include the following (at a minimum).

a. Name and contact information of the supervisor responsible for jobsite safety and carrying out the safety plan.

b. Emergency contact phone numbers:

i. Golden Gate (GOGA) Park Police Dispatch: 1-415-561-5505

ii. Keith Park, project Contracting Officer’s Representative: 650-678-0614

c. Local emergency medical facilities, with phone, map, and directions from the jobsite.

d. First aid and emergency medical procedures and staff training/certifications.

e. Job Hazard Analysis (JHA) per OSHA guidelines for each major work activity

f. Jobsite safety trainings and inspections; Personal Protective Equipment procedures

g. Company policy on safety, enforcement, and accident reporting/investigation.

h. Emergency plan in case of severe weather, wildland fire, extended utility outages or road closures, and earthquake.

5. Quality Control Plan (QCP): describe quality control procedures for this specific project and scope of work. Refer also to PART 6 Quality Requirements. Include the following (at a minimum).

a. Name of the supervisor responsible for carrying out the plan.

b. Organization chart showing key staff / subcontractors.

c. Qualifications of key staff and subcontractors with applicable licenses / certificates.

d. Communications and reporting plan / procedures / forms (include NPS daily report form, RFI form, and CM-16 form along with Contractor forms).

e. Testing and inspection procedures at all phases of the project (i.e. preparatory, initial, follow-up) to ensure quality, with steps for correction of work / re-work.

6. Storm Water Pollution Prevention Plan (SWPPP) or Under an Acre Pollution Prevention Plan (UPPP), as determined by Contracting Officer.

a. For projects with ground disturbance estimated to be greater than 1 acre, complete and submit a SWPPP to the Authority Having Jurisdiction that satisfies all Federal and State permit requirements under the National Pollution Discharge Elimination System (NPDES).

GENERAL REQUIREMENTS - 8

b. For projects with ground disturbance estimated to be less than 1 acre, complete and submit a UPPP for NPS approval. Describe best management practices (BMPs) to prevent the discharges of pollutants. Specify that BMPs will be checked daily and after storm events to ensure they are performing as intended.

7. Construction Waste Management Plan – Submit a construction waste management plan that addresses storage, handling, and disposal of all trash, recyclables, non-hazardous construction waste, and hazardous waste generated from the execution of the work.

Refer also to PART 8 Execution.

8. A list of Subcontractors for this project stating qualifications to perform the Work.

9. Written statements from subcontractors certifying compliance with applicable labor standard clauses.

10. Satisfactory evidence of liability insurance coverage and workman’s compensation for the Contactor and all subcontractors.

B. Division 02-49 Submittal Documents: The following documents shall be submitted to the

Contracting Officer prior to construction mobilization. If these documents have not been received and approved by the NPS prior to construction start, the construction start date may be delayed. Submit each document along with a form CM-16 for approval.

1. Contractor Qualifications – Submit qualification data for contractor and all subcontractors, providing evidence of completion of projects of similar level of complexity. Include relevant information on any specialized certifications or training to perform the Work.

2. Product Data – Submit product cut sheets / material data on all products to be used for approval. Indicate the size, model, or type of each recommended product.

3. Samples – When requested, submit a physical sample of a product or an array of color choices for approval, if applicable.

4. Shop Drawings – A shop drawing is a drawing or set of drawings produced by the contractor, supplier, manufacturer, subcontractor, or fabricator. Shop drawings are typically required for prefabricated components or to illustrate the coordination work between trades. The shop drawing’s primary emphasis is on the particular product or installation.

a. Drawings shall be developed in AutoCAD or similar drafting software.

b. Drawings shall include details, dimensions, notational information and other data to ensure the contractor has a complete understanding of the work.

c. Drawings (DRAFT) shall be submitted to the Contracting Officer in PDF format along with a CM-16 form. Allow 7 calendar days for the drawings to be reviewed by NPS. The Contractor shall incorporate review comments into the shop drawings and resubmit for final approval.

d. Update shop drawings during and after installation, and submit in the O&M Manual.

