B08_Drawing_140L4324R0018_Baker_Fire_Crew_Quarters.pdf
PDF 25 MB Posted
- Attached to
- Baker Fire Crew Quarters for BLM-Vale District Off Federal contract opportunity
- Solicitation number
- 140L4324R0018
About this file
This document appears to be a drawing for the Baker Fire Crew Quarters for the BLM-Vale District Office, part of the Department of the Interior Bureau of Land Management Oregon-Washington. The drawing is identified as B08_Drawing_140L4324R0018_Baker_Fire_Crew_Quarters.pdf and is related to Federal Contract Opportunity afceb832643f488191e432438179ad29, Solicitation Number 140L4324R0018.
The key details are: The federal agency involved is the Department of the Interior Bureau of Land Management Oregon-Washington. The contract opportunity is for the Baker Fire Crew Quarters for the BLM-Vale District Office. The solicitation number is 140L4324R0018. No additional information is provided about the specific products or services required, response dates, award dates, pricing terms, set asides, incumbents, or other salient details.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Sol_140L4324R0018_Amd_0002.pdf | ||
| B09_Amendment_0002_Sol_140L4324R0018_Baker_Fire_Crew_Quarters_0002.pdf | ||
| B09_Amd1_Attachment_3_List_of_Site_Visit_Attendees_UPDATED_0002.pdf | ||
| B09_Amd2_BLM_Baker_City_Fire_Crew_Quarters_100__Specifications_-_Final_0002.pdf | ||
| Sol_140L4324R0018_Amd_0001.pdf | ||
| B09_Amendment_0001_Sol_140L4324R0018_Baker_Fire_Crew_Quarters_0001.pdf | ||
| B08_RFP_140L4324R0018_Baker_Fire_Crew_Quarters.pdf | ||
| Sol_140L4324R0018.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
N
GENERAL
COVER SHEET
RC
RC
JH
G-001
JH
D3290113_G-001.dwgFILENAME: PLOT DATE: PLOT TIME:$PLOTDATE $PLOTTIME
JA
C
O
BS
0.
A
LL
R
IG
H
TS
R
ES
ER
VE
D c
$PWPATH$PWURL
BAKER CITY FIRE GUARD CREW QUARTERS BUILDING
FI
N
AL
P
R O
D U
C
TI
O N
D O
C U
M
EN
TS
FEBRUARY 2023 78
DRAWING NO.
SHEET OFDATE:
SCALE:DRAWN:
APPROVED
RECOMMENDED
SUBMITTED
VALE DISTRICT OREGON STATE OFFICE
UNITED STATES DEPARTMENT OF THE INTERIOR
BUREAU OF LAND MANAGEMENT
AS SHOWN
REV. NO. DESCRIPTION DATE APPROVED
DISTRICT MANAGER
OPERATION CHIEF OR EQUIVALENT
FIELD MANAGER
THINKALWAYS SAFETY
DSGN: CHK: APVD:
ENGINEERING APPROVAL
DISTRICT OR ZONE ENGINEER
GENERAL
G-001 COVER SHEET
G-002 SITE STAGING AND EROSION
CONTROL PLAN
G-003 SPECIAL INSPECTION TABLES
CIVIL
C-001 GENERAL NOTES AND LEGEND
C-101 SITE PLAN
C-102 SITE GRADING PLAN
C-103 SITE UTILITIES PLAN
C-501 DETAILS
C-502 DETAILS
C-503 DETAILS
ARCHITECTURAL
A-001 LEGEND AND ABBREVIATIONS
A-002 LIFE SAFETY PLAN
A-101A FLOOR PLAN
A-101B FLOOR PLAN
A-110 A REFLECTED CEILING PLAN
A-110B REFLECTED CEILING PLAN
A-120 A ROOF PLAN
A-120B ROOF PLAN
A-201 EXTERIOR ELEVATIONS
A-301 SECTIONS
A-302 WALL SECTIONS
A-401 ENLARGED PLANS
A-402 INTERIOR ELEVATIONS
A-403 INTERIOR ELEVATIONS
A-501 DETAILS
A-502 DETAILS
A-503 DETAILS
A-601 DOOR AND WINDOW SCHEDULES
A-602 SCHEDULES
STRUCTURAL
S-001 GENERAL NOTES
S-002 GENERAL NOTES
S-101A FLOOR FRAMING PLAN AND SECTION
S-101B FLOOR FRAMING PLAN AND SECTION
S-120A ROOF FRAMING PLAN
S-120B ROOF FRAMING PLAN
S-301 BUILDING SECTIONS
S-501 DETAILS
S-502 DETAILS
S-503 DETAILS
U.S. DEPARTMENT OF THE INTERIOR
BUREAU OF LAND MANAGEMENT
SHEET INDEX
SHEET # DRAWING NO.
PROJECT ADDRESS:
BAKER CITY, OREGON 97814
LOCATION MAP
VICINITY MAP
ST. HELENS
ASTORIA
TILLAMOOK
MCMINNVILLE
ALBANYNEWPORT
CORVALLIS
HOOD
RIVER
DALLES
THE
MADRAS
PRINEVILLE
COQUILLE
GRANTS
PASS
Ashland
BURNS
KLAMATH
FALLS
CONDON
MORO
PENDLETON
LA GRANDE
ENTERPRISE
VALE Ontario
PORTLAND
SALEM
MEDFORD
EUGENE
ROSEBURG
Athena
N. Powder
UnityDayville Sisters
Juntura
Frenchglen Burns Jct.
McDermitt
Paisley
La Pine
Crescent
Biggs
Lexington
Hermiston Boardman
Ukiah
Arlington
Malin Brookings
Coos Bay
Drain
Canyonvil le
Reedsport Oakridge
GoshenFlorence
Lincoln City
Waldport
Home Sweet
Detroit Antelope
Maupin
Forest Grove
Hebo
Cannon Beach Seaside
Rainier
Milton-Freewater
W
26 35 197
3951926
3953197
Bonanza
Junction City
BAKER CITY
HEPPNER
Copperfield
Lake Silver
Junction CaveBEACH
GOLD
Orford Port
LAKEVIEW
CANYON
CITY
Day John
CITY
OREGON
HILLSBORO
DALLAS
Redmond Z
Z
Val ley Jordan
BEND
Project Location
SHEET TITLE
BAKER CITY FIRE GUARD
CREW QUARTERS BUILDING
BAKER CITY, OREGON
UNITED STATES DEPARTMENT OF INTERIOR
VALE DISTRICT OFFICE
BUREAU OF LAND MANAGEMENT
3305 13TH STREET
UNION PACIFIC RR
N
MECHANICAL
M-001 LEGENDS AND ABBREVIATIONS
M-101A HVAC CRAWL SPACE PLAN
M-101B HVAC CRAWL SPACE PLAN
M-102A HVAC FLOOR PLAN
M-102B HVAC FLOOR PLAN
M-501 DETAILS
M-502 DETAILS
M-601 SCHEDULES
M-701 SEQUENCE OF OPERATIONS
PLUMBING
P-001 LEGEND AND ABBREVIATIONS
P-101A CRAWL SPACE PLAN
P-101B CRAWL SPACE PLAN
P-102A FLOOR PLAN
P-102B FLOOR PLAN
P-501 DETAILS
P-601 SCHEDULES
P-701 DIAGRAMS
ELECTRICAL
E-001 LEGEND
E-002 GENERAL NOTES AND ABBREVIATIONS
E-003 ONE LINE DIAGRAM
E-100 SITE PLAN
E-101A POWER PLAN
E-101B POWER PLAN
E-102A LIGHTING PLAN
E-102B LIGHTING PLAN
E-103A COMMUNICATIONS PLAN
E-103B COMMUNICATIONS PLAN
E-104A FIRE ALARM PLAN
E-104B FIRE ALARM PLAN
E-105 FIRE ALARM RISER DIAGRAM AND MATRIX
E-106A CRAWLSPACE PLAN
E-106B CRAWLSPACE PLAN
E-501 DETAILS
E-502 DETAILS
E-601 LUMINAIRE SCHEDULE
E-602 PANELBOARD SCHEDULES
E-603 LIGHTING COMPLIANCE CERTIFICATE
FIRE PROTECTION
FP-101A FLOOR PLAN
FP-101B FLOOR PLAN
SHEET # DRAWING NO. SHEET TITLE
US HIGHWAY 30
FIRE GUARD
STATION
92527PE
REENIGNE
OREGON
JUL Y 11, 2 0 17
Digital Signature csoules Cross-Out
X
X X X
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G G
G G
G G
G G
G G
G G
G G
G G
G G
G
OH
P
OH
P
OH
P
O
HP
OH
P
O
HP
OH
P
OH
P
OH
P
OH
P
OH
P
OH
P
OH
P
OH
P
OH
P
OH
P
OH
P OHP OHP OHP
O H
P
O H
P O
H P
O H
P O
H P
O H
P O
H P
O H
P
OHP
OHP
OHP
OHP
OHPOHP
OHP
OHP
OHP
O H
P O
H P
O H
P
O H
T O
H T
O H
T O
H T
O H
T O
H T
O H
T O
H T
T T
T T
T T
T
T T
T T
T T
T T
T T
T
T T
T T
T T
T W
W W
W W
W W
SS
SS
FILENAME: PLOT DATE: PLOT TIME:$PLOTDATE $PLOTTIME
JA
C
O
BS
0.
A
LL
R
IG
H
TS
R
ES
ER
VE
D c
$PWPATH$PWURL
BAKER CITY FIRE GUARD CREW QUARTERS BUILDING
FI
N
AL
P
R O
D U
C
TI
O N
D O
C U
M
EN
TS
FEBRUARY 2023 78
DRAWING NO.
SHEET OFDATE:
SCALE:DRAWN:
APPROVED
REVIEWED
DESIGNED
DIVISION OF OPERATIONS OREGON STATE OFFICE
UNITED STATES DEPARTMENT OF THE INTERIOR
BUREAU OF LAND MANAGEMENT
AS SHOWN
REV. NO. DESCRIPTION DATE APPROVED
DE
BLM CE/CET
AE OR BLM CE/CET
THINKALWAYS SAFETY
DSGN: CHK: APVD:
N
GENERAL
SITE STAGING AND
EROSION CONTROL PLAN
AT
JO
PR
G-002
AT
D3290113_G-002.dwg
EAST RAILROAD STREET
0 40 80 120
1"=40'
TH
S
TR
EE
T
"F" STREET
"E" STREET
TH
S
TR
EE
T
TH
S
TR
EE
T
GENERAL NOTES
A. UTILIZE STAGING AREA FOR STOCKPILES,
MATERIALS STORAGE, CONTRACTOR'S EMPLOYEE
PARKING AND TRAILERS. COORDINATE FINAL
LOCATIONS WITH CONTRACTING OFFICER.
B. ALL MATERIALS STOCKPILED FOR 24 HOURS OR
MORE MUST BE COVERED UNLESS OTHERWISE
DIRECTED OR APPROVED IN WRITING BY
CONTRACTING OFFICER.
C. EROSION AND SEDIMENT CONTROL MEASURES
SHOWN ARE MINIMUM REQUIREMENT. SWPPP TO
BE DESIGNED AND SUBMITTED TO OREGON
DEPARTMENT OF ENVIRONMENTAL QUALITY.
SHEET KEYNOTES
1. SILT FENCE, SEE 1/C-501
2. CONTRACTOR STAGING AREA
3. STABILIZED CONSTRUCTION ENTRANCE, SEE
4/C-503
4. PROPERTY LINE
5. SILT FENCE SURROUNDING INFILTRATION BASIN TO
REMAIN IN PLACE UNTIL SITE IS PERMANENTLY
STABILIZED
Digital Signature
JH
Amanda Thompson
Perrin Robinson
John Hatten
FILENAME: PLOT DATE: PLOT TIME:$PLOTDATE $PLOTTIME
JA
C
O
BS
0.
A
LL
R
IG
H
TS
R
ES
ER
VE
D c
$PWPATH$PWURL
BAKER CITY FIRE GUARD CREW QUARTERS BUILDING
FI
N
AL
P
R O
D U
C
TI
O N
D O
C U
M
EN
TS
FEBRUARY 2023 78
DRAWING NO.
SHEET OFDATE:
SCALE:DRAWN:
APPROVED
REVIEWED
DESIGNED
DIVISION OF OPERATIONS OREGON STATE OFFICE
UNITED STATES DEPARTMENT OF THE INTERIOR
BUREAU OF LAND MANAGEMENT
AS SHOWN
REV. NO. DESCRIPTION DATE APPROVED
DE
BLM CE/CET
AE OR BLM CE/CET
THINKALWAYS SAFETY
DSGN: CHK: APVD:
GENERAL
SPECIAL INSPECTION TABLES
CW
RC
KS
G-003
JH
D3290113_G-003.dwg
92527PE
REENIGNE
OREGON
JUL Y 11, 2 0 17
Digital Signature
Cory Webster
Kent Soelberg
C
O
BS
0.
