This is a specification document for the Wickersham Trailhead Improvements project located at Mile 28 Elliott Highway near Fairbanks, Alaska. The work includes removal and replacement of vault toilets, construction of a new loading ramp and kiosk, roadwork, parking area expansion, and deconstruction of existing culverts and signs no longer needed in the new layout. The project will be constructed under a single prime contract with the contractor having full use of the premises for construction operations, though the site may be closed to public use for up to 45 consecutive calendar days with alternate routes provided by the government.
The specifications establish comprehensive administrative and quality requirements governing contract execution, including mandatory preconstruction conferences, weekly progress meetings, construction schedules with activities defined in 20-day increments, photographic documentation (minimum 20 preconstruction and 10 weekly photos in digital format), submittal procedures with 21-day initial review and 14-day resubmittal review periods, and detailed quality assurance and quality control protocols. Key milestones include utilities location and marking, vegetation clearing completion, road and parking subgrade inspection, topsoil application, pre-placement concrete inspection, vault toilet construction completion, and approval to operate from the Alaska Department of Environmental Conservation. The contractor must provide temporary toilets before removing existing facilities and maintain them until new toilets are operational and approved. Temporary facilities required include storage sheds, safety fencing, potable water, portable toilets for public and construction use, fire extinguishers, electrical power, lighting, telephone service, temporary roads, parking areas, and waste disposal containers. The contractor is responsible for locating and protecting all existing utilities and must comply with local regulations for haul routes and environmental protection standards.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Sol_140L6326Q0017_Amd_0001.pdf | ||
| B08_140L6326Q0017_-_Attachment_03_-_Wage_Determination.pdf | ||
| B08_140L6326Q0017_-_Attachment_02_-_Drawings.pdf | ||
| Sol_140L6326Q0017.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
BUREAU OF LAND MANAGEMENT SPECIFICATION INDEX
WICKERSHAM TRAILHEAD IMPROVEMENTS
MILE 28 ELLIOT HWY, ALASKA
Index - 1
DIVISION 01 GENERAL REQUIREMENTS
01 10 00 Summary 01 20 00 Bid Items and Schedule of Values 01 31 00 Project Management and Coordination 01 32 00 Construction Progress Documentation 01 32 20 Photographic Documentation 01 33 00 Submittal Procedures 01 40 00 Quality Requirements 01 42 00 References 01 50 00 Temporary Facilities and Controls 01 57 00 Temporary Traffic Control
01 57 23 SWPPP
01 60 00 Product Requirements 01 64 00 Government Furnished Products 01 70 00 Execution Requirements 01 71 23 Field Engineering 01 77 00 Closeout Procedures 01 78 10 Project Record Documents 01 78 23 Operation and Maintenance Data
DIVISION 02 DEMOLITION
02 40 00 Site Demolition
DIVISION 03 CONCRETE
03 30 00 Cast-In-Place Concrete
DIVISION 06 WOOD, PLASTICS, AND COMPOSITES
06 10 00 Rough Carpentry 06 15 00 Wood Decking 06 20 00 Finish Carpentry
DIVISION 07 THERMAL AND MOISTURE PROTECTION
07 41 13 Metal Roof Panels 07 62 00 Sheet Metal Flashing and Trim 07 92 00 Joint Sealants
DIVISION 08 OPENINGS
08 11 00 Metal Doors and Frames 08 71 00 Door Hardware
DIVISION 09 FINISHES
09 91 00 Painting 09 93 00 Staining and Transparent Finishing
BUREAU OF LAND MANAGEMENT SPECIFICATION INDEX
MILE 28 ELLIOT HWY, ALASKA
Index - 2
DIVISION 10 SPECIALTIES
10 14 53 Traffic Signage 10 81 00 Vault Toilet Accessories
DIVISION 31 EARTHWORK
31 10 00 Site Clearing 31 20 00 Earth Moving
DIVISION 32 EXTERIOR IMPROVEMENTS
32 33 00 Site Furnishings 32 90 00 Plant Salvage and Transplant 32 92 00 Turf and Grasses
BUREAU OF LAND MANAGEMENT SECTION 01 10 00
WICKERSHAM TRAILHEAD IMPROVEMENTS SUMMARY
MILE 28 ELLIOT HWY, ALASKA
01 10 00- 1
PART 1 RELATED DOCUMENTS
A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification Sections, apply to this Section
1.2 SUMMARY
A. This Section includes the following:
1. Work covered by the Contract Documents.
2. Work under other Contracts.
3. Geotechnical data.
4. Use of premises.
5. Government occupancy requirements.
6. Work phasing.
7. Specification formats and conventions.
1.3 WORK COVERED BY CONTRACT DOCUMENTS
A. Project Identification: Wickersham Trailhead Improvements
1. Project Location: Approximately Mile 28 Elliot Highway at the BLM Wickersham dome trailhead.
B. The Work consists of the following:
1. The Work includes improvements to the existing trailhead including removal and replacement of vault toilets, new loading ramp, new kiosk, roadwork, and parking area expansion. The Work also includes deconstruction/obliteration of existing culvert, signs and other features no longer used in the new layout.
C. Project will be constructed under a single prime contract.
1.4 WORK UNDER OTHER CONTRACTS
A. Cooperate fully with separate contractors so work on those contracts may be carried out smoothly, without interfering with or delaying work under this Contract. Coordinate the Work of this Contract with work performed under separate contracts.
MILE 28 ELLIOT HWY, ALASKA
01 10 00- 2
1.5 GEOTECHNICAL DATA
A. Geotechnical Report: There is no existing geotechnical information available for this site.
Determination of actual subsurface soil conditions shall be Contractor's responsibility.
