Attch 6 - 50 Division Construction Cost Estimate Worksheet.xls
XLS spreadsheet 839 KB Posted
- Attached to
- SOF Enclose SERE Parachute Trainer 91057 Federal contract opportunity
- Solicitation number
- FA441720R0007
About this file
This solicitation requests proposals for an enclosed parachute training facility project at Hurlburt Field, Florida. The project scope includes enclosing and conditioning remaining open bays of an existing parachute training facility with concrete masonry walls, metal trim and flashing, and two new coiling overhead doors. Interior concrete floor slabs will receive an athletic floor coating and existing structures will receive additional thermal insulation. The acquisition is set aside for women-owned small businesses only and has a North American Industry Classification System code of 236220 with a size standard of $39.5 million. The solicitation will be awarded using negotiated procedures with the Department of the Air Force Special Operations Command as the contracting agency. The performance period is 120 calendar days with an estimated project value between $500,000 and $1 million. Bidders must register in the System for Award Management database and submit bid bonds with proposals by the closing date, with payment and performance bonds due within 10 days of award.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Site Visit BRIEF.pdf | ||
| Site Visit sign-in sheet.pdf | ||
| SV Questions Answers.pdf | ||
| Attch 3 - Wage Determination.pdf | ||
| Attch 2 - Drawings 20200302.pdf | ||
| Attch 5 - Financial Worksheet.docx | DOCX document | |
| Attch 7 - Site Visit Info.docx | DOCX document | |
| Attch 1 - Specifications 20200302.pdf | ||
| Solicitation - FA441720R0007.pdf | ||
| Attch 4 - PPQ.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Instructions
| Use the information from the provided prefilled division sheets to fill in the 50 Divisions Cost Estimate CSI Format tool to build your proposal. The information from the prefilled division sheets may not be all inclusive. The contractor is allowed to include any missing items from each division and is allowed to fill in other divisions that are not listed in the prefilled division sheets. If there is a disagreement with the prefilled division sheets, the contractor should not delete the element(s), but instead leave it blank and then include their suggested element(s) at the bottom of that division tab. |
| The ktr is required to complete the areas marked "Fill Here" in the summary tab. The rest of the information in the summary tab will automatically tabulate from the individual division tabs. |
Summary
| CONSTRUCTION COST ESTIMATE | Date: | |||||
| Fill Here | ||||||
| COMPANY | ||||||
| Fill Here | ||||||
| PROJECT | ||||||
| Rpr Corrision Control Facility in Hangar 90225 | ||||||
| LOCATION | PROJECT NO. | CP1028800 | ||||
| HURLBURT FIELD, FLORIDA | ||||||
| DIVISION | DESCRIPTION | % by | ||||
| Division | Division Total | |||||
| DIVISION 01 | GENERAL REQUIREMENTS | 0.0% | - 0 | |||
| DIVISION 02 | EXISTING CONDITIONS | 0.0% | - 0 | |||
| DIVISION 03 | CONCRETE WORK | 0.0% | - 0 | FILL IN AS REQUIRED (this will link to the entire document) | ||
| DIVISION 04 | MASONRY | 0.0% | - 0 | |||
| DIVISION 05 | METALS | 0.0% | - 0 | |||
| DIVISION 06 | WOOD, PLASTICS AND COMPOSITES | 0.0% | - 0 | GC Overhead | 0.00% | |
| DIVISION 07 | THERMAL AND MOISTURE PROTECTION | 0.0% | - 0 | GC Protit | 0.00% | |
| DIVISION 08 | OPENINGS | 0.0% | - 0 | Sub Overhead | 0.00% | |
| DIVISION 09 | FINISHES | 0.0% | - 0 | Sub Profit | 0.00% | |
| DIVISION 10 | SPECIALTIES | 0.0% | - 0 | Sales Tax | 0.00% | |
| DIVISION 11 | EQUIPMENT | 0.0% | - 0 | Risk/Bonding | 0.00% | |
| DIVISION 12 | FURNISHINGS | 0.0% | - 0 | |||
| DIVISION 13 | SPECIAL CONSTRUCTION | 0.0% | - 0 | This spreadsheet contains many formulas, please save a copy prior to editting in case you make a mistake. All shaded areas are either linked or contain formulas | ||
| DIVISION 14 | CONVEYING EQUIPMENT | 0.0% | - 0 | |||
| DIVISION 15 | RESERVED | 0.0% | - 0 | |||
| DIVISION 16 | RESERVED | 0.0% | - 0 | |||
| DIVISION 20 | RESERVED | 0.0% | - 0 | |||
| DIVISION 21 | FIRE SUPRESSION | 0.0% | - 0 | |||
| DIVISION 22 | PLUMBING | 0.0% | - 0 | |||
| DIVISION 23 | HEATING, VENTILATING AND A/C | 0.0% | - 0 | |||
| DIVISION 24 | RESERVED | 0.0% | - 0 | |||
| DIVISION 25 | INTEGRATED AUTOMATION | 0.0% | - 0 | |||
| DIVISION 26 | ELECTRICAL | 0.0% | - 0 | |||
| DIVISION 27 | COMMUNICATIONS | 0.0% | - 0 | |||
| DIVISION 28 | ELECTRONIC SAFETY AND SECURITY | 0.0% | - 0 | |||
| DIVISION 29 | RESERVED | 0.0% | - 0 | |||
| DIVISION 30 | RESERVED | 0.0% | - 0 | |||
| DIVISION 31 | EARTHWORK | 0.0% | - 0 | |||
| DIVISION 32 | EXTERIOR IMPROVEMENTS | 0.0% | - 0 | |||
| DIVISION 33 | UTILITIES | 0.0% | - 0 | |||
| DIVISION 34 | TRANSPORTATION | 0.0% | - 0 | |||
| DIVISION 35 | WATERWAYS AND MARINE CONSTRUCTION | 0.0% | - 0 | |||
| DIVISION 36 | RESERVED | 0.0% | - 0 | |||
| DIVISION 37 | RESERVED | 0.0% | - 0 | |||
| DIVISION 38 | RESERVED | 0.0% | - 0 | |||
| DIVISION 39 | RESERVED | 0.0% | - 0 | |||
| DIVISION 40 | PROCESS INTEGRATION | 0.0% | - 0 | |||
| DIVISION 41 | MATERIAL PROCESING AND HANDLING EQUIPMENT | 0.0% | - 0 | |||
| DIVISION 42 | PROCESS HEATING, COOLING AND DRYING EQUIPMENT | 0.0% | - 0 | |||
