B08_A6_IA_Form_3000_Material_Approval_Submittal.pdf
PDF 265 KB Posted
- Attached to
- INSTALL DIRECT DIGITAL CONTROLS C-EB Federal contract opportunity
- Solicitation number
- 140A2323R0084
About this file
This document is a Material Approval Submittal form used by contractors to submit shop drawings, equipment data, manufacturer literature, certificates, and material samples to the government for approval in accordance with contract provisions. It includes space to list up to 12 material items along with relevant specification sections, paragraph numbers, or drawing numbers. For each item, the contractor provides a description including type, model number, catalog number, and manufacturer. The form also includes spaces for contractor certification, government evaluation and approval signatures, and comments corresponding to listed item numbers. Approvals are required as stipulated by the contracting officer under the contract terms.
The related federal contract opportunity is a solicitation from the Department of the Interior Bureau of Indian Affairs Bureau of Indian Education to install direct digital controls for a central energy management system at location C-EB. No other details are provided regarding response date, award date, pricing terms, set-asides, or incumbent.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| B08_A5_Health_and_Safety_Codes.pdf | ||
| B08_A9_SF-1413_Statement_and_Acknowledgement_Form_(Subcontracting).pdf | ||
| B08_A2_CEB_DDC_-_Drawings.pdf | ||
| B08_A1_Statement_of_Work.pdf | ||
| B08_A7_IA_Form_C113_Progress_Schedule_-_Copy.pdf | ||
| B08_A10_SF-25_Performance_Bond_Form.pdf | ||
| B08_A8_IA_Form_C713_Progress_Report.pdf | ||
| B08_A4_Wage_Determination_SD20230012.pdf | ||
| B08_A3_CEB_DDC_-_Specs.pdf | ||
| B08_A11_SF-25A_Payment_Bond_Form.pdf | ||
| Sol_140A2323R0084.pdf |
Show all 11
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Department of the Interior, Indian Affairs Revised on Sept 29, 2020
TO: (Contracting Officer) FROM: (Contractor) DATE
CONTRACT NUMBER SUBMISSION NUMBER SUBMITTAL
NEW RESUBMITTAL
PREVIOUS SUBMISSION NUMBER PROJECT NUMBER
TO BE COMPLETED BY CONTRACTOR FOR GOVERNMENT USE ONLY
ITEM
NO.
SPECIFICATION SECTION/
PARA NO./DRAWING NO.
DESCRIPTION OF MATERIAL
(Include Type, Model Number, Catalog Number, Mfg., etc)
AP-
PROVED
DISAP-
PROVED
SEE
REVERSE INITIAL
BY COMPLETING THIS FORM, THE UNDERSIGNED CONTRACTOR CERTIFIES THAT
THE MATERIAL COMPLIES WITH ALL SPECIFICATIONS OF SUBJECT CONTRACT.
DATE TYPE OR PRINT NAME AND TITLE SIGNATURE
FOR GOVERNMENT USE ONLY
TO: (Contracting Officer)
For Evaluation and Action
DATE TYPE OR PRINT NAME AND TITLE SIGNATURE
TO: (Project Engineer or Contracting Officer Representative)
RECOMMEND APPROVAL DISAPPROVAL AS INDICATED ABOVE AND SUBJECT TO ANY APPLICABLE COMMENTS ON THE
REVERSE
DATE TYPE OR PRINT NAME AND TITLE SIGNATURE
TO: (Contractor)
APPROVED
DISAPPROVED AS INDICATED ABOVE AND SUBJECT TO ANY APPLICABLE COMMENTS ON THE REVERSE SIDE. REQUEST
RESUBMITTAL ON DISAPPROVED ITEMS WITHIN ________ DAYS OF DATE SHOWN BELOW.
DATE TYPE OR PRINT NAME AND TITLE SIGNATURE
IA FORM 3000 PREVIOUS EDITION IS OBSOLETE.
