B08 Contract Price Schedule.pdf
PDF 143 KB Posted
- Attached to
- Construct New Well, Mojave National Preserve Federal contract opportunity
- Solicitation number
- 140P8121R0006
About this file
This document is a contract price schedule for solicitation number 140P8121R0006 to construct a new well at Mojave National Preserve. The contract involves constructing a replacement primary water source well including mobilization, drilling a test well to 605 linear feet, furnishing and installing well casing, screens, filter packs, and formation stabilizers. Additional line items include well development, pumping and recovery tests, disinfection, video inspection, connecting to existing utilities, and furnishing a pump/motor assembly. Pricing will be evaluated based on the best value to the government using a calculation considering the base price for line items 1 through 16. The National Park Service Pacific West Region is the contracting agency.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| B09_Questions_and_Answers_amend_04_0004.pdf | ||
| Sol_140P8121R0006_Amd_0004.pdf | ||
| Sol_140P8121R0006_Amd_0003.pdf | ||
| B09_Questions_and_Answers_0003.pdf | ||
| Sol_140P8121R0006_Amd_0002.pdf | ||
| Sol_140P8121R0006_Amd_0001.pdf | ||
| B08 MOJA Map.pdf | ||
| A06 8K1 Well Completion Report.pdf | ||
| B08 Release of Claims.pdf | ||
| A04 Specifications.pdf | ||
| B08 Invoice Payment Request.docx | DOCX document | |
| B03 General Decision.pdf | ||
| Sol_140P8121R0006.pdf |
Show all 13
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
MOJA – 234372 CONTRACT PRICE SCHEDULE - 1
CONTRACT PRICE SCHEDULE
Mojave National Preserve
PMIS NO. 2234372
Construct New Well to Replace Primary Source to Hole-in-the-Wall
Offerors are required to submit an offer that conforms to the Solicitation with pricing for Contract Price Schedule’s Base Line Items and all Option line items - failure to do so may render the offer non-responsive.
On lump-sum price items, provide total cost only; on unit price items, provide the unit price and the extended amount of total price for the item. If no price item exists for a portion of the work, include the costs in a related price item. In case of error in extension of prices, unit price governs. In case of error in summation, the total of the corrected price item amount governs. Round totals and extend prices to whole dollars. Pricing will be evaluated based on what is determined to be the best value to the Government.
Price award will be made based upon the following equation.
Equation 1: Base Price
Base Price: Price Items 1 through 16.
MOJA – 234372 CONTRACT PRICE SCHEDULE - 2
CONTRACT CONTRACT
LINE ITEM LINE ITEM TITLE
NUMBER
(CLIN)
QUANTITY AND
UNIT OF
MEASURE
UNIT PRICE TOTAL PRICE
BASE LINE ITEMS
012700
Mobilization/Demobilization 1 LS @$________ =$_________
Drill & Set Temporary Conductor Casing for Test Well
1 LS @$________ =$_________
Drill Test Well 605 LF *NTE @$________ =$_________
Furnish 8-Inch Well Casing 568 LF *NTE @$________ =$_________
Install 8-Inch Well Casing 568 LF *NTE @$________ =$_________
Furnish 8-Inch Well Screen 40 LF *NTE @$________ =$_________
Install 8-Inch Well Screen 40 LF *NTE @$________ =$_________
Filter Pack Material 115 LF *NTE @$________ =$_________
Formation Stabilizer Material 430 LF *NTE @$________ =$_________
Grout Surface Seal 60 LF *NTE @$________ =$_________
Well Development 1 LS @$________ =$_________
Pumping and Recovery Tests 1 LS @$________ =$_________
Disinfection 1 LS @$________ =$_________
Video Inspection Logging of Completed Test Well
1 LS @$________ =$_________
Pitless Adapter and Connection to Existing Water Line & Electrical Power Sources (PV & Back Up Generator)
1 LS @$________ =$_________
MOJA – 234372 CONTRACT PRICE SCHEDULE - 3
Pump/Motor Assembly 1 LS @$________ =$_________
TOTAL BASE PRICE – (Items 1 to 16) ------------------------------------------------------------------- =$_________
Quantities for unit price items are estimated, but payment will be made only for actual quantities of work completed up to the Not-To-Exceed quantity.
Award will be made to one Offeror in accordance with the Solicitation.