A
LL
R
IG
H
TS
R
ES
ER
VE
D c
$PWPATH$PWURL
BAKER CITY FIRE GUARD CREW QUARTERS BUILDING
FI
N
AL
P
R O
D U
C
TI
O N
D O
C U
M
EN
TS
FEBRUARY 2023 78
DRAWING NO.
SHEET OFDATE:
SCALE:DRAWN:
APPROVED
REVIEWED
DESIGNED
DIVISION OF OPERATIONS OREGON STATE OFFICE
UNITED STATES DEPARTMENT OF THE INTERIOR
BUREAU OF LAND MANAGEMENT
AS SHOWN
REV. NO. DESCRIPTION DATE APPROVED
DE
BLM CE/CET
AE OR BLM CE/CET
THINKALWAYS SAFETY
DSGN: CHK: APVD:
CIVIL
GENERAL NOTES AND LEGEND
AT
JO
PR
C-001
AT
D3290113_C-001.dwg
GENERAL UTILITIES NOTES:
GENERAL SITE NOTES:
1. TOPOGRAPHIC SURVEY PROVIDED BY ANDERSON PERRY ON AUGUST 11, 2022. CONTRACTOR SHALL FIELD
VERIFY EXISTING CONDITIONS PRIOR TO CONSTRUCTION.
2. VERTICAL DATUM : ELEVATIONS SHOWN ARE A REPRESENTATION OF NAVD88 (GEOID18) BASED ON THE OREGON REAL-TIME GNSS NETWORK (ORGN), SOLUTIONS AT APA CONTROL POINTS #501 AND 502. POINT 502
WAS THEN TIED WITH RTK FOR A SECOND CHECK FROM APA CONTROL #501.
HORIZONTAL DATUM : THE COORDINATES OF APA CONTROL POINTS #501-504 ARE IN THE OREGON STATE PLANE COORDINATE SYSTEM - OREGON NORTH ZONE NAD83 (CORS2011), EXPRESSED IN INTERNATIONAL FEET, EPSG CODE 6559 FOR REFERENCE, BASED ON THE OREGON REAL-TIME GNSS (ORGN). ALL POINTS ARE
GRID COORDINATES. ANY BEARINGS SHOWN ARE GRID BEARINGS.
3. EXISTING STRUCTURES, AND SITE FEATURES ARE SHOWN SCREENED AND/OR LIGHT-LINED. NEW FINISH
GRADE, STRUCTURES, AND SITE FEATURES ARE SHOWN HEAVY-LINED.
4. MAINTAIN, RELOCATE, OR REPLACE EXISTING SURVEY MONUMENTS, CONTROL POINTS, AND STAKES WHICH ARE DISTURBED OR DESTROYED. PERFORM THE WORK TO PRODUCE THE SAME LEVEL OF ACCURACY AS
THE ORIGINAL MONUMENT(S) IN A TIMELY MANNER, AND AT THE CONTRACTOR'S EXPENSE.
5. COORDINATES AND DIMENSIONS SHOWN FOR IMPROVEMENTS ARE TO EDGE OF PAVEMENT, GRAVEL
SURFACING, OR STRUCTURE.
6. STAGING AREA SHALL BE FOR CONTRACTOR'S EMPLOYEE PARKING, CONTRACTOR'S TRAILERS AND ON-SITE
STORAGE OF MATERIALS.
7. ELEVATIONS GIVEN ARE TO FINISH GRADE UNLESS OTHERWISE SHOWN.
8. SLOPE UNIFORMLY BETWEEN CONTOURS AND SPOT ELEVATIONS SHOWN, PROVIDE POSITIVE DRAINAGE TO
ALL PLANNED LOW POINTS.
9. COMPLY WITH ALL FEDERAL, STATE, AND LOCAL LAWS, RULES AND REGULATIONS APPLICABLE TO
TEMPORARY EROSION AND SEDIMENT CONTROL AT THE SITE.
10. PROVIDE, IMPLEMENT AND MAINTAIN EROSION CONTROL DEVICES DURING CONSTRUCTION IN ACCORDANCE WITH THE OREGON DEPARTMENT OF ENVIRONMENTAL QUALITY'S CONSTRUCTION STORMWATER BEST
MANAGEMENT PRACTICES.
11. THE MEASURES SHOWN IN THESE PLANS ARE CONCEPTUAL. CONTRACTOR TO DEVELOP AND OBTAIN
EROSION AND SEDIMENT CONTROL PERMITS PRIOR TO CONSTRUCTION.
12. CONTRACTOR SHALL TAKE ALL OTHER MEASURES TO POSITIVELY PRECLUDE SEDIMENT LADEN RUNOFF
FROM LEAVING THE SITE.
1. ALL PIPES SHALL HAVE A CONSTANT SLOPE BETWEEN INVERT ELEVATIONS UNLESS A FITTING IS
SHOWN.
2. ALL NEW WATER PIPES MUST BE PROPERLY FLUSHED, PRESSURE TESTED, CHLORINATED AND
BACTERIOLOGICALLY TESTED, AS SPECIFIED.
3. CONFORM TO BAKER CITY'S STANDARD DRAWINGS AS INDICATED ON THESE DRAWINGS WITH "BC-".
FOR INSTANCE, BC-403 REFERENCES BAKER CITY STANDARD DETAIL 403.
CIVIL LEGEND
TREE
STRUCTURE, BUILDING OR FACILITYOR
GRAVEL SURFACING
DEMOLITION
ROW/PROPERTY LINE
CONCRETE PAVEMENT
OVERHEAD POWER
EDGE OF GRAVEL ROAD
SANITARY SEWER LINE
POWER POLE
ABBREVIATIONS
OR XXX
WATERLINE
AC
ADA
APPROX
BC
BLDG
BMP
BUR
C
CONC
COORD
C.O., CO
CL, C
DI
DIA, Ø
DEMO
DWG
E
ELEC
ELEV
EQUIP
ESC
EXST
FG
FL
FT
HP
IE
INV
L
LF
LP
MAX
MH
MIN
N
NIC
NTS
OC
ODEQ
OHP
OWRD
PCCP
PE
PJF
POV
PV
PVC
R, RAD
REQ'D
ROW
RV
S, SS
SD
SIM
SOG
SPEC'D
SST
SW
TOC
TYP
W W/
L
AND
ASPHALT CONCRETE
AMERICANS WITH DISABILITIES ACT
APPROXIMATE
BAKER CITY STANDARD DRAWINGS
BUILDING
BEST MANAGEMENT PRACTICE
BURIED
CATCH BASIN
CONCRETE
COORDINATE
CONTRACTING OFFICER
CENTERLINE
DUCTILE IRON
DIAMETER
DEMOLISH OR DEMOLITION
DRAWING
EAST, EASTING
ELECTRICAL
ELEVATION
EQUIPMENT
EROSION AND SEDIMENT CONTROL EXISTING
EXISTING
FINISHED GRADE
FLOWLINE
FEET
HIGH POINT
INVERT ELEVATION
INVERT
LENGTH
LINEAR FEET
LOW POINT
MAXIMUM
MANHOLE
MINIMUM
NORTH, NORTHING
NOT IN CONTRACT
NOT TO SCALE
ON CENTER
OREGON DEPARTMENT OF ENVIRONMENTAL
QUALITY
OVERHEAD POWER
OREGON WATER RESOURCES DEPARTMENT
PORTLAND CEMENT CONCRETE PAVEMENT
POLYETHELENE
PREFORMED JOINT FILLER
PRIVATELY OWNED VEHICLE
PHOTOVOLTAIC
POLYVINYL CHLORIDE
RADIUS
REQUIRED
RIGHT OF WAY
RECREATIONAL VEHICLE
SANITARY SEWER
STORMDRAIN
SIMILAR
SLAB ON GRADE
SPECIFIED
STAINLESS STEEL
SIDEWALK
TOP OF CONCRETE
TYPICAL
WATER
WITH
OHP
SILT FENCE
LIMITS OF DISTURBANCE
NATURAL GAS LINE
UNDERGROUND TELEPHONET
NATURAL GAS LINEG
WATER LINEW
TELEPHONE RISER
GAS METER
ROAD SIGN
WATER VALVE
OVERHEAD TELEPHONEOHT
ELECTRICAL RISER
GUY WIRE
SANITARY SEWER LINESS
SANITARY SEWER MANHOLE
SS
W
G
ROW CENTERLINE
CHAIN LINK FENCE
XX
WIRE FENCE
SANITARY SEWER MANHOLE
FIRE HYDRANT
CONTROL POINT
VALVE
ASPHALT PAVEMENT PATCH
CHAIN LINK FENCING
WATER METERM
Digital Signature
JH
Amanda Thompson
X X X
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G G
G G
G G
G G
G G
G G
G G
G G
G G
G G
OH
P
OH
P
OH
P
OH
P
OH
P
OH
P
O
HP
OH
P
OH
P
OH
P
OH
P
OH
P
OH
P
OH
P
O
HP
OH
P
OH
P
OH
P OHP OHP OHP
O H
P
O H
P O
H P
O H
P O
H P
O H
P O
H P
O H
P O
H P
OHP
OHP
OHP
OHP
OHPOHP
OHP
OHP
OHP
O
H P
O H
P O
H P
O H
T O
H T
O H
T O
H T
O H
T O
H T
O H
T O
H T
T T
T T
T T
T
T T
T T
T T
T T
T T
T
T T
T T
T T
T W
W W
W W
W W
SS
W W
WCOCO
M
M
CO
CO
CO
FILENAME: PLOT DATE: PLOT TIME:$PLOTDATE $PLOTTIME
JA
C
O
BS
0.
A
LL
R
IG
H
TS
R
ES
ER
VE
D c
$PWPATH$PWURL
BAKER CITY FIRE GUARD CREW QUARTERS BUILDING
FI
N
AL
P
R O
D U
C
TI
O N
D O
C U
M
EN
TS
FEBRUARY 2023 78
DRAWING NO.
SHEET OFDATE:
SCALE:DRAWN:
APPROVED
REVIEWED
DESIGNED
DIVISION OF OPERATIONS OREGON STATE OFFICE
UNITED STATES DEPARTMENT OF THE INTERIOR
BUREAU OF LAND MANAGEMENT
AS SHOWN
REV. NO. DESCRIPTION DATE APPROVED
DE
BLM CE/CET
AE OR BLM CE/CET
THINKALWAYS SAFETY
DSGN: CHK: APVD:
N
CIVIL
SITE PLAN
AT
JO
PR
C-101
AT
D3290113_C-101.dwg
EAST RAILROAD STREET
0 40 80 120
1"=40'
SHEET KEYNOTES
GENERAL SHEET NOTES
A. SURVEY WAS CONDUCTED ON APPROXIMATELY
AUGUST 11, 2022 BY ANDERSON PERRY AND
ASSOCIATES, INC.
B. VERIFY ALL EXISTING CONDITIONS PRIOR TO
CONSTRUCTION AND BRING INCONSISTENCIES TO
CONTRACTING OFFICER'S ATTENTION.
