B.08_OWCMD22_DRAFT_PLANS.pdf
PDF 7 MB Posted
- Attached to
- OR/WA Clamshell Maintenance Dredging 2022
- Solicitation number
- W9127N22B0011
About this file
This pre-solicitation synopsis provides details for the OR/WA Clamshell Maintenance Dredging 2022 project to be solicited by the U.S. Army Corps of Engineers Portland District. The project includes mechanical dredging at four locations requiring removal of approximately 229,000 cubic yards of material as mandatory line items, with optional additions of 80,000 cubic yards. Locations include Port Orford and Skipanon River in Oregon, and Baker Bay and Chinook in Washington. Dredged material will be disposed of in a designated ocean site. A pre-solicitation conference will be held on April 7th, 2022 followed by solicitation on or around May 9th with bids due 30 days after advertisement. The procurement is set aside for small businesses with a NAICS code of 237990 and size standard of $30 million. In-water work windows provided for each location range from May 1st to October 31st for Port Orford, and August 1st to December 15th for the other three locations.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| OWCMD22_ADV.pdf | ||
| 22B0011-OR-WA_Clamshell_2022_Adv_Plans.pdf | ||
| B.08_OWCMD22_DRAFT_SPECS.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
2 3 4 p
N
M
L
K
J
H
G
F
E
D
C
B
A
5 6
US ARMY CORPS
OF ENGINEERS
PORTLAND DISTRICT
7 8 9 10 11 12 13 14 15
SOLICITATION NO.: W9127N22B0011
KYMBERLY C. ANDERSON P.G.
CHIEF, OPERATIONS DIVISION
PATRICK L. DUYCK, P.E.
SIGNATURES AFFIXED HEREON INDICATE OFFICIAL
RECOMMENDATION AND APPROVAL OF ALL THE
DRAWINGS IN THIS SET
RONALD S. FLODIN, P.E.
OPERATIONS PROJECT MANAGER
CHANNELS AND HARBORS PROJECT
CHIEF, ENGINEERING AND CONSTRUCTION DIVISION
MICHAEL D. HELTON P.M.P.
COLONEL, EN
COMMANDING
DATE:
16 17 18 19 20
DRAFT
-1 �
N
M
L
K
J
H
G
F
E
D
C
B
A
I 2 I
PROJECT
LOCATIONS
3 I 4 I 5 I I�
BAKER BAY
I )CHINOOK
;�-SKIPANON , ..... -1 .:;._'\_
... 7
I
I
,j �
D PORT ORFORD
6 I 7 I 8 I 9
I
WASHINGTON
I
OREGON
I
I IDAHO
I
,... .. _,, _______ , ________ , ________ , _________ ,_, _____ r _______________ , ______ , _________
NEVADA
CALIFORNIA
10 I 11
OREGON AND WASHINGTON CLAMSHELL
MAINTENANCE DREDGING 2022
I 12 I 13 I
FILE DRAWING
NAME NUMBER
OWC-IND-000 1
OWC-POR-000 2
OWC-8B1-000 3
OWC-B82-000 4
OWC-CHK-000 5
OWC-SKP-000 6
OWC-DISP1-000 7
14 I 15 I 16 I 17
DRAWING
DESCRIPTION
INDEX SHEET AND VICINITY MAP
PORT ORFORD
PLANNING LAYOUT DRAWING
BAKER BAY SHEET 1 - RM 00+10+00 TO 01+50+00
PLANNING LAYOUT DRAWING
BAKER BAY SHEET 2- RM 01+50+00 TO 03+10+00
PLANNING LAYOUT DRAWING
CHINOOK-RM 00+40+00 TO 01+55+00
PLANNING LAYOUT DRAWING
SKIPANON RM 00+20+00 TO 01+35+00
PLANNING LAYOUT DRAWING
0-9.2-IW AND W-10.2-IW
PLACEMENT SITES LAYOUT DRAWING
I 18 I 19 I 20 ffl
US ARMY CORPS
OF ENGINEERS
PORTLAND DISTRICT
ww z- t- C) (.) z -o::w g:ou. C/) "0 -□ en □z c.. □<! o:: z..J 0 ::i�(.) t-0>- O::c..::ii: 0 0:: c..
cli
_J w I, U)N :'2:0 <(N
_JC)
Oz z-oe> 1-
Cl C)W z 0:::_Cl
Iw Cl) () oz zW <(I-z z o<( C) :'2:
w 0:::
z ., 0 0.
- rn [1l ., 2: 0 rn ., z <( 0 I
UJ rn
0. ..., 0 UJ z
I-w w
I Cl) w z
SHEET ID
OWC-IND-000
DWG 1 OF 7
ti:
Cl c..
E:
z
,a en z w z
LJ..
w
LEAD
1647 K
1647 J
1647 N 1647 G
1647 T
1647 S
N
X 3,847,000
X 3,848,000
X 3,847,000
Y
,0
Y
,0
Y
,0
X 3,848,000
REFUSAL
DIG TO
ROCK AREA
ANTICIPATED
REFUSAL
DIG TO
ROCK AREA
ANTICIPATED
A
B
C
D
E
F
A
B
3847980.66 416175.52
3847627.30 416379.77
3848025.70 416253.44
3847706.08 416438.19
3847540.66 416750.60
3847628.30 416771.08
X COORDINATE Y COORDINATE
OF YOUR CONTRACT
SAFETY IS A PART
J
G H
I
F T
N
N.T.S.
