Attch 2 - SOI (Schedule of Items).xlsx

XLSX spreadsheet 17 KB Posted

Attached to
Lost Valley Road Resurfacing Federal contract opportunity
Solicitation number
1282B123R0078
Issued by
Department of Agriculture Forest Service

About this file

This document is a schedule of items for a federal road resurfacing contract opportunity with the Department of Agriculture Forest Service. It includes eight base bid line items for road construction and rehabilitation work on Road 50089, as well as optional line items for additional road work, aggregate crushing, and dust abatement. The base bid line items cover tasks such as mobilization, culvert installation, road reconditioning using vibratory roller compaction, and aggregate surface course placement from government sources. The document also lists eight optional sections with additional road construction, rehabilitation, and material production work that may be awarded. These options cover tasks such as stockpiling aggregates, hauling, and further road work on additional routes. Pricing is to be provided by the contractor on a unit rate basis for each pay item, with the total contract value to be determined based on selected bid items and quantities.

View the file

Other files for this federal contract opportunity

Other files attached to Lost Valley Road Resurfacing, newest first.
File Type Posted
Amendment 0001_Lost Valley.pdf PDF
Attch 4 - Lost Valley FSSS.pdf PDF
Attch 7 BMP_Best Management Practices.pdf PDF
1282B123R0078_Lost Valley Road Resurfacing.pdf PDF
Attch 1 -SOW Lost Valley.pdf PDF
Attch 5 - Lost Valley Site Visit Info.pdf PDF
Attch 6 - Wage Determination.pdf PDF
Attch 3 - Signed Plans Lost Valley Loop Updated 8-9-23 - Copy.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Schedule of Items (No Prices)

B-1 - SCHEDULE OF ITEMS

Base Bid: Road 50089
Item NumberPay Item NumberDescriptionMethod of Measure*Pay UnitBase Bid: Road 50089Unit PriceAmount
115101MobilizationLSQLS1$ - 0$ - 0
220302Removal of CMP, disposal method aAQEach7$ - 0$ - 0
325101Placed Riprap, Class 0, acceptance method: visual inspectionAQCY4$ - 0$ - 0
430116Aggregate Surface Course, Compaction B Placement Method 2 - Vibratory Roller Compaction, (Government Source)AQCY22270$ - 0$ - 0
530315Roadway Reconditioning, Placement Method 2 - Vibratory Roller CompactionAQMiles12.26$ - 0$ - 0
660201A18-inch Pipe Culvert, 16 gauge steel, compaction method 6AQFeet232$ - 0$ - 0
760201B24-inch Pipe Culvert, 16 gauge steel, compaction method 6AQFeet36$ - 0$ - 0
863301Permanent Traffic Control (Contractor Supplied)AQEach4$ - 0$ - 0
Total$ - 0
Base Bid: Aggregate Crushing Woodland Creek Pit
Item NumberPay Item NumberDescriptionMethod of Measure*Pay UnitOption A: Aggregate Crushing Woodland Creek PitUnit PriceAmount
915101MobilizationLSQLS1$ - 0$ - 0
1031402AStockpiled Aggregate Surface CourseAQTons40000$ - 0$ - 0
1131402BStockpiled Aggregate SubbaseAQTons5000$ - 0$ - 0
Total$ - 0
Option B Road 50154
Item NumberPay Item NumberDescriptionMethod of Measure*Pay UnitOption B Road 50154Unit PriceAmount
1230109Aggregate Subbase, Compaction B Placement Method 2 - Vibratory Roller Compaction, (Government Source)AQCY500$ - 0$ - 0
1330116Aggregate Surface Course, Compaction B Placement Method 2 - Vibratory Roller Compaction, (Government Source)AQCY13072$ - 0$ - 0
1430315Roadway Reconditioning, Placement Method 2 - Vibratory Roller CompactionAQMiles10.51$ - 0$ - 0
Total$ - 0
Option C: Road 50520
Item NumberPay Item NumberDescriptionMethod of Measure*Pay UnitOption C: Road 50520Unit PriceAmount
1530116Aggregate Surface Course, Compaction B Placement Method 2 - Vibratory Roller Compaction, (Government Source)AQCY1224$ - 0$ - 0
1630315Roadway Reconditioning, Placement Method 2 - Vibratory Roller CompactionAQMiles1.34$ - 0$ - 0
Total$ - 0
Option D: Road 50097
Item NumberPay Item NumberDescriptionMethod of Measure*Pay UnitOption D: Road 50097Unit PriceAmount
1730116Aggregate Surface Course, Compaction B Placement Method 2 - Vibratory Roller Compaction, (Government Source)AQCY400$ - 0$ - 0
1830315Roadway Reconditioning, Placement Method 2 - Vibratory Roller CompactionAQMiles0.13$ - 0$ - 0
Total$ - 0
Option E: Road 50089 Dust Abatement
Item NumberPay Item NumberDescriptionMethod of Measure*Pay UnitOption E: Road 50089 Dust AbatementUnit PriceAmount
1931202Dust Palliative, MgCl 0.5 gal/SY, Method 1AQSY25000$ - 0$ - 0
Total$ - 0
Option F: Road 50139
Item NumberPay Item NumberDescriptionMethod of Measure*Pay UnitOption F: Road 50139Unit PriceAmount
2030116Aggregate Surface Course, Compaction B Placement Method 2 - Vibratory Roller Compaction, (Government Source)AQCY519$ - 0$ - 0
2130315Roadway Reconditioning, Placement Method 2 - Vibratory Roller CompactionAQMiles0.50$ - 0$ - 0
Total$ - 0
Option G: Aggregate Crushing Sheep Creek Pit
Item NumberPay Item NumberDescriptionMethod of Measure*Pay UnitOption H: Aggregate Crushing Sheep Creek PitUnit PriceAmount
2415101MobilizationLSQLS1$ - 0$ - 0
2520440HaulAQTons10000$ - 0$ - 0
2631402AStockpiled Aggregate Surface CourseAQTons15000$ - 0$ - 0
2731402BStockpiled Aggregate SubbaseAQTons5000$ - 0$ - 0
Total$ - 0
Option H: Road 50128
Item NumberPay Item NumberDescriptionMethod of Measure*Pay UnitOption G: Road 50128Unit PriceAmount
2230116Aggregate Surface Course, Compaction B Placement Method 2 - Vibratory Roller Compaction, (Government Source)AQCY8834$ - 0$ - 0
2330315Roadway Reconditioning, Placement Method 2 - Vibratory Roller CompactionAQMiles8.47$ - 0$ - 0
Total$ - 0
Total Base Bid$ - 0
Total Options B-H$ - 0
Total (all items)$ - 0

File details come from the government source that posted it. Updated .