MATERIAL APPROVAL SUBMITTAL
(See Instructions on Reverse)
COMMENTS
(Number to correspond with applicable Item Number on reverse)
INSTRUCTIONS TO CONTRACTORS
1. The term “material” is defined as articles, supplies, raw materials, equipment, parts, components, and end items that are to be incorporated into the work required by the contract.
2. This form is to be used by contractors for submitting Shop Drawings, Equipment Data, Manufacturer’s Literature and Certificates and samples of Materials to the Government for approval in accordance with the provisions of this contract. Unless otherwise specified, it is to be prepared in 4 copies, signed, and provided to the contracting officer with appropriate attachments.
3. Item(s) to be approved will be clearly tabbed or identified. Data pertaining to item(s) to be approved will be clearly identified or tabbed, particularly where documents are voluminous, in order to properly evaluate the materials or articles to be incorporated in the work. Each attachment will be numbered to correspond with the item number shown on the face of this form.
4. Request submitted shall be numbered consecutively, by contract, in the space entitled “Submission No.”. This number, in addition to the Contract No., will be used to identify each Material Approval Submittal. Resubmissions will be indicated in the appropriate block and the insertion of previous submission number and data in addition to a new submission number. A single submission should be used for all work of a section of the specifications, but in NO instance should the submission include work for more than one (1) contract. Submittals requiring priority handling will be submitted by separate submittal using the form and so marked across the face of the form.
5. This material Approval Submittal is not valid unless it is signed by the contracting officer. This approval is required as called for by the contracting officer under the terms of this contract.
IA FORM 3000
| Revised on Sept 29 2020: |
| TO Contracting Officer: |
| FROM Contractor: |
| DATE: |
| CONTRACT NUMBER: |
| SUBMITTAL: |
| PREVIOUS SUBMISSION NUMBER: |
| PROJECT NUMBER: |
| ITEM NORow1: |
| SPECIFICATION SECTION PARA NODRAWING NORow1: |
| DESCRIPTION OF MATERIAL Include Type Model Number Catalog Number Mfg etcRow1: |
| ITEM NORow2: |
| SPECIFICATION SECTION PARA NODRAWING NORow2: |
| DESCRIPTION OF MATERIAL Include Type Model Number Catalog Number Mfg etcRow2: |
| ITEM NORow3: |
| SPECIFICATION SECTION PARA NODRAWING NORow3: |
| DESCRIPTION OF MATERIAL Include Type Model Number Catalog Number Mfg etcRow3: |
| ITEM NORow4: |
| SPECIFICATION SECTION PARA NODRAWING NORow4: |
| DESCRIPTION OF MATERIAL Include Type Model Number Catalog Number Mfg etcRow4: |
| ITEM NORow5: |
| SPECIFICATION SECTION PARA NODRAWING NORow5: |
| DESCRIPTION OF MATERIAL Include Type Model Number Catalog Number Mfg etcRow5: |
| ITEM NORow6: |
| SPECIFICATION SECTION PARA NODRAWING NORow6: |
| DESCRIPTION OF MATERIAL Include Type Model Number Catalog Number Mfg etcRow6: |
| ITEM NORow7: |
| SPECIFICATION SECTION PARA NODRAWING NORow7: |
| DESCRIPTION OF MATERIAL Include Type Model Number Catalog Number Mfg etcRow7: |
| ITEM NORow8: |
| SPECIFICATION SECTION PARA NODRAWING NORow8: |
| DESCRIPTION OF MATERIAL Include Type Model Number Catalog Number Mfg etcRow8: |
| ITEM NORow9: |
| SPECIFICATION SECTION PARA NODRAWING NORow9: |
| DESCRIPTION OF MATERIAL Include Type Model Number Catalog Number Mfg etcRow9: |
