This performance work statement describes hazard fuels reduction services required by the Bureau of Land Management's Redding Field Office in Weaverville, California. The contractor will be required to conduct manual vegetation treatments on approximately 379 acres, including hand cutting, pruning, piling, and covering cut materials. Treatments will be conducted in three units over multiple years. The base year involves 97 acres, with additional optional years to complete 154 acres and 128 acres. Follow-up maintenance treatments may also be required for 250 acres. The performance period is from October 1st to March 15th each year. The contractor will be responsible for providing all equipment, labor, and materials needed to complete the tasks according to the specifications provided, which include requirements for tree spacing, pile sizes, and exclusion areas. The quality assurance plan establishes inspection procedures and performance standards for acceptable work.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

TBDPROJECT TITLE:

Weaverville Community Protection Fuels Reduction

Redding BLM, CA-NOD

Contents

Section 1.0 Background on the Government’s Requirement2
Section 2.0 General Scope of Work3
Section 3.0 Overall Objective(s)5
Section 4.0 Specific Tasks5
Section 5.0 Delivery / Performance Schedule8
Section 6.0 Government-Furnished Property, Materials, Services11
Section 7.0 Security and Administrative Matters11
Section 8.0 Technical Exhibits and Definitions12
EXHIBIT X: QUALITY ASSURANCE SURVEILLANCE PLAN (QASP)16

1.0 Background on the Government’s Requirement

Bureau of Land Management Redding Field Office is requesting 379 acres of hand thinning, hand piling, and pile covering of hazard fuels adjacent to Weaverville in Trinity County, CA. Heavy accumulations of hazard fuels on public lands adjacent to the Weaverville community have created elevated wildfire threat to infrastructure and natural resources. Hand thinning, Pruning, Hand Piling, Pile Covering, and loop and scatter will be used to reduce fuel loadings within three identified treatment units ranging from 97 acres to 154 acres in the overall 379-acre project area. Elevation in the treatment areas range from 1,920 feet and 3,310 feet, with slopes ranging from 30% to 60%. Vegetation is made up of mixed conifer, isolated pockets of oak woodlands and dense woody shrubs. Canopy cover ranges from 30% to 100% within the treatment areas. BLM is requesting cost per acre and cost per unit bids within the identified project area.

Project Location:

Unit 1 (Base Year):

· Township 33N, Range 10W, Sections 11,12

· Located on the north end of the BLM Weaverville Community Forest.

Unit 2 (Option Year 1):

· Township 33N, Range 10W, Sections 11, 12, 13, & 24

· Located in the BLM Weaverville Community Forest, adjacent to W Weaver Creek RD.

Unit 3 (Option Year 2):

· Township 33N, Range 10W, Sections 3, 12, & 13. Township 33N, Range 9W, Sections 18 & 19.

· North of Weaverville adjacent to Glennison Gap RD.

· Eastern boundary the BLM Weaverville Community Forest.

· West of Weaverville adjacent to Mill St.

· South of Weaverville adjacent to Highway 299 and Little Browns Creek RD.

Maintenance (Option Year 3 &4)

· Refer to Units 1, 2, & 3

This scope of work defines the requirements for the contractor to provide forestry or hazard fuels personnel to cut, pile, and pile cover vegetation within the project area.

Section 2.0 General Scope of Work

Services include hand cutting with power saws, hand piling cut material, and pile covering of live and dead standing or fallen vegetation on up to 379 acres of public land adjacent to the community of Weaverville in Trinity County, CA. The Contractor shall accomplish all cutting, piling, and covering within the designated treatment area in accordance with the specifications identified. Cutting, piling, and pile covering will occur within the entirety of this project area (379 acres) but will be divided by three independent units in which contractors will provide a cost per acre and cost per unit price.

Place of Performance The services under this contract will be performed at the Weaverville Community Protection Fuels Reduction project area which is located in Trinity County, CA and contains approximately 379 acres of hand cutting, piling, and pile covering treatments on public lands administered by the Bureau of Land Management (BLM) Redding Field Office (see attached map). The project area is located approximately west of Weaverville, CA, within Sections (or parts of Sections) of the following Township (T) and Range (R) identifiers: T33N R10W Sections 3, 11, 12, 13, & 24 & T33N R9W Sections 18 & 19.

Driving Directions to Project Area:

Unit 1 (Base Year): From Weaverville, CA drive west on Oregon St (from Hwy 299)1.5 miles, arrive at BLM Weaverville Community Forest kiosk. Additional unit access along Democrat Gulch RD & Stoney Gulch.