3.2 PRECONSTRUCTION AND PROGRESS MEETINGS

GENERAL REQUIREMENTS - 9

A. Preconstruction Meeting: Before the start of construction, the Contracting Officer will arrange for a preconstruction meeting either on site or via teleconference. The meeting agenda will include the following topics:

1. NPS Roles & Responsibilities

2. Key Contractor Personnel

3. Coordination with Subcontractors

4. Correspondence & Submittal Procedures

5. Submittals

a. Status of Division 01 Submittals

b. Status of Division 02-49 Submittals

6. Park Rules & Regulations

7. Work Hours and Weekend, Holiday, and Night Work

8. Project Information

a. Park Access & Vehicle Reporting

b. Jobsite Access & Parking

c. Staging, Storage, and Laydown Area(s)

d. Temporary Facilities & Controls

e. Jobsite Restrictions

f. Resource Protection

g. Weather, Climate, Environmental Conditions

h. Reference Documents

i. Other Contracts / Ongoing Work

9. Labor Standards Provisions

10. Labor Interviews

11. Payroll Reports

12. Payments to the Contractor

13. Change Orders / Modifications

14. Progress Meetings

15. QC Daily Reports

16. Inspections

17. Acceptance and Rejection of Work

18. Closeout Procedures & Submittals

19. Contract Period of Performance

20. Notice to Proceed

B. Progress Meetings: The NPS may schedule periodic meetings to discuss the progress of the work with the Contractor, Subcontractor(s), and key NPS staff. The need for and frequency of these meetings with be discussed at the preconstruction meeting. Progress meetings will likely be held via teleconference and last no more than 30 minutes. The Contractor shall take meeting minutes and distribute to all attendees within a day of the call.

3.3 REQUESTS FOR INFORMATION (RFIs)

A. General: On discovery of the need for additional information or interpretation of the contract documents, the Contractor shall prepare and submit an RFI utilizing the NPS form.

1. Contracting Officer will only respond to RFIs submitted by the prime contractor.

2. Coordinate and submit RFIs in a prompt manner to avoid delays in the work.

GENERAL REQUIREMENTS - 10

B. RFI Form: Include a detailed, legible description of the subject or item needing information or interpretation on the RFI Form with:

1. RFI number, numbered sequentially.

2. Date.

3. RFI subject.

4. Specification Section number and title and related paragraphs, if applicable.

5. Drawing number and detail references, if applicable.

6. Description of the issue or question.

7. Photographs or sketches, if applicable.

8. Contractor's suggested resolution. If the Contractor's suggested resolution impacts the contract time or the contract sum, Contractor shall state the impact in the RFI.

C. Response to the RFI: The Contracting Officer, or designated representative, will review each RFI, determine the action required, and respond accordingly.

PART 4 – SUBMITTAL PROCEDURES (SECTION 01 33 23)

4.1 SUBMITTAL PROCEDURES

A. CM-16 Transmittal Form: All submittals shall be transmitted using NPS CM-16 form sent via email or via an approved File Transfer Protocol (FTP) site. No action will be taken on a submittal item unless accompanied by the CM-16 transmittal form. Complete all applicable fields, sign the form, and attach all supporting documentation.

B. General Submittal Procedures:

1. Processing Time: Allow 7 days for NPS review of a submittal. When review is complete, an e-mail notification will be sent to the Contractor. No extension of contract time will be authorized because of failure to transmit submittals in a timely manner.

2. Approved Equals: For each item proposed as an “approved equal” submit supporting data including:

a. Comparison of the salient characteristics of the proposed item with that specified.

b. Name, address, and telephone number of vendor.

c. Manufacturer’s literature.

d. Compliance with the Buy American Act.

e. Difference in cost between the specified item and the

3. Electronic Submittals: Transmit all submittals except physical samples in PDF format.

Note that the preferred FTP site is OneDrive. Dropbox and similar private file share services are not secure and not allowed on the Department of Interior (DOI) systems.