| DIVISION 43 | PROCESS GAS & LIQUID HANDLING, PURIFICATION AND STORAGE EQUIPMENT | 0.0% | - 0 | |||
| DIVISION 44 | POLLUTION CONTROL EQUIPMENT | 0.0% | - 0 | |||
| DIVISION 45 | INDUSTRY-SPECIFIC MANUFACTURING EQUIPMENT | 0.0% | - 0 | |||
| DIVISION 46 | RESERVED | 0.0% | - 0 | |||
| DIVISION 47 | RESERVED | 0.0% | - 0 | |||
| DIVISION 48 | ELECTRICAL POWER GENERATION | 0.0% | - 0 | |||
| DIVISION 49 | RESERVED | 0.0% | - 0 | |||
| HARD COST TOTAL | 0% | - 0 | ||||
| GENERAL CONTRACT OFFICE OVERHEAD (Fill in%) | 0% | - 0 | ||||
| SUBTOTAL | - 0 | |||||
| GENERAL CONTRACTOR'S PROFIT(Fill in%) | 0% | - 0 | ||||
| SUBTOTAL | - 0 | |||||
| BUILDER'S RISK / PERFORMANCE BONDS (Fill in%) | 0% | - 0 | ||||
| CONTRACT TOTAL | $ - 0 |
&R&"Arial"&8&B SHEET &P OF &N davisjam:
Percentages listed are place fillers. Please complete as required
Div1
| CONSTRUCTION COST ESTIMATE | DATE | ||||||
| Fill Here | |||||||
| PROJECT | BASIS FOR ESTIMATE | ||||||
| Rpr Corrision Control Facility in Hangar 90225 | CODE A (No design completed) | ||||||
| LOCATION | CODE B (Preliminary design) | ||||||
| HURLBURT FIELD, FLORIDA | CODE C (Final design) | ||||||
| COMPANY | PROJECT NO. | OTHER (Specify) | |||||
| Fill Here | CP1028800 | ||||||
| DRAWING NO. | ESTIMATOR | CHECKED BY | |||||
| QUANTITY | LABOR | MATERIAL | |||||
| ITEM DESCRIPTION | NO. UNITS | UNIT MEAS. | PER UNIT | TOTAL | PER UNIT | TOTAL | TOTAL COST |
| GENERAL REQUIREMENTS | |||||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| TOTAL LABOR/MATERIALS | - 0 | - 0 | |||||
| SUBTOTAL | - 0 | ||||||
| Sub-Contractor's Overhead | 0.00% | - 0 | |||||
| Sub-Contractor's Profit | 0.00% | - 0 | |||||
| FL State Sales Tax | 0.00% | - 0 | |||||
| TOTAL | $ - 0 |
Div2
| CONSTRUCTION COST ESTIMATE | DATE | ||||||
| Fill Here | |||||||
| PROJECT | BASIS FOR ESTIMATE | ||||||
| Rpr Corrision Control Facility in Hangar 90225 | CODE A (No design completed) | ||||||
| LOCATION | CODE B (Preliminary design) | ||||||
| HURLBURT FIELD, FLORIDA | CODE C (Final design) | ||||||
| COMPANY | PROJECT NO. | OTHER (Specify) | |||||
| Fill Here | CP1028800 | ||||||
| DRAWING NO. | ESTIMATOR | CHECKED BY | |||||
| QUANTITY | LABOR | MATERIAL | |||||
| ITEM DESCRIPTION | NO. UNITS | UNIT MEAS. | PER UNIT | TOTAL | PER UNIT | TOTAL | TOTAL COST |
| EXISTING CONDITIONS | |||||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| TOTAL LABOR/MATERIALS | - 0 | - 0 | |||||
| SUBTOTAL | - 0 | ||||||
| Sub-Contractor's Overhead | 0.00% | - 0 | |||||
| Sub-Contractor's Profit | 0.00% | - 0 | |||||
| FL State Sales Tax | 0.00% | - 0 | |||||
| TOTAL | $ - 0 |
Div3
| CONSTRUCTION COST ESTIMATE | DATE | ||||||
| Fill Here | |||||||
| PROJECT | BASIS FOR ESTIMATE | ||||||
| Rpr Corrision Control Facility in Hangar 90225 | CODE A (No design completed) | ||||||
| LOCATION | CODE B (Preliminary design) | ||||||
| HURLBURT FIELD, FLORIDA | CODE C (Final design) | ||||||
| COMPANY | PROJECT NO. | OTHER (Specify) | |||||
| Fill Here | CP1028800 | ||||||
| DRAWING NO. | ESTIMATOR | CHECKED BY | |||||
| QUANTITY | LABOR | MATERIAL | |||||
| ITEM DESCRIPTION | NO. UNITS | UNIT MEAS. | PER UNIT | TOTAL | PER UNIT | TOTAL | TOTAL COST |
| CONCRETE WORK | |||||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| TOTAL LABOR/MATERIALS | - 0 | - 0 | |||||
| SUBTOTAL | - 0 | ||||||
| Sub-Contractor's Overhead | 0.00% | - 0 | |||||
| Sub-Contractor's Profit | 0.00% | - 0 | |||||
| FL State Sales Tax | 0.00% | - 0 | |||||
| TOTAL | $ - 0 |
Div4
| CONSTRUCTION COST ESTIMATE | DATE | ||||||
| Fill Here | |||||||
| PROJECT | BASIS FOR ESTIMATE | ||||||
| Rpr Corrision Control Facility in Hangar 90225 | CODE A (No design completed) | ||||||
| LOCATION | CODE B (Preliminary design) | ||||||
| HURLBURT FIELD, FLORIDA | CODE C (Final design) | ||||||
| COMPANY | PROJECT NO. | OTHER (Specify) | |||||
| Fill Here | CP1028800 | ||||||
| DRAWING NO. | ESTIMATOR | CHECKED BY | |||||
| QUANTITY | LABOR | MATERIAL | |||||
| ITEM DESCRIPTION | NO. UNITS | UNIT MEAS. | PER UNIT | TOTAL | PER UNIT | TOTAL | TOTAL COST |
| MASONRY | |||||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| TOTAL LABOR/MATERIALS | - 0 | - 0 | |||||
| SUBTOTAL | $ - 0 | ||||||
| Sub-Contractor's Overhead | 0.00% | - 0 | |||||
| Sub-Contractor's Profit | 0.00% | - 0 | |||||
| FL State Sales Tax | 0.00% | - 0 | |||||
| TOTAL | $ - 0 |
Div5
| CONSTRUCTION COST ESTIMATE | DATE | ||||||
| Fill Here | |||||||
| PROJECT | BASIS FOR ESTIMATE | ||||||
| Rpr Corrision Control Facility in Hangar 90225 | CODE A (No design completed) | ||||||
| LOCATION | CODE B (Preliminary design) | ||||||
| HURLBURT FIELD, FLORIDA | CODE C (Final design) | ||||||
| COMPANY | PROJECT NO. | OTHER (Specify) | |||||
| Fill Here | CP1028800 | ||||||
| DRAWING NO. | ESTIMATOR | CHECKED BY | |||||
| QUANTITY | LABOR | MATERIAL | |||||
| ITEM DESCRIPTION | NO. UNITS | UNIT MEAS. | PER UNIT | TOTAL | PER UNIT | TOTAL | TOTAL COST |
| METALS | |||||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| TOTAL LABOR/MATERIALS | - 0 | - 0 | |||||
| SUBTOTAL | $ - 0 | ||||||
| Sub-Contractor's Overhead | 0.00% | - 0 | |||||
| Sub-Contractor's Profit | 0.00% | - 0 | |||||
| FL State Sales Tax | 0.00% | - 0 | |||||
| TOTAL | $ - 0 |
Div6
| CONSTRUCTION COST ESTIMATE | DATE | ||||||
| Fill Here | |||||||
| PROJECT | BASIS FOR ESTIMATE | ||||||