1.6 USE OF PREMISES
A. Contractor shall have full use of premises for construction operations, including use of Project site, for the construction period. Contractor's use of premises is limited only by Public Use and Government right to perform work or to retain other contractors on por-tions of Project.
B. PUBLIC USE: Contractor will be allowed to close the site to public use for up to 45 con-secutive calendar days.
1. The government will make alternate routes available to the public during the closure. Temporary traffic control of the project site is the responsibility of the Contractor.
C. Schedule and sequence operations necessary to complete the work, including coordina-tion with other crafts relative to the Contractor's requirements. Schedule Work in such manner as to avoid delays in overall construction and permit proper installation of work.
D. Use of Site: Limit use of premises to areas within the Contract limits indicated. Do not disturb portions of Project site beyond areas in which the Work is indicated.
1. Government Occupancy: Allow for Government access of Project site. Govern-ment personnel will need access to the site to remove salvaged items and to perform construction progress inspections.
2. Driveways and Entrances: Keep driveways and entrances serving premises clear and available to Public (except during closure), Government, Government em-ployees, and emergency vehicles at all times. Do not use these areas for parking or storage of materials.
a. Schedule deliveries to minimize space and time requirements for stor-age of materials and equipment on-site.
E. Utilities: It is the Contractor’s responsibility to locate and protect all existing utilities.
1.7 GOVERNMENT OCCUPANCY REQUIREMENTS
A. Partial Government Occupancy: Government will require access to the premises during entire construction period, with the exception of areas under construction. Cooperate with Government during construction operations to minimize conflicts and facilitate
MILE 28 ELLIOT HWY, ALASKA
01 10 00- 3
Government usage. Perform the Work so as not to interfere with Government opera-tions.
1.8 WORK PHASING
A. Provide and maintain temporary toilet(s) for public and project use before removing ex-isting toilets. Provide temporary toilet(s) for the duration of the project until the new toilet(s) are operational AND accepted by the government. “Approval to operate” must be received in writing from Alaska Department of Environmental Conservation to be considered operational.
1.9 SPECIFICATION FORMATS AND CONVENTIONS
A. Specification Format: The Specifications are organized into Divisions and Sections using the 50-division format and CSI/CSC's "MasterFormat" six digit numbering system.
1. Division 1: Sections in Division 1 govern the execution of the Work of all Sec-tions in the Specifications.
B. Specification Content: The Specifications use certain conventions for the style of lan-guage and the intended meaning of certain terms, words, and phrases when used in particular situations. These conventions are as follows:
1. Abbreviated Language: Language used in the Specifications and other Contract Documents is abbreviated. Words and meanings shall be interpreted as appro-priate. Words implied, but not stated, shall be inferred as the sense requires.
Singular words shall be interpreted as plural, and plural words shall be inter-preted as singular where applicable as the context of the Contract Documents indicates.
2. Imperative mood and streamlined language are generally used in the Specifica-tions. Requirements expressed in the imperative mood are to be performed by Contractor. Occasionally, the indicative or subjunctive mood may be used in the Section Text for clarity to describe responsibilities that must be fulfilled indirect-ly by Contractor or by others when so noted.
a. The words "shall," "shall be," or "shall comply with," depending on the context, are implied where a colon (:) is used within a sentence or phrase.
MILE 28 ELLIOT HWY, ALASKA
01 10 00- 4
PART 2 PRODUCTS (NOT USED)
PART 3 EXECUTION (NOT USED)
END OF SECTION
THIS PAGE INTENTIONALLY LEFT BLANK
BUREAU OF LAND MANAGEMENT
MILE 28 ELLIOT HWY, ALASKA
SECTION 01 20 00
BID ITEMS AND SCHEDULE OF VALUES
01 20 00 - 1
PART 1 GENERAL
1.1 RELATED DOCUMENTS
A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification Sections, apply to this Section
1.2 SUMMARY
A. Bid Items and Schedule of Values.
1. This Section includes administrative and procedural requirements for unit prices and requirements to prepare schedule of values.
1.3 SCHEDULE OF VALUES
A. Coordination: Coordinate preparation of the Schedule of Values with preparation of Contractor's Construction Schedule.
1. Correlate line items in the Schedule of Values with other required administrative forms and schedules, including Application for Payment forms with Continuation Sheets and Contractor's Construction Schedule.
2. Submit the Schedule of Values to Government at earliest possible date but no later than 14 calendar days after the Notice to Proceed.
B. Format and Content: Use the Project Manual table of contents as a guide to establish line items for the Schedule of Values. Provide at least one line item for each Specification Section.
1. Identification: Include the following Project identification on the Schedule of Values:
a. Project name and location.
b. Contractor's name and address.
c. Date of submittal.
2. Provide a breakdown of the Contract Sum in enough detail to facilitate continued evaluation of Applications for Payment and progress reports. Coordinate with the Project Manual table of contents. Provide several line items for principal subcontract amounts, where appropriate.
MILE 28 ELLIOT HWY, ALASKA
01 20 00 - 2
3. Round amounts to nearest whole dollar; total shall equal the Contract Sum.
4. Provide a separate line item in the Schedule of Values for each part of the Work where Applications for Payment may include materials or equipment purchased or fabricated and stored, but not yet installed.
5. Provide separate line items in the Schedule of Values for initial cost of materials, for each subsequent stage of completion, and for total installed value of that part of the Work.
6. Each item in the Schedule of Values and Applications for Payment shall be complete. Include total cost and proportionate share of general overhead and profit for each item.
a. Temporary facilities and other major cost items that are not direct cost of actual work-in-place may be shown either as separate line items in the Schedule of Values or distributed as general overhead expense, at Contractor's option.