4. Physical samples: Deliver physical samples to COR (or onsite Point of Contact).

PART 5 – SAFETY REQUIREMENTS (SECTION 01 35 23)

4.1 SAFETY REQUIREMENTS

GENERAL REQUIREMENTS - 11

A. General: The Contractor must comply with the following safety requirements:

1. First Aid Equipment: Provide adequate first aid equipment for all contract employees for the hazards associated with the types of ongoing construction work at the site.

2. First Aid Training: Provide adequate training to all Contractor personnel to ensure prompt and efficient application of first aid.

3. Personal Protective Equipment (PPE): Provide personal protective equipment (PPE) that meets applicable OSHA and ANSI standards for all contract employees.

4. Hazardous Materials: Hazardous materials are defined as explosive, flammable, poisonous, corrosive, oxidizing, irritating, or otherwise harmful substances that could cause death or injury. Store hazardous materials in accordance with manufacturer’s and OSHA recommendations. Maintain MSDS onsite for each chemical used on the jobsite.

Immediately report all spills of hazardous materials to the contracting officer.

5. Safety Meetings: At a minimum, conduct weekly if not daily "toolbox" safety meetings.

These meetings shall be conducted by the Onsite Job Superintendent or crew leader and be attended by all construction personnel at the worksite. Topics need to coincide with work scheduled for the week.

6. Emergency Contacts: Post telephone numbers and reporting instructions for ambulance, hospital, fire department, police, and park dispatch in conspicuous locations at the site.

7. Emergency Medical & Accident Reporting: In the event of an emergency / medical incident, the Contractor shall Dial 911 as needed. The Contractor shall also contact Park Dispatch at: 1-808-985-6170 for any medical emergency, traffic accident, or personal injury occurring within the Park. Park Dispatch is called so that the entrance station will be prepared should any emergency vehicles need to enter the Park and so that any available Emergency Medical Services personnel in the Park might respond until such time as the ambulance arrives.

PART 6 – QUALITY REQUIREMENTS (SECTION 01 40 00)

6.1 QUALITY REQUIREMENTS

A. General: The Contractor is responsible for all quality control to guard against defects and deficiencies in the work. Inspect and test work as needed to ensure that the quality of materials, workmanship, construction, finishes, and functional performance are in compliance with applicable specifications, drawings, codes and standards, and the QC Plan.

B. Quality Control (QC) Daily Reports: Submit quality control daily reports documenting the progress and quality of the work. The daily report shall be typed, legible, and complete and include representative photos. The daily report shall be submitted on a daily basis no later than the day after the work. The NPS prefers that the contractor use the NPS daily report form, but an alternate form will be allowed if it contains all major sections of the NPS form.

PART 7 – TEMPORARY FACILITIES & CONTROLS (SECTION 01 50 00)

7.1 TEMPORARY FACILITIES & CONTROLS

GENERAL REQUIREMENTS - 12

A. General: The contractor will be allowed to set up temporary facilities and controls as outlined. All temporary facilities and controls shall be removed from the site before final acceptance of the work.

B. Temporary Utilities: The following utilities / services are available for use at the project site:

1. Electrical Power Service: Electrical power service is available from facilities at or near the project site for use on the contract without charge. Provide all connections and extensions of services in a safe manner in compliance with NEC, NEMA, and UL standards and regulations. Electrical power (ie normal 120V outlets) can be made available at several locations throughout the worksite, as needed (see map for locations):

Visitor Center, Muir House, Carriage House, west orchard.

2. Water Service: Non-potable water service is available from facilities at or near the project site for use on the contract without charge. Provide all connections and extensions of services with proper backflow prevention devices in compliance with AWWA standards and local regulations. Potable and non-potable water from hose bibs throughout the landscape may be limited during the course of new irrigation line installation for obvious reasons. The nearest non-affected water sources will be at the Visitor Center and near the Adobe (see map) where a separate water meter that is not part of this Work will be charged and available for use.