1600 FT
16 FT
MAX DEPTH
AREA
STANDOFF
15 FOOT
STA. 00+07+50
DREDGE AREA
UPSTREAM LIMIT OF
STA. 00+00+00
DREDGE AREA
DOWNSTREAM LIMIT OF
00+03 +91
00+07 +50
GAGE
STAFF
**2 FT MAXIMUM DEPOSITION**
FLOOD
EBB
LEGEND
Primary Control Point
Coordinated Survey Points
Uncoordinated Survey Points
Dredging Ranges
River Mileage from Mouth
Front
Flow Arrows Straight
Harbor Lines
State Boundary
Benchmarks
Gages Staff Recording
Rear
Tidal
Aids to Navigation
Lighthouses
Lights Fixed Flashing, Occulting
Lighted Ranges Front Rear
Lighted Buoys
Unlighted Buoys Port Starboard Mid Channel Junction
Daybeacons Port Starboard
Seasonal Lights and Lighted Dredging Ranges
NOTES
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
A
B
C
D
E
F
G
H
J
K
L
M
N
P
S U
B M
IT
T
E D
B Y
C H
E C
K E
D B
Y
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
IS
S
U E
D A
T E
S I Z
E
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E
US ARMY CORPS
OF ENGINEERS
PORTLAND DISTRICT
W N
C
X
X
U S
A
R M
Y C
O R
P S
O F
E N
G
IN
E E
R S
P O
R T
L A
N D
D
IS
T R
IC
T
P O
R T
L A
N D
O
R
C H
A N
N E
L S
A N
D H
A R
B O
R S
P R
O J E
C T
O P
E R
A T
IO
N
S D
IV
IS
IO
N
D A
B
D A
B
T S
G
-F
E B
-2
W
N
B
M
A
IN
T E
N A
N C
E D
R E
D G
IN
G
O R
E G
O N
A N
D W
A S
H
IN
G T
O N
C L
A M
S H
E L
L
P O
R T
O R
F O
R D
PLACEMENT SITE
PORT ORFORD 404 NEAR SHORE
SEE DISPOSAL PLAN FOR ADDITIONAL DETAILS
X COORDINATE Y COORDINATE
415818.35
3847832.26 414165.41
3847718.07 415761.23
3848516.06
3848630.31 414222.53
COORDINATES
NEAR SHORE PLACEMENT
E
F
C
D
G
H
I
J
COORDINATES
DREDGING AREA
Y
,0
075' 75' 150' 225' 300'
SCALE IN FEET
STAFF GAGE: Northing: 416704 Easting: 3847547
Navigation Chart No. 18589 2009 Aerial Photography data source: U.S.D.A., Service Center Agencies Reference is existing at that time.
date indicated and can only be considered to represent the general condition The information depicted on this map represents the results of a survey conductedon the
Pacific Northwest River Basins Commission, June 1968.
River mileage conforms to the River Mile Index of the Hydrology and Hydraulics Committee, MLLW is 0.49 feet below the North American Vertical Datum (NAVD 88).
Soundings are shown in feet and indicate depths below Mean Lower Low Water 1983-2001.
Vertical Datum:
System (SPCS), Oregon South Zone. Distance units in U.S. Survey Feet.
North American Datum of 1983 (NAD83), projected to the State Plane Coordinate Horizontal Coordinate System:
:7
16 ft. MLLW CONTOUR
18 ft. MLLW CONTOUR
20 ft. MLLW CONTOUR
16 ft. MLLW
18 ft. MLLW
20 ft. MLLW
18 ft. MLLW
***VERTICAL FACE***
MAXIMUM DREDGING / PAY DEPTH 16 ft
***NOTE ON DREDGING DEPTHS AT DOCK FACE***
B
B
A
A
S T
A
T
O S
T A
SEE SPECIFICATION SECTION 35 20 23.00 82
DETERMINED BASED ON PRE-DREDGE SURVEY
ACTUAL DREDGING DEPTHS & STATIONING TO BE
A W
A R
D D
A T
E
X X
X X
-2
45' 45'
30' 45'
FACE
DOCK
CL
REQUIRED DREDGING DEPTH
CL
REQUIRED DREDGING DEPTH
MAXIMUM DREDGING / PAY DEPTH
15'
DREDGING AND PAY DEPTH
DOCK FACE MAXIMUM
ADJACENT TO DOCKFACE
CROSS SECTION
DWG 2 OF 7
OWC-POR-000
SHEET ID
P L
A N
N
IN
G L
A Y
O U
T D
R A
W
IN
G
K A
R L
A G
E
L L
IS
+9
+8 +8
+6 +6 +7
+4 +4
+6 +7
+3 +5 +7+3+4 +1
+5 +7
+1 +1 +2 +4
+4
+5 +7
+2
+5 +6
2 1 1
0 0
+2 +4
8 5 7 2
1 1 1 1
+4 +5
+6
6 7 6 9 11
3 2
1 1
0 0
+2 +5
9 9 7 7
2 2 2 2 1 1 1
1 0
+2
+4 +7
8 8 8
10 7 8 7
5 3
2 2 1 1 1 1 1 1
+4 +5
9 9
8 11
5 44
3 2 2
2 2
2 1 1
1 1 1
0 +2 +5
+6
8 13 14 11 8
13 11 9
6 4 3 3 3 2
1 1 1 00
+4 +6
8 12 6 9
15 15 15
12 11
11 9 6
3 3 3 3 2
2 2 2
1 1 1 1 1
0 +2 +5
3 4
81113 16 16 16
16 15
13 1312 11 9 7 5 3 3 3
2 2
2 2 2 2 1 1 1 1 1
+3
2 1 2
5 11
151818 17 17 16 16
151414 14 13 13
11 4
3 3 3
2 2
2 2 2
1 1 1 1 1
+2
2 2 3 4 5
7 10
17 16 16
161616 15 15 14 14 12
9 5 4 3
3 2 2 2 2
2 1
1 1
3 3 3 3 4 4 5 6 8 11 15
18 18
171716 16 16 16 15
3 3
3 3 2 2
2 2 2 2 2 2 2
1 1 1 1 1 1
1 3 4 4 5
14 18
1617 16
15 151412
9 4 3 3 3
2 2 2
2 2
1 1
5 4 4 5 6 7 9
17 17
14 4 3
1 1
5 5 5 6
7 7 9 12
18 18
18181717
17 16 1616
13 10
5 4
3 3 3 3
2 2
2 2 1 1
1 1
2 5
7 7
8 91114 181817
1818 1818 17 171717 1616161514
4 4
4 3 3 3
2 2
2 2
2 1 1 1
4 5 6 7
9 10 1113
17 18
181817 1616 1515
6 5
4 4 3 3 3
3 3
3 2
2 2
2 2 2 1 1
9 9
13 15 17