| Rpr Corrision Control Facility in Hangar 90225 | CODE A (No design completed) | ||||||
| LOCATION | CODE B (Preliminary design) | ||||||
| HURLBURT FIELD, FLORIDA | CODE C (Final design) | ||||||
| COMPANY | PROJECT NO. | OTHER (Specify) | |||||
| Fill Here | CP1028800 | ||||||
| DRAWING NO. | ESTIMATOR | CHECKED BY | |||||
| QUANTITY | LABOR | MATERIAL | |||||
| ITEM DESCRIPTION | NO. UNITS | UNIT MEAS. | PER UNIT | TOTAL | PER UNIT | TOTAL | TOTAL COST |
| WOOD, PLASTICS AND COMPOSITES | |||||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| TOTAL LABOR/MATERIALS | - 0 | - 0 | |||||
| SUBTOTAL | - 0 | ||||||
| Sub-Contractor's Overhead | 0.00% | - 0 | |||||
| Sub-Contractor's Profit | 0.00% | - 0 | |||||
| FL State Sales Tax | 0.00% | - 0 | |||||
| TOTAL | $ - 0 |
Div7
| CONSTRUCTION COST ESTIMATE | DATE | ||||||
| Fill Here | |||||||
| PROJECT | BASIS FOR ESTIMATE | ||||||
| Rpr Corrision Control Facility in Hangar 90225 | CODE A (No design completed) | ||||||
| LOCATION | CODE B (Preliminary design) | ||||||
| HURLBURT FIELD, FLORIDA | CODE C (Final design) | ||||||
| COMPANY | PROJECT NO. | OTHER (Specify) | |||||
| Fill Here | CP1028800 | ||||||
| DRAWING NO. | ESTIMATOR | CHECKED BY | |||||
| QUANTITY | LABOR | MATERIAL | |||||
| ITEM DESCRIPTION | NO. UNITS | UNIT MEAS. | PER UNIT | TOTAL | PER UNIT | TOTAL | TOTAL COST |
| THERMAL AND MOISTURE PROTECTION | |||||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| TOTAL LABOR/MATERIALS | - 0 | - 0 | |||||
| SUBTOTAL | - 0 | ||||||
| Sub-Contractor's Overhead | 0.00% | - 0 | |||||
| Sub-Contractor's Profit | 0.00% | - 0 | |||||
| FL State Sales Tax | 0.00% | - 0 | |||||
| TOTAL | $ - 0 |
Div8
| CONSTRUCTION COST ESTIMATE | DATE | ||||||
| Fill Here | |||||||
| PROJECT | BASIS FOR ESTIMATE | ||||||
| Rpr Corrision Control Facility in Hangar 90225 | CODE A (No design completed) | ||||||
| LOCATION | CODE B (Preliminary design) | ||||||
| HURLBURT FIELD, FLORIDA | CODE C (Final design) | ||||||
| COMPANY | PROJECT NO. | OTHER (Specify) | |||||
| Fill Here | CP1028800 | ||||||
| DRAWING NO. | ESTIMATOR | CHECKED BY | |||||
| QUANTITY | LABOR | MATERIAL | |||||
| ITEM DESCRIPTION | NO. UNITS | UNIT MEAS. | PER UNIT | TOTAL | PER UNIT | TOTAL | TOTAL COST |
| OPENINGS | |||||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| TOTAL LABOR/MATERIALS | - 0 | - 0 | |||||
| SUBTOTAL | - 0 | ||||||
| Sub-Contractor's Overhead | 0.00% | - 0 | |||||
| Sub-Contractor's Profit | 0.00% | - 0 | |||||
| FL State Sales Tax | 0.00% | - 0 | |||||
| TOTAL | $ - 0 |
Div9
| CONSTRUCTION COST ESTIMATE | DATE | ||||||
| Fill Here | |||||||
| PROJECT | BASIS FOR ESTIMATE | ||||||
| Rpr Corrision Control Facility in Hangar 90225 | CODE A (No design completed) | ||||||
| LOCATION | CODE B (Preliminary design) | ||||||
| HURLBURT FIELD, FLORIDA | CODE C (Final design) | ||||||
| COMPANY | PROJECT NO. | OTHER (Specify) | |||||
| Fill Here | CP1028800 | ||||||
| DRAWING NO. | ESTIMATOR | CHECKED BY | |||||
| QUANTITY | LABOR | MATERIAL | |||||
| ITEM DESCRIPTION | NO. UNITS | UNIT MEAS. | PER UNIT | TOTAL | PER UNIT | TOTAL | TOTAL COST |
| FINISHES | |||||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| TOTAL LABOR/MATERIALS | - 0 | - 0 | |||||
| SUBTOTAL | $ - 0 | ||||||
| Sub-Contractor's Overhead | 0.00% | - 0 | |||||
| Sub-Contractor's Profit | 0.00% | - 0 | |||||
| FL State Sales Tax | 0.00% | - 0 | |||||
| TOTAL | $ - 0 |
Div10
| CONSTRUCTION COST ESTIMATE | DATE | ||||||
| Fill Here | |||||||
| PROJECT | BASIS FOR ESTIMATE | ||||||
| Rpr Corrision Control Facility in Hangar 90225 | CODE A (No design completed) | ||||||
| LOCATION | CODE B (Preliminary design) | ||||||
| HURLBURT FIELD, FLORIDA | CODE C (Final design) | ||||||
| COMPANY | PROJECT NO. | OTHER (Specify) | |||||
| Fill Here | CP1028800 | ||||||
| DRAWING NO. | ESTIMATOR | CHECKED BY | |||||
| QUANTITY | LABOR | MATERIAL | |||||
| ITEM DESCRIPTION | NO. UNITS | UNIT MEAS. | PER UNIT | TOTAL | PER UNIT | TOTAL | TOTAL COST |
| SPECIALTIES | |||||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| TOTAL LABOR/MATERIALS | - 0 | - 0 | |||||
| SUBTOTAL | $ - 0 | ||||||
| Sub-Contractor's Overhead | 0.00% | - 0 | |||||
| Sub-Contractor's Profit | 0.00% | - 0 | |||||
| FL State Sales Tax | 0.00% | - 0 | |||||
| TOTAL | $ - 0 |
Div11
| CONSTRUCTION COST ESTIMATE | DATE | ||||||
| Fill Here | |||||||
| PROJECT | BASIS FOR ESTIMATE | ||||||
| Rpr Corrision Control Facility in Hangar 90225 | CODE A (No design completed) | ||||||
| LOCATION | CODE B (Preliminary design) | ||||||
| HURLBURT FIELD, FLORIDA | CODE C (Final design) | ||||||
| COMPANY | PROJECT NO. | OTHER (Specify) | |||||
| Fill Here | CP1028800 | ||||||
| DRAWING NO. | ESTIMATOR | CHECKED BY | |||||
| QUANTITY | LABOR | MATERIAL | |||||
| ITEM DESCRIPTION | NO. UNITS | UNIT MEAS. | PER UNIT | TOTAL | PER UNIT | TOTAL | TOTAL COST |
| EQUIPMENT | |||||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| TOTAL LABOR/MATERIALS | - 0 | - 0 | |||||
| SUBTOTAL | - 0 | ||||||
| Sub-Contractor's Overhead | 0.00% | - 0 | |||||
| Sub-Contractor's Profit | 0.00% | - 0 | |||||
| FL State Sales Tax | 0.00% | - 0 | |||||
| TOTAL | $ - 0 |
Div12
| CONSTRUCTION COST ESTIMATE | DATE | ||||||
| Fill Here | |||||||
| PROJECT | BASIS FOR ESTIMATE | ||||||
| Rpr Corrision Control Facility in Hangar 90225 | CODE A (No design completed) | ||||||