The low offeror will be determined by taking each offeror’s Base Price, or Base Price with Option(s) at the discretion of the Government. Available funds will be announced as indicated in the Solicitation.
All measurement and payment information is included in the project specifications Section 01 27 00 Definition of Contract Price Schedule Line Items.
*NTE: Not-To-Exceed quantity
END OF SECTION
| 1.1 DESCRIPTION |
| A. General: |
| 1. The intent of this section is to explain, in general, what is and what is not included in a Contract Price Schedule Line Items, and the limits where one Contract Price schedule Line Item ends and another begins. |
| 2. The total contract price must cover all work required by the Contract Documents. All costs in connection with the proper and successful completion of the work, including furnishing all materials, equipment, supplies, and appurtenances; providing al... |
| 3. If no Contract Price Schedule Line Item exists for a portion of the work, include the costs in a related Contract Price Schedule Line Item. |
| 4. The description of the work of this section constitutes a summary of the work for the purpose of defining the Base Contract Price Schedule Line Items and Contract Price Schedule Option Items and is not intended to provide a detailed and exhaustive ... |
| B. Estimated Quantities: |
| 1. All estimated quantities stipulated in the Contract Price Schedule or other Contact Documents are approximate and are to be used only: |
| a. As a basis for estimating the probable cost of the work. |
| b. For the purpose of comparing the Contract Price Schedules submitted for the work. |
| 2. The basis of payment for unit price work and materials will be the actual amount of work done and materials furnished up to the not-to-exceed quantity. |
| 3. Except where otherwise specified the unit or lump sum price for each item of work that involves boring, drilling, excavation or trenching, backfilling, drilling mud containment and removal, borehole cuttings containment and removal must include all... |
| 1.2 BASE CONTRACT PRICE SCHEDULE LINE ITEMS |
| A. Contract Line Item Number (CLIN) 1 – MOBILIZATION AND DEMOBILIZATION - This line item consists of mobilizing and demobilizing all required equipment and construction materials to the site along with preparation of the site in order to initiate work... |
| B. CLIN 2 – DRILL AND SET TEMPORARY CONDUCTOR CASING FOR TEST WELL – This line item consists of furnishing all material, equipment, and labor for the completion of a bore hole to a sufficient depth to then install a temporary conductor casing to facil... |
| C. CLIN 3 – DRILL TEST WELL - This line item consists of furnishing all materials, equipment, and labor for the completion of the borehole for the test water well. The work also includes any reaming, under-reaming, and/or casing advancement operations... |
| D. CLIN 4 – FURNISH 8-INCH WELL CASING – This bid item consists of furnishing all materials, equipment, and labor necessary to furnish well casing and associated appurtenances for connecting it together at the project site. This line item will be pai... |
| E. CLIN 5 – INSTALL 8- INCH WELL CASING - This line item consists of furnishing all materials, equipment, and labor necessary to make a complete installation of the well casing into the test well borehole to allow for an operational well. The work als... |
| F. CLIN 6 – FURNISH 8-INCH WELL SCREEN- This line item consists of furnishing all materials, equipment, and labor necessary to furnish well screen and associated appurtenances for connecting it together at the project site. This line item will be pai... |
| G. CLIN 7 – INSTALL 8- INCH WELL SCREEN - This line item consists of furnishing all materials, equipment, and labor necessary to make a complete installation of the well screen into the test well borehole for an operational well. The work also include... |
| H. CLIN 8 – FILTER PACK MATERIAL - This line item consists of furnishing all materials, equipment, and labor necessary to make a complete installation of the filter pack material, including but not limited to under-reaming, gravel pack material, forma... |
| I. CLIN 9 – FORMATION STABILIZER MATERIAL- This line item consists of furnishing all materials, equipment, and labor necessary to make a complete installation of the formation stabilizer material, including but not limited to under-reaming, formation ... |
| J. CLIN 10 – GROUT SURFACE SEAL - This line item consists of furnishing all materials, equipment, and labor necessary to construct the surface (aka sanitary) seal by placement of impervious material in the annular space between the permanent well casi... |
| K. CLIN 11 – WELL DEVELOPMENT - This line item consists of furnishing all materials, equipment, and labor necessary to develop the test well to achieve sand-free water at an acceptable specific capacity. This includes but is not limited to the time r... |
| L. CLIN 12 – PUMPING TEST AND RECOVERY TEST- This line item consists of furnishing all necessary labor, equipment, tools, materials, and pumping equipment capable of pumping at the various discharge rates specified for the pumping test. This line ite... |
| M. CLIN 13 – DISINFECTION - This line item consists of furnishing all materials, equipment, and labor necessary to disinfect and keep disinfected the new well (test well phase and production well phase), and the new water line connection from the new ... |