7. Schedule Updating: Update and resubmit the Schedule of Values before the next Applications for Payment when Change Orders or Construction Change Directives result in a change in the Contract Sum
PART 2 PRODUCTS (NOT USED)
PART 3 EXECUTION
3.1 LUMP SUM PAYMENT ITEMS
A. Payment items for the work of this Contract for which contract lump sum payments will be made are listed in the BIDDING SCHEDULE and described below.
B. All costs for items of work, which are not specifically mentioned to be included in a particular lump sum or unit price payment item, shall be included in the listed lump sum item most closely associated with the work involved.
C. The lump sum price and payment made for each item listed shall constitute full compensation for furnishing all plant, labor, materials, and equipment, and performing any associated Contractor quality control, environmental protection, meeting safety requirements, tests and reports, and for performing all work required for which separate payment is not otherwise provided.
D. Mobilization and Demobilization: Preparatory work and operations, including movement of personnel, equipment, supplies and incidentals to the project site; and for other work
MILE 28 ELLIOT HWY, ALASKA
01 20 00 - 3 and operations that must be performed or costs incurred prior to beginning work on the various items on the project site. Does not include moves between project sites.
1. Payment: Payment will be made for costs associated with mobilization and demobilization as described herein. No direct payment for moves between project sites will be made. Include consideration for moves between project sites. Prices and payment will be full compensation for the work described in this section. Progress payments will be made as follows:
a. When 5 percent of the original Contract amount is earned from other bid items, 50 percent of the amount bid for mobilization or 5 percent of the original Contract amount, whichever is lesser, will be paid.
b. When 10 percent of the original Contract amount is earned from other bid items, 100 percent of the amount bid for mobilization or 10 percent of the original Contract amount, whichever is lesser, will be paid.
c. Upon completion of work for the project, payment of the amount bid for mobilization in excess of 10 percent of the original Contract amount, will be paid.
d. The total sum of all payments shall not exceed the original Contract amount bid for mobilization, regardless whether Contractor may have shut down the work on the project or moved equipment away from the project and then back again.
E. Unit of Measure: Lump sum.
3.2 SUMMARY OF BID ITEMS
A. Bid Items are listed in the BIDDING SCHEDULE.
MILE 28 ELLIOT HWY, ALASKA
SECTION 01 31 00
PROJECT MANAGEMENT AND
COORDINATION
01 31 00 - 1
1.1 RELATED DOCUMENTS
A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification Sections, apply to this Section
1.2 SUMMARY
A. This Section includes administrative provisions for coordinating construction operations on Project including, but not limited to, the following:
1. Coordination Drawings.
2. Project meetings.
3. Requests for Interpretation (RFIs).
B. See Division 1 Section "Execution Requirements" for procedures for coordinating general installation and field-engineering services, including establishment of benchmarks and control points.
1.3 DEFINITIONS
A. RFI: Request from Contractor seeking interpretation or clarification of the Contract Documents.
1.4 COORDINATION
A. Coordination: Coordinate construction operations included in different Sections of the Specifications to ensure efficient and orderly installation of each part of the Work.
Coordinate construction operations, included in different Sections that depend on each other for proper installation, connection, and operation.
1. Schedule construction operations in sequence required to obtain the best results where installation of one part of the Work depends on installation of other components, before or after its own installation.
2. Coordinate installation of different components with other contractors to ensure maximum accessibility for required maintenance, service, and repair.
3. Make adequate provisions to accommodate items scheduled for later installation.
MILE 28 ELLIOT HWY, ALASKA
SECTION 01 31 00
01 31 00 - 2
4. Where availability of space is limited, coordinate installation of different components to ensure maximum performance and accessibility for required maintenance, service, and repair of all components, including mechanical and electrical.
B. Prepare memoranda for distribution to each party involved, outlining special procedures required for coordination. Include such items as required notices, reports, and list of attendees at meetings.
1. Prepare similar memoranda for Government and separate contractors if coordination of their Work is required.
C. Administrative Procedures: Coordinate scheduling and timing of required administrative procedures with other construction activities and activities of other contractors to avoid conflicts and to ensure orderly progress of the Work. Such administrative activities include, but are not limited to, the following:
1. Preparation of Contractor's Construction Schedule.
2. Preparation of the Schedule of Values.
3. Installation and removal of temporary facilities and controls.
4. Delivery and processing of submittals.
5. Progress meetings.
6. Pre-installation conferences.
7. Project closeout activities.
8. Startup and adjustment of systems.
9. Project closeout activities.
1.5 PROJECT MEETINGS
A. General: Schedule and conduct meetings and conferences at BLMS’s offices on University Avenue in Fairbanks, Alaska, unless otherwise indicated.
1. Attendees: Inform participants and others involved, and individuals whose presence is required, of date and time of each meeting. Notify Government and Architect of scheduled meeting dates and times.
2. Agenda: Prepare the meeting agenda. Distribute the agenda to all invited attendees.
MILE 28 ELLIOT HWY, ALASKA
SECTION 01 31 00
01 31 00 - 3
3. Minutes: Record significant discussions and agreements achieved. Distribute the meeting minutes to everyone concerned, including Government and Architect, within three days of the meeting.
B. Preconstruction Conference: Schedule a preconstruction conference before starting construction, at a time convenient to Government, but no later than 15 days after execution of the Agreement. Hold the conference at BLM’s University Avenue offices or another convenient location. Conduct the meeting to review responsibilities and personnel assignments, review required work, project drawings, specifications, construction schedules, payroll, payments, and administrative provisions of the Contract.
Be prepared to summarize and explain procedures planned for the project and present specified preconstruction submittals.
1. Attendees: Authorized representatives of Government; Contractor and its superintendent; major subcontractors; suppliers; and other concerned parties shall attend the conference. All participants at the conference shall be familiar with the Project and authorized to conclude matters relating to the Work.