Unit 2 (Year 2): From Weaverville, CA drive west on Oregon St (from Hwy 299)1.5 miles, arrive at BLM Weaverville Community Forest kiosk. Additional unit access along Democrat Gulch RD.

Unit 3 (Year 3): From Weaverville, CA drive North on Highway 299 2.5 miles arrive at Glennison Gap Rd X Hwy 299 intersect. From Weaverville, CA drive west on Oregon St (from Hwy 299)1.5 miles, arrive at BLM Weaverville Community Forest kiosk. From Weaverville, CA drive west on Mill St 0.5 miles arrive at BLM Weaverville Community Forest kiosk, additional access along Mill St. From Weaverville, CA drive South on Hwy 299 1 mile arrive at Little Browns Creek Rd x Hwy 299.

Access Specifications Access will be by both gravel roads (improved) and dirt roads (unimproved), which may require four- wheel drive vehicles. Access is by all-weather and seasonal roads. Seasonal roads may be impassable for several days after heavy rains or snow-blocked during the winter months. Cross-country foot travel of one-half mile to one mile is typical to the unit boundaries and treatment areas.

If an all-terrain vehicle is used, it shall be of such design that it will travel over rough, uneven terrain and not create wheel ruts and channels, or cause significant damage to existing trail tread. The vehicle shall be approved by the COR prior to use.

Portions of the project area are beyond locked gates that require a key or lock combination for access. The Contractor will be given access to gate combos and required agency keys to make access, gate keys must be returned to the COR at the end of the period of performance. The Contractor shall lock gates with locks immediately after entry or exit.

Access through private property and use of private roads will be through agreement between BLM and adjacent private landowners. Gate combos or keys will be relayed to the contractor by the BLM. Contractor access through private property may be terminated by the landowner or BLM related to road condition, haul route conflicts, or gate security issues.

Hours of Operations The Contractor will coordinate their hours of operation with BLM, but the Contractor is not restricted to operating during regular BLM office hours. Chainsaw work may not begin until 1/2hr after sunrise and must end 1/2hr after sunset on any given working day. Other hours of operation restrictions may be implemented during high fire danger or during previously scheduled events.

Security of Equipment and Property The Contractor may leave equipment at the work site with approval from the COR. The Contractor shall be responsible for equipment if it should be lost, stolen or damaged. At the close of each work period, government facilities, equipment, and materials shall be secured. All personnel employed by the Contractor in the performance of this contract, or any representative of the Contractor entering the government worksite, shall abide by all security regulations.

Period of Performance:

The period of performance shall be for one (1) Base Year, two (2) additional option years to complete treatment on all proposed acres, and one (2) additional option year to complete maintenance treatment.

The Period of Performance reads as follows:

Base Year 1:

October 1st, 2023 through March 15th, 2024 (Unit 1 - 97ac)

Additional Performance Years – Option Years:

Option Year #1 - - October 1st, 2024 through March 15th, 2025 (Unit 2 -154ac) Option Year #2 - - October 1st, 2025 through March 15th, 2026 (Unit 3 – 128ac) Option Year #3 - - October 1st, 2026 through March 15th, 2027 (Maintenance -125ac) Option Year #4 - - October 1st, 2027 through March 15th, 2028 (Maintenance -125ac)

Section 3.0 Overall Objective(s)

The objective of this work is to reduce wildfire threat and promote forest health by reducing fuel loadings in overstocked mixed conifer, oak woodland, and woody shrub stands in Weaverville Community Protection Fuels Reduction project area. The proposed treatment will occur on public lands in Trinity County, CA administered by the Bureau of Land Management Redding Field Office.

· Fuel breaks will be constructed by hand severing, pruning, hand piling, and pile covering live or dead standing, and dead downed vegetation.

· Fuels breaks will be maintained utilizing hand severing, pruning, hand piling, and pile covering live or dead standing, and dead downed vegetation, or lopping and scattering if there is a lack of vegetative material to construct the minimum allowable size pile.

· Fuels breaks will focus on breaking continuity of vertical and horizontal fuels stands to limit unchecked fire spread in overstocked stands.

· Fuel Breaks will promote large conifer and hardwood stands that are resilient to future wildfires.

A site visit is recommended for this service contract; however, will only be done by request. We will meet at the BLM Weaverville Community Forest trail head kiosk on Oregon Street 1.5 miles west of Weaverville in Trinity County CA. Questions may be directed towards Rob Winkler, Assistant District Fire Management Officer, Northern Ca, 530-224-2124- or - Garrett Dunn, Fire Management Officer, Redding Arcata Zone, 530-310-4240.