| N. CLIN 14 – VIDEO INSPECTION LOGGING OF COMPLETED TEST WELL - This line item consists of furnishing all materials, equipment, and labor necessary to carry out the video inspection logging of the completed test well. This line item will be paid on a l... |
| O. CLIN 15 – PITLESS ADAPTER AND CONNECTION TO EXISTING UTILITIES - This line item consists of furnishing all materials, equipment, and labor necessary to install the pitless adapter onto the test well’s steel casing (transitioning from the test well... |
| P. CLIN 16 – PUMP MOTOR ASSEMBLY - This line item consists of furnishing all materials, equipment, and labor necessary to install: the pump/motor assembly connected to flexible drop pipe and the PVC sounding conduit and pressure transducer into the p... |
| 1.3 QUANTITIES |
| A. The quantities associated with the Contract Price Schedule Items and Option Items described in parts 1.2 and 1.3 above are indicated on the Contract Price Schedule and/or detailed in the specific specification sections for which the work relates. |
| 1. Starting and ending dates of ground-disturbing construction. |
| 2. Locations of temporary facilities, such as barriers, field offices, staging areas, sanitary facilities, borrow pits, and haul and access roads. |
| 3. Types of construction, such as clearing, topsoil stripping, structure or trench excavation, landscaping, and post construction clean-up. |
| 4. Methods and equipment used for each type of construction. |
| 5. Plan for relocating work in the event of temporary work stoppages at each archeologically sensitive area. |
| A. This Section includes administrative and procedural requirements for instructing NPS personnel, including the following: |
| 1. Demonstration of operation of systems, subsystems, and equipment. |
| 2. Training in operation and maintenance of systems, subsystems, and equipment, including environmental considerations. |
| 3. Demonstration and training video. |
| B. See Divisions 02 through 49 Sections for specific requirements for demonstration and training for products in those Sections. |
| A. The Contractor must prepare the list of System Demonstration and Training requirements to satisfy the requirements of the individual specification sections. |
| A. Instruction Program: Submit two (2) copies of outline of instructional program for demonstration and training, including a schedule of proposed dates, times, length of instruction time, and instructors' names for each training module. Include lea... |
| 1. For each training session, the Contractor must submit for approval a proposed outline of the subjects to be covered. The training must not be conducted until the outline is approved. |
| B. Demonstration and Training Video: Submit two (2) copies of each DVD for all training sessions within seven (7) days of end of each training module. |
| 1. Label each DVD with the date of demonstration or training, the instructor's name, and provide an index of the contents. The index must list the start and end time of each subject covered during the training session. The sequence of the training s... |
| A. Facilitator Qualifications: A firm or individual experienced in training or educating maintenance personnel in a training program similar in content and extent to that indicated for this Project, and whose work has resulted in training or educatio... |
| B. Instructor Qualifications: A factory-authorized service representative, complying with requirements in Division 01 Section "Quality Requirements," experienced in operation and maintenance procedures and training. |
| C. Coordinate content of training modules with content of approved emergency, operation, and maintenance manuals. Do not submit instruction program until operation and maintenance data has been reviewed and approved by Contracting Officer. |
| A. Program Structure: Develop an instruction program that includes individual training modules for each system and equipment not part of a system, as required by individual Specification Sections, and as follows: |
| 1. Water storage fire suppression system mechanical and electrical controls including pressure transducer. |
| 2. Environmental Topics |
| B. Training Modules: Develop a learning objective and teaching outline for each module. Include a description of specific skills and knowledge that participant is expected to master. For each module, include instruction for the following: |
| 1. Basis of System Design, Operational Requirements, and Criteria: Include system and equipment descriptions, operating standards, regulatory requirements, equipment function, operating characteristics, limiting conditions, and performance curves. |
| 2. Documentation: Review emergency, operations, and maintenance manuals; Project Record Documents; identification systems; warranties and bonds; and maintenance service agreements. |
| 3. Emergencies: Include instructions on stopping; shutdown instructions; operating instructions for conditions outside normal operating limits; instructions on meaning of warnings, trouble indications, and error messages; and required sequences for e... |
| 4. Operations: Include startup, break-in, control, and safety procedures; stopping and normal shutdown instructions; routine, normal, seasonal, and weekend operating instructions; operating procedures for emergencies and equipment failure; and requir... |