1919 19
16 14 1313 12 1110 8
6 6 5 5 4 4 4
3 3 3 3 3
3 2
2 22 2 2 2
6 8
11 121314
19 1919 19 19 18
12 12 11 9 8 6 6 5 5
5 4 4 4 4 3
3 3 3 3 2
2 2 2 2 2 2 2
6 5 5 7 9
121314
18161412 1111 10 9
6 6 6
4 4
3 2 2 2 2
5 6 8 9
19 19 19
15 12 10
7 7
6 6 5 5 4
4 4 4 3
2 2 2 2
10 12
13 14 1617 18 19
19 191919
12 1110
7 7 77 6 6 6 6 6
5 5
5 4
4 4 3 3 3 3
6 8
9 11 12 13
141617
1919 19 19 19 19 18 14
12 10 9 9
7 7 7 7 7 6 6 5
5 5 4 4 4 4 3 3
4 8
121314 1819 1919
19 1919
161512 11
10 8 8 8 7
7 7 7 7 7 6 6 6 5
5 5 4 4
8 10 11 13 14 15
19191918 16 15
13 1110 9 9
8 8 7 7 7 7 7
6 1010
121213 14 1616 19 1919
19 19 19
17 14 11
9 9 8 8 8 8 88 7
77 7
6 5
111212
15 1617 19 19 1919
191919 19 1918
141312 11 9
9 9 9
8 8
8 7 77 7 6
13 14
15 1819 19 19 1919
1514 11
9 9 9 8
88 8 8
12 12
18 19 2019 19 19 19 1816
9 9 9 9
7 7 13
1313 141515
19 2020 202019
1110 1010
10 9 9 9 9
12 13 14 1415 16 1718 1920
20 20
171615
10 10
8 711
151515 16
20 2019
11 10 1010
6 9 11 16
16 16 171717 18
20 2020
171716
15 13
1211 111110 10
111517 17 1718 18
18 19 20 20
20 20
12 12
12 11 1111 10
86 6
18 18 18181819 191919
17 14
14 12 12 12
111110
14 12 10
9 8
1920 19
20 2020
1919 18
1716 15
28 28
2215 12
23 21 21
20 20
20 19
121111
282828
2825 26 21
19 16 15
1724 22 22 21 21 21 20 20 20 21202020 201919
14 1313 1312 12
2828 28 282828
28 2621 19 19 19 22 26
2121 21 212121 21 20
19 18
1515 14
1313 12 11
28 28
27 2727 28 28 25 26 27
27 26
24 22 22
22 2222 21 2121 20
17 161615
13 13 12 12
2727 27 27 27
27 2728
28 282727
24 23
22222221212020 20
27 27 27
26 26
27 28
2525 24
23 23 23
21212020
1918 1717
15151414
131313
27 26
26 2728
242424 2323 2222
21 2120 2019
1615 15 14
26 26 2727
28 28 27 26
262525
24 24
212120
18171716
15141414
2626 26
24 2423 23
1919 18
15 15
25 25
2424 23 23
22 22 22 21
19 1918
161515 14 14
262626
23 22
18 17
17 15
26 25 25 25 25 24
2322 22 21
25 25
23 22
20 20
19 18 17
17 1716
25 24 24
21 2020 19 18
17 16
20 1919 18
17 16
2221 21
191918 1817
171716
22 22
21 21 20 19
19 18 18
222221
19 19
18 18
2221 21
19 19
191818
1720 2019
19 181820
20 19
19 18
20 ft. MLLW
DREDGING / PAY DEPTH
MAXIMUM
25-AUG-2021
SURVEY DATE
HYDRO
27-AUG-2021
SURVEY DATE
LAND
STA: 00+06+50
CROSS SECTION B - B
N.T.S.
N.T.S.
STA: 00+03+50
CROSS SECTION A - A
SEE SPECIFICATION SECTION 35 20 23.00 82
DETERMINED BASED ON PRE-DREDGE SURVEY
ACTUAL DREDGING DEPTHS & STATIONING TO BE
CENTROID OF PLACEMENT SITE APPROX. 1928 FT
DISTANCE FROM CENTROID OF DREDGE AREA TO
NOT TO SCALE
RM 03+01+00 to 03+40+00 RM 04+30+00 to 04+50+00
N
FLOOD
EBB
LEGEND
Primary Control Point
Coordinated Survey Points
Uncoordinated Survey Points
Dredging Ranges
River Mileage from Mouth
Front
Flow Arrows Straight
Harbor Lines
State Boundary
Benchmarks
Gages Staff Recording
Rear
Tidal
Aids to Navigation
Lighthouses
Lights Fixed Flashing, Occulting
Lighted Ranges Front Rear
Lighted Buoys
Unlighted Buoys Port Starboard Mid Channel Junction
Daybeacons Port Starboard
Seasonal Lights and Lighted Dredging Ranges
NOTES
SCALE IN FEET
US ARMY CORPS
OF ENGINEERS
PORTLAND DISTRICT
OF YOUR CONTRACT
SAFETY IS A PART
U S
A
R M
Y C
O R
P S
O F
E N
G
IN
E E
R S
P O
R T
L A
N D
D
IS
T R
IC
T
P O
R T
L A
N D
O
R
C H
A N
N E
L S
A N
D H
A R
B O
R S
P R
O J E
C T
O P
E R
A T
IO
N
S D
IV
IS
IO
N
NOT TO SCALE
STAFF GAGE AT USCG BOAT DOCK: Northing: 973042 Easting 7305497 be considered as indicating the general condition existing at that time.
The information depicted on this map represents the results of surveys made on the dates indicated and can only
River Basins Commission, July 1972
River mileage conforms to the River Mile Index of the Hydrology and Hydraulics Committee, Pacific Northwest
2012 Aerial Photography data source: USDA, Service Center Agencies
Reference is Navigation Chart No. 18521
Elevations are shown thus: +2, indicating height in feet above MLLW.
Soundings are shown in feet and indicate depths below MLLW.
1988 (NAVD88 Geoid 9 )at Columbia River Mile 2.6.
Vertical Datum is Mean Lower Low Water (MLLW ). MLLW is 0.22 feet below North American Vertical Datum of
Horizontal coordinates are based on the Lambert Projection for Oregon, North Zone (NAD 83, U.S. Survey Feet )
Control is by USACE.