FUTURE FOREST
SERVICE BUILDING
(NOT IN THIS
CONTRACT)
1. FIRE CREW QUARTERS BUILDING
2. CREOSOTE TREATED RAILROAD TIE BORDER, SEE
7/C-501
3. GRAVEL POV PARKING SPACES
4. CHAIN LINK FENCE, SEE 5/C-503
5. 24' WIDE GRAVEL DRIVEWAY, SEE 2/C-501
6. DOUBLE SWING, MANUAL SWING GATE, 24' TOTAL
OPENING WIDTH, SEE 5/C-503
7. OVERFLOW GRAVEL PARKING AREA
8. ADA PARKING SPACE, LOADING ZONE, AND
SIGNAGE, SEE 5/C-501, 6/C-501 AND 6/C-503
9. CONCRETE STOOP, SEE 3/C-501
10. 14' WIDE CONCRETE SIDEWALK, SEE 4/C-501
11. RETAIN AND PROTECT
12. DEMOLISH
13. TIE INTO EXISTING
14. GRAVEL SURFACING, SEE 2/C-501
15. CONCRETE EQUIPMENT PAD, SEE 7/S-501
16. INFILTRATION BASIN, SEE 2/C-503
17. CONCRETE PATIO, SEE 1/S-502
18. BOTTOM OF INFILTRATION BASIN
19. 28' LONG CONCRETE ENCASED 12" WIDE TRENCH
DRAIN, SEE 7/C-503
24'
14'
5' X 5'
"F" STREET
"E" STREET
TH
S
TR
EE
T
9'
18'
TYP 10
TH
S
TR
EE
T
FENCE
FENCE
200 LF OF
EXISTING FENCE
30'
30'
R=30'
TH
S
TR
EE
T
"F" STREET
OHP
FENCE
FUTURE PARKING
(NOT IN THIS CONTRACT)
FENCE
83.5'
95'
TYP 3
N 419744.90 E 8890438.29
N 419696.32 E 8890439.61
N 419484.84 E 419484.84
N 419498.55 E 8890906.71
N 419762.92 E 8890897.36
19'
178'
N 419599.72 E 8890798.71
N 419602.67 E 8890882.16
N 419507.73 E 8890885.52
N 419503.92 E 8890777.99
BUILDING LOCATION CONTROL POINTS
POINT # NORTHING EASTING ELEVATION
B1 B2
419621.67 8890859.53
419730.79 8890835.51
B1
B2
#501
#504
#502
#503
CONTROL POINT TABLE
POINT #
NORTHING
419781.24
419188.80
419144.34
419847.15
EASTING
8891097.84
8891130.96
8890705.98
8890353.47
ELEVATION
3423.76
3428.14
3424.43
3422.01
DESCRIPTION
APA_RPC
APA_H+MAG
APA_NLSPK
APA_NLSPK
18'
N 419722.34 E 8890812.30
N 419618.42 E 8890816.33
27'-3" X 13'-10"
27'-3" X 13'-10"
Digital Signature
JH
Amanda Thompson
X
X
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
O
H
P
O
H
P
O
H
P
O
H
P
O
H
P
O
H
P
O
H
P
O
H
P
O
H
P
O
H
P
O
H
P
O
H
P
O
H
P
O
H
P
O H
P
O H
P
O H
P
O H
P
O H
P
O H
P O
H P
O H
P O
H P
O
H
P
O
H
P
O
H
P
O
H
P
OHP
OHP
O
H
P
O
H
P
O
H
P
O H
P
O H
P
O H
P
O H
T
O H
T
O H
T
O H
T
O H
T
O H
T
O H
T
O H
T
T
T
T
T
T
T T
T T
T
T
T
T
T T
T T
T T
T
W
W
W
W
W
S S
S S
S S
W
W
W
CO
CO
M
M
CO
CO
CO
FILENAME: PLOT DATE: PLOT TIME:$PLOTDATE $PLOTTIME
J A
C O
B S
A
L
R
I G
H T
S
R
E S
E R
V E
D c
$PWPATH$PWURL
BAKER CITY FIRE GUARD CREW QUARTERS BUILDING
F I N
A L
P
R O
D U
C T
I O
N
D
O C
U M
E N
T S
FEBRUARY 2023
DRAWING NO.
SHEET OFDATE:
SCALE:DRAWN:
APPROVED
REVIEWED
DESIGNED
DIVISION OF OPERATIONS OREGON STATE OFFICE
UNITED STATES DEPARTMENT OF THE INTERIOR
BUREAU OF LAND MANAGEMENT
AS SHOWN
REV. NO. DESCRIPTION DATE APPROVED
DE
BLM CE/CET
AE OR BLM CE/CET
THINKALWAYS SAFETY
DSGN: CHK: APVD:
N
CIVIL
SITE GRADING PLAN
AT
JO
PR
C-102
AT
D3290113_C-102.dwg
0 40 80 120
1"=40'
SHEET KEYNOTES
1. LIMITS OF DISTURBANCE
2. FUTURE FOREST SERVICE BUILDING AND PARKING
(NOT IN CONTRACT)
3. DRAINAGE SWALE, SEE 3/C-503
4. INFILTRATION BASIN, SEE 2/C-503
5. 28' LONG CONCRETE ENCASED 12" WIDE TRENCH
DRAIN, SEE 7/C-503
GENERAL SHEET NOTES
A. FINISHED GRADE OF LANDSCAPED AREA DIRECTLY
OUTSIDE BUILDING TO BE 6" BELOW FINISHED
FLOOR ELEVATION, SLOPING AT A MINIMUM OF 5%
AWAY FROM BUILDING.
B. IN DISTURBED AREA NOT RECEIVING GRAVEL OR
CONCRETE SURFACING, TOPSOIL TO BE PLACED
ONLY. LANDSCAPING AND IRRIGATION BY OTHERS.
CONTRACTOR TO HYDROSEED SIDES OF
INFILTRATION BASIN PER 2/C-503 AND SIDES OF
SWALE PER 3/C-503.
C. SEE A-120A AND A-120B FOR DOWNSPOUT
LOCATIONS.
D. PROVIDE POSITIVE DRAINAGE TO ALL PROPOSED
LOW POINTS.
E
A
T
I
L
R
O
D
T
R
E
E
T
T
H
S
T R
E E
T
"F" STREET
"E " S
TREET
T
H
S
T R
E E
T
FUTURE FOREST
SERVICE BUILDING
(NOT IN THIS
CONTRACT)
2% M
IN
FFE :
3424.5
+ HP: 3
FUTURE PARKING (NOT
IN THIS CONTRACT)
T
H
S
T R
E E
T
3423.16
3424.0
3423.16
3423.32
3424.5
BOTTOM EL : 3
419.0
3424.2
3425.34
3423.75
3423.5
EDGE O
F G
RAVEL
= 3423.14, DAYLIG
HT TO TRENCH
DRAIN
IN
V. O
UT
3423.27
(FG = TOP
DRAIN)
EDGE O
F G
RAVEL
= 3421.39, DAYLIG
HT TO TRENCH
DRAIN IN
V. O
UT
3421.65
(FG = TOP
DRAIN)
Digital Signature
JH
Amanda Thompson
SS
W
W W W W W W W
W W
WCOSSCO
SS
M
W
M
CO
CO
SS
G
G
G G G G
CO
FILENAME: PLOT DATE: PLOT TIME:$PLOTDATE $PLOTTIME
JA
C
O
BS
0.
A
LL
R
IG
H
TS
R
ES
ER
VE
D c
$PWPATH$PWURL
BAKER CITY FIRE GUARD CREW QUARTERS BUILDING
FI
N
AL
P
R O
D U
C
TI
O N
D O
C U
M
EN
TS
FEBRUARY 2023 78
DRAWING NO.
SHEET OFDATE:
SCALE:DRAWN:
APPROVED
REVIEWED
DESIGNED
DIVISION OF OPERATIONS OREGON STATE OFFICE
UNITED STATES DEPARTMENT OF THE INTERIOR
BUREAU OF LAND MANAGEMENT
AS SHOWN
REV. NO. DESCRIPTION DATE APPROVED
DE
BLM CE/CET
AE OR BLM CE/CET
THINKALWAYS SAFETY
DSGN: CHK: APVD:
N
CIVIL
SITE UTILITIES PLAN
AT
JO
PR
C-103
AT
D3290113_C-103.dwg
0 40 80 120
1"=40'
SHEET KEYNOTES
1. SEWER STUB EXTENSION TO ROW (BY BAKER CITY)
2. 8" DI WATER MAIN AND CAPPED STUB (BY BAKER
CITY)
3. HYDRANT (BY BAKER CITY)
4. 2" COPPER WATER SERVICE
5. HOT TAP EXISTING 8" CI WATER MAIN (BY BAKER
CITY)
6. 4" PVC SANITARY SEWER SERVICE
7. SINGLE CLEANOUT, SEE 3/P-501
8. NATURAL GAS SERVICE PAID BY CONTRACTOR
AND INSTALLED BY CASCADE NATURAL GAS
COMPANY, SEE P-102A FOR LOCATION OF METER
9. WATER SERVICE STUB FOR FUTURE TRUCK FILL
STATION (BY BAKER CITY)
10. NOT USED
11. 2" IRRIGATION WATER SERVICE BUILDING STUBOUT
WITH IRRIGATION VALVE BOX, SEE 5/C-502
12. CAP SANITARY SEWER SERVICE FOR FUTURE
EXTENSION
13. NOT USED
14. NOT USED
15. GREASE INTERCEPTOR, SEE 1/C-502
16. 1" RV PARKING SPACES WATER SERVICE BUILDING
STUBOUT WITH IRRIGATION BOX, SEE 5/C-502
17. ELECTRICAL VAULT, SEE E-100
GENERAL SHEET NOTES
A. FOR UTILITY TRENCHING INFORMATION, SEE
6/C-502.
B. SEE E-100 FOR ELECTRICAL INFORMATION.
C. MAINTAIN 10' HORIZONTAL AND 18" VERTICAL
SEPARATION BETWEEN POTABLE AND
NON-POTABLE PIPES.
D. MAINTAIN A MINIMUM OF 10' BETWEEN BUILDING
FOOTING AND NEAREST UTILITY.
E. UTILITY MAIN AND SERVICE INSTALLATION TO
CONFORM TO BAKER CITY STANDARD
SPECIFICATIONS AND DETAILS. IF A CONFLICT
EXISTS BETWEEN THESE DRAWINGS AND THE
CITY'S, INFORM THE CONTRACTING OFFICER.
F. CONTRACTOR WILL APPLY AND PAY FOR WATER
MAIN EXTENSION, WATER SERVICES, AND METERS.
BAKER CITY WILL INSTALL THE WATER MAIN AND
CAPPED STUBOUT, HYDRANT, WATER SERVICES
AND WATER METERS WITHIN THE ROW.
CONTRACTOR TO INSTALL WATER SERVICES
DOWNSTREAM OF THE METERS TO THE BUILDING.
G. CONTRACTOR WILL APPLY AND PAY FOR SANITARY
SEWER SERVICE STUBOUT. BAKER CITY WILL
INSTALL SANITARY SEWER SERVICE STUBOUT TO
ROW.
H. CONTRACTOR WILL APPLY AND PAY FOR NATURAL
GAS SERVICE LINE. CASCADE NATURAL GAS
COMPANY WILL INSTALL NATURAL GAS SERVICE
LINE AND SET THE METER.
EAST RAILRO
AD STREET
TH
S
TR
EE
T
"F" STREET
"E" STREET
TH
S
TR
EE
T
TH
S
TR
EE
T
FUTURE FOREST
SERVICE BUILDING
(NOT IN THIS
CONTRACT)
FUTURE PARKING (NOT
IN THIS CONTRACT)
EXST SSMH B14
RIM EL:3422.84
INV OUT (N):3416.10
INV IN (SE):3416.20
GREASE INTERCEPTOR
RIM EL: 3422.25
INV IN (S): 3417.55
INV OUT (N): 3417.45
168 LF @ 1.36%
ASSUMED SS
INV: 3416.5
28.5 LF @ 11.93%
SS INV: 3418.2
SS INV: 3421.6
SS INV: 3417.11
33 LF
646.5 LF @ 2%
6 52.5 LF @ 7.71%
SS INV: 3421.60
SHEET KEYNOTES
18. 2" WATER METER (BY BAKER CITY)
19. 3" COPPER WATER LINE
20. 2.5" COPPER WATER SERVICE
21. POST INDICATOR VALVE, SEE 8/C-502
22. FIRE DEPARTMENT CONNECTION, SEE 7/C-502
23. COMMUNICATION HANDHOLE, SEE E-100
24. ELECTRICAL SPLICE BOX, SEE E-100
SS INV: 3419.39
Digital Signature
JH
Amanda Thompson
C
O
BS
0.
A
LL
R
IG
H
TS
R
ES
ER
VE
D c
$PWPATH$PWURL
BAKER CITY FIRE GUARD CREW QUARTERS BUILDING
FI
N
AL
P
R O
D U
C
TI
O N
D O
C U
M
EN
TS
FEBRUARY 2023 78
DRAWING NO.
SHEET OFDATE:
SCALE:DRAWN:
APPROVED
REVIEWED
DESIGNED
DIVISION OF OPERATIONS OREGON STATE OFFICE
UNITED STATES DEPARTMENT OF THE INTERIOR
BUREAU OF LAND MANAGEMENT
AS SHOWN
REV. NO. DESCRIPTION DATE APPROVED
DE
BLM CE/CET
AE OR BLM CE/CET
THINKALWAYS SAFETY
DSGN: CHK: APVD:
CIVIL
DETAILS - 1
AT
JO
PR
C-501
AT
D3290113_C-501.dwg
TYPICAL SIDEWALK
NTS
1. FINISH GRADE 1"
BELOW TOP OF
CONCRETE
2. 4" BASE COURSE
3. PREPARED
SUBGRADE
4. WIDTH AS NOTED
ON PLANS
5. NOT USED
6. 4" CONCRETE
KEYED NOTES:
2:1 MAX SLOPE
2:1 MAX SLOPE
4" M
IN
4" M
IN
6"
TYP
1.0'
MIN
SLOPE 1/4"/FT
OR AS SHOWN
1:1, TYP
TYPICAL SECTION (DETACHED FROM BLDG)
A. PROVIDE 1/2" PJF AT ALL INTERFACES WITH EXISTING
STRUCTURES, PCCP AND CONC PADS
B. SIDEWALK MUST CONFORM TO ADA DESIGN REQUIREMENTS
NOTES:
FINISH GRADE
GRAVEL SURFACING
BASE COURSE
PREPARED SUBGRADE
1.