| 5. Adjustments: Include alignments and checking, noise, vibration, economy, and efficiency adjustments. |
| 6. Troubleshooting: Include diagnostic instructions and test and inspection procedures. |
| 7. Maintenance: Include inspection procedures, types of cleaning agents, methods of cleaning, procedures for preventive and routine maintenance, and instruction on use of special tools. |
| 8. Repairs: Include diagnosis, repair, and disassembly instructions; instructions for identifying parts; and review of spare parts needed for operation and maintenance. |
| A. Facilitator: Engage a qualified facilitator to prepare instruction program and training modules, to coordinate instructors, and to coordinate between Contractor and Contracting Officer for number of participants, instruction times, and location. |
| B. Engage qualified instructors to instruct NPS personnel to adjust, operate, and maintain systems, subsystems, and equipment not part of a system. |
| C. Scheduling: Provide instruction at mutually agreed on times. For equipment that requires seasonal operation, provide similar instruction at start of each season. |
| 1. Schedule training with NPS through the Contracting Officer with at least seven (7) days' advance notice. |
| 2. Conduct training sessions after the equipment or system has been accepted and turned over to the Government. Coordinate with commissioning requirements. |
| 3. Coordinate with Integrated pest management requirements. Refer to the specifications section and the approved IPM plan. |
| 4. Individual sections specify the duration of training required. If no duration is listed, provide training of sufficient duration to adequately cover the subjects. |
| PART 1 - GENERAL |
| 1.1 RELATED DOCUMENTS |
| A. General provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply to this Section. |
| 1.2 SUMMARY |
| A. This Section includes the following: |
| 1. Hangers and supports for electrical equipment and systems. |
| 2. Construction requirements for concrete bases. |
| 1.3 DEFINITIONS |
| A. EMT: Electrical metallic tubing. |
| B. IMC: Intermediate metal conduit. |
| C. RMC: Rigid metal conduit. |
| 1.4 PERFORMANCE REQUIREMENTS |
| A. Design supports for multiple raceways capable of supporting combined weight of supported systems and its contents. |
| 1.5 SUBMITTALS |
| A. Product Data: For the following: |
| 1. Steel slotted support systems. |
| 2. Nonmetallic slotted support systems. |
| PART 2 - PRODUCTS |
| 2.1 SUPPORT, ANCHORAGE, AND ATTACHMENT COMPONENTS |
| A. Steel Slotted Support Systems: Comply with MFMA-4, factory-fabricated components for field assembly. |
| 1. Available Manufacturers: Subject to compliance with requirements, manufacturers offering products that may be incorporated into the Work include, but are not limited to, the following: |
| 2. Manufacturers: Subject to compliance with requirements, provide products by one of the following: |
| B. Nonmetallic Slotted Support Systems: Structural-grade, factory-formed, glass-fiber-resin channels and angles with nine-sixteenths (9/16) inch- (14-mm-) diameter holes at a maximum of eight (8) inches (200 mm) o.c., in at least one (1) surface. |
| C. Raceway and Cable Supports: As described in NECA 1 and NECA 101. |
| D. Conduit and Cable Support Devices: steel hangers, clamps, and associated fittings, designed for types and sizes of raceway or cable to be supported. |
| E. Support for Conductors in Vertical Conduit: Factory-fabricated assembly consisting of threaded body and insulating wedging plug or plugs for non-armored electrical conductors or cables in riser conduits. Plugs must have number, size, and shape of... |
| F. Structural Steel for Fabricated Supports and Restraints: ASTM A 36/A 36M, steel plates, shapes, and bars; black and galvanized. |
| G. Mounting, Anchoring, and Attachment Components: Items for fastening electrical items or their supports to building surfaces include the following: |
| 2.2 FABRICATED METAL EQUIPMENT SUPPORT ASSEMBLIES |
| A. Description: Welded or bolted, structural-steel shapes, shop or field fabricated to fit dimensions of supported equipment. |
| PART 3 - EXECUTION |
| 3.1 APPLICATION |
| A. Comply with NECA 1 and NECA 101 for application of hangers and supports for electrical equipment and systems except if requirements in this Section are stricter. |
| B. Maximum Support Spacing and Minimum Hanger Rod Size for Raceway: Space supports for EMT, IMC, and RMC as required by NEC, where its Table 1 lists maximum spacings less than stated in NFPA 70. Minimum rod size must be one-fourth (1/4) inch (6 mm) ... |
| C. Multiple Raceways or Cables: Install trapeze-type supports fabricated with steel slotted support system, sized so capacity can be increased by at least twenty-five (25) percent in future without exceeding specified design load limits. |
| 1. Secure raceways and cables to these supports with two-bolt conduit clamps single-bolt conduit clamps single-bolt conduit clamps using spring friction action for retention in support channel. |
D. Spring-steel clamps designed for supporting single conduits without bolts may be used for one and one-half (1-1/2) inch (38-mm) and smaller raceways serving branch circuits and communication systems above suspended ceilings and for fastening racewa...
