This document contains electrical load calculations for a proposed Kyle Health Center wellness facility expansion project. The calculations specify the electrical needs for four modules totaling 70 feet in length with circuit amperage requirements, connected loads in watts, power factors, and resulting feeder and branch circuit loads. The main breaker is specified as 100 amps for modules 1-3 and 125 amps for module 4. Module 4 requires the largest electrical capacity with needs including lights, numerous receptacles, a water heater, heat tape, HVAC, dryer, and stove circuits. The total calculated electrical load for the facility expansion is 27,131.5 watts.

View the file

Other files for this federal contract opportunity

Show all 18

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ELECTRICAL LOAD CALCULATIONS MAIN BREAKER: 100 AMPS 120/240V, 1-PHASE

MODEL: R1729 LENGTH 70 FT

MODULE: 1 WIDTH 12'-9" FT

CIRCUIT AMP CONNECTED CONNECTED POWER FEEDER BRANCH TOTAL

NO. RATING VOLTS WIRE AMPS LOAD (WATTS) DESCRIPTION FACTOR FACTOR CKT. LOAD FEEDER LOAD

A1 20-SP 120 12/2 NMB WG 18.25 1752 LIGHTS/FANS 1.25 1.25 2190 2190

A2 20-SP 120 12/2 NMB WG 9.91 951 LIGHTS/FANS 1.25 1.25 1188.75 1188.75

A3 20-SP 120 12/2 NMB WG 13.79 1655 RECEPTS 1 1 1655 1655

A4 20-SP 120 12/2 NMB WG 7.79 935 RECEPTS 1 1 935 935

A5,7 45-DP 240 6-6-8 SE CABLE 22.30 5352 HVAC GAS 1 1 5352 5352

A6 20-SP 120 12/2 NMB WG 6.25 750 RECEPTS 1 1 750 750

A8 20-SP 120 12/2 NMB WG 8.33 1000 RECEPTS 1 1 1000 1000

A9 20-SP 120 12/2 NMB WG 6.25 750 RECEPTS 1 1 750 750

A10 20-SP 120 12/2 NMB WG 6.25 750 RECEPTS 1 1 750 750

SUBTOTAL: 14570.75

CALCULATED LIGHTING LOAD: 0

ACTUAL LIGHTING LOAD: 3378.75

ACTUAL LIGHTING LOAD EXCEEDS CALCULATED LIGHTING LOAD: 3378.75

NEC RECEPTS, FIRST 10,000 @ 100%, 50% THEREAFTER: 0

TOTAL WATTS: 14570.75

AMPS: 60.71

ELECTRICAL LOAD CALCULATIONS MAIN BREAKER: 100 AMPS 120/240V, 1-PHASE

MODEL: R1729 LENGTH 70 FT

MODULE: 2 WIDTH 8'-9" FT

CIRCUIT AMP CONNECTED CONNECTED POWER FEEDER BRANCH TOTAL

NO. RATING VOLTS WIRE AMPS LOAD (WATTS) DESCRIPTION FACTOR FACTOR CKT. LOAD FEEDER LOAD

B1 20-SP 120 12/2 NMB WG 4.60 442 LIGHTS/FANS 1.25 1.25 552.5 552.5

B2 20-SP 120 12/2 NMB WG 12.50 1500 RECEPTS 1 1 1500 1500

B3 20-SP 120 12/2 NMB WG 11.67 1400 RECEPTS 1 1 1400 1400

B4,6 45-DP 240 6-6-8 SE CABLE 22.30 5352 HVAC GAS 1 1 5352 5352

SUBTOTAL: 8804.5

CALCULATED LIGHTING LOAD: 0