2.
3.
4.
2"
KEYED NOTES:
GRAVEL SURFACING
NTS
6"
A. PROVIDE CONCRETE STOOP THE GREATER OF: 1'-0" WIDER THAN
THE WIDTH OF THE DOOR, OR AS INDICATED ON C-101.
B. PROVIDE THICKENED EDGE ON ALL SIDES OF STOOP.
C. AT BUILDING INTERFACE PROVIDE 1/2" EXPANSION JOINT
CONSISTING OF PREFORMED JOINT MATERIAL AND HOT-POURED
JOINT SEALANT OR SILICONE SEALER.
NOTES:
6" 8" 6"
5' TYP
4" M
IN
4" 4"
2% MAX
1% MIN
2%
1/ 4"
M
IN
1/ 3"
M
AX
1/ 4"
M
AX
1'
1/2" R
TYPICAL CONCRETE STOOP
NTS
1. FINISH GRADE
2. AGGREGATE BASE
COURSE
3. PREPARED SUBGRADE
4. FACILITY FF
5. STOOP-FF INTERFACE,
SEE NOTE C
6. CONCRETE
KEYED NOTES:
SILT FENCE
NTS
NOTES:
ELEVATION
SECTION
BURY BOTTOM OF FILTER FABRIC 6" VERTICALLY BELOW FINISHED GRADE.
2"x4" DOUGLAS FIR OR STEEL FENCE POSTS.
STITCHED LOOPS TO BE INSTALLED DOWNHILL SIDE OF SLOPE.
COMPACT ALL AREAS OF FILTER FABRIC TRENCH.
A.
B.
C.
D.
6"
5' -0
6" 2'
-6
6' MAXIMUM SPACING
5' -0
2' -6
2'
-6
6" 6"
1.
2.
3.
4.
5.
USE STITCHED LOOPS
OVER 2"X4" POSTS
PROVIDE BASE COURSE
BACKFILL IN TRENCH
FILTER FABRIC MATERIAL
NEWLY GRADED OR
DISTURBED SLOPE
FILTER FABRIC MATERIAL
36" WIDE ROLLS
KEYED NOTES:1
ADA SIGN AND MOUNTING
NTS
1' -6
TYP
3" MIN
3" M
IN
1'-0"
A.
B.
C.
1.
2.
3.
4.
5.
6.
MOUNTING BRACKET
MOUNTING BRACKET
FOR SIGN WORDING LAYOUT
SEE SIGN DETAIL, RIGHT;
MATERIAL TO BE PER LOCAL
CITY AND/OR STATE CODE.
2" ID (2 3/8" OD) GALVANIZED
WELDED STEEL PIPE
EXISTING PARKING SPACE
CONCRETE BACKFILL
SIGN, 0.080" THICK ALUMINUM
18" SQUARE WITH 3/4" RADIUS
CORNERS
NOTES:
3' -0
5 ALL HOLES TO BE 9/16" DIAMETER FOR 1/2" BOLTS.
ALL MATERIAL TO BE HOT-DIP GALVANIZED AFTER
FABRICATION.
USE MOUNTING BRACKET NO. THDW-105 OR
APPROVED EQUAL
KEYED NOTES:
VAN
ACCESSIBLE
R7-8
RESERVED
PARKING
R7-8P
ADA SIGN DETAIL
ADA PARKING SPACE
NTS
1. SIGN CENTERED ON
STALL, SEE DETAIL 5,
THIS SHEET
2. 4" WIDE, WHITE
PAVEMENT MARKING
3. ACCESSIBLE SYMBOL
PAVEMENT MARKING,
PER MUTCD FIGURE
3B-22
4. CONCRETE
WHEELSTOP
5. CONCRETE JOINT
5'9'
KEYED NOTES:
2'
NOTES:
1. TRAFFIC PAINT IN ACCORDANCE WITH AASHTO M248, TYPE S.
2. HOMOGENEOUS, EASILY STIRRED TO SMOOTH CONSISTENCE, WITH NO
HARD SETTLEMENT OR OTHER OBJECTIONABLE CHARACTERISTICS
DURING STORAGE PERIOD.
3. ALLOW A MINIMUM CURE TIME OF 30 DAYS BEFORE CLEANING AND
MARKING.
4. THOROUGHLY CLEAN SURFACES TO BE MARKED BEFORE APPLICATION
OF PAVEMENT MARKING MATERIAL.
5. APPLY WHEN AIR TEMPERATURES ARE ABOVE 40 DEGREES AND BELOW
90 DEGREES F. APPLY WHEN SURFACE IS DRY, USE TEMPLATES TO
CONTROL PAINT APPLICATIONS OF SYMBOLS. DO NOT APPLY IN WINDY
CONDITIONS TO AVOID FUZZY LINES AND OVERSPRAYING.
6. PROTECT MARKINGS FROM TRAFFIC UNTIL PAINT IS THOROUGHLY DRY.
7. REMOVE PAINT SPLATTERS, SPILLS OR DRIPS FROM THE WORK AND
ANY PLACE SPILLS HAVE OCCURRED.
CREOSOTE TREATED RAILROAD TIE
NTS
9"
4" 4"
STOP L=6'-0"
CONCRETE
PAVEMENT
" M
IN
6"
3"R
2" R
1/2" DIA. STEEL
ANCHOR ROD, 18"
LONG, 2 PER STOP
TYPICAL CONCRETE WHEELSTOP
7"
4"
1. 7-IN x 9-IN x 8 FT
CREOSTORE RAILROAD
TIE
2. COMPACTED
AGGREGATE BASE
COURSE
3. DRILLED HOLE
THROUGH RAILROAD
TIE WITH 18" LONG #5
REBAR DRIVEN
THROUGH AND FLUSH
WITH TOP
4. SUBGRADE
5. GRAVEL PARKING
AREA SURFACING
KEYED NOTES:
4"
PRECAST
CONCRETE
WHEELSTOP
Digital Signature
JH
Amanda Thompson
J A
C O
G
H T
S
R
E S
E R
V E
D c
$PWPATH$PWURL
BAKER CITY FIRE GUARD CREW QUARTERS BUILDING
F I N
A L
P
R O
D U
C T
I O
N
D
O C
U M
E N
T S
FEBRUARY 2023
DRAWING NO.
SHEET OFDATE:
SCALE:DRAWN:
APPROVED
REVIEWED
DESIGNED
DIVISION OF OPERATIONS OREGON STATE OFFICE
UNITED STATES DEPARTMENT OF THE INTERIOR
BUREAU OF LAND MANAGEMENT
AS SHOWN
REV. NO. DESCRIPTION DATE APPROVED
DE
BLM CE/CET
AE OR BLM CE/CET
THINKALWAYS SAFETY
DSGN: CHK: APVD:
CIVIL
DETAILS - 2
AT
JO
PR
C-502
AT
D3290113_C-502.dwg
INVERT
ELEVATION SECTION
PLAN VIEW
INLET
(COVERS NOT SHOWN)
INVERT
OUTLET
GREASE INTERCEPTOR
NTS
1000 GALLON
4'-7 1/8"
1. 24" DIA CAST IRON RING AND
COVER WITH GASKET, 2 TOTAL
2. PRECAST 2", 4" OR 6" GRADE
RINGS, AS REQUIRED
3. 3" PIPE AND FITTINGS
STANDARD
4. 24" DIA ACCESS OPENINGS
5. 12" BASE COURSE
6. PREPARED SUBGRADE
7. OPEN TOP TEE
8. PROVIDE MINIMUM 5" GAP TO
ALLOW FOR AIR EXCHANGE
KEYED NOTES:
NOT USED
NTS
NOT USED
NTS
NOT USED
NTS
IRRIGATION VALVE BOX DETAIL
NTS
M
I N
1. 1' X 2' FIBERGLASS IRRIGATION
BOX W/LID
2. PIPE PLUG AND CAP
3. FACE OF BUILDING
4. PIPE STUBOUT
KEYED NOTES:
MIN WIDTH
PIPE ZONE
PIPE OD+1'-6"
DEPTH OF
COVER
12" MIN
PIPE OUTSIDE
DIAMETER
TYPICAL TRENCH
NTS
1. NEW SURFACING, OR
SURFACE RESTORATION,
SEE NOTE
2. TRENCH BACKFILL ABOVE
PIPE ZONE
3. PIPE BEDDING MATERIAL
4. TRENCH STABILIZATION
WHERE REQD
5. MARKING TAPE AS
SPECIFIED
KEYED NOTES:
1. FOR GRAVEL SURFACING, SEE 2/C-501. FOR ASPHALT SURFACING,
SEE 7/C-501. WIDTH OF SURFACE TO BE 2' WIDER THAN TRENCH
WIDTH (1' EITHER SIDE OF TRENCH)
NOTE:
SUPPLY TO SYSTEM
CONCRETE THRUST
BLOCK, SEE
GATE VALVE, MATCH
SUPPLY LINE SIZE
INDICATOR POST
FINISH GRADE
EXTENSION, AS REQUIRED
WINDOW
MASTIC COATED REBAR
WITH ANCHOR HOOKS
POST INDICATOR VAVLE
NTS
C
L
3'-0"
MIN
AUTO BALL DRIP
PIPING DIAGRAM
ELEVATION
FINISHED
GRADE
TO BUILDING
FIRE PROTECTION
SYSTEM
SLOPE TO AUTO
BALL DRIP
ONE CUBIC YARD OF
WASHED GRAVEL
SURROUND WITH
DUPONT "TYPAR"
OR EQUAL
4'-0"
MIN
ELEVATION
ABOVE FINISHED
GRADE PER
MANUFACTURER
FINISHED
GRADE
BRASS CAP
AND CHAIN
FREE STANDING FIRE
DEPARTMENT INLET
CONNECTION
FIRE DEPARTMENT CONNECTION
NTS
5' MIN
Digital Signature
JH
Amanda Thompson
C
O
BS
0.
A
LL
R
IG
H
TS
R
ES
ER
VE
D c
$PWPATH$PWURL
BAKER CITY FIRE GUARD CREW QUARTERS BUILDING
FI
N
AL
P
R O
D U
C
TI
O N
D O
C U
M
EN
TS
FEBRUARY 2023 78
DRAWING NO.
SHEET OFDATE:
SCALE:DRAWN:
APPROVED
REVIEWED
DESIGNED
DIVISION OF OPERATIONS OREGON STATE OFFICE
UNITED STATES DEPARTMENT OF THE INTERIOR
BUREAU OF LAND MANAGEMENT
AS SHOWN
REV. NO. DESCRIPTION DATE APPROVED
DE
BLM CE/CET
AE OR BLM CE/CET
THINKALWAYS SAFETY
DSGN: CHK: APVD:
CIVIL
DETAILS - 3
AT
JO
PR
C-503
AT
D3290113_C-503.dwg
PLAN
ELEVATION
2"
1'
2"
2'
1/
2" 3"
PRECAST CONCRETE
SPLASH BLOCK
6" 3"
1" M
IN
1" M
IN
SPLASH BLOCK
NTS
VA
R
IE
S
U P
TO
4" OF TOPSOIL
COMPACTED
SUBGRADE
DRAINAGE SWALE
NTS
MAX 2
1.
2.
3.
4.
5.
ADDITIONAL GRAVEL SHALL
BE ADDED PERIODICALLY
TO MAINTAIN PROPER
FUNCTION OF THE PAD.
REMOVE GRAVEL
ENTRANCE AND REPLACE
WITH NEW BASE COURSE
PRIOR TO COMPLETION
OF ACCESS ROAD.
A.
B.
50' MIN
EXISTING PAVEMENT
OR APPROVED
ACCESS POINT.
25' R, MIN.
CLEAN PIT RUN OR
2 1/2" MINUS GRAVEL
(OR LARGER IF
REQUIRED), 8" MINIMUM
THICKNESS
GEOTEXTILE.
FREE DRAINING EXCAVATED
MATERIAL, 4" MINIMUM THICKNESS.
NOTES:
2 3
STABILIZED CONSTRUCTION ENTRANCE
NTS
CHAIN LINK FENCE AND DOUBLE SWING GATE
NTS 6
CONCRETE PAVEMENT DETAIL
NTS
BASE COURSE
SE
E
N O
TE
NOTES:
4"
PREPARED
SUBGRADE
1.