| 3.2 SUPPORT INSTALLATION |
| A. Comply with NECA 1 and NECA 101 for installation requirements except as specified in this Article. |
| B. Raceway Support Methods: In addition to methods described in NECA 1, EMT, IMC, RMC, EMT, IMC, RMC, and MC (where approved by local jurisdiction) may be supported by openings through structure members, as permitted in NFPA 70. |
| C. Strength of Support Assemblies: Where not indicated, select sizes of components so strength will be adequate to carry present and future static loads within specified loading limits. Minimum static design load used for strength determination must... |
| D. Mounting and Anchorage of Surface-Mounted Equipment and Components: Anchor and fasten electrical items and their supports to building structural elements by the following methods unless otherwise indicated by code: |
| 1. To Wood: Fasten with lag screws or through bolts. |
| 2. To New Concrete: Bolt to concrete inserts. |
| 3. To Masonry: Approved toggle-type bolts on hollow masonry units and expansion anchor fasteners on solid masonry units. |
| 4. To Existing Concrete: Expansion anchor fasteners. |
| 5. Instead of expansion anchors, powder-actuated driven threaded studs provided with lock washers and nuts may be used in existing standard-weight concrete four (4) inches (100 mm) thick or greater. Do not use for anchorage to lightweight-aggregate c... |
| 6. To Steel: Welded threaded studs complying with AWS D1.1/D1.1M, with lock washers and nuts Beam clamps (MSS Type 19, 21, 23, 25, or 27) complying with MSS SP-69 Spring-tension clamps. |
| 7. To Light Steel: Sheet metal screws. |
| 8. Items Mounted on Hollow Walls and Nonstructural Building Surfaces: Mount cabinets, panelboards, disconnect switches, control enclosures, pull and junction boxes, transformers, and other devices on slotted-channel racks attached to substrate by mea... |