Section 4.0 Specific Tasks

All tasks will occur through the entirety of the project area, approx. 379 acres total for initial treatment (BASE year, OPTION Year #1, OPTION Year #2).

Task 1: Hand sever using power saws live and dead standing or fallen vegetation throughout identified treatment units – see attached treatment map.

· Hand cut live standing vegetation up to 10 inches DBH. Post treatment spacing of 25 feet between leave tree stems.

· Live standing material greater than 10 inches DBH will not be cut within the treatment area but may be used to create 25-foot stem spacing profile post treatment.

· No live or dead limbs shall be left on the stumps after cutting. Stumps shall be cut level or perpendicular to the vertical angle of the stump and at a height not exceeding 6 inches form ground surface measured on the uphill side.

· All live conifers and hardwoods 10 inches DBH and larger are reserved from cutting or girdling.

· Conifer trees up to 15 inches DBH may be cut when growing within the canopy dripline of an oak tree (any species) greater than 10 inches DBH.

· No riparian vegetation would be cut as part of the fuels reduction, regardless of diameter.

· Hand cut, limb and buck standing dead fuels up to 18 inches DBH and downed dead fuels up to 10 inches diameter, material greater than 10 inches diameter will be bucked to create maximum contact with ground surface and left on site. Un-piled logs and slash (greater than 10 inches) will be set back 10 feet from trails, infrastructure, or roadways.

· No dead standing vegetation less than 18 inches DBH will be left uncut, unless identified as a wildlife tree (marked with red and white candy stripe flagging). Dead standing vegetation will not be used in creating 30ft stem spacing post treatment profile.

· Downed material greater than 10 inches will be limbed and the limbs piled along with other material less than 10 inches.

· Dead standing vegetation less than 18 inches DBH and downed material less than 10 inches will be cut within riparian buffer areas, however piles must be placed outside of riparian buffer area.

· No fuels reduction cutting will occur within Archeological exclusion areas

Task 2: Pruning of all leave trees and leave snags to a height of 8 feet above ground level.

· Live and dead limbs and branches shall be cut cleanly and as close to the bole of the tree as possible.

· Tree limbs and branches attached to the bole above the designated pruning height but have limbs or branches extending into the pruning height area, shall be pruned so they do not extend below the designated height.

Task 3: Hand pile all cut material and downed slash throughout identified treatment units – see attached treatment map.

· Cut material and slash between 1/2 inch and 10 inches in diameter and greater than 2 feet in length will be utilized to construct burn piles. Burn pile dimensions shall range from a minimal footprint of 6 foot by 6 foot to a maximum footprint of 15 foot by 15 foot. Burn piles shall be constructed at a minimal height that is equal to the width the pile footprint.

· Slash less than 1/2 inch in diameter or less than 2 feet in length shall be left on the ground. Slash left on the ground shall not exceed 6 inches in depth.

· Burn piles will be compact, free of interior open spaces, free of dirt or other non-combustibles.

· Burn piles will be trimmed of any material that protrudes beyond 2 feet from the outermost compacted edge of the burn piles footprint.

· Burn piles will be placed a minimum of 10 feet from leave trees, trails, fence lines, roadways, and unit boundaries.

· Burn piles will be placed a minimum of 10 feet from powerline drip lines.

· Burn piles will not be built within cultural exclusions.

· All roads and trails designated on the project map(s) shall be kept free of slash and piled material.

Task 4: Hand pile covering all created piles within treatment areas – see attached map.

· All hand piles shall be covered with a minimum of 6-foot by 6-foot piece of 4-mil thickness black polyethylene plastic or forestry slash paper (Kraft paper). Hand piles shall be covered such that at least 80 percent of the pile’s surface area shall be covered. All four corners and the middle of the cover material shall be anchored with slash or other debris. The cover material must be placed in the top ¼ of the pile.

· All pile covering material will be provided by the contractor unless otherwise agreed upon with the BLM.

Task 5: Maintenance Treatment – Maintenance tasks will occur on 250 acres as part of OPTION Year #3 & #4 Maintenance treatments would utilize the original manual vegetation treatment specifications previously outlined.

· All follow-up maintenance intervals would adhere to described cutting methods and specifications. Hand Cut, Hand Pile, Pruning, and Pile Covering.