2.
3.
4.
5.
CONTRACTION JOINT (1/4") SHALL BE MADE, CLEANED WITH
COMPRESSED AIR, AND FILLED WITH SIKAFLEX 1A ELASTOMERIC
SEALANT OR APPROVED EQUAL.
CONCRETE JOINT SPACING, SEE 6/C-501.
INSTALL 1/2" PREMOLDED JOINT FILLER FULL DEPTH WHERE
CONCRETE PAVEMENT ABUTS CONCRETE CURB, BUILDING OR
ANY RIGID STRUCTURE.
PROVIDE A 12" THICK BY 18" WIDE THICKENED EDGE AROUND
PERIMETER OF SLAB.
TRANSITION THICKENED EDGE TO NORMAL 6" THICKNESS IN 18".
CONCRETE SLAB
ON GRADE
CONTRACTION JOINT,
SEE NOTE 1 AND 2
6"
BRACE
2' -1
0" M
IN
2"
LINE POST
TRUSS ROD
2" M
IN
2' -1
0"
10'-0"10'-0" MAX
2"
LINE POST CONNECTION TOP RAIL CONNECTION
NOTES:
TYPICAL CORNER POST
TYPICAL PULL POST
16" DIA CONC
CORNER BASE
STRETCHER
BAR, TYP
CORNER
POST, TYP
NO. 9 GALV
WIRE CLIP
SPACE 24" MAX
9" DIA CONC
BASE, TYP
NO. 9 GALV
WIRE CLIP
SPACE 12" MAX
BOTTOM TIE
TO BE 10" MAX
ABOVE GROUND
TENSION
WIRE NO. 7
9" DIA CONC
BASE, TYP M
IN
TY
P
M
IN
TY
P
STRETCHER
BANDS, TYP
MAX POST
SPACING
3 STRANDS
BARBED WIRETOP RAIL
TOP RAIL
3 STRANDS
BARBED WIRE 2" CHAIN LINK FABRIC
TENSION WIRE
3/8 " TRUSS
ROD ASSEMBLY
LINE
POST
PULL POST
16" DIA CONC
PULL BASE
BRACE AND TRUSS
ROD REQUIRED AT
GATES AND SIDE
OF ALL CORNER
POSTS.
FABRIC ATTACHED
TO OUTSIDE OF
POSTS.
1.
2.
2" CHAIN LINK FABRIC
C
LE
AR
1/ 2"
2" M
IN
ROAD MATERIAL
WIDTH
2' -1
0"TENSION WIRE2"
WIDTH/2, TYP
SEE PLANS
FINISH GRADE
STRETCHER
BAR BANDS
3/8"
TRUSS ROD
ASSEMBLY,
TYP
STRETCHER BAR
12"x12" SQx18" DEEP
CONCRETE STOP
WITH HOLE FOR
PLUNGER BAR
M
IN
TY
P
BRACE, TYP
2" CHAIN
LINK FABRIC
PLUNGER BAR TYPE LOCKABLE LATCH
W/ CENTER STOP SET IN CONCRETE
16" DIA
CONCRETE, TYP
GATE
POST, TYP
3 STRANDS
BARBED WIRE
INFILTRATION BASIN
NTS
NOTE:
SPLASH BLOCKS TO BE PLACED AT EACH
DOWNSPOUT AS SHOWN ON A-120A AND A-120B.
12" TRENCH DRAIN
NTS
SUBGRADE
TOP OF INFILTRATION BASIN
STORAGE VOLUME,
ELEV. = 3421
TOP OF INFILTRATION BASIN BERM,
ELEV. = 3422
INFILTRATION BASIN BOTTOM, ELEV. = 3419
SCARIFY SOIL AT BASIN BOTTOM TO A
DEPTH OF 4" AND LEAVE UNCOMPACTED.
INFILTRATION BASIN VOLUME
= 8,746 CF
HYDROSEED SIDE SLOPES FOR
FINAL SOIL STABILIZATION
HYDROSEED SIDE SLOPES FOR
FINAL SOIL STABILIZATION
#4 @ 12" EW AT
2" CLR FROM
TOP SURFACE
CONCRETE ENCASED
1. COMPACTED SUBGRADE
2. GRAVEL SURFACE COURSE
3. 4500 PSI CAST-IN-PLACE
CONCRETE
4. 3/4" R, TYP
5. #4 U-BAR @ 12" OC
6. #4 EA SIDE
7. (3) #4
8. #4 REBAR REBAR STAKES FOR
TRENCH DRAIN INSTALLATION
9. GRATED TRENCH DRAIN SYSTEM
9 4
3" C
LR
2" CLR
NOTES:
6"
6"
TYP 2"
C
LR
1. SEE S-001 FOR CONCRETE REINFORCING AND CAST-IN-PLACE CONCRETE NOTES.
2. GRATED TRENCH DRAIN WILL BE ZURN Z882 12 WIDE REVEAL TRENCH DRAIN
SYSTEM WITH STEEL FRAME AND D.I. SLOTTED GRATE OR APPROVED EQUAL.
REFER TO TABLE FOR ZURN NUMBER.
3. CONTRACTOR TO FIELD CUT TRENCH DRAIN COMPONENTS ON THE DOWNSTREAM
SECTION TO ACHIEVE LENGTH INDICATED ON C-101.
4. INSTALL TRENCH DRAIN SYSTEM IN ACCORDANCE WITH MANUFACTURE'S
INSTRUCTIONS.
TRENCH DRAIN
LOCATION
ZURN TRENCH
NO.
SHALLOW INVERT
DEPTH (IN)
DEEP INVERT
DEPTH (IN)
LENGTH
(FT)
SOUTHERN
NORTHERN
8203N 9.25 9.25 8 8203N 9.25 9.25 8
ZURN Z882 TRENCH NO. FOR PROJECT BY LOCATION
UPSTREAM
I.E.
3422.50
DOWNSTREAM
I.E.
3422.36
3420.88 3420.60
MAX 2
Digital Signature
JH
Amanda Thompson
C
O
BS
0.
A
LL
R
IG
H
TS
R
ES
ER
VE
D c
$PWPATH$PWURL
BAKER CITY FIRE GUARD CREW QUARTERS BUILDING
FI
N
AL
P
R O
D U
C
TI
O N
D O
C U
M
EN
TS
FEBRUARY 2023 78
DRAWING NO.
SHEET OFDATE:
SCALE:DRAWN:
APPROVED
REVIEWED
DESIGNED
DIVISION OF OPERATIONS OREGON STATE OFFICE
UNITED STATES DEPARTMENT OF THE INTERIOR
BUREAU OF LAND MANAGEMENT
AS SHOWN
REV. NO. DESCRIPTION DATE APPROVED
DE
BLM CE/CET
AE OR BLM CE/CET
THINKALWAYS SAFETY
DSGN: CHK: APVD:
ARCHITECTURAL
LEGEND & ABBREVIATIONS
JR
KB
AP
A-001
JH
D3290113_A-001.dwg
SHEET NOTE:
THIS IS A STANDARD LEGEND SHEET: THEREFORE, NOT ALL OF
THE INFORMATION SHOWN MAY BE USED ON THIS PROJECT.
1.
2.
3.
4.
5.
6.
7.
8.
CONCRETE
METAL STUD WALL (PLAN)
GYPSUM WALLBOARD
RIGID INSULATION
BATT INSULATION
ACOUSTICAL TILE
PLYWOOD
WOOD, ROUGH NON-CONTINUOUS
WOOD, ROUGH CONTINUOUS
WOOD, FINISHED
GROUT
GRANULAR FILL
EARTH OR FINISH GRADE
SYMBOL LEGEND
INDICATES PAIR OF DOORS
OR
DIRECTION OF SLOPE DOWN
OR
A
XX101 ROOM IDENTIFIER
DOOR IDENTIFIER
WINDOW IDENTIFIER
LOUVER IDENTIFIER
A E
B
C
D
XX-A-301
XXL-1 L-1
INTERIOR ELEVATION INDICATOR
A
S-1 SIGNAGE IDENTIFIER
WALL TYPE INDICATOR
DOOR LETTER
ROOM NUMBER
HINGE SIDE
INACTIVEACTIVE
QUANTITY AND
DIRECTION OF
POINTERS AS
REQUIRED
"XX" = FACILITY
INDICATOR
(IF SHOWN)
XX
1A
ROOM NAMEROOM NAME
SYMBOL LEGEND
HATCH SWING INDICATOR
XX
1A
(DOOR # ON ACTIVE)
GRID / COLUMN INDICATOR
9.
SYMBOL LEGEND
UNLESS OTHERWISE INDICATED, PLAN DIMENSIONS ARE TO COLUMN GRID ON CENTERLINES, NOMINAL SURFACE OF MASONRY, FACE OF
STUDS AND FACE OF CONCRETE WALLS.
"FLOOR LINE" REFERS TO TOP OF CONCRETE SLABS. FINISH FLOORING IS INSTALLED ABOVE THE FLOOR LINE. FOR DEPRESSED FLOORS
AND CURBS, SEE STRUCTURAL DRAWINGS.
REPETITIVE FEATURES ARE NOT DRAWN IN THEIR ENTIRETY AND SHALL BE COMPLETELY PROVIDED AS IF DRAWN IN FULL.
WHERE DOOR OR WINDOW IS LOCATED NEAR CORNER OF ROOM AND IS NOT LOCATED BY DIMENSION ON PLAN OR DETAILS, DIMENSION SHALL BE 3-INCHES
FROM FACE OF STUD (WALL) TO FACE OF ROUGH OPENING.
LINE OF EXISTING GRADES, AS SHOWN ON THE BUILDING ELEVATIONS AND SECTIONS ARE APPROXIMATE. THEY ARE AT THE BUILDING FACE, OR
ON THE SECTION END EXCEPT AS NOTED.
VERIFY ALL ROUGH-IN DIMENSIONS FOR EQUIPMENT PROVIDED IN THIS CONTRACT, OR BY OTHERS.
REFER TO ARCHITECTURAL, STRUCTURAL, MECHANICAL, ELECTRICAL AND OTHER CATEGORIES OR DRAWINGS FOR ADDITIONAL NOTES.
10.
11.
12.
VERIFY SIZE AND LOCATION OF, AND PROVIDE: REQUIRED OPENINGS THROUGH FLOORS AND WALLS, ACCESS DOORS, FURRING, CURBS, ANCHORS AND INSERTS. PROVIDE ALL BASES AND BLOCKING REQUIRED FOR ACCESSORIES, MECHANICAL, ELECTRICAL AND OTHER EQUIPMENT.
FOR DOOR AND HARDWARE DESCRIPTIONS SEE SPECIFICATION SECTION 08 11 00, 08 14 00 and 08 71 00.
FOR DOOR SCHEDULE SEE DRAWING A-601.
NIC MEANS "NOT IN CONTRACT".
VERIFY ACTUAL REQUIRED CLEAR DISTANCES FOR ALL FIXTURES AND EQUIPMENT PRIOR TO CONSTRUCTION.
ARCH/STRUCT MATERIAL SYMBOLS ARCHITECTURAL/STRUCTURAL LEGEND
GENERAL ARCHITECTURAL NOTES
ARCHITECTURAL WALL TYPES
W1
ALL WALLS FULL HEIGHT UNLESS NOTED AS SIM.
A
5/8" GYPSUM SHEATHING
STAGGERED WOOD
STUDS PER STRUCTURAL
ZIP R-12 SHEATHING
(2 1/2" ASSEMBLY)
R-13 BATT
INSULATION
C1
5/8" GYPSUM SHEATHING
2X4 WOOD
STUDS @ 16" OC
R-13 BATT INSULATION
5/8" GYPSUM SHEATHING EACH SIDE.
AT SIM GYPSUM BACKER BOARD & TILE
ONE SIDE
2 LAYERS OF 5/8"
GYPSUM SHEATHING
2X4 WOOD
STUDS @ 16" OC
R-13 BATT INSULATION
CEMENTITIOUS LAP SIDING
D
5/8" GYPSUM SHEATHING EACH SIDE
2X6 WOOD
STUDS @ 16" OC
R-19 BATT INSULATION
SHEATHING,
SEE STRUCTURAL
1 HOUR
UL - U419
1/2" RESILIENT
CHANNEL AT 16" O.C.