E. Drill holes for expansion anchors in concrete at locations and to depths that avoid reinforcing bars.
| 3.3 INSTALLATION OF FABRICATED METAL SUPPORTS |
| A. Not Used |
| B. Cut, fit, and place miscellaneous metal supports accurately in location, alignment, and elevation to support and anchor electrical materials and equipment. |
| C. Field Welding: Comply with AWS D1.1/D1.1M. |
| 3.4 PAINTING |
| A. Touchup: Clean field welds and abraded areas of shop paint. Paint exposed areas immediately after erecting hangers and supports. Use same materials as used for shop painting. Comply with SSPC-PA 1 requirements for touching up field-painted surf... |
| 1. Apply paint by brush or spray to provide minimum dry film thickness of 2.0 mils. |
| B. Touchup: Comply with requirements in Division 09 Painting sections for cleaning and touchup painting of field welds, bolted connections, and abraded areas of shop paint on miscellaneous metal. |
| C. Galvanized Surfaces: Clean welds, bolted connections, and abraded areas and apply galvanizing-repair paint to comply with ASTM A 780. |
| PART 1 - GENERAL |
| 1.1 RELATED DOCUMENTS |
| A. General provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply to this Section. |
| 1.2 SUMMARY |
| A. This Section includes raceways, fittings, boxes, enclosures, and cabinets for electrical wiring. |
| 1.3 DEFINITIONS |
| A. EMT: Electrical metallic tubing. |
| B. ENT: Electrical nonmetallic tubing. |
| C. FMC: Flexible metal conduit. |
| D. IMC: Intermediate metal conduit. |
| E. LFMC: Liquidtight flexible metal conduit. |
| F. LFNC: Liquidtight flexible nonmetallic conduit. |
| G. RNC: Rigid nonmetallic conduit. |
| 1.4 SUBMITTALS |
| A. Product Data: For surface raceways, wireways and fittings, floor boxes, hinged-cover enclosures, and cabinets. |
| B. Shop Drawings: For the following raceway components. Include plans, elevations, sections, details, and attachments to other work. |
| 1. Custom enclosures and cabinets. |
| 1.5 QUALITY ASSURANCE |
| A. Electrical Components, Devices, and Accessories: Listed and labeled as defined in NFPA 70, Article 100, by a testing agency acceptable to authorities having jurisdiction, and marked for intended use. |
| B. Comply with NFPA 70. |
| A. Manufacturers: Subject to compliance with requirements, provide products by one of the following: |
| 1. AFC Cable Systems, Inc. |
| 2. Alflex Inc. |
| 3. Allied Tube & Conduit; a Tyco International Ltd. Co. |
| 4. Anamet Electrical, Inc.; Anaconda Metal Hose. |
| 5. Electri-Flex Co. |
| 6. Manhattan/CDT/Cole-Flex. |
| 7. Maverick Tube Corporation. |
| 8. O-Z Gedney; a unit of General Signal. |
| 9. Wheatland Tube Company. |
| B. Rigid Steel Conduit: ANSI C80.1. |
| C. Aluminum Rigid Conduit: ANSI C80.5. |
| D. IMC: ANSI C80.6. |
| E. EMT: ANSI C80.3. |
| F. FMC: Zinc-coated steel or aluminum. |
| G. LFMC: Flexible steel conduit with PVC jacket. |
| H. Fittings for Conduit (Including all Types and Flexible and Liquidtight), EMT, and Cable: NEMA FB 1; listed for type and size raceway with which used, and for application and environment in which installed. |
| 1. Conduit Fittings for Hazardous (Classified) Locations: Comply with UL 886. |
| 2. Fittings for EMT: Steel, set-screw, or compression type. |
| A. Manufacturers: Subject to compliance with requirements, provide products by one of the following: |
| 1. AFC Cable Systems, Inc. |
| 2. Anamet Electrical, Inc.; Anaconda Metal Hose. |
| 3. Arnco Corporation. |
| 4. CANTEX Inc. |
| 5. CertainTeed Corp.; Pipe & Plastics Group. |
| 6. Condux International, Inc. |
| 7. ElecSYS, Inc. |
| 8. Electri-Flex Co. |
| 9. Lamson & Sessions; Carlon Electrical Products. |
| 10. Manhattan/CDT/Cole-Flex. |
| 11. RACO; a Hubbell Company. |
| 12. Thomas & Betts Corporation. |
| B. ENT: NEMA TC 13. |
| C. RNC: NEMA TC 2, Type EPC-40-PVC, unless otherwise indicated. |
| D. LFNC: UL 1660. |
| E. Fittings for ENT and RNC: NEMA TC 3; match to conduit or tubing type and material. |
| F. Fittings for LFNC: UL 514B. |
| A. Manufacturers: Subject to compliance with requirements, provide products by one of the following: |
| 1. Cooper B-Line, Inc. |
| 2. Hoffman. |
| 3. Square D; Schneider Electric. |
| B. Description: Sheet metal sized and shaped as indicated, NEMA 250, Type 1, 12, 3R, unless otherwise indicated. |