3. Sanitary Facilities: Contractor shall provide and maintain their own porta-potty during the duration of construction. Coordinate with Owner’s representative on location(s).

4. Telephone Cellular Service: The project site does have cellular service.

C. Temporary Office: The construction of temporary office buildings or installation of trailers will not be allowed in the park. If the contractor requires office space, the park will attempt to accommodate the contractor with an existing space for administrative work.

D. Temporary Enclosures: For uncontrolled sites, the contractor shall construct an enclosure fence, barrier, or partition to prevent people (and animals) from entering the project site except by locked gates or doors. Enclosures shall be checked daily to ensure they are performing as intended. Refer to 311000 for temporary construction fencing requirements.

E. Temporary Storage: The Contractor is responsible for ensuring that all materials are new and undamaged from weather, age, or neglect. All temporary storage sheds or containers shall be weather tight. If materials appear to be used, damaged, aged, or neglected, the Contracting Officer may request the items be replaced with new items at no additional cost to the government. If materials become wet, ensure they are fully dry prior to installation.

F. Temporary Traffic Controls: The contractor shall erect and maintain barricades, danger signals, and warning signs in accordance with the Manual on Uniform Traffic Control Devices (MUTCD), 2009 edition. The contractor shall provide adequate traffic control, including flaggers on either side of any work performed in the road. Any workers on or near the road must wear highly visible, bright clothing.

PART 8 – EXECUTION (SECTION 01 73 40)

8.1 EXECUTION

GENERAL REQUIREMENTS - 13

A. Examination: Examine the project area and site facilities and verify compatibility between existing conditions and the scope of work. Notify Owner’s representative immediately if there are any discrepancies.

B. Preparation: Take field measurements or conduct surveys to verify quantities and dimensions before procurement and fabrication or installation.

C. Digging: Exercise caution when digging with heavy equipment. Tone and mark for utilities in advance of digging. If a buried utility or feature is discovered, exercise extreme caution or hand dig to prevent damage to the utility or feature. If the utility or feature is damaged, repair at no additional cost to the government.

D. Cutting & Patching: Examine surfaces to be cut and patched and the conditions under which cutting and patching are to be performed. Before patching, verify compatibility with and suitability of substrates, including compatibility with in-place finishes or primers. Proceed with installation only after unsafe or unsatisfactory conditions have been corrected.

E. Installation: Install all systems or components according to the specifications, manufacturer’s recommendations, permit conditions (where applicable), and local, State, and Federal codes, standards, and regulations. All systems or components shall be complete and operable.

F. Correction of the Work: Upon discovery of defects or damage of new work or to existing facilities damaged by new work, repair or replace damaged systems or components and restore substrates and finishes.

G. Progress Cleaning: Clean the project site and work area on a daily basis. Keep site free of waste and debris in proper containment. Dispose of food refuse in proper containers so as not to attract wildlife, vermin, or pests. Properly dispose of all waste and debris offsite.

H. Final Cleaning & Waste Disposal: At the completion of the work, clean all surfaces and remove all waste materials, trash, tools, equipment, machinery, and surplus items from the project site and legally dispose of all waste items.

PART 9 – CLOSEOUT PROCEDURES (SECTION 01 77 00)

9.1 SUBSTANTIAL COMPLETION AND FINAL INSPECTION

A. When the project, or a designated portion of the project, is substantially complete, the Contractor shall request a pre-final inspection in writing at least fourteen (14) calendar days in advance of the inspection date. The work is substantially complete when all major work is complete, and all project functions are operable.

B. If the NPS confirms that the work is substantially complete at the time of the pre-final inspection, the Contracting Officer will prepare a Letter of Substantial Completion with a Punch List of deficiencies to be corrected before final inspection / acceptance. The Contractor shall complete the work described in the Punch List within thirty (30) calendar days, as weather permits. Once all onsite Punch List work is complete, the Contractor shall request a final inspection in writing to arrange for the confirmation of punchlist completion.