| LOCATION | CODE B (Preliminary design) | ||||||
| HURLBURT FIELD, FLORIDA | CODE C (Final design) | ||||||
| COMPANY | PROJECT NO. | OTHER (Specify) | |||||
| Fill Here | CP1028800 | ||||||
| DRAWING NO. | ESTIMATOR | CHECKED BY | |||||
| QUANTITY | LABOR | MATERIAL | |||||
| ITEM DESCRIPTION | NO. UNITS | UNIT MEAS. | PER UNIT | TOTAL | PER UNIT | TOTAL | TOTAL COST |
| FURNISHINGS | |||||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| TOTAL LABOR/MATERIALS | - 0 | - 0 | |||||
| SUBTOTAL | - 0 | ||||||
| Sub-Contractor's Overhead | 0.00% | - 0 | |||||
| Sub-Contractor's Profit | 0.00% | - 0 | |||||
| FL State Sales Tax | 0.00% | - 0 | |||||
| TOTAL | $ - 0 |
Div13
| CONSTRUCTION COST ESTIMATE | DATE | ||||||
| Fill Here | |||||||
| PROJECT | BASIS FOR ESTIMATE | ||||||
| Rpr Corrision Control Facility in Hangar 90225 | CODE A (No design completed) | ||||||
| LOCATION | CODE B (Preliminary design) | ||||||
| HURLBURT FIELD, FLORIDA | CODE C (Final design) | ||||||
| COMPANY | PROJECT NO. | OTHER (Specify) | |||||
| Fill Here | CP1028800 | ||||||
| DRAWING NO. | ESTIMATOR | CHECKED BY | |||||
| QUANTITY | LABOR | MATERIAL | |||||
| ITEM DESCRIPTION | NO. UNITS | UNIT MEAS. | PER UNIT | TOTAL | PER UNIT | TOTAL | TOTAL COST |
| SPECIAL CONSTRUCTION | |||||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | |||||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| TOTAL LABOR/MATERIALS | - 0 | - 0 | |||||
| SUBTOTAL | - 0 | ||||||
| Sub-Contractor's Overhead | 0.00% | - 0 | |||||
| Sub-Contractor's Profit | 0.00% | - 0 | |||||
| FL State Sales Tax | 0.00% | - 0 | |||||
| TOTAL | $ - 0 |
Div14
| CONSTRUCTION COST ESTIMATE | DATE | ||||||
| Fill Here | |||||||
| PROJECT | BASIS FOR ESTIMATE | ||||||
| Rpr Corrision Control Facility in Hangar 90225 | CODE A (No design completed) | ||||||
| LOCATION | CODE B (Preliminary design) | ||||||
| HURLBURT FIELD, FLORIDA | CODE C (Final design) | ||||||
| COMPANY | PROJECT NO. | OTHER (Specify) | |||||
| Fill Here | CP1028800 | ||||||
| DRAWING NO. | ESTIMATOR | CHECKED BY | |||||
| QUANTITY | LABOR | MATERIAL | |||||
| ITEM DESCRIPTION | NO. UNITS | UNIT MEAS. | PER UNIT | TOTAL | PER UNIT | TOTAL | TOTAL COST |
| CONVEYING EQUIPMENT | |||||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| TOTAL LABOR/MATERIALS | - 0 | - 0 | |||||
| SUBTOTAL | $ - 0 | ||||||
| Sub-Contractor's Overhead | 0.00% | - 0 | |||||
| Sub-Contractor's Profit | 0.00% | - 0 | |||||
| FL State Sales Tax | 0.00% | - 0 | |||||
| TOTAL | $ - 0 |
Div15
| CONSTRUCTION COST ESTIMATE | DATE | ||||||
| Fill Here | |||||||
| PROJECT | BASIS FOR ESTIMATE | ||||||
| Rpr Corrision Control Facility in Hangar 90225 | CODE A (No design completed) | ||||||
| LOCATION | CODE B (Preliminary design) | ||||||
| HURLBURT FIELD, FLORIDA | CODE C (Final design) | ||||||
| COMPANY | PROJECT NO. | OTHER (Specify) | |||||
| Fill Here | |||||||
| DRAWING NO. | ESTIMATOR | CHECKED BY | |||||
| QUANTITY | LABOR | MATERIAL | |||||
| ITEM DESCRIPTION | NO. UNITS | UNIT MEAS. | PER UNIT | TOTAL | PER UNIT | TOTAL | TOTAL COST |
| RESERVED | |||||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| TOTAL LABOR/MATERIALS | - 0 | - 0 | |||||
| SUBTOTAL | $ - 0 | ||||||
| Sub-Contractor's Overhead | 0.00% | - 0 | |||||
| Sub-Contractor's Profit | 0.00% | - 0 | |||||
| FL State Sales Tax | 0.00% | - 0 | |||||
| TOTAL | $ - 0 |
Div16
| CONSTRUCTION COST ESTIMATE | DATE | ||||||
| Fill Here | |||||||
| PROJECT | BASIS FOR ESTIMATE | ||||||
| Rpr Corrision Control Facility in Hangar 90225 | CODE A (No design completed) | ||||||
| LOCATION | CODE B (Preliminary design) | ||||||
| HURLBURT FIELD, FLORIDA | CODE C (Final design) | ||||||
| COMPANY | PROJECT NO. | OTHER (Specify) | |||||
| Fill Here | CP1028800 | ||||||
| DRAWING NO. | ESTIMATOR | CHECKED BY | |||||
| QUANTITY | LABOR | MATERIAL | |||||
| ITEM DESCRIPTION | NO. UNITS | UNIT MEAS. | PER UNIT | TOTAL | PER UNIT | TOTAL | TOTAL COST |
| RESERVED | |||||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| TOTAL LABOR/MATERIALS | - 0 | - 0 | |||||
| SUBTOTAL | - 0 | ||||||
| Sub-Contractor's Overhead | 0.00% | - 0 | |||||
| Sub-Contractor's Profit | 0.00% | - 0 | |||||
| FL State Sales Tax | 0.00% | - 0 | |||||
| TOTAL | $ - 0 |
Div20
| CONSTRUCTION COST ESTIMATE | DATE | ||||||
| Fill Here | |||||||
| PROJECT | BASIS FOR ESTIMATE | ||||||
| Rpr Corrision Control Facility in Hangar 90225 | CODE A (No design completed) | ||||||
| LOCATION | CODE B (Preliminary design) | ||||||
| HURLBURT FIELD, FLORIDA | CODE C (Final design) | ||||||
| COMPANY | PROJECT NO. | OTHER (Specify) | |||||
| Fill Here | CP1028800 | ||||||
| DRAWING NO. | ESTIMATOR | CHECKED BY | |||||
| QUANTITY | LABOR | MATERIAL | |||||
| ITEM DESCRIPTION | NO. UNITS | UNIT MEAS. | PER UNIT | TOTAL | PER UNIT | TOTAL | TOTAL COST |
| RESERVED | |||||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| TOTAL LABOR/MATERIALS | - 0 | - 0 | |||||
| SUBTOTAL | - 0 | ||||||
| Sub-Contractor's Overhead | 0.00% | - 0 | |||||
| Sub-Contractor's Profit | 0.00% | - 0 | |||||
| FL State Sales Tax | 0.00% | - 0 | |||||
| TOTAL | $ - 0 |
Div21
| CONSTRUCTION COST ESTIMATE | DATE | ||||||
| Fill Here | |||||||
| PROJECT | BASIS FOR ESTIMATE | ||||||
| Rpr Corrision Control Facility in Hangar 90225 | CODE A (No design completed) | ||||||
| LOCATION | CODE B (Preliminary design) | ||||||
