B08_140P1424Q0010_Attachment_1_SOW.pdf
PDF 647 KB Posted
- Attached to
- Replace sewer lines at Big Horn Canyon National Re Federal contract opportunity
- Solicitation number
- 140P1424Q0010
About this file
This document is a summary of work outlining requirements for replacing residential sewer lines at three housing units within Bighorn Canyon National Recreation Area in Fort Smith, Montana. The contractor will replace approximately 78 linear feet of existing 4-inch residential sewer lines at three separate residences, connecting new 4-inch PVC pipe to existing foundations and an 8-inch clay main line. Two chain link fences will need to be partially removed and reinstalled to access the work sites. The contractor must field locate all public and NPS utilities beforehand, call for locates at least three days in advance of digging, and use additional locating methods as needed. The contractor is responsible for cleaning up any spills or leaks. A quality control and safety plan must be submitted prior to the start of work. The anticipated period of performance is January 22, 2024 through April 30, 2024. The related federal contract opportunity is solicitation number 140P1424Q0010 to replace sewer lines at Big Horn Canyon National Recreation Area, issued by the National Park Service Intermountain Region of the Department of the Interior.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Sol_140P1424Q0010_Amd_0004.pdf | ||
| Sol_140P1424Q0010_Amd_0003.pdf | ||
| B08_140P1424Q0010_Attachment_2_DOL_WD_20240056_01052024_0003.pdf | ||
| Sol_140P1424Q0010_Amd_0002.pdf | ||
| Sol_140P1424Q0010_Amd_0001.pdf | ||
| B08_140P1424Q0010_Attachment_3_Site_Visit_Sign-in_Sheet_0001.pdf | ||
| B08_140P1424Q0010_Attachment_2_DOL_WD_20230056_Rev_6_10062023.pdf | ||
| Sol_140P1424Q0010.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Bighorn Canyon NRA 5 Ave B
Fort Smith, MT
Summary of Work
Replace residential sewer lines in three housing units at Bighorn Canyon NRA, Fort Smith MT. Fort Smith is located 45 miles southwest of Hardin Montana.
Tasks & Supplies
Contractor will Replace approximately 78 LF of existing 4” residential sewer lines at three separate residences. The 14, 16 and 48 LF lines will be replaced with 4” PVC pipe. These lateral lines will be connected to the existing piping at the foundation and the 8” clay main line. The lateral lines will require new gravity double clean-outs. Two chain link fences will need to be partially removed and reinstalled to provide room to dig the trench.
The contractor shall be responsible for field locating all utilities including public utilities and NPS owned utilities to determine exact locations, elevations and sizes.
Contractor shall be responsible for calling for utility locates a minimum three working days in advance of digging. Contractor may be required to use additional methods for utility locations, such as electromagnetic utility locating, acoustic pipe locating, or ground penetrating radar. Any severing or damage of existing utilities shall be repaired at no cost to the Government.
Trucks and equipment must be in good operation and maintenance. Any leaks or spills need to be cleaned up immediately using a spill kit or absorbent material.
Quality Control and safety plan shall be submitted prior to start of contract. Plan should address clean up and disposal of spills and leaks.
Anticipated Period of Performance: January 22, 2024, through April 30, 2024
459-650-8011
D
C
B
LEGEND
( l Sewer Manhole
□ Sewer Cfeanou t
Sewer Line
4" Laderol Line
D Building Layout
U.S.B.R.
Mointonce YorrJ
C. dt-1.
Cquip. s,dg.
N.P.S.
Equip. Storage Bldg Mointance Yard
Gord/!n Area
J
8"- -
MH-5 ,-
8"-- -
,,MH-19
MH-17
8" ---
8"-i;H-14
8"
MH-15,,
MH-18
/ Pumphouse _,,,,,, �
� �WATER TOWER
50,000 CAL
MK Hill Picnic Area (is on o sepic tonk system)
UNITED STAT[S
D£PARTM£NT Of" TH[ /NTfRIOR
BUR(AU or R[O..AMAm::,, PICK-SLOAN MISSOURI BASIN PRcx;RA/1
D lOl+fR BIGHORN 0/',1SION - 'tfl.LOWTAIL UNIT - MONTANA
YELLOWTAIL POWERPLANT
MECHANICAL INSTALLA T/ON
GOVERNMENT CAMP COMPLEX
SEWER MAIN & LATERALS
MAP
OCSIGNED ___ _ _ ___ ntLD APPROVAL _ _ ____ _ __
DRA'I//N ROBERT WINSTON TEQ-INfCAL APPROVAi.. ____ _ _ __
CHECKED
APPROvm - ---s Rf a,Cla,ON=AL-E�N=CIN�C=[R---
CADD SYST[M CADD FILENAME OAT[ AND TIM£ PLOTTfO
----- ------ -- - ---;-- ----------T------ - --- -----;--------- - --T _ ________ 71 __ -;
____ _ _ ______ 1 _______ _____________ _____ J��,u�roc�,o�z�oo:7��:=�"�•-�,,._�.,�11�-•�·'"��'j]�n;�11£�Rui"�'�'t· �200�7QL,200t_[j
(22x34) 5 4
BILLINGS, MONTANA
SHffT I OF I FEBERUARY I, 2007 459-650-8011-1
J 2 SH[frTOF!
D
C
B
A
File details come from the government source that posted it. Updated .