| C. Fittings and Accessories: Include couplings, offsets, elbows, expansion joints, adapters, hold-down straps, end caps, and other fittings to match and mate with wireways as required for complete system. |
| D. Wireway Covers: Hinged type or Screw-cover type. |
| E. Finish: Manufacturer's standard enamel finish. |
| A. Manufacturers: Subject to compliance with requirements, provide products by one of the following: |
| 1. Hoffman. |
| 2. Lamson & Sessions; Carlon Electrical Products. |
| B. Description: PVC plastic, extruded and fabricated to size and shape indicated, with snap-on cover and mechanically coupled connections with plastic fasteners. |
| C. Fittings and Accessories: Include couplings, offsets, elbows, expansion joints, adapters, hold-down straps, end caps, and other fittings to match and mate with wireways as required for complete system. |
| A. Surface Metal Raceways: Galvanized steel with snap-on covers. Manufacturer's standard enamel finish in color selected by Architect. |
| B. Surface Nonmetallic Raceways: Two-piece construction, manufactured of rigid PVC with texture and color selected by Architect from manufacturer's standard custom colors. |
| A. Available Manufacturers: Subject to compliance with requirements, manufacturers offering products that may be incorporated into the Work include, but are not limited to, the following: |
| 1. Cooper Crouse-Hinds; Div. of Cooper Industries, Inc. |
| 2. EGS/Appleton Electric. |
| 3. Erickson Electrical Equipment Company. |
| 4. Hoffman. |
| 5. Hubbell Incorporated; Killark Electric Manufacturing Co. Division. |
| 6. O-Z/Gedney; a unit of General Signal. |
| 7. RACO; a Hubbell Company. |
| 8. Robroy Industries, Inc.; Enclosure Division. |
| 9. Scott Fetzer Co.; Adalet Division. |
| 10. Spring City Electrical Manufacturing Company. |
| 11. Thomas & Betts Corporation. |
| 12. Walker Systems, Inc.; Wiremold Company (The). |
| 13. Woodhead, Daniel Company; Woodhead Industries, Inc. Subsidiary. |
| B. Sheet Metal Outlet and Device Boxes: NEMA OS 1. |
| C. Cast-Metal Outlet and Device Boxes: NEMA FB 1, aluminum, Type FD, with gasketed cover. |
| D. Nonmetallic Outlet and Device Boxes: NEMA OS 2. |
| E. Small Sheet Metal Pull and Junction Boxes: NEMA OS 1. |
| F. Hinged-Cover Enclosures: NEMA 250, Type 1, with continuous-hinge cover with flush latch, unless otherwise indicated. |
| 1. Metal Enclosures: Steel, finished inside and out with manufacturer's standard enamel. |
| 2. Nonmetallic Enclosures: Plastic; finished inside with radio-frequency-resistant paint. |
| G. Cabinets: |
| 1. NEMA 250, Type 1, galvanized-steel box with removable interior panel and removable front, finished inside and out with manufacturer's standard enamel. |
| 2. Hinged door in front cover with flush latch and concealed hinge. |
| 3. Key latch to match panelboards. |
| 4. Metal barriers to separate wiring of different systems and voltage. |
| 5. Accessory feet where required for freestanding equipment. |
| A. Outdoors: Apply raceway products as specified below, unless otherwise indicated: |
| 1. Exposed Conduit: Rigid steel conduit, IMC, RNC, Type EPC-40-PVC, RNC, Type EPC-80-PVC. |
| 2. Concealed Conduit, Aboveground: Rigid steel conduit, IMC, EMT], RNC, Type EPC-40-PVC. |
| 3. Underground Conduit: RNC, Type EPC-40], 80 -PVC, direct buried. |
| 4. Connection to Vibrating Equipment (Including Transformers and Hydraulic, Pneumatic, Electric Solenoid, or Motor-Driven Equipment): LFMC, LFNC. |
| 5. Boxes and Enclosures, Aboveground: NEMA 250, Type 3R, 4. |
| B. Comply with the following indoor applications, unless otherwise indicated: |
| 1. Exposed, Not Subject to Physical Damage: EMT, ENT, RNC, or MC. |
| 2. Exposed and Subject to Severe Physical Damage: Rigid steel conduit, IMC. Includes raceways in the following locations: |
| 3. Connection to Vibrating Equipment (Including Transformers and Hydraulic, Pneumatic, Electric Solenoid, or Motor-Driven Equipment): FMC, except use LFMC in damp or wet locations. |
| 4. Damp or Wet Locations: Rigid steel conduit, IMC. |
| C. Minimum Raceway Size: three-fourths (3/4) inch (16-mm) trade size. |
| D. Raceway Fittings: Compatible with raceways and suitable for use and location. |
| 1. Rigid and Intermediate Steel Conduit: Use threaded rigid steel conduit fittings, unless otherwise indicated. |