| HURLBURT FIELD, FLORIDA | CODE C (Final design) | ||||||
| COMPANY | PROJECT NO. | OTHER (Specify) | |||||
| Fill Here | CP1028800 | ||||||
| DRAWING NO. | ESTIMATOR | CHECKED BY | |||||
| QUANTITY | LABOR | MATERIAL | |||||
| ITEM DESCRIPTION | NO. UNITS | UNIT MEAS. | PER UNIT | TOTAL | PER UNIT | TOTAL | TOTAL COST |
| FIRE SUPRESSION | |||||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| TOTAL LABOR/MATERIALS | - 0 | - 0 | |||||
| SUBTOTAL | - 0 | ||||||
| Sub-Contractor's Overhead | 0.00% | - 0 | |||||
| Sub-Contractor's Profit | 0.00% | - 0 | |||||
| FL State Sales Tax | 0.00% | - 0 | |||||
| TOTAL | $ - 0 |
Div22
| CONSTRUCTION COST ESTIMATE | DATE | ||||||
| Fill Here | |||||||
| PROJECT | BASIS FOR ESTIMATE | ||||||
| Rpr Corrision Control Facility in Hangar 90225 | CODE A (No design completed) | ||||||
| LOCATION | CODE B (Preliminary design) | ||||||
| HURLBURT FIELD, FLORIDA | CODE C (Final design) | ||||||
| COMPANY | PROJECT NO. | OTHER (Specify) | |||||
| Fill Here | |||||||
| DRAWING NO. | ESTIMATOR | CHECKED BY | |||||
| QUANTITY | LABOR | MATERIAL | |||||
| ITEM DESCRIPTION | NO. UNITS | UNIT MEAS. | PER UNIT | TOTAL | PER UNIT | TOTAL | TOTAL COST |
| PLUMBING | |||||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| TOTAL LABOR/MATERIALS | - 0 | - 0 | |||||
| SUBTOTAL | $ - 0 | ||||||
| Sub-Contractor's Overhead | 0.00% | - 0 | |||||
| Sub-Contractor's Profit | 0.00% | - 0 | |||||
| FL State Sales Tax | 0.00% | - 0 | |||||
| TOTAL | $ - 0 |
Div23
| CONSTRUCTION COST ESTIMATE | DATE | ||||||
| Fill Here | |||||||
| PROJECT | BASIS FOR ESTIMATE | ||||||
| Rpr Corrision Control Facility in Hangar 90225 | CODE A (No design completed) | ||||||
| LOCATION | CODE B (Preliminary design) | ||||||
| HURLBURT FIELD, FLORIDA | CODE C (Final design) | ||||||
| COMPANY | PROJECT NO. | OTHER (Specify) | |||||
| Fill Here | |||||||
| DRAWING NO. | ESTIMATOR | CHECKED BY | |||||
| QUANTITY | LABOR | MATERIAL | |||||
| ITEM DESCRIPTION | NO. UNITS | UNIT MEAS. | PER UNIT | TOTAL | PER UNIT | TOTAL | TOTAL COST |
| HEATING, VENTILATING AND A/C | |||||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| TOTAL LABOR/MATERIALS | - 0 | - 0 | |||||
| SUBTOTAL | $ - 0 | ||||||
| Sub-Contractor's Overhead | 0.00% | - 0 | |||||
| Sub-Contractor's Profit | 0.00% | - 0 | |||||
| FL State Sales Tax | 0.00% | - 0 | |||||
| TOTAL | $ - 0 |
Div24
| CONSTRUCTION COST ESTIMATE | DATE | ||||||
| Fill Here | |||||||
| PROJECT | BASIS FOR ESTIMATE | ||||||
| Rpr Corrision Control Facility in Hangar 90225 | CODE A (No design completed) | ||||||
| LOCATION | CODE B (Preliminary design) | ||||||
| HURLBURT FIELD, FLORIDA | CODE C (Final design) | ||||||
| COMPANY | PROJECT NO. | OTHER (Specify) | |||||
| Fill Here | |||||||
| DRAWING NO. | ESTIMATOR | CHECKED BY | |||||
| QUANTITY | LABOR | MATERIAL | |||||
| ITEM DESCRIPTION | NO. UNITS | UNIT MEAS. | PER UNIT | TOTAL | PER UNIT | TOTAL | TOTAL COST |
| RESERVED | |||||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| TOTAL LABOR/MATERIALS | - 0 | - 0 | |||||
| SUBTOTAL | $ - 0 | ||||||
| Sub-Contractor's Overhead | 0.00% | - 0 | |||||
| Sub-Contractor's Profit | 0.00% | - 0 | |||||
| FL State Sales Tax | 0.00% | - 0 | |||||
| TOTAL | $ - 0 |
Div25
| CONSTRUCTION COST ESTIMATE | DATE | ||||||
| Fill Here | |||||||
| PROJECT | BASIS FOR ESTIMATE | ||||||
| Rpr Corrision Control Facility in Hangar 90225 | CODE A (No design completed) | ||||||
| LOCATION | CODE B (Preliminary design) | ||||||
| HURLBURT FIELD, FLORIDA | CODE C (Final design) | ||||||
| COMPANY | PROJECT NO. | OTHER (Specify) | |||||
| Fill Here | |||||||
| DRAWING NO. | ESTIMATOR | CHECKED BY | |||||
| QUANTITY | LABOR | MATERIAL | |||||
| ITEM DESCRIPTION | NO. UNITS | UNIT MEAS. | PER UNIT | TOTAL | PER UNIT | TOTAL | TOTAL COST |
| INTEGRATED AUTOMATION | |||||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| TOTAL LABOR/MATERIALS | - 0 | - 0 | |||||
| SUBTOTAL | $ - 0 | ||||||
| Sub-Contractor's Overhead | 0.00% | - 0 | |||||
| Sub-Contractor's Profit | 0.00% | - 0 | |||||
| FL State Sales Tax | 0.00% | - 0 | |||||
| TOTAL | $ - 0 |
Div26
| CONSTRUCTION COST ESTIMATE | DATE | ||||||
| Fill Here | |||||||
| PROJECT | BASIS FOR ESTIMATE | ||||||
| Rpr Corrision Control Facility in Hangar 90225 | CODE A (No design completed) | ||||||
| LOCATION | CODE B (Preliminary design) | ||||||
| HURLBURT FIELD, FLORIDA | CODE C (Final design) | ||||||
| COMPANY | PROJECT NO. | OTHER (Specify) | |||||
| Fill Here | CP1028800 | ||||||
| DRAWING NO. | ESTIMATOR | CHECKED BY | |||||
| QUANTITY | LABOR | MATERIAL | |||||
| ITEM DESCRIPTION | NO. UNITS | UNIT MEAS. | PER UNIT | TOTAL | PER UNIT | TOTAL | TOTAL COST |
| ELECTRICAL | |||||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| TOTAL LABOR/MATERIALS | - 0 | - 0 | |||||
| SUBTOTAL | - 0 | ||||||
| Sub-Contractor's Overhead | 0.00% | - 0 | |||||
| Sub-Contractor's Profit | 0.00% | - 0 | |||||
| FL State Sales Tax | 0.00% | - 0 | |||||
| TOTAL | $ - 0 |
Div27
| CONSTRUCTION COST ESTIMATE | DATE | ||||||
| Fill Here | |||||||
| PROJECT | BASIS FOR ESTIMATE | ||||||
| Rpr Corrision Control Facility in Hangar 90225 | CODE A (No design completed) | ||||||
| LOCATION | CODE B (Preliminary design) | ||||||
| HURLBURT FIELD, FLORIDA | CODE C (Final design) | ||||||
| COMPANY | PROJECT NO. | OTHER (Specify) | |||||