2. Agenda: Discuss items of significance that could affect progress, including the following:
a. Tentative construction schedule.
b. Phasing.
c. Critical work sequencing and long-lead items.
d. Designation of key personnel and their duties.
e. Procedures for processing field decisions and Change Orders.
f. Procedures for RFIs.
g. Procedures for testing and inspecting.
h. Procedures for processing Applications for Payment.
i. Distribution of the Contract Documents.
j. Submittal procedures.
k. Preparation of Record Documents.
l. Use of the premises.
m. Work restrictions.
n. Government access requirements.
MILE 28 ELLIOT HWY, ALASKA
SECTION 01 31 00
01 31 00 - 4
o. Responsibility for temporary facilities and controls.
p. Construction waste management and recycling.
q. Parking availability.
r. Office, work, and storage areas.
s. Equipment deliveries and priorities.
t. First aid.
u. Security.
v. Progress cleaning.
w. Working hours.
3. Minutes: Record and distribute meeting minutes.
C. Pre-installation Conferences: Conduct a pre-installation conference at BLM’s University Avenue office before each major construction activity that requires coordination with other construction.
1. Attendees: Installer and representatives of manufacturers and fabricators involved in or affected by the installation and its coordination or integration with other materials and installations that have preceded or will follow, shall attend the meeting. Advise Government of scheduled meeting dates.
2. Agenda: Review progress of other construction activities and preparations for the particular activity under consideration, including requirements for the following:
a. The Contract Documents.
b. Options.
c. Related RFIs.
d. Related Change Orders.
e. Purchases.
f. Deliveries.
g. Submittals.
h. Review of mockups.
MILE 28 ELLIOT HWY, ALASKA
SECTION 01 31 00
01 31 00 - 5
i. Possible conflicts.
j. Compatibility problems.
k. Time schedules.
l. Weather limitations.
m. Manufacturer's written recommendations.
n. Warranty requirements.
o. Compatibility of materials.
p. Acceptability of substrates.
q. Temporary facilities and controls.
r. Space and access limitations.
s. Regulations of authorities having jurisdiction.
t. Testing and inspecting requirements.
u. Installation procedures.
v. Coordination with other work.
w. Required performance results.
x. Protection of adjacent work.
y. Protection of construction and personnel.
3. Record significant conference discussions, agreements, and disagreements, including required corrective measures and actions.
4. Reporting: Within three days distribute minutes of the meeting to each party present and to parties who should have been present.
5. Do not proceed with installation if the conference cannot be successfully concluded. Initiate whatever actions are necessary to resolve impediments to performance of the Work and reconvene the conference at earliest feasible date.
MILE 28 ELLIOT HWY, ALASKA
SECTION 01 31 00
01 31 00 - 6
D. Progress Meetings: Conduct progress meetings as necessary and agreed upon with the government. Hold the meetings at the BLM’s University Avenue office. Coordinate dates of meetings with preparation of payment requests. Additional progress meetings may be requested by either the Government or Contractor. Progress Meetings may be held in conjunction with other required meetings.
1. Attendees: In addition to representatives of Government, each contractor, subcontractor, supplier, and other entity concerned with current progress or involved in planning, coordination, or performance of future activities shall be represented at these meetings. All participants at the conference shall be familiar with Project and authorized to conclude matters relating to the Work.
2. Agenda: Review and correct or approve minutes of previous progress meeting.
Review other items of significance that could affect progress. Include topics for discussion as appropriate to status of Project.
a. Contractor's Construction Schedule: Review progress since the last meeting. Determine whether each activity is on time, ahead of schedule, or behind schedule, in relation to Contractor's Construction Schedule.
Determine how construction behind schedule will be expedited; secure commitments from parties involved to do so. Discuss whether schedule revisions are required to ensure that current and subsequent activities will be completed within the Contract Time.
1) Review schedule for next period.
b. Review present and future needs of each entity present, including the following:
1) Interface requirements.
2) Sequence of operations.
3) Status of submittals.
4) Deliveries.
5) Off-site fabrication.
6) Access.
7) Site utilization.
8) Temporary facilities and controls.
9) Work hours.
MILE 28 ELLIOT HWY, ALASKA
SECTION 01 31 00
01 31 00 - 7
10) Hazards and risks.
11) Progress cleaning.
12) Quality and work standards.
13) Status of correction of deficient items.
14) Field observations.
15) RFIs.
16) Status of proposal requests.
17) Pending changes.
18) Status of Change Orders.
19) Pending claims and disputes.
20) Documentation of information for payment requests.
3. Minutes: Record the meeting minutes.
4. Reporting: Within three days, distribute minutes of the meeting to each party present and to parties who should have been present.
a. Schedule Updating: Revise Contractor's Construction Schedule after each progress meeting where revisions to the schedule have been made or recognized. Issue revised schedule concurrently with the report of each meeting.
1.6 REQUESTS FOR INTERPRETATION (RFIS)
A. Procedure: Immediately on discovery of the need for interpretation of the Contract Documents, and if not possible to request interpretation at Project meeting, prepare and submit an RFI in the form specified.
1. RFIs shall originate with Contractor. RFIs submitted by entities other than the Prime Contractor will be returned with no response.
2. Coordinate and submit RFIs in a prompt manner so as to avoid delays in Contractor's work or work of subcontractors.
MILE 28 ELLIOT HWY, ALASKA
SECTION 01 31 00
01 31 00 - 8
B. Content of the RFI: Include a detailed, legible description of item needing interpretation and the following:
1. Project name.
2. Date.
3. Name of Contractor.
4. Name of Government and Construction Manager.
5. RFI number, numbered sequentially.
6. Specification Section number and title and related paragraphs, as appropriate.
7. Drawing number and detail references, as appropriate.
8. Field dimensions and conditions, as appropriate.
9. Contractor's suggested solution(s). If Contractor's solution(s) impact the Contract Time or the Contract Sum, Contractor shall state impact in the RFI.