| 2. PVC Externally Coated, Rigid Steel Conduits: Use only fittings listed for use with that material. Patch and seal all joints, nicks, and scrapes in PVC coating after installing conduits and fittings. Use sealant recommended by fitting manufacturer. |
| E. Install nonferrous conduit or tubing for circuits operating above sixty (60) Hz. Where aluminum raceways are installed for such circuits and pass through concrete, install in nonmetallic sleeve. |
| F. Do not install aluminum conduits in contact with concrete. |
| A. Comply with NECA 1 for installation requirements applicable to products specified in Part 2 or in this Article are stricter. |
| B. Keep raceways at least six (6) inches (150 mm) away from parallel runs of flues and steam or hot-water pipes. Install horizontal raceway runs above water and steam piping. |
| C. Complete raceway installation before starting conductor installation. |
| D. Support raceways as specified in Division 26 Section 26 05 29 "Hangers & Supports." |
| E. Arrange stub-ups so curved portions of bends are not visible above the finished slab. |
| F. Install no more than the equivalent of three (3) ninety (90) degree bends in any conduit run except for communications conduits, for which fewer bends are allowed. |
| G. Conceal conduit and EMT within finished walls, ceilings, and floors, unless otherwise indicated. |
| H. Raceways Embedded in Slabs: |
| 1. Run conduit larger than one-half (½) -inch (27-mm) trade size, parallel or at right angles to main reinforcement. Where at right angles to reinforcement, place conduit close to slab support. |
| 2. Arrange raceways to cross building expansion joints at right angles with expansion fittings. |
| 3. Change from ENT to RNC, Type EPC-40-PVC, rigid steel conduit, or IMC before rising above the floor. |
| I. Threaded Conduit Joints, Exposed to Wet, Damp, Corrosive, or Outdoor Conditions: Apply listed compound to threads of raceway and fittings before making up joints. Follow compound manufacturer's written instructions. |
| J. Raceway Terminations at Locations Subject to Moisture or Vibration: Use insulating bushings to protect conductors, including conductors smaller than No. 4 AWG. |
| K. Install pull wires in empty raceways. Use polypropylene or monofilament plastic line with not less than two hundred (200) lb (90-kg) tensile strength. Leave at least twelve (12) inches (300 mm) of slack at each end of pull wire. |
| L. Raceways for Optical Fiber and Communications Cable: Install raceways, metallic and nonmetallic, rigid and flexible, as follows: |
| 1. Three-fourths (3/4) inch (19-mm) Trade Size and Smaller: Install raceways in maximum lengths of fifty (50) feet (15 m). |
| 2. One (1) inch (25-mm) Trade Size and Larger: Install raceways in maximum lengths of seventy-five (75) feet (23 m). |
| 3. Install with a maximum of two (2) ninety (90) degree bends or equivalent for each length of raceway unless Contract Documents have stricter requirements. Separate lengths with pull or junction boxes or terminations at distribution frames or cabine... |
| M. Flexible Conduit Connections: Use maximum of seventy-two (72) inches (1830 mm) of flexible conduit for recessed and semi-recessed lighting fixtures, equipment subject to vibration, noise transmission, or movement; and for transformers and motors. |
| 1. Use LFMC in damp or wet locations subject to severe physical damage. |
| 2. Use LFMC or LFNC in damp or wet locations not subject to severe physical damage. |
| N. Recessed Boxes in Masonry Walls: Saw-cut opening for box in center of cell of masonry block, and install box flush with surface of wall. |
| O. Set metal floor boxes level and flush with finished floor surface. |
| P. Set nonmetallic floor boxes level. Trim after installation to fit flush with finished floor surface. |
| A. Provide final protection and maintain conditions that ensure coatings, finishes, and cabinets are without damage or deterioration at time of Substantial Completion. |
| 1. Repair damage to galvanized finishes with zinc-rich paint recommended by manufacturer. |
| 2. Repair damage to PVC or paint finishes with matching touchup coating recommended by manufacturer. |
| SECTION 31 23 33.20 |
| RESTORATION OF SURFACES |
| PART 1 - GENERAL |
| PART 2 - PRODUCTS - NOT USED. |
| PART 3 - EXECUTION |
| 4.1 TEST WELL |
File details come from the government source that posted it. Updated .