B08_-_140L5725Q0012_-_Attachment_001_-_SOW_-_Cattle_Guard_Specifications.pdf

PDF 137 KB Posted

Attached to
CCFO - CATTLE GUARDS Federal contract opportunity
Solicitation number
140L5725Q0012
Issued by
Department of the Interior Bureau of Land Management Utah Region

About this file

This is a detailed technical specification document for cattle guard grids and accessories to be delivered to the BLM Cedar City Field Office in Utah. The specifications call for 14' HS-20 BLM Grid cattle guards constructed of all steel with no cleanout, measuring 14' x 8' x 8" and painted yellow, along with accompanying cattle guard wings and pressure-treated timber supports (16' x 12" x 12" rough sawn ponderosa pine timbers, grade #2 or better).

The document outlines comprehensive fabrication requirements including all-welded construction conforming to AWS D1.1 standards, specific paint requirements (zinc-rich primer and oil alkyd-enamel finish in Federal Safety Yellow), and quality control measures for welds and sandblasting. Products must be delivered to the BLM's Cedar City Districts Coal Creek Ware yard at 1770 N Airport Road, Cedar City, UT 84721 by May 1, 2025. Delivery is restricted to Monday-Thursday between 8am and 4:30pm, with 24-hour advance notice required. The materials must be packaged on pallets or with lifting points for unloading by BLM equipment.

View the file

Other files for this federal contract opportunity

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CATTLE GUARDS SPECIFICATIONS - Cedar City Field Office

PART 1: GENERAL

14’ Cattle Guard HS-20 (BLM Grid)

a. All Steel Cattle Guard – No Cleanout

b. 14’ X 8’ X 8”

c. Painted Yellow

Cattle Guard Wings

a. Include hex bolts and nuts (to attach to cattle guards)

b. Painted Yellow

Pressure Treated Timbers Description

a. Rough Sawn

b. 16’ x 12” x 12” dimension

c. #2 or better grade

d. Minimum of .40 pcf

See the specification drawings for: Standard Cattle Guard HS-20 and Cattle Guard Wings

1.01 SUMMARY:

A. Section Includes: Furnishing cattle guard grids and accessories.

1.02 REFERENCES:

A. American Society for Testing and Materials: ASTM A 36-89 Structural Steel

ASTM A 53 REV A-89 Pipe, Steel, Black and Hot-Dipped, Zinc-Coated, Welded and

Seamless

ASTM A 123 REV A-89 Zinc (Hot-Dip Galvanized) Coatings on Iron and Steel Products

ASTM A 153-82 Zinc Coating (Hot-Dip) on Iron and Steel Hardware (R 1987) ASTM A 242-89 High-Strength Low-Alloy Structural Steel

ASTM A 307 REV A-88 Carbon Steel Bolts and Studs, 60,000 psi Tensile Strength

ASTM A 500-84 Cold-Formed Welded and Seamless Carbon Steel Structural Tubing in Rounds and Shapes

ASTM A 501-89 Hot-Formed Welded and Seamless Carbon Steel Structural Tubing

ASTM A 572 High-Strength Low-Alloy Columbarium-Vanadium Structural Steel

ASTM A 972 Fusion Bonded Epoxy-Coated Pipe Piles

B. American Welding Society:

AWS B1.10-86 Guide for Nondestructive Inspection of Welds

AWS D1.1-88 Structural Welding Code Steel

AWS WI-80 Welding Inspection

C. Federal Standard:

Federal Safety Yellow or match color no. 13655, FS 595

D. Society of Automotive Engineers:

SAE-J 429-83 Mechanical and Material Requirements for Externally Threaded Fasteners

E. Steel Structures Painting Council:

SSPC-SP-6-85 Commercial Blast Cleaning minimum

F. U.S. Department of Transportation, Federal Highway Administration:

MUTCD-2009 Manual on Uniform Traffic Control Devices, for Streets and Highways

1.03 SUBMITTALS:

A. Manufacturer's Literature: Submit one (1) copy of the manufacturer's descriptive data including design data and drawings for cattle guard grids.

