FOUNDRY CONVEYOR SYSTEM SOLICITATION W9098S20Q0042 QUESTIONS AND ANSWERS

QUESTIONSANSWERS
1Are there up to date schematics of the system?No, there is no available schematics of the system.
2Will the current programs be provided to the chosen contractor?The Government will provide the current PLC program in which the contractor can download the program.
3Are there any restrictions or requirements on those performing the installation in regards to union affiliation, certifications, etc.?No there is not any restrictions or requirements on those performing the installation as long as requirements are followed per the contract.
4Are the any restrictions on the firmware revision used for the new controller or HMI’s?The Government prefers the newest version.
5What is the expectation for providing training after the system is installed: Number of days? Multiple shifts? Operators and maintenance?The contractor needs to be able to provide training in 1 day. Multiple shifts is not required or necessary. Yes, Operators and Maintenance need training.
6Would upgrading the PLC and HMIs to modern devices, but keeping the existing IO as remote racks be acceptable?Preferably not, the Government is trying to avoid having to possibly replace any obsolete componets.
7Would you be able to provide a list of all IO cards with part numbers in each PLC rack ?Please see Attachment 0001 which includes pictures.
8Would converting the Logix500 program used into the newer software be acceptable, or would a complete rewrite of the logic be preferred?Yes, converting would be acceptable.
9Would also like to request pictures of the following: - Each PLC rack showing all IO cards - An overall view of the cabinet containing each PLC rack - Each HMI devicePlease see Attachment 0001 which includes pictures.
10Can someone please take pictures of all the equipment that need to be replaced as part of the scope of this project?Please see Attachment 0001 which includes pictures.