| Fill Here | CP1028800 | ||||||
| DRAWING NO. | ESTIMATOR | CHECKED BY | |||||
| QUANTITY | LABOR | MATERIAL | |||||
| ITEM DESCRIPTION | NO. UNITS | UNIT MEAS. | PER UNIT | TOTAL | PER UNIT | TOTAL | TOTAL COST |
| COMMUNICATIONS | |||||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| TOTAL LABOR/MATERIALS | - 0 | - 0 | |||||
| SUBTOTAL | - 0 | ||||||
| Sub-Contractor's Overhead | 0.00% | - 0 | |||||
| Sub-Contractor's Profit | 0.00% | - 0 | |||||
| FL State Sales Tax | 0.00% | - 0 | |||||
| TOTAL | $ - 0 |
Div28
| CONSTRUCTION COST ESTIMATE | DATE | ||||||
| Fill Here | |||||||
| PROJECT | BASIS FOR ESTIMATE | ||||||
| Rpr Corrision Control Facility in Hangar 90225 | CODE A (No design completed) | ||||||
| LOCATION | CODE B (Preliminary design) | ||||||
| HURLBURT FIELD, FLORIDA | CODE C (Final design) | ||||||
| COMPANY | PROJECT NO. | OTHER (Specify) | |||||
| Fill Here | CP1028800 | ||||||
| DRAWING NO. | ESTIMATOR | CHECKED BY | |||||
| QUANTITY | LABOR | MATERIAL | |||||
| ITEM DESCRIPTION | NO. UNITS | UNIT MEAS. | PER UNIT | TOTAL | PER UNIT | TOTAL | TOTAL COST |
| ELECTRONIC SAFETY AND SECURITY | |||||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| TOTAL LABOR/MATERIALS | - 0 | - 0 | |||||
| SUBTOTAL | - 0 | ||||||
| Sub-Contractor's Overhead | 0.00% | - 0 | |||||
| Sub-Contractor's Profit | 0.00% | - 0 | |||||
| FL State Sales Tax | 0.00% | - 0 | |||||
| TOTAL | $ - 0 |
Div29
| CONSTRUCTION COST ESTIMATE | DATE | ||||||
| Fill Here | |||||||
| PROJECT | BASIS FOR ESTIMATE | ||||||
| Rpr Corrision Control Facility in Hangar 90225 | CODE A (No design completed) | ||||||
| LOCATION | CODE B (Preliminary design) | ||||||
| HURLBURT FIELD, FLORIDA | CODE C (Final design) | ||||||
| COMPANY | PROJECT NO. | OTHER (Specify) | |||||
| Fill Here | |||||||
| DRAWING NO. | ESTIMATOR | CHECKED BY | |||||
| QUANTITY | LABOR | MATERIAL | |||||
| ITEM DESCRIPTION | NO. UNITS | UNIT MEAS. | PER UNIT | TOTAL | PER UNIT | TOTAL | TOTAL COST |
| RESERVED | |||||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| TOTAL LABOR/MATERIALS | - 0 | - 0 | |||||
| SUBTOTAL | $ - 0 | ||||||
| Sub-Contractor's Overhead | 0.00% | - 0 | |||||
| Sub-Contractor's Profit | 0.00% | - 0 | |||||
| FL State Sales Tax | 0.00% | - 0 | |||||
| TOTAL | $ - 0 |
Div30
| CONSTRUCTION COST ESTIMATE | DATE | ||||||
| Fill Here | |||||||
| PROJECT | BASIS FOR ESTIMATE | ||||||
| Rpr Corrision Control Facility in Hangar 90225 | CODE A (No design completed) | ||||||
| LOCATION | CODE B (Preliminary design) | ||||||
| HURLBURT FIELD, FLORIDA | CODE C (Final design) | ||||||
| COMPANY | PROJECT NO. | OTHER (Specify) | |||||
| Fill Here | |||||||
| DRAWING NO. | ESTIMATOR | CHECKED BY | |||||
| QUANTITY | LABOR | MATERIAL | |||||
| ITEM DESCRIPTION | NO. UNITS | UNIT MEAS. | PER UNIT | TOTAL | PER UNIT | TOTAL | TOTAL COST |
| RESERVED | |||||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| TOTAL LABOR/MATERIALS | - 0 | - 0 | |||||
| SUBTOTAL | $ - 0 | ||||||
| Sub-Contractor's Overhead | 0.00% | - 0 | |||||
| Sub-Contractor's Profit | 0.00% | - 0 | |||||
| FL State Sales Tax | 0.00% | - 0 | |||||
| TOTAL | $ - 0 |
Div31
| CONSTRUCTION COST ESTIMATE | DATE | ||||||
| Fill Here | |||||||
| PROJECT | BASIS FOR ESTIMATE | ||||||
| Rpr Corrision Control Facility in Hangar 90225 | CODE A (No design completed) | ||||||
| LOCATION | CODE B (Preliminary design) | ||||||
| HURLBURT FIELD, FLORIDA | CODE C (Final design) | ||||||
| COMPANY | PROJECT NO. | OTHER (Specify) | |||||
| Fill Here | CP1028800 | ||||||
| DRAWING NO. | ESTIMATOR | CHECKED BY | |||||
| QUANTITY | LABOR | MATERIAL | |||||
| ITEM DESCRIPTION | NO. UNITS | UNIT MEAS. | PER UNIT | TOTAL | PER UNIT | TOTAL | TOTAL COST |
| EARTHWORK | |||||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| TOTAL LABOR/MATERIALS | - 0 | - 0 | |||||
| SUBTOTAL | - 0 | ||||||
| Sub-Contractor's Overhead | 0.00% | - 0 | |||||
| Sub-Contractor's Profit | 0.00% | - 0 | |||||
| FL State Sales Tax | 0.00% | - 0 | |||||
| TOTAL | $ - 0 |
Div32
| CONSTRUCTION COST ESTIMATE | DATE | ||||||
| Fill Here | |||||||
| PROJECT | BASIS FOR ESTIMATE | ||||||
| Rpr Corrision Control Facility in Hangar 90225 | CODE A (No design completed) | ||||||
| LOCATION | CODE B (Preliminary design) | ||||||
| HURLBURT FIELD, FLORIDA | CODE C (Final design) | ||||||
| COMPANY | PROJECT NO. | OTHER (Specify) | |||||
| Fill Here | CP1028800 | ||||||
| DRAWING NO. | ESTIMATOR | CHECKED BY | |||||
| QUANTITY | LABOR | MATERIAL | |||||
| ITEM DESCRIPTION | NO. UNITS | UNIT MEAS. | PER UNIT | TOTAL | PER UNIT | TOTAL | TOTAL COST |
| EXTERIOR IMPROVEMENTS | |||||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| TOTAL LABOR/MATERIALS | - 0 | - 0 | |||||
| SUBTOTAL | - 0 | ||||||
| Sub-Contractor's Overhead | 0.00% | - 0 | |||||
| Sub-Contractor's Profit | 0.00% | - 0 | |||||
| FL State Sales Tax | 0.00% | - 0 | |||||
| TOTAL | $ - 0 |
Div33
| CONSTRUCTION COST ESTIMATE | DATE | ||||||
| Fill Here | |||||||
| PROJECT | BASIS FOR ESTIMATE | ||||||
| Rpr Corrision Control Facility in Hangar 90225 | CODE A (No design completed) | ||||||
| LOCATION | CODE B (Preliminary design) | ||||||
| HURLBURT FIELD, FLORIDA | CODE C (Final design) | ||||||
| COMPANY | PROJECT NO. | OTHER (Specify) | |||||
| Fill Here | CP1028800 | ||||||
| DRAWING NO. | ESTIMATOR | CHECKED BY | |||||