· Maintenance interval requires Hand Cut LOP/ SCATTER on acres without sufficient vegetation to create hand piles to minimum standards.

· Lop/ Scatter will disperse cut vegetation as to not create jackpots or accumulations of cut vegetation greater than ONE foot in depth.

· Lop/ Scatter will disperse vegetation TEN feet away from Leave Trees, Trails, Roadways, and Unit Boundaries.

Criteria for Selection of Leave Trees:

All live conifers and hardwoods lager than 10 inches DBH are reserved from cutting or girdling. All living Blue Oak and Black Oak hardwoods regardless of diameter will be retained. These trees shall be included in spacing requirements. The largest, healthiest, best-formed trees shall be selected as leave trees. Characteristics used in the selection of leave trees include the following:

· Has no apparent damage to the main bole;

· Is not visibly dead/dying;

· Demonstrates good vigor and is disease/bug free;

· Has at least 40 percent crown ratio or largest crown ratio if none greater than 40 percent are present

Section 5.0 Delivery / Performance Schedule

Mapping Unit boundaries are not marked. A shapefile and PDF Map of the treatment area for GPS/ Avenza will be provided and contractor will be required to accurately work within boundary of unit. Trailheads, intersections, and trail spurs are identified with recreation signage.

Additional Information:

The Contractor is responsible for organizing and directing all the equipment and personnel needed to fully accomplish the work. The Contractor shall develop and submit a Treatment Plan and Schedule to accomplish the project objectives. The Treatment Plan and Schedule will be agreed upon by both parties and incorporated into the contract at the Pre-Work. The Contractor shall notify the BLM COR a minimum of 2 weeks prior to initiating work. All changes to the Treatment Plan and Schedule will be agreed to prior to the changes taking effect. The Treatment Plan and Schedule shall include as a minimum the following items:

1. Cutting Plan – Discussed in more detail at Pre-Work meeting

2. Safety Plan – To include traffic control, identification of hazards, and trail closures if applicable

3. Fire Prevention Plan – For prevention and control of fires, with detailed list of personnel and equipment

Statutory Compliance The Contractor agrees to conduct operations under this contract and other related business activities in compliance with federal, state, and local statutes, standards, orders, permits or other regulations. Failure to comply will be grounds for default in accordance with the Default clause. The contract shall govern if such laws conflict with or preclude performance of contractual requirements.

Improvements The Contractor shall comply with the rules and regulations governing the operation of premises which are occupied and shall perform the contract in a manner that will not interrupt or interfere with the conduct of BLM business.

Before any camp, quarry, borrow pit, storage or service area other than shown on drawings is opened or operated lands administered by the BLM, written permission shall be obtained through the BLM and COR. A camp is interpreted to include the campsite or trailer parking area of any employee working on the project for Contractor. Such permission, if granted, shall be without charge to Contractor. Contractor must remove and dispose of all said improvements when no longer needed.

Wildlife Resources The Contractor shall comply with seasonal restrictions administered by the Bureau of Land Management project design features. Sensitive resource areas will be flagged and identified on maps provided at the pre-work meeting. No treatments will be permitted from March 15th until September 30th of any given year of project implementation.

However, if this protection measure proves inadequate, if other such areas are discovered, or if new concerns are identified, the BLM may either cancel or unilaterally modify this contract to provide additional protection regardless of when such facts become known. Discovery of such areas by either party shall be promptly reported to the other party and operations will be suspended at that location until the significance or potential significance of the area is determined.

The project area contains suitable nesting habitat for a multitude of species protected under the Migratory Bird Treaty Act of 1918. The regional nesting season for raptors protected under the act with the potential to occur within the project area runs from January 1 through August 31; for non-raptors, nesting season in the region occurs from mid-February through August 15.

Pre-project surveys:

· Project activities conducted during either nesting season will require surveys to determine the presence of active nests within or adjacent to project areas, no more than 7 days prior to commencing work.

Implementation of Avoidance Measures:

· Where nests are found, a buffer of 250 feet should be established around the nest and maintained until birds have fledged or breeding activities have ceased.

· Any active raptor nest will be reported to the COR or Wildlife Biologist and project activities ceased within a 0.5-mile buffer until surveys indicate that project activities would not disturb nesting and/or breeding activities.

Sensitive Vegetation and Riparian Areas Perennial Streams requires a riparian buffer of 150 feet within the project area. Intermittent streams within the project area will require a buffer of 100 feet. These riparian buffers will be identified on the project map. Fuels reduction activities with riparian buffers may occur with the following specifications:

· Live standing vegetation up to 7 inches will be cut to a post treatment stem spacing profile of 15 feet.