2x8 TOP AND BOTTOM
PLATE
B
TYPE 'X' GYPSUM BOARD AT RATED ASSEMBLIES
E
5/8" GYPSUM BACKER
BOARD & TILE
STAGGERED WOOD
STUDS PER STRUCTURAL
ZIP R-12 SHEATHING
(2 1/2" ASSEMBLY)
R-13 BATT
INSULATION
CEMENTITIOUS LAP SIDING
SHEATHING,
SEE STRUCTURAL
1/2" RESILIENT
CHANNEL AT 16" O.C.
2x8 TOP AND BOTTOM
PLATE
5/8" GYPSUM BACKER BOARD
& TILE EACH SIDE
2X4 WOOD
STUDS @ 16" OC
R-13 BATT INSULATION
F
G
2X6 WOOD
STUDS @ 16" OC
R-19 BATT INSULATION
5/8" GYPSUM BACKER BOARD
& TILE EACH SIDE
H1
2X4 WOOD
STUDS @ 16" OC
R-13 BATT INSULATION
2 LAYERS OF 5/8"
GYPSUM SHEATHING
5/8" GYPSUM BACKER BOARD
& TILE
1 HOUR
UL - U419
Anastasia Perrigo
2023.02.14 20:21:41-08'00'
John Reseigh
Anastasia Perrigo
AR
D R
O
BE
W
AR
D R
O
BE
W
AR
D R
O
BE
W
AR
D R
O
BE
W
AR
D R
O
BE
W
AR
D R
O
BE
W
AR
D R
O
BE
W
AR
D R
O
BE
W
AR
D R
O
BE
SHWRSHWR
WC WC
LA
V
LA
V
W
AR
D R
O
BE
SHWR
WC
LA
V
ADA
SHWR
LA
V
WC
ADA
SIDE
REFREF
RANGERANGE
DW DW
D D
W W
WH
FURN
FURN
FURN
MOP
SINK
SNK
SNK
48X30
CRAWL
ACCESS
ICE
MKR
FILENAME: PLOT DATE: PLOT TIME:$PLOTDATE $PLOTTIME
JA
C
O
BS
0.
A
LL
R
IG
H
TS
R
ES
ER
VE
D c
$PWPATH$PWURL
BAKER CITY FIRE GUARD CREW QUARTERS BUILDING
FI
N
AL
P
R O
D U
C
TI
O N
D O
C U
M
EN
TS
FEBRUARY 2023 78
DRAWING NO.
SHEET OFDATE:
SCALE:DRAWN:
APPROVED
REVIEWED
DESIGNED
DIVISION OF OPERATIONS OREGON STATE OFFICE
UNITED STATES DEPARTMENT OF THE INTERIOR
BUREAU OF LAND MANAGEMENT
AS SHOWN
REV. NO. DESCRIPTION DATE APPROVED
DE
BLM CE/CET
AE OR BLM CE/CET
THINKALWAYS SAFETY
DSGN: CHK: APVD:
ARCHITECTURAL
LIFE SAFETY PLAN
JR
KB
AP
A-002
JH
D3290113_A-002.dwg
KITCHEN
STORAGE
LAUNDRY
MUDROOM
LIVING ROOM
DINING
MECH
BEDROOM
H.C. R/R
N
LIFE SAFETY PLAN
NTS
X"
X'
EGRESS WIDTH (IN INCHES)
TRAVEL DISTANCE (X = TOTAL
DISTANCE TO EXIT IN FEET)
LEGEND
X'
COMMON PATH OF TRAVEL
(CPT)
DIRECTIONAL EXIT LIGHT,
TWO SIDED
CODE ANALYSIS (2019 OREGON STRUCTURAL SPECIALTY CODE)
OCCUPANCY:
R-3 RESIDENTIAL
CONSTRUCTION TYPE: V-B
ALLOWABLE HEIGHT:
R-3 = (13R SPRINKLER) = 60 FEET
ALLOWABLE AREA:
R-3 = (13R SPRINKLER) = UNLIMITED
OCCUPANCT LOAD:
R-3 = 1/200 GROSS
3,519/200 = 18.24 (19 OCCUPANTS)
EGRESS REQ = 19 x .2 = 3.8 INCHES
EGRESS PROVIDED = 3 @ 36 INCHES
COMMON PATH OF TRAVEL:
R-3 (13R SPRINKLER) = 125 FEET
RESTROOMS:
OCCUPANT LOAD = 19
REQUIRED:
R-3:
WC = 1/10 = 1M/1F
LAV = 1/8 = 2M/2F
PROVIDED:
R-3
WC = 4
LAV = 4
4 SHOWERS
1 ADA KITCHEN SINK
1 SERVICE SINK
ACTUAL HEIGHT: 16 FEET
ACTUAL AREA: 3,648 SF
WALL & CEILING FINISHES:
R-3 = CLASS C
FLAME SPREAD = 76-200
SMOKE INDEX = 0-450
FIRE SPRINKLER SYSTEM = 13R
EXITS REQUIRED = 2
EXITS PROVIDED = 3
MAXIMUM TRAVEL DISTANCE: 250 FEET
R-3 SEPARATION REQUIREMENTS:
WALLS - FIRE PARTITIONS: 1 HOUR
USING ICC 721.1 - ITEM 14-1.3
FLOOR/CEILING ASSEMBLY: 1 HOUR
USING ICC 721.1 - ITEM 21-1.1
R-3 1-HOUR OCCUPANCY
SEPARATION WALL
R
RATED DOOR ASSEMBLY
BEDROOM
R/R
BEDROOM
BEDROOM
BEDROOM
BEDROOM
HALLWAY
BEDROOM
BEDROOM
BEDROOM
BEDROOM
R/R
R/R
JANITOR
ELEC
59'
IBC TABLE 1017.2
SRC SEMI-RECESSED FIRE
EXTINGUISHER CABINET;
10 LB ABC
SRC
SRC
E1
E2
E3
E1=42' E2=73'
CPT=26'
E1=106' E2=80' E3=43'
CPT=15'
R
R
R
R
R
R
R
RRR
1 HOUR RATED
CEILING ( 2 LAYERS OF
GYPSUM BOARD)
1 HOUR RATED FLOOR -
INTUMESCENT PAINT ON
JOISTS AND SUBFLOOR AND
SUPPORTING PONY WALL
NOTE:
· SEE DETAILS 8/A502 AND 11/A502 FOR
PENETRATION DETAILS IN RATED WALLS
AT SLEEPING ROOMS
· SEE DETAIL 6/A502 FOR TYPICAL
FLOOR/ROOF-CEILING ASSEMBLY SECTION
Anastasia Perrigo
2023.02.15 09:36:14-08'00'
John Reseigh
C
O
BS
0.
A
LL
R
IG
H
TS
R
ES
ER
VE
D c
$PWPATH$PWURL
BAKER CITY FIRE GUARD CREW QUARTERS BUILDING
FI
N
AL
P
R O
D U
C
TI
O N
D O
C U
M
EN
TS
FEBRUARY 2023 78
DRAWING NO.
SHEET OFDATE:
SCALE:DRAWN:
APPROVED
REVIEWED
DESIGNED
DIVISION OF OPERATIONS OREGON STATE OFFICE
UNITED STATES DEPARTMENT OF THE INTERIOR
BUREAU OF LAND MANAGEMENT
AS SHOWN
REV. NO. DESCRIPTION DATE APPROVED
DE
BLM CE/CET
AE OR BLM CE/CET
THINKALWAYS SAFETY
DSGN: CHK: APVD:
AREA A
FLOOR PLAN - AREA A
1/4" = 1'-0"
ARCHITECTURAL
FLOOR PLAN - AREA A
JR
KB
AP
A-101A
JH
D3290113_A-101A.dwg
KITCHEN
STORAGE
LAUNDRY
MUDROOM
LIVING ROOM
DINING
MECH
BEDROOM
A-301
0A
2A
3A
1A
1A
2A
120A
H.C. R/R
4A
8A
119A
M
AT
C H
LI
N
E A-
1B
M
AT
C H
LI
N
E A-
1B
52'-1"
'-0
'-4
A B
A-301
GENERAL NOTES
A. FOR GENERAL ARCHITECTURAL NOTES, MATERIAL
SYMBOLS, LEGENDS AND WALL TYPES, SEE
DRAWING A-001.
B. FOR LIFE SAFETY PLAN, SEE DRAWING A-002
C. FOR DOOR, WINDOW AND FINISH SCHEDULES,
SEE SHEE A-601 AND A-602.
D. SEE STRUCTURAL DRAWINGS FOR ADDITIONAL
FOUNDATION AND OPENING LOCATIONS.
E. SEE MECHANICAL, ELECTRICAL, AND PLUMBING
FOR ADDITIONAL WORK.
SHEET KEYNOTES
1. RANGE OVEN W/ UNDER CABINET MICROWAVE HOOD
2. DISHWASHER
3. ICE MAKER
4. REFRIGERATOR
5. WATER HEATER, SEE PLUMBING
6. FURNACE, SEE MECHANICAL
7. CRAWL SPACE ACCESS HATCH, SEE DETAIL 4/A-502
8. WATER SOFTENING SYSTEM, SEE MECHANICAL
9. MILLWORK WARDROBE, SEE SHEET 4/A-401
10. ADA SHOWER UNIT, SEE PLUMBING
11. ADA COMPLIANT MILLWORK COUNTER AT ADA HEIGHT
12. FINISH FACE OF WALLS TO ALIGN FLUSH
13. FLOOR REGISTER, SEE MECHANICAL
14. FLOOR DRAIN, SEE PLUMBING
15. SINK, SEE PLUMBING
16. WALL HEATER, SEE MECHANICAL
17. FIRE EXTINGUISHER CABINET (FLUSH OR
SEMI-RECESSED)
18. FLOORING TRANSITION
19. OFCI CLOTHES DRYER
20. OFCI CLOTHES WASHER
A-401
2'-0"
4'-5"
3'-10" 10'-5 1/2" 6'-6 3/4" 3'-4" 4'-7" 3'-4" 6'-8"
W2
W1
W3 W4 W5
W21 W20
W19 W18
W22
A-401
1 1
22 22
A
D D
B
D
B A
B
B
B
B
B B
BB
F
C1
H1
A
A
A
A
A-201
A-201
21. TUB SINK, SEE PLUMBING
22. WRAPPED POST, SEE
STRUCTURAL AND DETAIL 2/A503
23. WALK OFF MAT. 4'-0"x4'-0" MIN
24. MOP & BROOM HOLDER/SHELF
25. ALUMINUM LADDER, 21 INCHES
WIDE MIN. 9 - (3/4") STEPS AT 12"
O.C. ATTACHED SECURELY TO
WALL. TOP RUNG AT 9'-0"
26. OUTLINE OF ROOF ABOVE.
N
13 TYP
A.3 A.7 B
8'-4" 11'-3 1/2"22'-10 3/4"
4'-10 1/4" 4'-3 1/4" 5'-3 1/4"
'-0
5' -8
/4
5'-9 1/4" 7'-0 1/2" 2'-11 1/4"
2'-2 1/2"
34'-3 1/2" 5'-3 1/2" 10'-4 1/4" 8'-10 1/2"
12'-10" 26'-9" 12'-6"
'-8
1'-3"1'-3"
2' -9
/4
'-4
8'
-9
/4
4' -9
/2
4'
-9
7' -1
1" 6'
-0
/4
5'-8 1/4"
9' -6
/4
4'-0 1/4"
3'-3 1/4"
2'-8"
2'-10 1/4"
2' -4
/2
2' -4
/4
B
F
E
A-201
Anastasia Perrigo
2023.02.15 09:37:01-08'00'
John Reseigh
Anastasia Perrigo
John Hatten
AR
D R
O
BE
W
AR
D R
O
BE
W
AR
D R
O
BE
W
AR
D R
O
BE
W
AR
D R
O
BE
W
AR
D R
O
BE
W
AR
D R
O
BE
W
AR
D R
O
BE
SHWRSHWR
WC WC
LA
V
LA
V
W
AR
D R
O
BE
SHWR
WC
LA
V
ADA
SHWR
LA
V
WC
FILENAME: PLOT DATE: PLOT TIME:$PLOTDATE $PLOTTIME
JA
C
O
BS
0.
A
LL
R
IG
H
TS
R
ES
ER
VE
D c
$PWPATH$PWURL
BAKER CITY FIRE GUARD CREW QUARTERS BUILDING
FI
N
AL
P
R O
D U
C
TI
O N
D O
C U
M
EN
TS
FEBRUARY 2023 78
DRAWING NO.