| ITEM NORow10: |
| SPECIFICATION SECTION PARA NODRAWING NORow10: |
| DESCRIPTION OF MATERIAL Include Type Model Number Catalog Number Mfg etcRow10: |
| ITEM NORow11: |
| SPECIFICATION SECTION PARA NODRAWING NORow11: |
| DESCRIPTION OF MATERIAL Include Type Model Number Catalog Number Mfg etcRow11: |
| ITEM NORow12: |
| SPECIFICATION SECTION PARA NODRAWING NORow12: |
| DESCRIPTION OF MATERIAL Include Type Model Number Catalog Number Mfg etcRow12: |
| DATE_2: |
| TYPE OR PRINT NAME AND TITLE: |
| TO Contracting Officer_2: |
| For Evaluation and Action: |
| DATE_3: |
| TYPE OR PRINT NAME AND TITLE_2: |
| TO Project Engineer or Contracting Officer Representative: |
| DATE_4: |
| TYPE OR PRINT NAME AND TITLE_3: |
| TO Contractor: |
| DAYS OF DATE SHOWN BELOW: |
| DATE_5: |
| TYPE OR PRINT NAME AND TITLE_4: |
| COMMENTS Number to correspond with applicable Item Number on reverseRow1: |
| COMMENTS Number to correspond with applicable Item Number on reverseRow2: |
| COMMENTS Number to correspond with applicable Item Number on reverseRow3: |
| COMMENTS Number to correspond with applicable Item Number on reverseRow4: |
| COMMENTS Number to correspond with applicable Item Number on reverseRow5: |
| COMMENTS Number to correspond with applicable Item Number on reverseRow6: |
| COMMENTS Number to correspond with applicable Item Number on reverseRow7: |
| COMMENTS Number to correspond with applicable Item Number on reverseRow8: |
| COMMENTS Number to correspond with applicable Item Number on reverseRow9: |
| COMMENTS Number to correspond with applicable Item Number on reverseRow10: |
| COMMENTS Number to correspond with applicable Item Number on reverseRow11: |
| COMMENTS Number to correspond with applicable Item Number on reverseRow12: |
| COMMENTS Number to correspond with applicable Item Number on reverseRow13: |
| COMMENTS Number to correspond with applicable Item Number on reverseRow14: |
| COMMENTS Number to correspond with applicable Item Number on reverseRow15: |
| COMMENTS Number to correspond with applicable Item Number on reverseRow16: |
| COMMENTS Number to correspond with applicable Item Number on reverseRow17: |
| COMMENTS Number to correspond with applicable Item Number on reverseRow18: |
| COMMENTS Number to correspond with applicable Item Number on reverseRow19: |
| COMMENTS Number to correspond with applicable Item Number on reverseRow20: |
| Check Box2: Off |
| Check Box3: Off |
| Check Box4: Off |
| Check Box5: Off |
| Check Box6: Off |
| Check Box7: Off |
| Check Box8: Off |
| Check Box9: Off |
| Check Box10: Off |
| Check Box11: Off |
| Check Box12: Off |
| Check Box13: Off |
| Check Box14: Off |
| Check Box15: Off |
| Check Box16: Off |
| Check Box17: Off |
| Check Box18: Off |
| Check Box19: Off |
| Check Box20: Off |
| Check Box21: Off |
| Check Box22: Off |
| Check Box23: Off |
| Check Box24: Off |
| Check Box25: Off |
| Check Box26: Off |
| Check Box27: Off |
| Check Box28: Off |
| Check Box29: Off |
| Check Box30: Off |
| Check Box31: Off |
| Check Box32: Off |
| Check Box33: Off |
| Check Box34: Off |
| Check Box35: Off |
| Check Box36: Off |
| Text37: |
| Check Box38: Off |
| Text38: |
| Text39: |
| Text40: |
| Text41: |
| Text42: |
| Text43: |
| Text44: |
| Text45: |
| Text46: |
| Text47: |
| Text48: |
| Check Box39: Off |
| Check Box40: Off |
| Check Box41: Off |
| Check Box44: Off |
| Check Box45: Off |
File details come from the government source that posted it. Updated .