· Dead standing vegetation up to 18 inches will be cut, no dead standing material less than 18 inches will remain post treatment and will not be used in post treatment spacing profile.

· Downed dead material up to 10 inches will be cut. Downed material larger than 10 inches will be limbed and the limbs piled along with other material less than 10 inches diameter.

· A burn pile is permitted every 100-foot horizontal distance within the riparian reserve; however, the pile most not be placed within 50-feet of the stream.

· Stream channels are excluding from cutting and removal of vegetation.

· No riparian vegetation will be cut.

Archeological Resource Protection No fuels reduction operations will occur within mapped or flagged Archeological exclusion areas. Archeological features are protected by federal law and are prohibited from excavation, disturbance, damage, or collecting. Should previously unidentified archeological resources be found or uncovered, the contractor must make immediate contact with COR and stop all fuels reduction operations in the immediate area of discovery.

Protection of Improvements The Contractor shall protect roads and other improvements (such as fences, roads, trails, telephone lines, and ditches) whether designated on the project area map or not.

Protection of Improvements Not Owned by the BLM The Contractor will notify all utility companies, or other parties affected, and plans for all necessary adjustments of the public utility fixtures, pipelines, and other appurtenances affected by Contractor’s operations.

When Contractor’s operations are adjacent to properties of railway, telegraph, telephone, or power companies, or other property, work shall not begin until all necessary arrangements to prevent damage have been made by the Contractor.

The Contractor will cooperate with all owners of above-mentioned property. In the event of interruption because of accidental breakage, the Contractor shall promptly notify the proper authority, and cooperate with that authority in the restoration of service.

Protection of Land Survey Monuments The Contractor shall protect all known survey monuments, witness corners, reference monuments and bearing trees against any damage during Contractor’s operations.

Safety The Contractor will follow all United States Department of Labor Occupational Safety and Health Standards that pertain to the operations set forth in this contract under Subpart R, Special Industries Standards 1910.266 Logging Operations Standards.

Sanitation and Servicing The Contractor shall take all reasonable precautions to prevent pollution of air, soil, and water by Contractor’s operations. If facilities for employees are established within the project area, they shall be operated in a sanitary manner. Contractor shall not service tractors, trucks or other equipment on BLM lands where servicing is likely to result in pollution to soil or water.

Contractor shall remove from BLM lands all refuse resulting from use, servicing, repair, or abandonment of equipment. If the contractor’s operations or servicing of equipment result in pollution to soil or water, Contractor shall conduct cleanup to restore the polluted site to the previous observed conditions, and approved by the COR.

Section 6.0 Government-Furnished Property, Materials, Services

General:

The Contractor shall furnish all personnel, materials, equipment, supplies, facilities, transportation, tools, supervision, and other items and non-personal services necessary to perform the work tasks defined in this Performance Work Statement, except for those items specified as government furnished property and services.

Materials:

The Contractor shall furnish all materials necessary to meet the requirement of this contract except for those items specified as government-furnished property and services.

Equipment:

The Contractor shall furnish equipment necessary to meet the requirement of this contract except for those items specified as government-furnished property and services.

Section 7.0 Security and Administrative Matters

Regular Work Hours:

Unless otherwise specified work hours under this task order shall be limited to the time between one-half hour before sunrise to one-half hour after sunset each day. Work may be done on Saturday, Sunday with notification to the COR, however work will not occur on Federal holidays unless authorized by the COR.

Federal Holidays:

The following Federal Legal Holidays are observed:

New Year’s DayMemorial Day
President’s DayJuneteenth National Independence Day
Independence DayLabor Day
Columbus DayVeterans Day
Thanksgiving DayChristmas Day
Martin Luther King, Jr Day

Fire Danger Season:

The Contractor shall take every reasonable precaution to prevent a wildland fire from occurring from his or her actions on this project. The Authorized Officer may, under certain conditions, require fire prevention and control measures in addition to those required by applicable state laws and regulations. This may include but will not be limited to changes in daily work schedules or full closure of operations due to extreme fire risk.

Section 8.0 Technical Exhibits and Definitions

Standard Definitions:

Physical Condition The Physical appearance of Federal equipment or facilities that considers cracks, chips, dents, abrasions, rust, corrosion, general cleanliness, vibration, operating temperature, and discoloration and other items as identified by the COR.. Physical condition may be determined by visual as well as diagnostic means.