PLACEMENT SITE W-4.8-IWPLACEMENT SITE O-3.2-IW
250' 250' 500' 750' 1000'
FLOOD
EBB
52+
A
B
C
D
X COORDINATE Y COORDINATE
A
B
C
D
Y
,0
X 7,310,000
X 7,308,000
Y
,0
X 7,310,000
X 7,306,000
X 7,308,000
Y
,0
Y
,0
0X 7,306,000
Y
,0
Y
,0
K
L
M
Q
P
O
N
R
S
T
U
Baker Bay West Channel
Channel 12 Fl W
Daybeacon 11
Baker Bay West
Channel Buoy 11
Baker Bay West
Channel Buoy 10
Baker Bay West Channel
Channel 10 Fl R
West Daybeacon 9
Baker Bay West Channel
Channel 8, Fl W
Baker Bay West
Channel Buoy 6A
HEEL
Daybeacon 6
Entrance Jetty 2, Fl W
Baker Bay West Channel
Bake
Channel Buoy 3 Baker Bay West
Daybeacon 7
Channel Buoy WR7
Baker Bay West
BOAT HUB
BETTY M
D
IK
E
B
.2
D O
L
D
.5
L
D
.5
L
D
.8
L
O R E G
O N
W A S H
IN
G
TO
N
W A S
H
IN
G T
O N
O R E
G O
N
971766.20
7307835.08 971984.31
7307445.15 972294.95
7307538.62 972412.27
M A
IN
T
E N
A N
C E
D R
E D
G
IN
G
O R
E G
O N
A N
D W
A S
H
IN
G T
O N
C L
A M
S H
E L
RM 01+03+00
LIMIT OF AA1
DOWNSTREAM
RM 01+11+00
LIMIT OF AA1
UPSTREAM
P L
A N
N
IN
G L
A Y
O U
T D
R A
W
IN
G
B A
K E
R B
A Y
S H
E E
T
AREA 1 COORDINATES
FOR PLACEMENT SITE REQUIREMENTS
SEE PLACEMENT PLAN (ATTACHMENT A20-2)
N
N
APPROXIMATE LOCATION
BUOY CHAIN & ANCHOR
X: 7309342.54 Y: 969533.94
E
F
7308021.90
7307933.03 972099.55
7308135.82 971863.78
E
F
R M
T
O
R M
T O
20 21
18 1818
19 19
171717
18 18
15 15
16 1616
17 17
17 17
12 12121213
1717 17
121414 14
666 7 77 9
16 16 16
55 5
14 1414
15 16
17 17
1212 12
16 16
17 17
18 20
8 7
61816
17 1716
G
H
I
J
A
A
1111 13
15 16
10 10 10
9 9910
111112
13 141416
181818
3 3 3 4 4 5 5 5
6 6 6 77 7 7
9 9910
121213
17 1717
18 18
18 19
3 3
34 4
21 21
22 23
36 37
141414
18 18
33 36
15 16
12 91013
421 19
2927 WASHINGTON
OREGON
18 FT (MLLW )
16 FT (MLLW )
14 FT (MLLW )
18 FT (MLLW )
16 FT (MLLW )
RIVER MILE: 01+07+00
CROSS SECTION B - B
16 ft MLLW
CL
AREA1 PRE/POST
18 ft MLLW
N.T.S.
75' 37.5' 37.5'
14 ft MLLW
QTR TO RED TOE
REQUIRED DEPTH RED
PAY DEPTH RED QTR TO RED TOE
TO RED QTR / MAX DREDGING AND
REQUIRED DEPTH GREEN TOE
TOE TO RED QTR
AND PAY DEPTH GREEN
MAXIMUM DREDGING
B
B
X COORDINATE Y COORDINATE X COORDINATE Y COORDINATE
7310850.30 961901.70
7309330.95 962448.96
7307747.52 962766.20
7307924.65 963648.93
7308889.88 963585.59
7309450.51 963433.90
7311057.00 962244.28
7317420.19 962282.45
7318493.91 961226.22
PLACEMENT SITE O-3.2-IW COORDINATES PLACEMENT SITE W-4.8-IW COORDINATES
P
K
L
M
N
O
Q
R
T
S
U
10-SEP-2021
HYDRO SURVEY
AREA 2
7317665.14 960383.72
7316593.58 961437.82
X COORDINATE Y COORDINATE
G
H
I
J
7309397.77 968651.65
7309248.16 969892.67
7309347.44 969904.63
7309497.05 968663.62
AREA 2 COORDINATES
08-SEP-2021
HYDRO SURVEY
AREA 1
APPROX, 9,992 FT
TO CENTROID OF O-3,2-IW IS
DISTANCE FROM RM 01+10+00
APPROX, 15,279 FT
TO CENTROID OF O-4,8-IW IS
DISTANCE FROM RM 01+10+00
RIVER MILE: 00+27+00
CROSS SECTION A - A
100'
16 ft MLLW
CL
AREA 2 PRE/POST
MAXIMUM PAY DEPTH
REQUIRED DEPTH
18 ft MLLW
N.T.S.
SEE SPECIFICATION SECTION 35 20 23.00 82
DETERMINED BASED ON PRE-DREDGE SURVEY
ACTUAL DREDGING DEPTHS & STATIONING TO BE
SEE SPECIFICATION SECTION 35 20 23.00 82
DETERMINED BASED ON PRE-DREDGE SURVEY
ACTUAL DREDGING DEPTHS & STATIONING TO BE
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
A
B
C
D
E
F
G
H
J
K
L
M
N
P
S U
B M
IT
T
E D
B Y
C H
E C
K E
D B
Y
D R
A W
N B
Y
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
IS
S
U E
D A
T E
S I Z
E
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E
T S
G
W
N
B
-M A
R -2
:2
W
N
C X
X X
X
A W
A R
D D
A T
E
X X
X X
-2
DWG 3 OF 7
OWC-BB1-000
SHEET ID
K A
R L
A G
E
L L
IS
D E
S
IG
N E
D B
Y
D A
B
D A
B
RM 00+20+00
LIMIT OF AA2
DOWNSTREAM
RM 00+32+50
LIMIT OF AA2
UPSTREAM
Y ,0
PR
OJ
ECT
END
OF
F
EDERAL
LOCAL
IN
TE
RE
ST
S
MAI
NTAI
NED
BY
Y ,0
Y ,0
X 7 ,30
7,0
X 7 ,30
7,0
N
MAXIMUM PAY DEPTH
FLOOD
EBB
LEGEND
Primary Control Point
Coordinated Survey Points
Uncoordinated Survey Points
Dredging Ranges
River Mileage from Mouth
Front
Flow Arrows Straight
Harbor Lines
State Boundary
Benchmarks
Gages Staff Recording
Rear
Tidal
Aids to Navigation
Lighthouses
Lights Fixed Flashing, Occulting
Lighted Ranges Front Rear
Lighted Buoys
Unlighted Buoys Port Starboard Mid Channel Junction
Daybeacons Port Starboard
Seasonal Lights and Lighted Dredging Ranges
NOTES
SCALE IN FEET
US ARMY CORPS
OF ENGINEERS
PORTLAND DISTRICT
OF YOUR CONTRACT
SAFETY IS A PART
REQUIRED DEPTH
U S
A
R M
Y C
O R
P S
O F
E N
G
IN
E E
R S
P O
R T
L A
N D
D
IS
T R
IC
T
P O
R T
L A
N D
O
R
C H
A N
N E
L S
A N
D H
A R
B O
R S
P R
O J E
C T
O P
E R
A T
IO
N
S D
IV
IS
IO
N
100' 100' 200' 300' 400'
16 FT (MLLW )
17 FT (MLLW )
16 ft MLLW
17 ft MLLW
PRE/POST
R M
T O
R M
75' 75'
RIVER MILE: 03+05+25
CROSS SECTION A - A
A
100'
(N..T.S )
STAFF GAGE AT USCG BOAT DOCK: Northing: 973042 Easting 7305497 be considered as indicating the general condition existing at that time.