SHEET OFDATE:
SCALE:DRAWN:
APPROVED
REVIEWED
DESIGNED
DIVISION OF OPERATIONS OREGON STATE OFFICE
UNITED STATES DEPARTMENT OF THE INTERIOR
BUREAU OF LAND MANAGEMENT
AS SHOWN
REV. NO. DESCRIPTION DATE APPROVED
DE
BLM CE/CET
AE OR BLM CE/CET
THINKALWAYS SAFETY
DSGN: CHK: APVD:
AREA B
FLOOR PLAN - AREA B
1/4" = 1'-0"
ARCHITECTURAL
FLOOR PLAN - AREA B
JR
KB
AP
A-101B
JH
D3290113_A-101B.dwg
BEDROOM
A-301
H.C. R/R
R/R
BEDROOM
BEDROOM
BEDROOM
BEDROOM
HALLWAY
BEDROOM
BEDROOM
BEDROOM
BEDROOM
R/R
R/R
JANITOR
ELEC
2A
5A
6A
7A
8A
9A
0A
111B
3A
4A
5A
6A
7A
8'-8 1/4"
'-8
/4
'-4
4' -2
4'-0 1/4"
M
AT
C H
LI
N
E A-
1A
M
AT
C H
LI
N
E A-
1A
B
C
GENERAL NOTES
A. FOR GENERAL ARCHITECTURAL NOTES, MATERIAL
SYMBOLS, LEGENDS AND WALL TYPES, SEE
DRAWING A-001.
B. FOR LIFE SAFETY PLAN, SEE DRAWING A-002
C. FOR DOOR, WINDOW AND FINISH SCHEDULES,
SEE SHEE A-601 AND A-602.
D. SEE STRUCTURAL DRAWINGS FOR ADDITIONAL
FOUNDATION AND OPENING LOCATIONS.
E. SEE MECHANICAL, ELECTRICAL, AND PLUMBING
FOR ADDITIONAL WORK.
SHEET KEYNOTES
1. PRE-FABRICATED SHOWER UNIT, SEE PLUMBING
2. MILLWORK WARDROBE, SEE SHEET 4/A-401
3. ADA SHOWER UNIT, SEE PLUMBING
4. ADA COMPLIANT MILLWORK COUNTER AT ADA
HEIGHT
5. CONCRETE STOOP, SEE CIVIL
6. FLOOR REGISTER, SEE MECHANICAL
7. WALL HEATER, SEE MECHANICAL
8. 4'-0" x 4'-0" MIN WALK-OFF CARPET MIN.
9. FLOORING TRANSITION
10. NOT USED
11. WRAPPED POST, SEE STRUCTURAL AND DETAIL
2/A503
12. FINISH FACE OF WALLS TO ALIGN FLUSH
13. FLOOR DRAIN, SEE PLUMBING
14. FIRE EXTINGUISHER CABINET (FLUSH OR
SEMI-RECESSED)
15. OUTLINE OF ROOF ABOVE
16. SINK, SEE PLUMBING
A-401
A-401
'-7
/4
2 2 2 2
TYP
TYP
N
9 TYP
9 TYP
9TYP
2 2 2 22
TYP
A-201
A-201
W6 W7 W8 W9 W10 W11
W17 W16 W15 W14 W13 W12W18
A A
A
C1C1C1H1
G
B
B B
C1C1C1C1
C1C1 C1 C1 C1
C1C1C1C1H1
G
7'-0 1/2" 7'-2 1/2" 8'-5" 8'-5"
8'-10 1/2" 7'-9 1/2" 8'-5" 8'-5" 8'-5" 8'-5" 9'-0 3/4"
B.4
B CB.4
A
A
9'-0 3/4"
1'-10 1/4" 1'-7 1/4" 2'-8 1/4" 2'-5 1/2" 2'-8 3/4" 3'-1 1/4"
2' -9
/4
2' -0
/4
26'-9" 30'-6"
2'-2 1/2" 1'-6 3/4" 2'-8 3/4" 2'-8 3/4" 2'-5" 2'-8 3/4" 3'-1 1/4"
3'-1 1/4"
4'-0 3/4"
8' -9
/4
2' -7
/2
5' -2
4' -2
3'-6 3/4"
'-7
/4
4'
-9
3'-9 3/4"
E E A
F
B
SIM
BSIM
SIM
B SIM
F
AEE
A-201
Anastasia Perrigo
2023.02.14 19:59:22-08'00'
John Reseigh
U3
U3
U3
OS
OS
OSOS
OS
OS
OS
FILENAME: PLOT DATE: PLOT TIME:$PLOTDATE $PLOTTIME
JA
C
O
BS
0.
A
LL
R
IG
H
TS
R
ES
ER
VE
D c
$PWPATH$PWURL
BAKER CITY FIRE GUARD CREW QUARTERS BUILDING
FI
N
AL
P
R O
D U
C
TI
O N
D O
C U
M
EN
TS
FEBRUARY 2023 78
DRAWING NO.
SHEET OFDATE:
SCALE:DRAWN:
APPROVED
REVIEWED
DESIGNED
DIVISION OF OPERATIONS OREGON STATE OFFICE
UNITED STATES DEPARTMENT OF THE INTERIOR
BUREAU OF LAND MANAGEMENT
AS SHOWN
REV. NO. DESCRIPTION DATE APPROVED
DE
BLM CE/CET
AE OR BLM CE/CET
THINKALWAYS SAFETY
DSGN: CHK: APVD:
AREA A
REFLECTED CEILING PLAN - AREA A
1/4" = 1'-0"
ARCHITECTURAL
REFLECTED CEILING PLAN - AREA A
JR
KB
AP
A-110A
JH
D3290113_A-110A.dwg
KITCHEN
STORAGE
LAUNDRY
MUDROOM
LIVING ROOM
DINING
MECH
BEDROOM
A-301
A-301
M
AT
C H
LI
N
E A-
0B
M
AT
C H
LI
N
E A-
0B
A B
A. FOR GENERAL ARCHITECTURAL NOTES, MATERIAL
SYMBOLS, LEGENDS AND WALL TYPES, SEE
DRAWING A-001.
B. FOR LIFE SAFETY PLAN, SEE DWG. A-002.
C. FOR DOOR, WINDOW AND FINISH SCHEDULES, SEE
SHEETS A-601 AND A-602.
D. SEE STRUCTURAL DRAWINGS FOR ADDITIONAL
WORK.
E. SEE MECHANICAL, ELECTRICAL, AND PLUMBING
FOR ADDITIONAL WORK.
1. CEMENTITIOUS SOFFIT BOARD PANEL WITH VENTS
2. WRAPPED POST AND BEAM, SEE STRUCTURAL AND
DETAILS 2/A503 AND 3/A503
3. PRE-FINISHED METAL GUTTER
4. PRE-FINISHED METAL DOWNSPOUT
5. ATTIC ACCESS HATCH, SEE DETAIL 2/A502
6. UNDER CABINET LIGHT FIXTURE, SEE ELECTRICAL
7. RATED GYPSUM BOARD CEILING
8. GYPSUM BOARD CEILING
9. LADDER TO ACCESS HATCH
10. FURNACE, SEE MECHANICAL
11. VENTED PANELS WITH INSECT SCREEN, SEE
MECHANICAL
12. GYPSUM BOARD SOFFIT. BOTTOM AT 7'-5" SEE
DETAIL 4/A503
LEGEND
GYPSUM BOARD CEILING
EXTERIOR WALL MOUNTED
LIGHTING, SEE ELECTRICAL
EXIT LIGHTING, SEE ELECTRICAL
LIGHT FIXTURES, SEE
ELECTRICAL
CEILING EXHAUST, RETURN OR
TRANSFER GRILLE OR
REGISTER, SEE MECHANICAL
GENERAL NOTES
SHEET KEYNOTES
N
4 3
TYP
TYP
TYP
A BA.3 A.7
OCCUPANCY SENSOR, SEE
ELECTRICAL
TYP
TYP
TYP
Anastasia Perrigo
2023.02.14 19:59:48-08'00'
John Reseigh
OS OS OS OS OS
OS
FILENAME: PLOT DATE: PLOT TIME:$PLOTDATE $PLOTTIME
JA
C
O
BS
0.
A
LL
R
IG
H
TS
R
ES
ER
VE
D c
$PWPATH$PWURL
BAKER CITY FIRE GUARD CREW QUARTERS BUILDING
FI
N
AL
P
R O
D U
C
TI
O N
D O
C U
M
EN
TS
FEBRUARY 2023 78
DRAWING NO.
SHEET OFDATE:
SCALE:DRAWN:
APPROVED
REVIEWED
DESIGNED
DIVISION OF OPERATIONS OREGON STATE OFFICE
UNITED STATES DEPARTMENT OF THE INTERIOR
BUREAU OF LAND MANAGEMENT
AS SHOWN
REV. NO. DESCRIPTION DATE APPROVED
DE
BLM CE/CET
AE OR BLM CE/CET
THINKALWAYS SAFETY
DSGN: CHK: APVD:
AREA B
REFLECTED CEILING PLAN - AREA B
1/4" = 1'-0"
ARCHITECTURAL
REFLECTED CEILING PLAN - AREA B
JR
KB
AP
A-110B
JH
D3290113_A-110B.dwg
BEDROOM
A-301
H.C. R/R
R/R
BEDROOM
BEDROOM
BEDROOM
BEDROOM
HALLWAY
BEDROOM
BEDROOM
BEDROOM
BEDROOM
R/R
R/R
JANITOR
ELEC
M
AT
C H
LI
N
E A-
0A
M
AT
C H
LI
N
E A-
0A
B
C
A. FOR GENERAL ARCHITECTURAL NOTES, MATERIAL
SYMBOLS, LEGENDS AND WALL TYPES, SEE
DRAWING A-001.
B. FOR LIFE SAFETY PLAN, SEE DWG. A-002.
C. FOR DOOR, WINDOW AND FINISH SCHEDULES, SEE
SHEETS A-601 AND A-602.
D. SEE STRUCTURAL DRAWINGS FOR ADDITIONAL
WORK.
E. SEE MECHANICAL, ELECTRICAL, AND PLUMBING
FOR ADDITIONAL WORK.
LEGEND
GYPSUM BOARD CEILING
EXTERIOR WALL MOUNTED
LIGHTING, SEE ELECTRICAL
EXIT LIGHTING, SEE ELECTRICAL
LIGHT FIXTURES, SEE
ELECTRICAL
CEILING EXHAUST, RETURN OR
TRANSFER GRILLE OR
REGISTER, SEE MECHANICAL
GENERAL NOTES
SHEET KEYNOTES
N
2 2
OCCUPANCY SENSOR, SEE
ELECTRICAL
1. CEMENTITIOUS SOFFIT BOARD PANEL WITH VENTS
2. WRAPPED POST AND BEAM, SEE STRUCTURAL AND
DETAILS 3/A-503 AND 4/A-503
3. PRE-FINISHED METAL GUTTER
4. PRE-FINISHED METAL DOWNSPOUT
5. RATED GYPSUM BOARD CEILING
6. GYPSUM BOARD CEILING
7. VENTED PANELS WITH INSECT SCREEN, SEE
MECHANICAL
B.7
B C
55555
TYP
TYP
Anastasia Perrigo
2023.02.14 20:00:11-08'00'
John Reseigh
C
O
BS
0.
A
LL
R
IG
H
TS
R
ES
ER
VE
D c
$PWPATH$PWURL
BAKER CITY FIRE GUARD CREW QUARTERS BUILDING
FI
N
AL
P
R O
D U
C
TI
O N
D O
C U
M
EN
TS
FEBRUARY 2023 78
DRAWING NO.
SHEET OFDATE:
SCALE:DRAWN:
APPROVED
REVIEWED
DESIGNED
DIVISION OF OPERATIONS OREGON STATE OFFICE
UNITED STATES DEPARTMENT OF THE INTERIOR
BUREAU OF LAND MANAGEMENT
AS SHOWN
REV. NO. DESCRIPTION DATE APPROVED
DE
BLM CE/CET
AE OR BLM CE/CET
THINKALWAYS SAFETY
DSGN: CHK: APVD:
AREA A
N
ROOF PLAN - AREA A
1/4" = 1'-0"
ARCHITECTURAL
ROOF PLAN - AREA A
JR
KB
AP
A-120A
JH
D3290113_A-120A.dwg
A-301
A-301
A B
A. FOR GENERAL ARCHITECTURAL NOTES, MATERIAL
SYMBOLS, LEGENDS AND WALL TYPES, SEE
DRAWING A-001.
B. SEE STRUCTURAL DRAWINGS FOR ADDITIONAL
WORK.
C. SEE MECHANICAL, ELECTRICAL, AND PLUMBING
FOR ADDITIONAL WORK.