Contracting Officer (CO) The Secretary of the Interior or designated authorized representative who is the only agent capable of signing a federal award or obligating funds.

Contracting Officer’s Representative (COR) The Contracting Officer’s designated representative as indicated in a delegation of authority letter.

Quality Assurance (QA) Surveillance of Contractor performance to determine performance requirements are met.

Performance Requirements Summary (PRS) (see Technical Exhibit below) The PRS identifies the key performance indicators of the Contract that will be evaluated by the Government to assure Contract performance standards are met by the Contractor.

Quality Control Those actions taken by the Contractor to control the production of goods or services so that they meet the requirements of the performance work statement.

Performance Work Statement (PWS)

PWS Page 5

EXHIBIT X: QUALITY ASSURANCE SURVEILLANCE PLAN (QASP)

Work Tasks to be Performed
Acceptable Quality Level
Method of Surveillance
Consequences, Remedies, and/or Deduction(s)

Task(s):

1: Hand Sever

2: Hand Pile All trees, brush, and downed material up to 10 inches in diameter must be hand severed using power saws in accordance with the specification listed under Section 4 of this task order.

All cut material and downed slash from 1/2 to 10 inches in diameter and greater than 2 feet in length must be piled in accordance with the specifications listed under section 4 of this task order.

The COR and/or Project Inspector (PI) will conduct government inspections. The Contractor (or designated representative) is encouraged to be present to observe inspections. Summary results will be made available on request. Government inspections will consist of:

a. Compliance Inspections Visual compliance inspections of work tasks will be made on a periodic basis across the project area. Such inspections are not final and do not constitute acceptance by the Government.

b. Final Inspections Final inspections for payment will be made on the completed project unit unless otherwise agreed upon in writing. Contractor shall request a final inspection.

Inspection requests shall be verbal and documented within the diary or in writing and pursuant to FAR 52.246-4, shall include results of Contractor’s quality inspections. Inspections will be completed within ten

(10) calendar days after the notice is received for each item. If a formal request for an item inspection is within the ten (10) working days since the previous request, the time will not start until the time for the previous inspection expires.

The Contractor will be responsible for ensuring his or her crew can identify leave trees and cut to desired spacing distances.

The contractor will be made aware of the deficiencies and documented in the COR’s diary. Deficiencies will need to be corrected within 48 hours unless the BLM representative states otherwise.

Incentives/Disincentives

a. Contractor will be required to rework the area at no additional cost to the Government

b. The Government will charge to the Contractor any additional cost of subsequent inspection of reworked area

c. Positive or negative Performance rating at the end of the contract (this will have definitive impacts on the

3. Pile Covering

All piles created within the project area must be covered under the specification outlined within section 4 of this task order.

See above

See above image1.emf

West Weaver Creek

State Hwy 299

DutchLn

Tri nc o Rd

WendyLn

Stoney Gulch

Oregon St

Oregon To West Weaverville

W Weaver Rd

Democrat Gulch Rd

Sources: Esri, HERE, Garmin, Intermap, increment P Corp., GEBCO, USGS, FAO, NPS, NRCAN, GeoBase, IGN, Kadaster NL, Ordnance Survey, Esri Japan, METI, Esri China (Hong Kong), (c) OpenStreetMap contributors, and the GIS User Community

Weaverville Community Protection - Year 1 97 Acres

¹ 0 0.09 0.18 0.27 0.360.045 Miles image2.emf

Weaver Creek

East Weaver

Creek

Gr an ite Pe ak

Ha tle y L n

Tucker

Hill Rd

Hart St

Ca rs on St

Wild Rose Ln

Pine Song Ln

SmithSt

Helen Dr

Me ad ow Ln

Mo un tai n

Vie w

Bart lett

LnSamLee Dr Rocky Rd

Virginia St

SpringHill Rd

Center St Lower Mill St

Lo ren z R d

Wa sh ing ton

Ma so nic

Ln

Main St

Odd Fellows Ave

S Ridge Rd

Mi ll St

Oregon To West

Weaverville

Timber Ridge Rd OregonSt

Democrat

Gulch Rd

W Weaver Rd

Weaverville Community Protection - Year 2 154 Acres

0 0.2 0.4 0.6 0.80.1 Miles image3.emf

Dutton Creek Weaver Creek

Ea st W eav er

Cr eek

Little Brow ns C reek

Weaverville Community Protection - Year 3 128 Acres

0 0.45 0.9 1.35 1.80.225 Miles