ACTUAL LIGHTING LOAD: 552.5

ACTUAL LIGHTING LOAD EXCEEDS CALCULATED LIGHTING LOAD: 552.5

NEC RECEPTS, FIRST 10,000 @ 100%, 50% THEREAFTER: 0

TOTAL WATTS: 8804.5

AMPS: 36.69

ELECTRICAL LOAD CALCULATIONS MAIN BREAKER: 100 AMPS 120/240V, 1-PHASE

MODEL: R1729 LENGTH 70 FT

MODULE: 3 WIDTH 11'-4" FT

CIRCUIT AMP CONNECTED CONNECTED POWER FEEDER BRANCH TOTAL

NO. RATING VOLTS WIRE AMPS LOAD (WATTS) DESCRIPTION FACTOR FACTOR CKT. LOAD FEEDER LOAD

C1 20-SP 120 12/2 NMB WG 9.91 951 LIGHTS 1.25 1.25 1188.75 1188.75

C2 20-SP 120 12/2 NMB WG 12.00 1440 RECEPTS 1 1 1440 1440

C3 20-SP 120 12/2 NMB WG 6.00 720 RECEPTS 1 1 720 720

C4,6 45-DP 240 6-6-8 SE CABLE 22.30 5352 HVAC GAS 1 1 5352 5352

SUBTOTAL: 8700.75

CALCULATED LIGHTING LOAD: 0

ACTUAL LIGHTING LOAD: 1188.75

ACTUAL LIGHTING LOAD EXCEEDS CALCULATED LIGHTING LOAD: 1188.75

NEC RECEPTS, FIRST 10,000 @ 100%, 50% THEREAFTER: 0

TOTAL WATTS: 8700.75

AMPS: 36.25

ELECTRICAL LOAD CALCULATIONS MAIN BREAKER: 125 AMPS 120/240V, 1-PHASE

MODEL: R1729 LENGTH 70 FT

MODULE: 4 WIDTH 11'-3" FT

CIRCUIT AMP CONNECTED CONNECTED POWER FEEDER BRANCH TOTAL

NO. RATING VOLTS WIRE AMPS LOAD (WATTS) DESCRIPTION FACTOR FACTOR CKT. LOAD FEEDER LOAD

D1 20-SP 120 12/2 NMB WG 13.48 1294 LIGHTS 1.25 1.25 1617.5 1617.5

D2 20-SP 120 12/2 NMB WG 9.25 1110 RECEPTS 1 1 1110 1110

D3 20-SP 120 12/2 NMB WG 7.50 900 RECEPTS 1 1 900 900

D4 20-SP 120 12/2 NMB WG 9.00 1080 RECEPTS 1 1 1080 1080

D5 20-SP 120 12/2 NMB WG 9.00 1080 RECEPTS 1 1 1080 1080

D6 20-SP 120 12/2 NMB WG 6.58 790 RECEPTS 1 1 790 790

D7 20-SP 120 12/2 NMB WG 9.00 1080 RECEPTS 1 1 1080 1080

D8 20-SP 120 12/2 NMB WG 4.17 500 HEAT TAPE 1 1 500 500

D9 20-SP 120 12/2 NMB WG 2.08 250 WATER HEATER 1 1 250 250

D10,12 45-DP 240 6-6-8 SE CABLE 22.30 5352 HVAC GAS 1 1 5352 5352

D11 20-SP 120 12/2 NMB WG 2.83 272 LIGHTS 1.25 1.25 340 340

D13,15 30-DP 240 10/3 NMB WG 22.30 5352 DRYER 1 1 5352 5352

D14,16 40-DP 240 8/4 NMB WG 32.00 7680 STOVE 1 1 7680 7680

SUBTOTAL: 27131.5

CALCULATED LIGHTING LOAD: 0

ACTUAL LIGHTING LOAD: 1957.5

ACTUAL LIGHTING LOAD EXCEEDS CALCULATED LIGHTING LOAD: 1957.5

NEC RECEPTS, FIRST 10,000 @ 100%, 50% THEREAFTER: 0

TOTAL WATTS: 27131.5

AMPS: 113.05

R1729 production asm-1 (1).pdf
R1729 production aem-1 (1).pdf
R1729 production AM-1 (1).pdf
R1729 production p-1 (1).pdf
R1729 production ceiling (1).pdf

File details come from the government source that posted it. Updated .