| QUANTITY | LABOR | MATERIAL | |||||
| ITEM DESCRIPTION | NO. UNITS | UNIT MEAS. | PER UNIT | TOTAL | PER UNIT | TOTAL | TOTAL COST |
| UTILITIES | |||||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| TOTAL LABOR/MATERIALS | - 0 | - 0 | |||||
| SUBTOTAL | - 0 | ||||||
| Sub-Contractor's Overhead | 0.00% | - 0 | |||||
| Sub-Contractor's Profit | 0.00% | - 0 | |||||
| FL State Sales Tax | 0.00% | - 0 | |||||
| TOTAL | $ - 0 |
Div34
| CONSTRUCTION COST ESTIMATE | DATE | ||||||
| Fill Here | |||||||
| PROJECT | BASIS FOR ESTIMATE | ||||||
| Rpr Corrision Control Facility in Hangar 90225 | CODE A (No design completed) | ||||||
| LOCATION | CODE B (Preliminary design) | ||||||
| HURLBURT FIELD, FLORIDA | CODE C (Final design) | ||||||
| COMPANY | PROJECT NO. | OTHER (Specify) | |||||
| Fill Here | |||||||
| DRAWING NO. | ESTIMATOR | CHECKED BY | |||||
| QUANTITY | LABOR | MATERIAL | |||||
| ITEM DESCRIPTION | NO. UNITS | UNIT MEAS. | PER UNIT | TOTAL | PER UNIT | TOTAL | TOTAL COST |
| TRANSPORTATION | |||||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| TOTAL LABOR/MATERIALS | - 0 | - 0 | |||||
| SUBTOTAL | $ - 0 | ||||||
| Sub-Contractor's Overhead | 0.00% | - 0 | |||||
| Sub-Contractor's Profit | 0.00% | - 0 | |||||
| FL State Sales Tax | 0.00% | - 0 | |||||
| TOTAL | $ - 0 |
Div35
| CONSTRUCTION COST ESTIMATE | DATE | ||||||
| Fill Here | |||||||
| PROJECT | BASIS FOR ESTIMATE | ||||||
| Rpr Corrision Control Facility in Hangar 90225 | CODE A (No design completed) | ||||||
| LOCATION | CODE B (Preliminary design) | ||||||
| HURLBURT FIELD, FLORIDA | CODE C (Final design) | ||||||
| COMPANY | PROJECT NO. | OTHER (Specify) | |||||
| Fill Here | |||||||
| DRAWING NO. | ESTIMATOR | CHECKED BY | |||||
| QUANTITY | LABOR | MATERIAL | |||||
| ITEM DESCRIPTION | NO. UNITS | UNIT MEAS. | PER UNIT | TOTAL | PER UNIT | TOTAL | TOTAL COST |
| WATERWAYS AND MARINE CONSTRUCTION | |||||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| TOTAL LABOR/MATERIALS | - 0 | - 0 | |||||
| SUBTOTAL | $ - 0 | ||||||
| Sub-Contractor's Overhead | 0.00% | - 0 | |||||
| Sub-Contractor's Profit | 0.00% | - 0 | |||||
| FL State Sales Tax | 0.00% | - 0 | |||||
| TOTAL | $ - 0 |
Div36
| CONSTRUCTION COST ESTIMATE | DATE | ||||||
| Fill Here | |||||||
| PROJECT | BASIS FOR ESTIMATE | ||||||
| Rpr Corrision Control Facility in Hangar 90225 | CODE A (No design completed) | ||||||
| LOCATION | CODE B (Preliminary design) | ||||||
| HURLBURT FIELD, FLORIDA | CODE C (Final design) | ||||||
| COMPANY | PROJECT NO. | OTHER (Specify) | |||||
| Fill Here | |||||||
| DRAWING NO. | ESTIMATOR | CHECKED BY | |||||
| QUANTITY | LABOR | MATERIAL | |||||
| ITEM DESCRIPTION | NO. UNITS | UNIT MEAS. | PER UNIT | TOTAL | PER UNIT | TOTAL | TOTAL COST |
| RESERVED | |||||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| TOTAL LABOR/MATERIALS | - 0 | - 0 | |||||
| SUBTOTAL | $ - 0 | ||||||
| Sub-Contractor's Overhead | 0.00% | - 0 | |||||
| Sub-Contractor's Profit | 0.00% | - 0 | |||||
| FL State Sales Tax | 0.00% | - 0 | |||||
| TOTAL | $ - 0 |
Div37
| CONSTRUCTION COST ESTIMATE | DATE | ||||||
| Fill Here | |||||||
| PROJECT | BASIS FOR ESTIMATE | ||||||
| Rpr Corrision Control Facility in Hangar 90225 | CODE A (No design completed) | ||||||
| LOCATION | CODE B (Preliminary design) | ||||||
| HURLBURT FIELD, FLORIDA | CODE C (Final design) | ||||||
| COMPANY | PROJECT NO. | OTHER (Specify) | |||||
| Fill Here | |||||||
| DRAWING NO. | ESTIMATOR | CHECKED BY | |||||
| QUANTITY | LABOR | MATERIAL | |||||
| ITEM DESCRIPTION | NO. UNITS | UNIT MEAS. | PER UNIT | TOTAL | PER UNIT | TOTAL | TOTAL COST |
| RESERVED | |||||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| TOTAL LABOR/MATERIALS | - 0 | - 0 | |||||
| SUBTOTAL | $ - 0 | ||||||
| Sub-Contractor's Overhead | 0.00% | - 0 | |||||
| Sub-Contractor's Profit | 0.00% | - 0 | |||||
| FL State Sales Tax | 0.00% | - 0 | |||||
| TOTAL | $ - 0 |
Div38
| CONSTRUCTION COST ESTIMATE | DATE | ||||||
| Fill Here | |||||||
| PROJECT | BASIS FOR ESTIMATE | ||||||
| Rpr Corrision Control Facility in Hangar 90225 | CODE A (No design completed) | ||||||
| LOCATION | CODE B (Preliminary design) | ||||||
| HURLBURT FIELD, FLORIDA | CODE C (Final design) | ||||||
| COMPANY | PROJECT NO. | OTHER (Specify) | |||||
| Fill Here | |||||||
| DRAWING NO. | ESTIMATOR | CHECKED BY | |||||
| QUANTITY | LABOR | MATERIAL | |||||
| ITEM DESCRIPTION | NO. UNITS | UNIT MEAS. | PER UNIT | TOTAL | PER UNIT | TOTAL | TOTAL COST |
| RESERVED | |||||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| TOTAL LABOR/MATERIALS | - 0 | - 0 | |||||
| SUBTOTAL | $ - 0 | ||||||
| Sub-Contractor's Overhead | 0.00% | - 0 | |||||
| Sub-Contractor's Profit | 0.00% | - 0 | |||||
| FL State Sales Tax | 0.00% | - 0 | |||||
| TOTAL | $ - 0 |
Div39
| CONSTRUCTION COST ESTIMATE | DATE | ||||||
| Fill Here | |||||||
| PROJECT | BASIS FOR ESTIMATE | ||||||
| Rpr Corrision Control Facility in Hangar 90225 | CODE A (No design completed) | ||||||
| LOCATION | CODE B (Preliminary design) | ||||||
| HURLBURT FIELD, FLORIDA | CODE C (Final design) | ||||||
| COMPANY | PROJECT NO. | OTHER (Specify) | |||||
| Fill Here | CP1028800 | ||||||
| DRAWING NO. | ESTIMATOR | CHECKED BY | |||||
| QUANTITY | LABOR | MATERIAL | |||||
| ITEM DESCRIPTION | NO. UNITS | UNIT MEAS. | PER UNIT | TOTAL | PER UNIT | TOTAL | TOTAL COST |