1.04 QUALITY ASSURANCE:

A. Welder Qualifications: As a minimum, the welder shall meet the qualifications for: Electrodes up to and including E 7018; Steel thickness 1/8- to 3/8-inch; fillet, groove, low-hydrogen welding; or meet code qualifications for structural plate and rolled structural shapes.

PART 2: PRODUCTS

2.01 MATERIALS:

A. Cattle Guard Grids: Shall be constructed of materials as shown on the drawings and described in these specifications. Design loading of grids shall conform to AASHTO HS-20 for BLM grid and dimensions shall be as shown on the drawings and the Work Data Sheet.

1. New material shall be used in the fabrication of cattle guards.

B. End Wings: Shall be as shown on the drawings.

C. Rough treated 12x12 rough treated CCA.4 ponderosa pine 16 ft timbers

2.02 FABRICATION:

A. Steel Cattle Guard Grids: Steel grids shall be all-welded construction. Welds shall be secure and complete along both edges of cross pieces and at joints in the frame and shall conform to AWS

D1.1. Welding shall be performed according to a welding procedure specification (See AWS D1.1) which has been approved by the Contracting Officer.

B. Paint: Structural steel shall be cleaned according to SSPC SP-6, Commercial Blast Cleaning.

Cattle guard grids and end wings shall each receive a prime and finish coat. The prime coat shall be a lead free, zinc-rich, rust-inhibitive alkyd metal primer. Minimum thickness shall be 1-1/2 mils dry-film thickness (DFT). The finish coat shall be an oil alkyd-enamel, gloss paint. Minimum thickness shall be 3 mils DFT, applied in two applications. Color shall be Federal Safety Yellow or match color no. 13655, FS 595. Cattle guards shall be painted after fabrication.

2.03 SOURCE QUALITY CONTROL:

A. Plant Inspection: The contractor's manufacturing facility shall be open to the Contracting Officer during normal hours. There shall be a Contractor's Representative on the site to answer questions.

B. Material Marking: Material to be used in the fabrication process shall be labeled, marked, or otherwise segregated from differing material.

C. Weld Inspection: The quality of the weld shall be "acceptable" under the visual requirement of

AWS D1.1, AWS B1.10, and AWS WI, CH16. Unacceptable welds or defects in the welds as detected by visual inspection or by radiographic, penetrant dye, or magnetic particle techniques shall be repaired or removed and replaced by methods acceptable under the applicable AWS welding codes, or the entire piece may be rejected by the Contracting Officer. Repaired or replaced welds shall be re-inspected by the applicable nondestructive testing method.

D. Sandblast Inspection: The Contractor shall notify the Contracting Officer when and where the grids shall be sandblasted so that the Contracting Officer will arrange an inspection of the sandblasting quality prior to paint application.

PART 3: DELIVERY

3.01 DELIVERY:

A. All materials must be packaged and labeled in an orderly way to keep all products clean and protected so that it can be stored until the structure is installed.

Products shall be delivered to the BLM’s Cedar City Districts Coal Creek Ware yard by May

1, 2025.

1770 N Airport Road

Cedar City, UT 84721

Delivery shall occur between Monday – Thursday from 8am to 4:30 pm. No delivery will be accepted on Fridays, Federal Holiday or weekends. Exact delivery date shall be coordinated with the BLM COR, Lara Kitchen. The Coal Creek Ware Yard is unmanned. Vendor shall provide at least 24 hours’ notice of delivery. BLM will have equipment to unload the delivery truck.

Products must be packaged on pallets or with lifting points.

Lara Kitchen (POC): Office: (435) 865-3009 or Cell: (208) 851-2360

Cedar City Field Office: Office: (435) 865-3000

END OF SECTION