10. Contractor's signature.
11. Attachments: Include drawings, descriptions, measurements, photos, Product Data, Shop Drawings, and other information necessary to fully describe items needing interpretation.
C. Hard-Copy RFIs: The contractor may utilize an RFI form of their choosing. The form shall be presented to the Contracting Office for approval at the pre-construction meeting.
1. Identify each page of attachments with the RFI number and sequential page number.
D. Government's Action: Government will review each RFI, determine action required, and return it. Allow seven calendar days for Government's response for each RFI.
1. The following RFIs will be returned without action:
a. Requests for approval of submittals.
b. Requests for approval of substitutions.
c. Requests for coordination information already indicated in the Contract Documents.
d. Requests for adjustments in the Contract Time or the Contract Sum.
MILE 28 ELLIOT HWY, ALASKA
SECTION 01 31 00
01 31 00 - 9
e. Requests for interpretation of Government's actions on submittals.
f. Incomplete RFIs or RFIs with numerous errors.
2. Government's action may include a request for additional information, in which case Government's time for response will start again.
E. On receipt of Government's action, update the RFI log and immediately distribute the RFI response to affected parties. Review response and notify Government within three days if Contractor disagrees with response.
F. RFI Log: Prepare, maintain, and submit a tabular log of RFIs organized by the RFI number.
Submit log weekly. Include the following:
1. Project name.
2. Name and address of Contractor.
3. Name and address of Government.
4. RFI number including RFIs that were dropped and not submitted.
5. RFI description.
6. Date the RFI was submitted.
7. Date Government's response was received.
8. Identification of related bilateral or unilateral modifications, extensions, and changes in scope, as appropriate.
PART 2 PRODUCTS (NOT USED)
MILE 28 ELLIOT HWY, ALASKA
SECTION 01 31 00
01 31 00 - 10
MILE 28 ELLIOT HWY, ALASKA
SECTION 01 32 00
CONSTRUCTION PROGRESS
DOCUMENTATION
01 32 00 - 1
PART 1 - GENERAL
1.1 RELATED DOCUMENTS
A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification Sections, apply to this Section
1.2 SUMMARY
A. This Section includes administrative and procedural requirements for documenting the progress of construction during performance of the Work, including the following:
1. Contractor's Construction Schedule.
2. Submittals Schedule.
1.3 DEFINITIONS
A. Activity: A discrete part of a project that can be identified for planning, scheduling, monitoring, and controlling the construction project. Activities included in a construction schedule consume time and resources.
B. Fragnet: A partial or fragmentary network that breaks down activities into smaller activities for greater detail.
1.4 SUBMITTALS
A. Submittals Schedule: Submit three copies of schedule. Arrange the following information in a tabular format:
1. Scheduled date for first submittal.
2. Specification Section number and title.
3. Submittal category (action or informational).
4. Name of subcontractor.
5. Description of the Work covered.
6. Scheduled date for Contracting Officer's final release or approval.
B. Contractor's Construction Schedule: Submit 2 opaque copies of initial schedule, large enough to show entire schedule for entire construction period.
MILE 28 ELLIOT HWY, ALASKA
SECTION 01 32 00
01 32 00 - 2
1.5 COORDINATION
A. Coordinate preparation and processing of schedules and reports with performance of construction activities and with scheduling and reporting of separate contractors.
B. Coordinate Contractor's Construction Schedule with the Schedule of Values, list of subcontracts, Submittals Schedule, progress reports, payment requests, and other required schedules and reports.
1. Secure time commitments for performing critical elements of the Work from parties involved.
2. Coordinate each construction activity with other activities and schedule them in proper sequence.
PART 2 - PRODUCTS
2.1 SUBMITTALS SCHEDULE
A. Preparation: Submit a schedule of submittals, arranged in chronological order by dates required by construction schedule. Include time required for review, resubmittal, ordering, manufacturing, fabrication, and delivery when establishing dates.
1. Coordinate Submittals Schedule with list of subcontracts, the Schedule of Values, and Contractor's Construction Schedule.
2. Submit concurrently with the first complete submittal of Contractor's Construction Schedule.
2.2 CONTRACTOR'S CONSTRUCTION SCHEDULE, GENERAL
A. Time Frame: Extend schedule from date established for the Notice to Proceed to date of Final Completion.
1. Contract completion date shall not be changed by submission of a schedule that shows an early completion date, unless specifically authorized by Change Order.
B. Activities: Treat each story or separate area as a separate numbered activity for each principal element of the Work. Comply with the following:
1. Activity Duration: Define activities so no activity is longer than 20 days, unless specifically allowed by Contracting Officer.
2. Procurement Activities: Include procurement process activities for the following long lead items and major items, requiring a cycle of more than 60 days, as separate activities in schedule. Procurement cycle activities include, but are not limited to, submittals, approvals, purchasing, fabrication, and delivery.
MILE 28 ELLIOT HWY, ALASKA
SECTION 01 32 00
01 32 00 - 3
3. Submittal Review Time: Include review and resubmittal times indicated in Division 1 Section "Submittal Procedures" in schedule. Coordinate submittal review times in Contractor's Construction Schedule with Submittals Schedule.
4. Substantial Completion: Indicate completion in advance of date established for Substantial Completion, and allow time for Contracting Officer's administrative procedures necessary for certification of Substantial Completion.
C. Constraints: Include constraints and work restrictions indicated in the Contract Documents and as follows in schedule, and show how the sequence of the Work is affected.
1. Work by Government: Include a separate activity for each portion of the Work performed by Government.
2. Work Restrictions: Show the effect of the following items on the schedule:
a. Coordination with existing construction.
b. Limitations of continued occupancies.
c. Uninterruptible services.
d. Partial occupancy before Substantial Completion.
e. Use of premises restrictions.
f. Provisions for future construction.
g. Seasonal variations.
h. Environmental control.
3. Work Stages: Indicate important stages of construction for each major portion of the Work.
D. Milestones: Include milestones indicated in the Contract Documents in the construction schedule, including, but not limited to, the Notice to Proceed, Substantial Completion, and Final Completion, and the following interim milestones:
1. All utilities located and marked.
2. Vegetation clearing completion.
3. Road and Parking subgrade ready for inspection.
4. Topsoil applied before crushed aggregate surfacing
5. Pre-placement concrete inspection.
6. Vault toilet construction complete.
7. Vault toilet approval to operate received from DEC.
E. Contract Modifications: For each proposed contract modification and concurrent with its submission, prepare a time-impact analysis using fragnets to demonstrate the effect of the proposed change on the overall project schedule.
2.3 CONTRACTOR'S CONSTRUCTION SCHEDULE (GANTT CHART)
A. Gantt-Chart Schedule: Submit a comprehensive, fully developed, horizontal Gantt-chart-type, Contractor's Construction Schedule within 30 days of the Award Notice. Base schedule on the
MILE 28 ELLIOT HWY, ALASKA
SECTION 01 32 00
01 32 00 - 4
Preliminary Construction Schedule and whatever updating and feedback was received since the start of Project.
B. Preparation: Indicate each significant construction activity separately. Identify first workday of each week with a continuous vertical line.
PART 3 - EXECUTION
3.1 CONTRACTOR'S CONSTRUCTION SCHEDULE
A. Contractor's Construction Schedule Updating: At monthly intervals, update schedule to reflect actual construction progress and activities. Issue schedule one week before each regularly scheduled progress meeting.
1. Revise schedule immediately after each meeting or other activity where revisions have been recognized or made. Issue updated schedule concurrently with the report of each such meeting.
2. Include a report with updated schedule that indicates every change, including, but not limited to, changes in logic, durations, actual starts and finishes, and activity durations.
3. As the Work progresses, indicate Actual Completion percentage for each activity.
B. Distribution: Distribute copies of approved schedule to Contracting Officer, separate contractors, testing and inspecting agencies, and other parties identified by Contractor with a need-to-know schedule responsibility.
1. Post copies in Project meeting rooms and temporary field offices.
2. When revisions are made, distribute updated schedules to the same parties and post in the same locations. Delete parties from distribution when they have completed their assigned portion of the Work and are no longer involved in performance of construction activities.
MILE 28 ELLIOT HWY, ALASKA
SECTION 01 32 20
PHOTOGRAPHIC DOCUMENTATION
01 32 20 - 1
1.1 RELATED DOCUMENTS
A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification Sections, apply to this Section
1.1 SUMMARY
A. This Section includes administrative and procedural requirements for the following:
1. Preconstruction photographs.
2. Periodic construction photographs.
B. See Division 1 Section "Closeout Procedures" for submitting digital media as Project Record Documents at Project closeout.
1.2 SUBMITTALS
A. Key Plan: Submit key plan of Project site and building with notation of vantage points marked for location and direction of each photograph. Indicate elevation or story of construction. Include same label information as corresponding set of photographs.
B. Construction Photographs: Submit MS Word electronic file via email within seven days of taking photographs.
1. Format: Insert digital photos into MS Word file with two 4-by-6-inch prints per page and titles beneath each photo.
2. Identification: On first page of MS Word file, provide the following information:
a. Name of Project.
b. Name of Contractor.
c. Date photograph was taken if not date stamped by camera
3. Digital Images: Submit a complete set of digital image electronic files by email.
Identify electronic media with date photographs were taken. Submit images that have same aspect ratio as the sensor, uncropped.
MILE 28 ELLIOT HWY, ALASKA
01 32 20 - 2
PART 2 PRODUCTS
2.1 PHOTOGRAPHIC MEDIA
A. Format below is compatible with all digital cameras.
1. Digital Images: Provide images in uncompressed JPG format, produced by a digital camera with minimum sensor size of 4.0 megapixels, and at an image resolution of not less than 1600 by 1200 pixels.
PART 3 EXECUTION
3.1 CONSTRUCTION PHOTOGRAPHS
A. Take photographs using the maximum range of depth of field, and that are in focus, to clearly show the Work. Photographs with blurry or out-of-focus areas will not be accepted.
1. Maintain key plan with each set of construction photographs that identifies each photographic location.
B. Digital Images: Submit digital images exactly as originally recorded in the digital camera, without alteration, manipulation, editing, or modifications using image-editing software.
1. Date and Time: Include date and time in filename for each image
C. Preconstruction Photographs: Before starting construction, take color, digital photographs of Project site and surrounding properties, including existing items to remain during construction, from different vantage points, as directed by Government.
1. Flag construction limits before taking construction photographs.
2. Take no less than 20 photographs to show existing conditions adjacent to property before starting the Work.
3. Take eight photographs of existing buildings and features either on or adjoining property to accurately record physical conditions at start of construction.
D. Periodic Construction Photographs: Take 10 color, digital photographs weekly with the cutoff date associated with each Application for Payment. Select vantage points to show status of construction and progress since last photographs were taken.
E. Additional Photographs: Government may issue requests for additional photographs, in addition to periodic photographs specified. Additional photographs will be paid for by Change Order and are not included in the Contract Sum.
MILE 28 ELLIOT HWY, ALASKA
01 32 20 - 3
1. Three days' notice will be given, where feasible.
2. In emergency situations, take additional photographs within 48 hours of request.
3. Circumstances that could require additional photographs include, but are not limited to, the following:
a. Immediate follow-up when on-site events result in construction damage or losses.
b. Photographs to be taken at fabrication locations away from Project site.
c. Substantial Completion of a major phase or component of the Work.
4. Extra record photographs at time of final acceptance
MILE 28 ELLIOT HWY, ALASKA
01 32 20 - 4
MILE 28 ELLIOT HWY, ALASKA
SECTION 01 33 00
SUBMITTAL PROCEDURES
01 33 00 - 1
1.1 RELATED DOCUMENTS
A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification Sections, apply to this Section
1.1 SUMMARY
A. This Section includes administrative and procedural requirements for submitting Shop Drawings, Product Data, Samples, Design Computations, and other submittals.
B. See Division 1 Section "Construction Progress Documentation" for submitting schedules and reports, including Contractor's Construction Schedule.
C. See Division 1 Section "Photographic Documentation" for submitting construction photographs.
D. See Division 1 Section "Quality Requirements" for submitting test and inspection reports.
E. See Division 1 Section "Closeout Procedures" for submitting warranties.
F. See Division 1 Section "Project Record Documents" for submitting Record Drawings, Record Specifications, and Record Product Data.
G. See Division 1 Section "Operation and Maintenance Data" for submitting operation and maintenance manuals.
1.2 DEFINITIONS
A. Action Submittals: Written and graphic information that requires Government's responsive action.
B. Informational Submittals: Written information that does not require Government's responsive action. Submittals may be rejected for not complying with requirements.
1.3 SUBMITTAL PROCEDURES
A. Coordination: Coordinate preparation and processing of submittals with performance of construction activities.
1. Coordinate each submittal with fabrication, purchasing, testing, delivery, other submittals, and related activities that require sequential activity.
MILE 28 ELLIOT HWY, ALASKA
01 33 00 - 2
2. Coordinate transmittal of different types of submittals for related parts of the Work so processing will not be delayed because of need to review submittals concurrently for coordination.
a. Government reserves the right to withhold action on a submittal requiring coordination with other submittals until related submittals are received.
B. Submittals Schedule: Comply with requirements in Division 1 Section "Construction Progress Documentation" for list of submittals and time requirements for scheduled performance of related construction activities.
C. Processing Time: Allow enough time for submittal review, including time for resubmittals, as follows. Time for review shall commence on Government's receipt of submittal. No extension of the Contract Time will be authorized because of failure to transmit submittals enough in advance of the Work to permit processing, including resubmittals.
1. Initial Review: Allow 21 calendar days for initial review of each submittal. Allow additional time if coordination with subsequent submittals is required.
Government will advise Contractor when a submittal being processed must be delayed for coordination.
2. Intermediate Review: If intermediate submittal is necessary, process it in same manner as initial submittal.
3. Resubmittal Review: Allow 14 calendar days for review of each resubmittal.
D. Identification: Place a permanent label or title block on each submittal for identification.
1. Indicate name of firm or entity that prepared each submittal on label or title block.
2. Provide a space approximately 6 by 8 inches on label or beside title block to record Contractor's review and approval markings and action taken by Government.
3. Include the following information on label for processing and recording action taken:
a. Project name.
b. Date.
c. Name and address of Contractor.
d. Name and address of subcontractor.
e. Name and address of supplier.
MILE 28 ELLIOT HWY, ALASKA
01 33 00 - 3
f. Name of manufacturer.
g. Revise first subparagraph and associated subparagraph below to suit Project and office practice. See Evaluations.
h. Submittal number or other unique identifier, including revision identifier.
1) Submittal number shall use Specification Section number followed by a decimal point and then a sequential number (e.g., 061000.01). Resubmittals shall include an alphabetic suffix after another decimal point (e.g., 061000.01.A). Value schedule shall be number 012000.01.
i. Number and title of appropriate Specification Section.
j. Drawing number and detail references, as appropriate.
k. Location(s) where product is to be installed, as appropriate.
l. Other necessary identification.
E. Cover Sheet: Use Cover Sheet for each submittal. The Contractor may use a cover sheet of their choosing. The Cover Sheet shall be presented to the Government for approval at the pre-construction meeting.
1. Ensure that cover sheet includes following information:
a. Submittal Number
b. Contract Number
c. Specification section number and title, paragraph, and complete description of item being submitted. Be specific and clearly identify what is being submitted. When appropriate, reference a specific sheet and detail of the Drawings. Note multiple items individually.
d. Signature and date.
e. Name and telephone number of individual to contact for further information, if other than Contractor.
MILE 28 ELLIOT HWY, ALASKA
01 33 00 - 4
2. Submitted Information: Link submittal to cover sheet by contract number, project name, and submittal number. Stamp is recommended, but may be hand-written on each copy; ensure submittal stamp includes project name and contract number and blank space in which to write submittal number. Stamp or write this information on all copies.
F. Deviations: Highlight, encircle, or otherwise specifically identify deviations from the Contract Documents on submittals.
G. Additional Copies: Unless additional copies are required for final submittal, and unless Government observes noncompliance with provisions in the Contract Documents, initial submittal may serve as final submittal.
H. Transmittal: Package each submittal individually and appropriately for transmittal and handling. Transmit each submittal using a transmittal form. Government will return submittals, without review received from sources other than Contractor.
1. Transmittal Form: Use Contractor form as approved by Government.
I. Resubmittals: Make resubmittals in same form as initial submittal.
1. Note date and content of previous submittal.
2. Note date and content of revision in label or title block and clearly indicate extent of revision.
3. Resubmit submittals until they are marked "Approved".
J. Distribution: Furnish copies of final submittals to manufacturers, subcontractors, suppliers, fabricators, installers, authorities having jurisdiction, and others as necessary for performance of construction activities. Show distribution on transmittal forms.