The information depicted on this map represents the results of surveys made on the dates indicated and can only
River Basins Commission, July 1972
River mileage conforms to the River Mile Index of the Hydrology and Hydraulics Committee, Pacific Northwest
2012 Aerial Photography data source: USDA, Service Center Agencies
Reference is Navigation Chart No. 18521
Elevations are shown thus: +2, indicating height in feet above MLLW.
Soundings are shown in feet and indicate depths below MLLW.
1988 (NAVD88 Geoid 9 )at Columbia River Mile 2.6.
Vertical Datum is Mean Lower Low Water (MLLW ). MLLW is 0.22 feet below North American Vertical Datum of
Horizontal coordinates are based on the Lambert Projection for Oregon, North Zone (NAD 83, U.S. Survey Feet )
Control is by USACE.
B
C
D
E
F
G
+8
Daybe acon
Chann el 22
Qk Fl GBaker
Bay W est
Basin 2 Fl RIlwaco
Mooring
Basin 3 Fl GIlwaco
Mooring
91H-01 -04
X 7 ,30
8,0
Y ,0
Y ,0
X 7 ,30
6,0
X 7 ,30
8,0
X 7 ,30
6,0
Y ,0
Daybea con 2
CL
M A
IN
T
E N
A N
C E
D R
E D
G
IN
G
O R
E G
O N
A N
D W
A S
H
IN
G T
O N
C L
A M
S H
E
NOT TO SCALE
RM 03+01+00 to 03+40+00 RM 04+30+00 to 04+50+00
NOT TO SCALE
PLACEMENT SITE W-4.8-IWPLACEMENT SITE O-3.2-IW
N
N
X COORDINATE Y COORDINATE X COORDINATE Y COORDINATE
7310850.30 961901.70
7309330.95 962448.96
7307747.52 962766.20
7307924.65 963648.93
7308889.88 963585.59
7309450.51 963433.90
7311057.00 962244.28
7317420.19 962282.45
7318493.91 961226.22
PLACEMENT SITE O-3.2-IW COORDINATES PLACEMENT SITE W-4.8-IW COORDINATES
X COORDINATE Y COORDINATE
A
B
C
D
FOR PLACEMENT SITE REQUIREMENTS
SEE PLACEMENT PLAN (ATTACHMENT A20-2)
7317665.14 960383.72
7316593.58 961437.82
AREA 4 COORDINATES
H
I
E
F
G
H
I
J
K
L
M
N
P
Q
O
R
S
T
J
K
L
M
N
O
P
Q
R
S
T
P L
A N
N
IN
G L
A Y
O U
T D
R A
W
IN
G
B A
K E
R B
A Y
S H
E E
T
7306967.17 978496.76
7307057.83 978569.67
979090.97
7307148.40 980054.28
7307297.55 980070.21
7307338.59 979685.96
7307446.00 979621.93
7307537.72 978763.24
7307061.19 978379.89
7307251.29
A
A
03+10+00
OF AA4
UPSTREAM LIMIT
02+45+00
OF AA4
DOWNSTREAM LIMIT
7 7
8 7
17 17
11 9
8 7
14 10
13 16
18 17
12 10
11 10
15 11
8 8
9 10 11 13
18 18
9 10
11 13
17 18
18 18
9 10
17 18
13 12
8 8 8
8 9
12 15
18 1818
88 7
17 16
16 18
18 19
19 18
6 7
19 20
7 66
6 7
19 19
6 6
6 8
6 66
7 8
8 9
17 17
18 18
19 18
8 9
15 17
15 15
45 6
4 5
19 19
18 18
17 18
6 7
17 17
19 19 18 18
18 18
11 14
15 15
151515
12 14
18 18
16 16
9 4
3 3
9 12
17171
9 12
16 16
4 4
10 12
17 17
18 18
19 19
4 4
11 12
15 15
16 16
171715
7 11
14 14
16 16
4 5
8 11
18181
18 18
17 17
16 16
17 17
16 16
6 9
11 12 13 13
17 18
191919
151511
19 19
14 14
3 3
5 8
11 12
202021
21 1918
11 12
14 14
17 17
4 7
9 10
13 14
18 19
4 7
17 18
16 17
33 3
16 17
3 3
3 3
6 7
16 12
18 18
18 18
4 4
28-SEP-2021
HYDRO SURVEY
APPROX, 9,992 FT
TO CENTROID OF O-3,2-IW IS
DISTANCE FROM RM 01+10+00
APPROX, 15,279 FT
TO CENTROID OF O-4,8-IW IS
DISTANCE FROM RM 01+10+00
SEE SPECIFICATION SECTION 35 20 23.00 82
DETERMINED BASED ON PRE-DREDGE SURVEY
ACTUAL DREDGING DEPTHS & STATIONING TO BE
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
A
B
C
D
E
F
G
H
J
K
L
M
N
P
S U
B M
IT
T
E D
B Y
C H
E C
K E
D B
Y
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
IS
S
U E
D A
T E
S I Z
E
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E
T S
G
D A
B
T S
G
:1
-F E
B -2
W
N
B
W
N
C X
X X
X
X X
X X
-2
A W
A R
D D
A T
E
DWG 4 OF 7
OWC-BB2-000
SHEET ID
K A
R L
A G
E
L L
IS
p
N
M
K
J
H
G
F
D
C
B
A
F
G
H
PLACEMENT SITE
W-4.8-IW
G
L----1 1-1
I N.T.S.
3 4
PLACEMENT AREA D
j
5 6 7 8
I N.T.S.
5 -
DISTANCE FROM RM
01+30+00 TO DISPOSAL
CENTROID IS 13813 FT
SEE PLACEMENT PLAN (ATTACHMENT A20-2)
FOR PLACEMENT SITE REQUIREMENTS
CENTROID IS 13813 FT
01+30+00 TO DISPOSAL
CENTROID IS 13890 FT
REQUIRED DEPTH
MAXIMUM PAY DEPTH
PLACEMENT SITE
W-4.8-IW COORDINATE S
X COORDINATE
7316593.58
7317420.19
7318493.91
7317665.14 ao
I
Y COORDINATE
961437.82
962282.45
961226.22
960383. 72
3li
I
J
K
L
M
PLACEMENT SITE
'ARE A D' COORDINATES
X COORDINATE
7324454.22
7324876.38
7329800.28
7329378.12
:0 ['T'\ Cl z
I
Y COORDINATE
955917.09 0
957874.81
956813.02 5 -
954855.30
REQUIRED DEPTH
MAXIMUM PAY DEPTH
J> cJ) :i:
z Cl z
DOWNSTREAM LIMIT
OF AREA 1
00+47+50
I
IIO
I
Kl
\ 1 ,. -----------------------------------�
I ao
AREA1
HYDRO SURVEY
01-MAR-2022
I 3li
I
I
9 9_f 1 1 6 !, 6 !, 4 A 4 4- '!, g & g & ,.:J 6
1 6 6 !J 6, !> It 4 4 '!, '!, '!, '3 '!, 2 'l.
I
A
--- -10 FT MLLW CONTOUR
--- -11 FT MLLW CONTOUR
--- -12 FT MLLW CONTOUR
75'
AREA2
I
75'
CROSS SECTION B - B
RIVER MILE: 01+44+00
AREA1
75'
CROSS SECTION B - B
RIVER MILE: 01+47+50
I
I
AREA 1 COORDINATES AREA 2 COORDINATES
X COORDINATE Y COORDINATE X COORDINATE Y COORDINATE X COORDINATE Y COORDINATE X COORDINATE
A 7326571.27 965444.56 G 7328886.33 968600.17 K 7328632.30 968626.77 Q 7328897.66
B 7327403.68 966052.21 H 7328617.97 967110.89 L 7328775.78 968832.54 R 7326659. 71
C 7328169.24 966786.69 7327942.93 966260.15 M 7329044.34 968925.39
D 7328289.41 966938.14 J 7326659.71 965323.41 N 7329981.54 968078.80
E 7328529.73 967467.07 0 7329880. 78 967967 .67
F 7328632.30 968626. 77 p 7329051.92 968716.40
\fl
12 13
ACTUAL DREDGING DEPTHS & STATIONING TO BE
DETERMINED BASED ON PRE-DREDGE SURVEY
SEE SPECIFICATION SECTION 35 20 23.00 82
_____ 10ftMLLW
----- 11 fl:MLLW
N.T.S.
ACTUAL DREDGING DEPTHS & STATIONING TO BE
DETERMINED BASED ON PRE-DREDGE SURVEY
SEE SPECJFJCATION SECTION 35 20 23.00 82
-----10ftMLLW
----- 12flMLLW
N.T.S.
14 15 16 17 18 19 20
SAFETY IS A PART
OF YOUR CONTRACT
POTENTIAL DOWNSTREAM
LIMITS OF AREA 2
01+36+00
IV
2 '). L � • •
-10 FT MLLW CONTOUR
I ct\, \,, \,, POTENTIAL
UPSTREAM
6 •
LIMITS OF
_ -=----______________ AREA_ 1 ___________ --+-�\:_�
0 1 + 3 6 + 0 0 8.s ' ', ,0
-· 13
-11 FT MLLW CONTOUR
-12 FT MLLW CONTOUR
POTEN;i:IAl:
UPSTREAM
LIMITS 0m
AREA 2
01+51+50
SCALE IN FEET
Y COORDINATE
968663.06
965323.41 Primary Control PolnL ____ -� Benchmarks.._ ________ X Coordinated Survey Pointa._ __ -@ Gagas StafL.f-l-- _Recording....-0- Uncoordlnated Survey Pointa._ _ -0 LJ LJ Dredging Ranges_ Front- - _ @- - - - _-
- ___ -Rear- �
River MIieage from Mouth.- _________ - � . � fBB Flow Arrows ___ _ S/ra,ghL _________ . ___ T1daL , Harbor Lines ,,__~-'-----__,,�-�---o I nooO r State Boundary--- - -- -- ---- ---- --
Aids 19 Navigation
'*' --Lighthouses_-..±,-________ --� ________ _ L(ghts.... __ Find_ -J'f<;:
FJnhi��-
Occulrlnp. �. 'tt-., ..._.L..
-� 1 ', � Lighted Renges_ _ _ _F,on'--1"':; ______ �-Reel'-� ' Lighted Buoys____ _ _ _ _ _ _ _ _ _ __ Unlighted Buoys Poj
1":
__ Starbo9JX _ _ Mid c��nn,1�
_ Junotr� _ 1
Daybeacans _______________ PorLTif _S/arboard -� ..A, Seasonal Lights and Lighted Dredging Ranges.. __________ �,:(, •
250' 0 250' 500' 750' 1000' - - -- -- -
NOTES
Horizontal Coordinate Sy_stem:
North American Datum of 1983 (NAD83), projected to tho Stato Plano Coordinate Sys/om (SPCS), Oregon North Zona. [)/stance units in U.S. Survey Feet.
Varticaf Datum:
Soundings are shown in feet and indicate depths below Mean Lower Low Water.
MLLW is 0.15 feet bolow tho North American Vertical Datum (NAVO 88 Geoid 09) at Columbia River Mite 5.7.
River mileage conforms to the River Mila Index of the Hydrology and Hydraulics Commitee, Pacific Northwest River Basins Comm;ssion, July f972.
The information depicted on this map represents the results of a survey conducted on the data indicated and can only be considered to represent the general condition existing at that time.
STAFF GAGE CHINOOK BOAT RAMP: Northing: 968032 Easting: 7330649 m
US ARMY CORPS
OF ENGINEERS
PORTLAND DISTRICT
ci z;::
zo w ··N oo W N - Dl f- (.) !,: N !i � ��
(.) N Cl� Cl ' f- z �� w� - .... f- Cl ')I
!,! N
I� �i _, � z� 0 "' 0 "' Cl) :::: (.)::::
.. Cl) ► ► � ;:j Dl c, -' w
Cl z
Cl) w Cl
II'.
