Attachment 1: Work Item List 70Z08523QLREP0001 Sources Sought
USCGC STONE DS FY23Q3
Work Item List (DRAFT) Dock-Side: USCGC STONE FY23Q3
Work Item Description
001 Tanks (Potable Water), Clean and Inspect 002 Fire Detection System, Inspect and Test 003 Dual Point Davit ,Biennial Maintenance, Perform 004 Folding Boom Cranes, Biennial Maintenance, Perform 005 Stern Boat Launch and Recovery, Level II 006 Talon Grid, Inspect and Test 007 Ventilation Ducting, Clean and Inspect 008 Fan Coil Assembly Drain Piping, Modify 009 Chilled Water System Insulation, Renew 010 Ventilation Duct Insulation, Renew 011 Low Pressure Air Compressor, Replace 012 Deck Covering (Polymeric), Seal 013 BERP and QAWTD 01-57-2, Install 014 Auxiliary Seawater Piping, Modify 015 Cofferdam, Install 016 Temporary Services, Dockside, Home Pier 017 Dry Provision Storeroom, Modify 018 Cargo Handling Elevator, Annual Inspection and Test, Perform 019 Tanks (Potable Water), Preserve (Partial) - OPTIONAL 020 Fire Prevention, Provide