K. Use for Construction: Use only final submittals with mark indicating "Approved" by Government.
1.4 ELECTRONIC SUBMITTALS
A. Contractor shall typically provide electronic submittal information in PDF file format, current version.
1. Certain submittals, such as Operation and Maintenance Manuals, are required to be submitted as hard copies.
B. Each electronic submittal shall be a separate file.
C. Contractor shall typically transmit electronic submittals by email.
MILE 28 ELLIOT HWY, ALASKA
01 33 00 - 5
PART 2 PRODUCTS
2.1 ACTION SUBMITTALS
A. Prepare and submit Action Submittals required by individual Specification Sections.
B. Product Data: Collect information into a single submittal for each element of construction and type of product or equipment.
1. If information must be specially prepared for submittal because standard printed data are not suitable for use, submit as Shop Drawings, not as Product Data.
2. Mark each copy of each submittal to show which products and options are applicable.
3. Include the following information, as applicable:
a. Manufacturer’s written recommendations.
b. Manufacturer’s product specifications.
c. Manufacturer’s installation instructions
d. Manufacturer’s catalog cuts
e. Wiring diagrams showing factory installed wiring
f. Printed performance curves
g. Operational range diagrams
h. Compliance with specified referenced standards
i. Testing by recognized testing agency
4. Number of Copies: Submit one electronic copy of Product Data, unless otherwise indicated. Government will return one marked up copy electronically. Mark up and retain one returned copy as a Project Record Document
C. Shop Drawings: Prepare Project-specific information, drawn accurately to scale. Do not base Shop Drawings on reproductions of the Contract Documents or standard printed data.
1. Preparation: Fully illustrate requirements in the Contract Documents. Include the following information, as applicable:
a. Dimensions
MILE 28 ELLIOT HWY, ALASKA
01 33 00 - 6
b. Identification of products
c. Fabrication and installation drawings
d. Roughing in and setting diagrams
e. Wiring diagrams showing field-installed wiring, including power, signal, and control wiring
f. Shopwork manufacturing instructions
g. Templates and patterns
h. Schedules
i. Notation of coordination requirements
j. Notation of dimensions established by field measurement
k. Relationship to adjoining construction clearly indicated
l. Seal and signature of professional engineer if specified
m. Wiring Diagrams: Differentiate between manufacturer-installed and field-installed wiring.
2. Sheet size: Except for templates, patterns, and similar full-size drawings, submit Shop Drawings on sheets at least 8-1/2 by 11 inches but no larger than 22 by 34 inches
3. Subparagraph below assumes Government and Contractor will make copies from opaque print
4. Number of Copies: Submit one electronic copy of each submittal. Government will return one marked up copy electronically.
D. Samples: Submit Samples for review of kind, color, pattern, and texture for a check of these characteristics with other elements and for a comparison of these characteristics between submittal and actual component as delivered and installed
1. Transmit Samples that contain multiple, related components such as accessories together in one submittal package
2. Identification: Attach label on unexposed side of Samples that includes the following:
a. Generic description of Sample
MILE 28 ELLIOT HWY, ALASKA
01 33 00 - 7
b. Product name and name of manufacturer
c. Sample source
d. Lot
e. Style
f. Color
g. Locations of use
h. Number and title of appropriate specification section
3. Disposition: Maintain sets of approved Samples at Contractor’s Main Office, available for quality-control comparisons throughout the course of construction activity. Sample sets may be used to determine final acceptance of construction associated with each set
4. Samples for Initial Selection: Submit manufacturer's color charts consisting of units or sections of units showing the full range of colors, textures, and patterns available. Color selections will be made only after all related color samples have been received
a. Number of Samples: Submit one full set of available choices where color, pattern, texture, or similar characteristics are required to be selected from manufacturer's product line. Government will return submittal with options selected
5. Samples for Verification: Submit full-size units or Samples of size indicated, prepared from same material to be used for the Work, cured and finished in manner specified, and physically identical with material or product proposed for use, and that show full range of color and texture variations expected. Samples include, but are not limited to, the following: partial sections of manufactured or fabricated components; small cuts or containers of materials; complete units of repetitively used materials; swatches showing color, texture, and pattern; color range sets; and components used for independent testing and inspection
a. Number of Samples: Submit two sets of Samples. Government will retain one Sample sets; remainder will be returned. Mark up and retain one returned Sample set as a Project Record Sample.
E. Product Schedule or List: As required in individual Specification Sections, prepare a written summary indicating types of products required for the Work and their intended location
1. Number of Copies: Submit one electronic copy of product schedule or list, unless otherwise indicated. Government will return one marked up copy electronically
MILE 28 ELLIOT HWY, ALASKA
01 33 00 - 8
F. Submittals Schedule: Comply with requirements specified in Division 1 Section "Construction Progress Documentation.”
G. Schedule of Values: Comply with requirements specified in Division 1 Section "Unit Prices and Schedule of Values.”
H. Subcontract List: Prepare a written summary identifying individuals or firms proposed for each portion of the Work, including those who are to furnish products or equipment fabricated to a special design
1. Number of Copies: Submit one electronic copy of subcontractor list, unless otherwise indicated
2.2 INFORMATIONAL SUBMITTALS
A. Prepare and submit Informational Submittals required by other Specification Sections
B. Number of Copies: Submit one electronic copy of each submittal, unless otherwise indicated. Government will mark up and return one copy electronically
C. Certificates and Certifications: Provide notarized statement that includes signature of entity responsible for…