| RESERVED | |||||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| TOTAL LABOR/MATERIALS | - 0 | - 0 | |||||
| SUBTOTAL | - 0 | ||||||
| Sub-Contractor's Overhead | 0.00% | - 0 | |||||
| Sub-Contractor's Profit | 0.00% | - 0 | |||||
| FL State Sales Tax | 0.00% | - 0 | |||||
| TOTAL | $ - 0 |
Div40
| CONSTRUCTION COST ESTIMATE | DATE | ||||||
| Fill Here | |||||||
| PROJECT | BASIS FOR ESTIMATE | ||||||
| Rpr Corrision Control Facility in Hangar 90225 | CODE A (No design completed) | ||||||
| LOCATION | CODE B (Preliminary design) | ||||||
| HURLBURT FIELD, FLORIDA | CODE C (Final design) | ||||||
| COMPANY | PROJECT NO. | OTHER (Specify) | |||||
| Fill Here | CP1028800 | ||||||
| DRAWING NO. | ESTIMATOR | CHECKED BY | |||||
| QUANTITY | LABOR | MATERIAL | |||||
| ITEM DESCRIPTION | NO. UNITS | UNIT MEAS. | PER UNIT | TOTAL | PER UNIT | TOTAL | TOTAL COST |
| PROCESS INTEGRATION | |||||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| TOTAL LABOR/MATERIALS | - 0 | - 0 | |||||
| SUBTOTAL | - 0 | ||||||
| Sub-Contractor's Overhead | 0.00% | - 0 | |||||
| Sub-Contractor's Profit | 0.00% | - 0 | |||||
| FL State Sales Tax | 0.00% | - 0 | |||||
| TOTAL | $ - 0 |
Div41
| CONSTRUCTION COST ESTIMATE | DATE | ||||||
| Fill Here | |||||||
| PROJECT | BASIS FOR ESTIMATE | ||||||
| Rpr Corrision Control Facility in Hangar 90225 | CODE A (No design completed) | ||||||
| LOCATION | CODE B (Preliminary design) | ||||||
| HURLBURT FIELD, FLORIDA | CODE C (Final design) | ||||||
| COMPANY | PROJECT NO. | OTHER (Specify) | |||||
| Fill Here | CP1028800 | ||||||
| DRAWING NO. | ESTIMATOR | CHECKED BY | |||||
| QUANTITY | LABOR | MATERIAL | |||||
| ITEM DESCRIPTION | NO. UNITS | UNIT MEAS. | PER UNIT | TOTAL | PER UNIT | TOTAL | TOTAL COST |
| MATERIAL PROCESING AND HANDLING EQUIPMENT | |||||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| TOTAL LABOR/MATERIALS | - 0 | - 0 | |||||
| SUBTOTAL | - 0 | ||||||
| Sub-Contractor's Overhead | 0.00% | - 0 | |||||
| Sub-Contractor's Profit | 0.00% | - 0 | |||||
| FL State Sales Tax | 0.00% | - 0 | |||||
| TOTAL | $ - 0 |
Div42
| CONSTRUCTION COST ESTIMATE | DATE | ||||||
| Fill Here | |||||||
| PROJECT | BASIS FOR ESTIMATE | ||||||
| Rpr Corrision Control Facility in Hangar 90225 | CODE A (No design completed) | ||||||
| LOCATION | CODE B (Preliminary design) | ||||||
| HURLBURT FIELD, FLORIDA | CODE C (Final design) | ||||||
| COMPANY | PROJECT NO. | OTHER (Specify) | |||||
| Fill Here | |||||||
| DRAWING NO. | ESTIMATOR | CHECKED BY | |||||
| QUANTITY | LABOR | MATERIAL | |||||
| ITEM DESCRIPTION | NO. UNITS | UNIT MEAS. | PER UNIT | TOTAL | PER UNIT | TOTAL | TOTAL COST |
| PROCESS HEATING, COOLING AND DRYING EQUIPMENT | |||||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| TOTAL LABOR/MATERIALS | - 0 | - 0 | |||||
| SUBTOTAL | $ - 0 | ||||||
| Sub-Contractor's Overhead | 0.00% | - 0 | |||||
| Sub-Contractor's Profit | 0.00% | - 0 | |||||
| FL State Sales Tax | 0.00% | - 0 | |||||
| TOTAL | $ - 0 |
Div43
| CONSTRUCTION COST ESTIMATE | DATE | ||||||
| Fill Here | |||||||
| PROJECT | BASIS FOR ESTIMATE | ||||||
| Rpr Corrision Control Facility in Hangar 90225 | CODE A (No design completed) | ||||||
| LOCATION | CODE B (Preliminary design) | ||||||
| HURLBURT FIELD, FLORIDA | CODE C (Final design) | ||||||
| COMPANY | PROJECT NO. | OTHER (Specify) | |||||
| Fill Here | |||||||
| DRAWING NO. | ESTIMATOR | CHECKED BY | |||||
| QUANTITY | LABOR | MATERIAL | |||||
| ITEM DESCRIPTION | NO. UNITS | UNIT MEAS. | PER UNIT | TOTAL | PER UNIT | TOTAL | TOTAL COST |
| PROCESS GAS & LIQUID HANDLING, PURIFICATION AND STORAGE EQUIPMENT | |||||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| TOTAL LABOR/MATERIALS | - 0 | - 0 | |||||
| SUBTOTAL | $ - 0 | ||||||
| Sub-Contractor's Overhead | 0.00% | - 0 | |||||
| Sub-Contractor's Profit | 0.00% | - 0 | |||||
| FL State Sales Tax | 0.00% | - 0 | |||||
| TOTAL | $ - 0 |
Div44
| CONSTRUCTION COST ESTIMATE | DATE | ||||||
| Fill Here | |||||||
| PROJECT | BASIS FOR ESTIMATE | ||||||
| Rpr Corrision Control Facility in Hangar 90225 | CODE A (No design completed) | ||||||
| LOCATION | CODE B (Preliminary design) | ||||||
| HURLBURT FIELD, FLORIDA | CODE C (Final design) | ||||||
| COMPANY | PROJECT NO. | OTHER (Specify) | |||||
| Fill Here | CP1028800 | ||||||
| DRAWING NO. | ESTIMATOR | CHECKED BY | |||||
| QUANTITY | LABOR | MATERIAL | |||||
| ITEM DESCRIPTION | NO. UNITS | UNIT MEAS. | PER UNIT | TOTAL | PER UNIT | TOTAL | TOTAL COST |
| POLLUTION CONTROL EQUIPMENT | |||||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| - 0 | - 0 | - 0 | |||||
| TOTAL LABOR/MATERIALS | - 0 | - 0 | |||||
| SUBTOTAL | - 0 | ||||||
| Sub-Contractor's Overhead | 0.00% | - 0 | |||||
| Sub-Contractor's Profit | 0.00% | - 0 | |||||
| FL State Sales Tax | 0.00% | - 0 | |||||
| TOTAL | $ - 0 |
Div45
| CONSTRUCTION COST ESTIMATE | DATE | ||||||
| Fill Here | |||||||
| PROJECT | BASIS FOR ESTIMATE | ||||||
| Rpr Corrision Control Facility in Hangar 90225 | CODE A (No design completed) | ||||||
| LOCATION | CODE B (Preliminary design) | ||||||
| HURLBURT FIELD, FLORIDA | CODE C (Final design) | ||||||
| COMPANY | PROJECT NO. | OTHER (Specify) | |||||
| Fill Here | CP1028800 | ||||||
| DRAWING NO. | ESTIMATOR | CHECKED BY |
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .