B.08.02_Attachment 01_Past Performance Assessment Worksheet.pdf

PDF 374 KB Posted

Attached to
MSSC Troop Housing
Solicitation number
W5J9JE23R0014
Issued by

About this file

This document contains an attachment for a past performance assessment worksheet related to the federal contract opportunity for MSSC Troop Housing under solicitation number W5J9JE23R0014 issued by the Department of the Army Corps of Engineers. The past performance assessment worksheet collects details on previous relevant projects to evaluate an offeror's performance, and includes sections for the project name and location, owner and reference contact information, awarded and final construction costs with explanations for any cost growth, original and revised completion dates with explanations for any time growth, percent complete, scope of work and role of the offeror, extent of self-performed versus subcontracted work, and relevancy of the project in terms of scope, magnitude and complexity as compared to the requirements of the MSSC Troop Housing opportunity.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ATTACHMENT 1 –

PAST PERFORMANCE ASSESSMENT WORKSHEET

(To be completed for each project submitted)

CONSTRUCTION OR PRIME CONTRACTOR PROJECT #_

Offeror:

Project and Location:

Was this project performed by the division or unit of the company submitting the offer for

W5J9JE23R0014

Owner:

Owner’s Point of Contact for Reference: Telephone:

Awarded Construction Cost: Final Construction Cost:

Explain Cost Growth, if any:

Date of Award: Original Completion Date: Revised Completion Date: Percent Complete:

Explain Time Growth, if any:

General Scope of Construction and Offeror’s Role:

Work Your Company Self-Performed: Extent and Type of Work You Subcontracted Out:

Describe extent of relevancy and complexity of the project by checking all applicable boxes below. RELEVANCY:

Criteria 1: Civil Site Work (excavation, leveling, trenching, etc.)

Criteria 2: Electrical work Criteria 3: Plumbing Work

Provide any additional narrative to support relevancy assessment (in terms of scope, magnitude and complexity as compared to the scope of the RFP).

Your Performance Evaluation by Owner, if known :

File details come from the government source that posted it. Updated .