► Cl WW ---Dl w w � ci z z "(!)
1� (.) � :5 .. 0 iii Dl WC!) Dl II'. w"' w <( IC/) iil �
NN
Cl Cl Cl Cl (.) f- u5.;.:
en w ... w u z z (.) z -o:: Q g:o <J) <J) en - � 0 0 -o C "' fJl Oz <J) "'
0� z <a.. 0 I Cl:'. z f- � j 0 �Cl:'.
!i:� w <J) a. � O W
� 0 z Cl:'. a..
u ui w
J: N Cl)N �o <(N _J (!) N
Oz oa � 00 (!)
z-
++ z o<!> CON
I (")LO 1--0 c:: ++<( w w �� zC::: (.) 00 f-z ::::>
-0 ;'!: 00 Iw a.. I-I- � Cl) () 00 (!)
(.) LOO z <( ++ z " I'-- co z 0 "<t (") :5 oz 0 zw z ++ 0..
I o�
<(I-- (.) 00 zZ o<( w
SHEET ID
OWC-CHK-000
DWG 5 OF7
US ARMY CORPS
OF ENGINEERS
PORTLAND DISTRICT
OF YOUR CONTRACT
SAFETY IS A PART
936058.06
X COORDINATE Y COORDINATE
A 7339441.10
AREA 1 COORDINATES
930247.33B 7337156.44
930153.52C 7337065.30
930486.89D 7336827.63
930497.86E 7336912.73
930621.42F 7337086.03
936131.43G 7339254.46
M A
IN
T E
N A
N C
E D
R E
D G
IN
G
O R
E G
O N A
N D W
A S
H
IN
G T
O N C
L A
M S
H E
R M
T
O
S K
IP
A N
O N R
IV
R
P
A N
N
IN
G L
A Y
O U
T D
R A
W
IN
G
FLOOD
EBB
LEGEND
Primary Control Point
Coordinated Survey Points
Uncoordinated Survey Points
Dredging Ranges
River Mileage from Mouth
Front
Flow Arrows Straight
Harbor Lines
State Boundary
Benchmarks
Gages Staff Recording
Rear
Tidal
Aids to Navigation
Lighthouses
Lights Fixed Flashing, Occulting
Lighted Ranges Front Rear
Lighted Buoys
Unlighted Buoys Port Starboard Mid Channel Junction
Daybeacons Port Starboard
Seasonal Lights and Lighted Dredging Ranges
SCALE IN FEET
U S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
P O
R T
L A
N D D
IS
T R
IC
T P
O R
T L
A N
D
O R
C H
A N
N E
L S A
N D H
A R
B O
R S P
R O J E
C T
O P
E R
A T
IO
N S D
IV
IS
IO
N
250'250' 0 500' 1000' 1500'
X COORDINATE Y COORDINATE
M
N
O
P
7334064.91
7336981.32
7339665.48
7340000.45 939547.63
938876.59
940216.48
942583.56
W-10.2-IW COORDINATES
X COORDINATE Y COORDINATE
Q
R
7329819.77
7329463.13
7333756.39
7334113.04 940602.37
940251.94
944621.38
944971.81
O-9.2-IW COORDINATES
W-10.2-IW
PLACEMENT SITE
N.T.S.
NOT TO SCALE
O-9.2-IW
PLACEMENT SITE
K
L
S
T
Q
R
S
T
L
M
N
O
P
7337316.29 940887.52
7334824.38 943051.42
MATERIAL WITHIN THIS SITE
PLACE 35-45% OF ALL SKIPANON
DISPERSAL.
PLACEMENT. MAXIMIZE
CELL BEFORE REPEATING
INITIATE ONE LOAD IN EACH
***USE ON EBB ONLY***
MATERIAL WITHIN THIS SITE
PLACE 55 - 65% OF ALL SKIPANON
DISPERSAL.
PLACEMENT. MAXIMIZE
CELL BEFORE REPEATING
INITIATE ONE LOAD IN EACH
USE ON FLOOD OR EBB
52+80
30 40 50
504030
10 20
Range Front Skipanon Waterway
HLM 39
HLM 40
HLM 38 (Reset)
HLM 37
LT 4 Fl R Skipanon Channel West
LT 3 Fl G Skipanon Channel East
GAGE
STAFF
X 7 ,33
8,0
X 7 ,33
8,0
Y ,0
Y ,0
Y ,0
Y ,0
THE EXISTING PROJECT
Presently maintained at 16 feet based on user needs.
N
A
A
CL
RIVER MILE: 01+33+50
CROSS SECTION B - B
N.T.S.
206' 208'
-14 ft MLLW
-15 ft MLLW
REQUIRED DEPTH
A B
I
E
F G
J
121211
13115
161616
-0
-001
-0
-01
151515
25 27
-14 FT CONTOUR (MLLW)
-15 FT CONTOUR (MLLW)
-16 FT CONTOUR (MLLW)
-17 FT CONTOUR (MLLW)
H
C
D
930153.52
X COORDINATE Y COORDINATE
H
7337065.30
AREA 2 COORDINATES
930018.37
I
7336934.01
930056.87
J
7336466.95
930439.277336458.49
930486.897336827.63
02-MAR-2022
SURVEY DATE
RM 00+20+00
DREDGE AREA #1
DOWNSTREAM LIMIT OF
RM 01+35+00
DREDGE AREA #2
UPSTREAM LIMIT OF
NOTES
Northing: 929630 Easting: 7335381 STAFF GAGE AT Boat Basin and can only be considered as indicating the general condition existing at that time.
The information depicted on this map represents the results of surveys made on the dates indicated
Commission,July 1972.
to the River Mile Index of the Hydrology and Hydraulics Committee, Pacific Northwest River Basin 2012 Aerial Photography data source: USDA, Service Center Agencies. River mileage conforms Reference is Navigation Chart No. 18521.
The project depth curve is shown thus:
depths below MLLW. Elevations are shown thus: +2, indicating height in feet above MLLW.
Datum (NAVD 88 Geoid 09) at Columbia River Mile 10.9 Soundings are shown in feet and indicate Vertical datum is Mean Lower Low Water. (MLLW is 0.09 feet below the NorthAmerican Vertical
(NAD 83, U.S. Survey Feet).
Horizontal coordinates are based on the Lambert Projection for Oregon, North Zone Control is by USACE and NOS-C&GS.