C. If the Contractor fails to complete the Punch List work within the allotted timeframe, the Contracting Officer may either replace or correct the work with an appropriate reduction in

GENERAL REQUIREMENTS - 14

the contract price, or charge for re-inspection costs in accordance with the Inspection of Construction clause of the contract.

D. If the NPS determines that the work is not substantially complete at the time of the pre-final inspection, the Contracting Officer will notify the Contractor in writing. The Contractor may request a new pre-final inspection; however, all re-inspection costs may be charged against the Contractor in accordance with the Inspection of Construction clause of the contract.

E. After all onsite deficiencies have been corrected, and all project closeout submittals have been received, a Letter of Final Acceptance will be issued by the Contracting Officer.

9.2 CLOSEOUT SUBMITTALS

A. OPERATIONS AND MAINTENANCE MANUAL: Submit an Operation & Maintenance (O&M) Manual to the Contracting Officer with the following information:

1. Preventative maintenance schedule for all major components – This should be the first page of the O&M Manual. The preventative maintenance schedule lists the recommended preventative maintenance for each components, system, or facility and summarizes it on the first page for quick reference by the park’s Facility Manager.

2. A one (1) year Contractor-issued warranty on all workmanship starting from the date of final acceptance.

3. Product warranties for individual products and systems.

4. Operating instructions, if applicable.

5. Product / material cut sheets (ALL approved products used on the project).

6. Before and After progress photos showing all aspects of the work and multiple perspectives of the assets. (Note: No more than 4 photos to a page).

The Contractor shall submit the O&M Manual to the Contracting Officer in PDF format along with a CM-16 transmittal form for NPS review and acceptance.

Once the O&M Manual in PDF format is accepted by NPS, the Contractor shall assemble and mail / deliver two (2) hard copies of the O&M Manual (in D-ring binders) to the onsite Point of Contact (POC). Binders shall be organized in the sections above with a separate tab for each section. Final invoice will not be approved until the Contractor presents proof of delivery of the hard copy O&M Manuals.

B. FINAL RECORD DRAWINGS: Contractor shall provide detailed As-Built/Record Drawings indicating the actual location, sizes, and types of irrigation equipment installed and any modifications to the plans. Record drawings shall be delivered in PDF format to the COR and Park Chief of Maintenance for review and acceptance.

9.3 DEMONSTRATION & TRAINING

A. Demonstration & Training: Provide onsite demonstration and training to NPS operators and staff on the proper and safe operation of all new systems and components. This demonstration & training can occur at the time of the pre-final or final inspections, or it can be arranged as a separate event to accommodate park employees and the training vendors.

SECTION 31 10 00

SITE PREPARATION - 1

SECTION 31 10 00 - SITE PREPARATION

PART 1 GENERAL

1.1 SUMMARY

A. Work includes but is not limited to the following:

1. Locating existing utilities

2. Installing temporary construction fencing to secure the site

3. Protecting existing trees, vegetation and site features to remain

4. Removing, disconnecting or capping below grade site utilities

5. Excavation of subgrade

6. Saw cutting pavement

7. Disposing of materials from site

1.2 REFERENCES

A. Comply with Section 01 33 00.

1.3 MATERIAL OWNERSHIP

A. Except for excavated backfill/topsoil material and other materials indicated to remain on Government’s property, cleared materials shall become Contractor's property and shall be removed from Project site and disposed of properly.

1.4 PROJECT CONDITIONS

A. Traffic: minimize interference with adjoining roads, streets, walks, and other adjacent occupied or used facilities during site-clearing operations.

1. Do not close or obstruct streets, walks, or other adjacent occupied or used facilities without permission from Contracting Officer and authorities having jurisdiction.

2. Provide alternate routes around closed or obstructed traffic ways if required by Contracting Officer or authorities having jurisdiction.

B. Protection of Existing Improvements

1. Provide, erect and maintain barricades, covering or other types of protection necessary to prevent damage to existing site features.

2. Restore any existing improvements damaged by this work to original condition or condition considered acceptable by Owner’s representative.

3. Do not store or operate heavy equipment within the Critical Root Zone or Drip Line of existing trees.

C. Salvable Improvements: Carefully remove items indicated to be salvaged and store on Government’s premises as directed by Contracting Officer.

D. Utility Locator Service: Notify utility locator service for area where Project is located before site clearing. Coordinate with utility providers as required to obtain all necessary permits.

SITE PREPARATION - 2

E. Do not commence site clearing operations until temporary construction fencing has been placed to secure the construction site. Do no excavate within the drip line of a tree without consulting with the Owner’s Representative.

F. Do not shut off or cap utilities without prior notice and coordination.

G. The following practices are prohibited within protection zones:

1. Storage of construction materials, debris, or excavated material.

2. Parking vehicles or equipment.

3. Excavation or other digging unless otherwise indicated.

4. Attachment of signs to or wrapping materials around trees or plants unless otherwise indicated.

PART 2 PRODUCTS

2.1 Construction Fencing

A. Fencing Material: 4’ high visibility orange fencing secured to 2x2 metal posts or wood stakes.

B. For contractor’s operations a galvanized 6’ fence supported with concrete blocks may be used as an option.

C. Provide warning signage on every 50’ of fence with contrasting lettering as follows: “WARNING

CONSTRUCTION KEEP OUT”

PART 3 EXECUTION

3.1 PREPARATION

A. Locate and clearly identify trees, shrubs, and other vegetation to remain.

B. Protect existing site improvements to remain from damage during construction.

1. Restore damaged improvements to their original condition, as acceptable to Contracting Officer.

3.2 TREE AND VEGETATION PROTECTION

A. General: Protect trees and plants remaining on-site according to requirements below.

B. Erect and maintain temporary fencing around tree protection zones before starting site clearing.

Remove fence when construction is complete.

C. Do not excavate within tree protection zones, or drip line of trees, unless otherwise indicated.

D. Repair or replace trees, shrubs, and other vegetation indicated to remain or be relocated that are damaged by construction operations, in a manner approved by Owner.

E. Where excavation for new construction is required within drip line of trees, hand clear and excavate to minimize damage to root systems. Use narrow-tine spading forks, or utilize pneumatic Airspade

SITE PREPARATION - 3

to expose roots, and cleanly cut roots as close to excavation as possible. Notify owner’s representative if roots larger than 2” are encountered that must be cut.

1. Cover exposed roots with burlap and water regularly. Exposed roots smaller than 1-1/2” shall be cut cleanly.

2. Temporarily support and protect roots from damage until they are permanently relocated and covered with soil.

3. Coat cut faces of roots more than 1-1/2 inches in diameter with emulsified asphalt or other approved coating formulated for use on damaged plant tissues.

4. Cover exposed roots with wet burlap to prevent roots from drying out. Backfill with soil as soon as possible.

3.3 CONSTRUCTION FENCING

A. Contractor shall verify construction fence locations with Owner’s Representative prior to construction. Contractor shall notify and coordinate with Owner’s Representative if fencing needs to be relocated as construction progresses.

B. Rolls of orange PVC web fencing may be used secured to wood stakes or steel posts driven into the ground at approximately 10’ O.C. Fencing shall be removed promptly once the Work is completed.

C. Chain-link fence, if utilized, shall be properly secured and connected mechanically with bolted brackets provided by Manufacturer. Fence panels shall not be wired together.

3.4 UTILITIES

D. Locate, identify, disconnect, and seal or cap utilities indicated to be removed or abandoned in place.

1. Arrange with utility companies to shut off indicated utilities.

E. Interrupting Existing Utilities: Do not interrupt utilities serving facilities occupied by Government or others unless permitted under the following conditions and then only after arranging to provide temporary utility services according to requirements indicated:

1. Notify Contracting Officer not less than two days in advance of proposed utility interruptions.

2. Do not proceed with utility interruptions without Contracting Officer’s written permission.

Excavate for and remove underground utilities indicated to be removed.