1. CONTINUOUS VENTED RIDGE CAP. SEE DETAIL 8/A501
2. RAKE TRIM
3. PRE-FINISHED METAL GUTTER
4. PRE-FINISHED METAL DOWNSPOUT
5. NOT USED
6. SNOW RAIL/FENCE
7. VENT PIPES THROUGH ROOF
8. OUTLINE OF BUILDING BELOW
9. PRE-FINISHED STANDING SEAM METAL ROOF OVER
ZIP SHEATHING SYSTEM OVER PRE-ENGINEERED
TRUSSES
SL
O
PE
- 1
SL
O
PE
- 1
GENERAL NOTES
SHEET KEYNOTES
A-201
A-201
SL
O
PE
- 1
4 3 4
M
AT
C H
LI
N
E A-
1B
M
AT
C H
LI
N
E A-
1B
28'-11"
A.3A BA.7
A-201
Anastasia Perrigo
2023.02.14 20:00:31-08'00'
John Reseigh
C
O
BS
0.
A
LL
R
IG
H
TS
R
ES
ER
VE
D c
$PWPATH$PWURL
BAKER CITY FIRE GUARD CREW QUARTERS BUILDING
FI
N
AL
P
R O
D U
C
TI
O N
D O
C U
M
EN
TS
FEBRUARY 2023 78
DRAWING NO.
SHEET OFDATE:
SCALE:DRAWN:
APPROVED
REVIEWED
DESIGNED
DIVISION OF OPERATIONS OREGON STATE OFFICE
UNITED STATES DEPARTMENT OF THE INTERIOR
BUREAU OF LAND MANAGEMENT
AS SHOWN
REV. NO. DESCRIPTION DATE APPROVED
DE
BLM CE/CET
AE OR BLM CE/CET
THINKALWAYS SAFETY
DSGN: CHK: APVD:
AREA B
N
ROOF PLAN - AREA B
1/4" = 1'-0"
ARCHITECTURAL
ROOF PLAN - AREA B
JR
KB
AP
A-120B
JH
D3290113_A-120B.dwg
A-301
B
C
A. FOR GENERAL ARCHITECTURAL NOTES, MATERIAL
SYMBOLS, LEGENDS AND WALL TYPES, SEE
DRAWING A-001.
B. SEE STRUCTURAL DRAWINGS FOR ADDITIONAL
WORK.
C. SEE MECHANICAL, ELECTRICAL, AND PLUMBING
FOR ADDITIONAL WORK.
1. CONTINUOUS VENTED RIDGE CAP. SEE DETAIL 8/A501
2. RAKE TRIM
3. PRE-FINISHED METAL GUTTER
4. PRE-FINISHED METAL DOWNSPOUT
5. NOT USED
6. SNOW RAIL/FENCE
7. VENT PIPES THROUGH ROOF
8. OUTLINE OF BUILDING BELOW
9. PRE-FINISHED STANDING SEAM METAL ROOF OVER
ZIP SHEATHING SYSTEM OVER PRE-ENGINEERED
TRUSSES
SL
O
PE
- 1
SL
O
PE
- 1
GENERAL NOTES
SHEET KEYNOTES
A-201
A-201
A-201
SL
O
PE
- 1
4 3 6
3 4
M
AT
C H
LI
N
E A-
1B
M
AT
C H
LI
N
E A-
1B
B.7
B C
28'-2"
Anastasia Perrigo
2023.02.14 20:00:56-08'00'
John Reseigh
ARCHITECTURAL
EXTERIOR ELEVATIONS
JR
KB
AP
A-201
JH
D3290113_A-201.dwg
1. CONTINUOUS VENTED RIDGE CAP
2. RAKE TRIM
3. PRE-FINISHED METAL GUTTER
4. PRE-FINISHED METAL DOWNSPOUT WITH
SPLASHBLOCK
5. CEMENTITIOUS BOARD LAP SIDING
6. CEMENTITIOUS BOARD VENTED SOFFIT PANELS
7. VENT PIPES THOUGH ROOF
8. ALUMINUM WINDOW SYSTEM
9. PRE-FINISHED STANDING SEAM METAL ROOF OVER
ZIP SHEATHING SYSTEM OVER PRE-ENGINEERED
TRUSSES
10. INSULATED HOLLOW METAL DOOR/FRAME SYSTEM
11. CONCRETE STOOP, SEE CIVIL
12. CEMENTITIOUS BOARD TRIM, 5-1/2"X5/4"
13. SNOW RAIL SYSTEM
14. GRADE
15. VENT, SEE MECHANICAL
16. WRAPPED POST, SEE STRUCTURAL AND DETAIL
2/A503
17. KNOX BOX
18. ELECTRICAL PANEL, SEE ELECTRICAL. PAINT TO
MATCH SIDING
19. ENERGY RECOVERY UNIT VENT, SEE MECHANICAL
20. 28 GA GALVANIZED STEP FLASHING
21. ENERGY RECOVERY UNIT, SEE MECHANICAL
22. INSULATED DUCT, SEE MECHANICAL
SHEET KEYNOTES
FILENAME: PLOT DATE: PLOT TIME:$PLOTDATE $PLOTTIME
JA
C
O
BS
0.
A
LL
R
IG
H
TS
R
ES
ER
VE
D c
$PWPATH$PWURL
BAKER CITY FIRE GUARD CREW QUARTERS BUILDING
FI
N
AL
P
R O
D U
C
TI
O N
D O
C U
M
EN
TS
FEBRUARY 2023 78
DRAWING NO.
SHEET OFDATE:
SCALE:DRAWN:
APPROVED
REVIEWED
DESIGNED
DIVISION OF OPERATIONS OREGON STATE OFFICE
UNITED STATES DEPARTMENT OF THE INTERIOR
BUREAU OF LAND MANAGEMENT
AS SHOWN
REV. NO. DESCRIPTION DATE APPROVED
DE
BLM CE/CET
AE OR BLM CE/CET
THINKALWAYS SAFETY
DSGN: CHK: APVD:
SOUTH ELEVATION
3/16" = 1'-0"
WEST ELEVATION
NORTH ELEVATION
EAST ELEVATION
3" 12" 3"
12"
A-301
ARCHITECTURAL
EXTERIOR ELEVATIONS
JR
KB
AP
A-201
JH
D3290113_A-201.dwg
A-301
A-301
A-301
3" 12"
3" 12"
3" 12"
3" 12"
W3 W2 W4W5
W6W7
W8W9W10W11
W21 W20 W19
W18 W17
W16 W15 W14 W13 W12
W22 W1
14 15 12 5
TYP
TYP
10 10 4
102A100A
8 TYP
111B 120A
9 3
101112 510 12 4
12 TYP
TYP TYP
12TYP
7 9
1 7
TOP OF ROOF
117'-7"
TOP OF ROOF
115'-4"
TOP OF WALL
109'-1 1/8"
FINISHED FLOOR
100'-0"
TYP
16 16
C B.4 B A
CBA A.3 A.7
4 3 2 1
1 2 3 4
TYP
12 TYP
12 TYP
12 TYP
12 TYP
16 22
2 2
TYP
Anastasia Perrigo
2023.02.14 20:01:14-08'00'
John Reseigh
C
O
BS
0.
A
LL
R
IG
H
TS
R
ES
ER
VE
D c
$PWPATH$PWURL
BAKER CITY FIRE GUARD CREW QUARTERS BUILDING
FI
N
AL
P
R O
D U
C
TI
O N
D O
C U
M
EN
TS
FEBRUARY 2023 78
DRAWING NO.
SHEET OFDATE:
SCALE:DRAWN:
APPROVED
REVIEWED
DESIGNED
DIVISION OF OPERATIONS OREGON STATE OFFICE
UNITED STATES DEPARTMENT OF THE INTERIOR
BUREAU OF LAND MANAGEMENT
AS SHOWN
REV. NO. DESCRIPTION DATE APPROVED
DE
BLM CE/CET
AE OR BLM CE/CET
THINKALWAYS SAFETY
DSGN: CHK: APVD:
ARCHITECTURAL
BUILDING SECTIONS
JR
KB
AP
A-301
JH
D3290113_A-301.dwg
A-101
BUILDING SECTION
1/4" = 1'-0"
A-101
BUILDING SECTION
1/4" = 1'-0"
A-301
A-301
A-302
8 7
24522
TYP
TYP
A-302
A. FOR GENERAL ARCHITECTURAL NOTES, MATERIAL
SYMBOLS, LEGENDS AND WALL TYPES, SEE
DRAWING A-001.
B. FOR LIFE SAFETY PLAN, SEE DWG. A-002.
C. FOR DOOR, WINDOW AND FINISH SCHEDULES, SEE
SHEETS A-601 AND A-602.
D. SEE STRUCTURAL DRAWINGS FOR ADDITIONAL
WORK.
E. SEE MECHANICAL, ELECTRICAL, AND PLUMBING
FOR ADDITIONAL WORK.
1. FOOTING, SEE STRUCTURAL
2. CONCRETE STEM WALL WITH PERIMETER
INSULATION AND PROTECTION BARRIER
3. PONY WALL, SEE STRUCTURAL
4, FLOOR JOIST, SEE STRUCTURAL
5. R-30 MIN BATT INSULATION
6. SUB-FLOOR WITH FLOOR FINISH. SEE STRUCTURAL
AND SHEET A-602
7. INTERIOR WALL SYSTEM. SEE FLOOR PLAN AND
SHEET A-602
8. DOOR/DOOR FRAME AS SCHEDULED
9. R-38 BLOW-IN ATTIC INSULATION
10. PRE-ENGINEERED ROOF TRUSSES
11. STANDING SEAM METAL ROOF OVER ZIP SHEATHING
SYSTEM
GENERAL NOTES SHEET KEYNOTES
12. PRE-FINISHED ROOF GUTTERS
13. CONTINUOUS VENTED RIDGE CAP
14. WRAPPED POST, SEE STRUCTURAL & 2/A503
15. CEMENTITIOUS BOARD SOFFIT PANEL
16 CEMENTITIOUS BOARD TRIM
17 THICKENED CONCRETE SLAB, SEE
STRUCTURAL/CIVIL
18 WRAPPED BEAM, SEE STRUCTURAL & 3/A503
19 PRE-FINISHED METAL DOWNSPOUT
20 SNOW RAIL SYSTEM
21 ACCESS OPENING IN PONY WALL, SEE STRUCTURAL
S501
22 10 MIL VAPOR BARRIER. FROM SILL PLATE TO SILL
PLATE CONTINUOUS. ALL SEAMS TO BE TAPED
23 RATED GYPSUM BOARD CEILING
45 TYP
TYP
TYP
10 9
13 11
TYP
24. 1 HOUR INTUMESCENT PAINT ON JOISTS AND WOOD
SUBFLOOR. SEE LIFE SAFETY PLAN FOR EXTENT
TYP
TYP
TOP OF ROOF
117'-7"
BOTTOM OF FOOTING
95'-9"
TOP OF WALL
109'-1 1/8"
FINISHED FLOOR
100'-0"
MECH
LAUNDRY
BEDROOM
BEDROOM
BEDROOM
BEDROOM
R/R
R/R
JANITOR
MECH
DINING
LIVING
23232323
Anastasia Perrigo
2023.02.15 11:48:12-08'00'
John Reseigh
C
O
BS
0.
A
LL
R
IG
H
TS
R
ES
ER
VE
D c
$PWPATH$PWURL
BAKER CITY FIRE GUARD CREW QUARTERS BUILDING
FI
N
AL
P
R O
D U
C
TI
O N
D O
C U
M
EN
TS
FEBRUARY 2023 78
DRAWING NO.
SHEET OFDATE:
SCALE:DRAWN:
APPROVED
REVIEWED
DESIGNED
DIVISION OF OPERATIONS OREGON STATE OFFICE
UNITED STATES DEPARTMENT OF THE INTERIOR
BUREAU OF LAND MANAGEMENT
AS SHOWN
REV. NO. DESCRIPTION DATE APPROVED
DE
BLM CE/CET
AE OR BLM CE/CET
THINKALWAYS SAFETY
DSGN: CHK: APVD:
ARCHITECTURAL
ENLARGED WALL SECTIONS
JR
KB
AP
A-302
JH
D3290113_A-302.dwg
A. FOR GENERAL ARCHITECTURAL NOTES, MATERIAL
SYMBOLS, LEGENDS AND WALL TYPES, SEE
DRAWING A-001.
B. SEE STRUCTURAL DRAWINGS FOR ADDITIONAL
WORK.
C. SEE MECHANICAL, ELECTRICAL, AND PLUMBING
FOR ADDITIONAL WORK.
GENERAL NOTES
SHEET KEYNOTES
GENERAL NOTES
SHEET KEYNOTES
1. FOOTING, SEE STRUCTURAL
2. STEM WALL, SEE STRUCTURAL
3. 1/2" CEMENT COVER BOARD
4. FLOOR JOIST, SEE STRUCTURAL
5…
This is the start of the file's text. The full file is on GovTribe.