RM 01+30+00
DREDGE AREA #2
DREDGE AREA #1 &
BOUNDARY OF
C
D
K
CL
RIVER MILE: 01+23+15
CROSS SECTION A - A
100'
MAXIMUM PAY DEPTH
AREA 1
100'
-16 ft MLLW
-17 ft MLLW
REQUIRED DEPTH
N.T.S.
DREDGING DEPTH
MAXIMUM PAY AND
AREA 2
B
B
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
A
B
C
D
E
F
J
K
L
M
N
P
S U
B M
IT
T E
D B
Y
C H
E C
K E
D B
Y
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
C O
N T
R A
C T N
O
S O
L
IC
IT
A T
IO
N N
O
IS
S
U E D
A T
E
S
IZ
E
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E
DWG 6 OF 7
OWC-SKP-000
SHEET ID
S C
A L E
D A
B
K A
R L
A G E
L L
IS
D A
B
T S
G
-M
A R -2
W
N F
Y C
X X
X X
W
N
B
:2
N
FLOOD
EBB
LEGEND
Primary Control Point
Coordinated Survey Points
Uncoordinated Survey Points
Dredging Ranges
River Mileage from Mouth
Front
Flow Arrows Straight
Harbor Lines
State Boundary
Benchmarks
Gages Staff Recording
Rear
Tidal
Aids to Navigation
Lighthouses
Lights Fixed Flashing, Occulting
Lighted Ranges Front Rear
Lighted Buoys
Unlighted Buoys Port Starboard Mid Channel Junction
Daybeacons Port Starboard
Seasonal Lights and Lighted Dredging Ranges
NOTES
SCALE IN FEET
US ARMY CORPS
OF ENGINEERS
PORTLAND DISTRICT
OF YOUR CONTRACT
SAFETY IS A PART
30-JUL-2021
HYDRO SURVEY DATE
O-9.2-IW
O -9 .2 -I
W A
N D W
-1 .2 -I
W
P L
A C
E M
E N
T S
IT
S
U S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
P O
R T
L A
N D D
IS
T R
IC
T P
O R
T L
A N
D
O R
C H
A N
N E
L S A
N D H
A R
B O
R S P
R O J E
C T
O P
E R
A T
IO
N S D
IV
IS
IO
N
500' 500' 1000' 1500' 2000'
+2
"29"
"27"
20 30
53+25
Ft. Stevens 26, Fl R
"25"
GAGE
STAFF
9011 K
9011 J
9011 A
9011 E
9011 B
HAM BAY
SHRILL RM 1
SHRILL
9.46
DIKE
9.34
DIKE
D
IKE 9.21
53+25
Y 9 40, Y 9 40, X ,3 ,0
X ,3 ,0
X ,3 ,0
53+25
COLUMBIA
RIV
ER
S K I P
A N
N
C H
A N
N
W
S T
X COORDINATE Y COORDINATE
A
B
C
D 7339665.48
7340000.45
7337316.29
7334444.64 943051.42
940887.52
939547.63
938876.59
X COORDINATE Y COORDINATE
I
J 7329463.12
7333756.39
7334113.04
7329819.77 944971.81
940602.37
940251.94
944621.38
O-9.2-IW
PLACEMENT SITE
E
F
G
H
7334064.91 942583.56
7336981.32 940216.48
O-9.2-IW COORDINATESW-10.2-IW COORDINATES
W-10.2-IW
PLACEMENT SITE
STAFF GAGE AT HAMMOND: Northing: 943436 Easting: 7328475
STAFF GAGE AT WOODEN PILING: Northing: 945307 Easting: 7328118 general condition existing at that time.
made on the dates indicated and can only be considered as indicating the
The information depicted on this map represents the results of surveys
Commission,July 1972.
mileage conforms to the River Mile Index of the Hydrology and HydraulicsCommittee, Pacific Northwest River Basin
Reference is Navigation Chart No. 18521. 2012 Aerial Photography data source: USDA, Service Center Agencies.River
The project depth curve is shown thus:
indicating height in feet above MLLW.
at Columbia River Mile 8.3. Soundings are shown in feet and indicate depths below MLLW. Elevations are shown thus: +2, Vertical datum is Mean Lower Low Water. (MLLW is 0.09 feet below the North American Vertical Datum (NAVD 88 Geoid 09)
Horizontal coordinates are based on the Lambert Projection for Oregon, North Zone (NAD 83, U.S. Survey Feet).
Control is by USACE and NOS-C&GS.
V
56 50
51 48
46 47
50 50
53 52
47 45
45 45
50 47
41 38
36 36
01-APR-2021
HYDRO SURVEY DATE
W-10.2-IW
H
I
J
G
C
D
E
F
A
B
M A
IN
T E
N A
N C
E D
R E
D G
IN
G
O R
E G
O N W
A S
H
IN
G T
O N C
L A
M S
H E
L L
MATERIAL WITHIN THIS SITE
PLACE 35-45% OF ALL SKIPANON
MATERIAL
REPEATING PLACEMENT - MAXIMIZE DISPERSAL OF
INITIATE ONE LOAD IN EACH CELL BEFORE
***USE ON EBB ONLY***
MATERIAL WITHIN THIS SITE
PLACE 55-65% OF ALL SKIPANON
MATERIAL
REPEATING PLACEMENT- MAXIMIZE DISPERSAL OF
INITIATE ONE LOAD IN EACH CELL BEFORE
USE ON FLOOD OR EBB
P L
A N
N
IN
G P
L A
C E
M E
N T S
IT
E L
A Y
O U
T
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
A
B
C
D
E
F
G
H
J
K
L
M
N
P
S U
B M
IT
T E
D B
Y
C H
E C
K E
D B
Y
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
C O
N T
R A
C T N
O
S O
L
IC
IT
A T
IO
N N
O
IS
S
U E D
A T
E
S
IZ
E
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E
DWG 7 OF 7
OWC-DISP1-000
SHEET ID
S C
A L E
D A
B
K A
R L
A G E
L L
IS
D A
B
T S
G
-M
A R -2
W
N
C X
X X
X
W
N
B
| 00_OWC-TLT-000 |
| 01_OWC-IND-000 |
| 02_OWC-POR-000 |
| 03_OWC-BB1-000 |
| 04_OWC-BB2-000 |
| 05_OWC-CHK-000 |
| 07_OWC-SKP-000 |
| 06_OWC-DISP1-000 |
File details come from the government source that posted it. Updated .