3.5 CLEARING AND GRUBBING

A. Remove obstructions, trees, shrubs, and other vegetation to permit installation of new construction.

Removal includes digging out stumps and obstructions and grubbing roots.

1. Do not remove trees, shrubs, and other vegetation indicated to remain or be relocated.

2. Cut minor roots and branches of trees indicated to remain in a clean and careful manner where such roots and branches obstruct installation of new construction.

3. Completely remove stumps and remove roots, obstructions, and debris to a depth of 18 inches below exposed subgrade.

4. Use only hand methods for grubbing within protection zones.

SITE PREPARATION - 4

B. Fill depressions caused by clearing and grubbing operations with satisfactory soil material unless further excavation or earthwork is indicated.

1. Place fill material in horizontal layers not exceeding a loose depth of 8 inches, and compact each layer to a density equal to adjacent original ground.

3.6 TOPSOIL STRIPPING

A. Remove sod and grass before stripping topsoil.

B. Strip topsoil to depth of 6 inches in a manner to prevent intermingling with underlying subsoil or other waste materials.

C. Stockpile topsoil away from edge of excavations without intermixing with subsoil. Grade and shape stockpiles to drain surface water. Cover to prevent windblown dust and erosion by water.

3.7 SITE IMPROVEMENTS

A. Remove existing above- and below-grade improvements as indicated and necessary to facilitate new construction.

B. Remove slabs, paving, curbs, and gutters at existing full-depth joints unless indicated otherwise.

Neatly saw-cut length of existing pavement to remain with vertical faces prior to removing existing pavement. Refer to 328400 for backfill and pavement requirements.

3.8 DISPOSAL OF SURPLUS AND WASTE MATERIALS

A. Remove surplus soil material, unsuitable topsoil, obstructions, demolished materials, and waste materials including trash and debris, and legally dispose of them off Government’s property.

B. Separate recyclable materials produced during site clearing from other nonrecyclable materials.

Store or stockpile without intermixing with other materials and transport them to recycling facilities.

Do not interfere with other Project work.

END OF SECTION 31 10 00

SECTION 32 84 00

IRRIGATION - 1

SECTION 32 84 00 – IRRIGATION

PART 1 - GENERAL

1.1 DESCRIPTION

A. The work in this section consists of furnishing, layout and installing an irrigation.

B. Related work specified elsewhere includes:

1. Section 31 10 00, SITE PREPARATION

1.2 QUALITY ASSURANCE

A. Manufacturer's Specifications: Follow manufacturer's current printed specifications and drawings in all cases where the manufacturers of articles used in the Contract furnish directions covering points not specified or shown in the drawings.

B. Ordinances and Regulations: All local, municipal and state laws, codes and regulations governing or relating to all portions of this work are hereby incorporated into and made a part of these Specifications. Anything contained in these Specifications shall not be construed to conflict with any of the above codes, regulations or requirements of the same. However, when these Specifications and Drawings call for or describe materials, workmanship or construction of a better quality, higher standard, or larger size than is required by the above codes and regulations, the provisions of these Specifications and Drawings shall take precedence. Furnish without extra charge additional materials and labor required to comply with above rules and regulations.

C. References, Codes and Standards:

1. Irrigation Association (CAIA) standards.

2. American Society of Irrigation Consultants (ASIC) Design Guidelines.

3. Electric Code.

4. International Plumbing Code (IPC) published by the International Code Council.

5. NFPA 24, Section 10.4, Depth of Cover.

6. Underwriters Laboratories (UL): Electrical wiring, controls, motors and devices, UL listed and so labeled.

7. American Society of Testing Materials (ASTM).

D. Furnish without extra charge any additional material and labor when required by the compliance with all above mentioned codes and regulations, though the work be not mentioned in these specifications or shown on the…