18 Mar 21

STATEMENT OF WORK

FY21 O&M PAINT SIGN STRIPING

GENERAL DESCRIPTION:

The contractor shall provide all materials, labor, supervision, and equipment to complete painting, signage, and striping for work orders listed below. All work shall conform to specifications outlined in the contract, the line item task listing description, and in accordance with (IAW) the Traffic Engineering for Better Signs and Markings SDDCTEA Pamphlet 55-14, the UFC 3-120-01 Design (Sign standard), UFGS 09 90 00, (Paints and coatings), the Manual of Uniform Traffic Control Devices (MUTCD) and California MUTCD standards. Point of contact for this project is: Warren Cabanlit, 60 CES/CEOES, (707) 424-2706.

DESCRIPTION OF WORK: FY21 O&M Paint sign & striping projects

Project No.

W/O # BLDG POC Name POC Phone Description

8234278

Warren Cabanlit

424-2706

Stain & clear coat doors 120SF

2 9166946

Paint repair behind door 400SF

3 8540051

Paint wall repair 400SF

4 8553068 51

Paint wall repair 150SF

8755368

Fire truck bay, reflective yellow paint 256SF

8869701

424-2706 Exterior paint 1500SF

8869550

8870074

9 8540051

424-2706 Exterior paint 3000SF

8791286 549

Rm 233, training room be painted, 1630 SF

8376527 712 Warren Cabanlit 424-2706

Paint patch repair, 140SF

6308539 1334

Paint rm 204 water damage /wall in shower, 270SF

7427550 14 Warren Cabanlit 424-2706

Paint Hangar P-14 repaint red line

500SF

14 4744842

Paint CEMIRT Engine Rebuild Shop 3800SF

7333443

Interior paint room 105, 810SF

7333415

424-2706 Interior paint room 129 810SF

7278356

Paint metal door 130SF

7061088

Paint Protocol Office Rm 224, 275SF

6883197

Paint, handrail repair, 10SF

6835746

Paint second floor, room 242 conf rm ,720SF

6311115

Paint break room 900SF

22 9166948 1314 424-2706 424-2706 Paint ceiling patch in bathroom

100SF

6000422

Wallpaper removal & paint Chapel entry way & hallways, 1200SF

5962017

Fire Station #1, Building 38 interior paint, 4500SF

25 5584534

Paint repair Stairwell #4 on 3rd floor and paint room C202, 20SF

5580749 400 Warren Cabanlit 424-2706 Paint ceiling repair, 100SF

5555235 668

Paint wall repair, 15SF

5491324 381

Paint wall repair, 45SF

5450994 380

Paint wall repair, 4SF

30 5368281 83 Warren Cabanlit 424-2706 Paint natural gas line on exterior, 20SF

5202621 170

Paint new overhead door, 384SF

32 5200920 446

Paint front door Rm 4611, 50SF

4762084 1356

Paint rm 107 paint wall repair, restroom on wall, 5SF

34 9166694 875 Warren Cabanlit 424-2706 Paint patched holes, wall towards the bathroom 180SF

35 9136775 1356 Warren Cabanlit 424-2706 Room 201, paint drywall/entire room 450SF

36 8946061 1315 Warren Cabanlit 424-2706 Room 204A, paint drywall 100 SF

37 8945871 1316 Warren Cabanlit 424-2706 Room 101B, paint ceiling drywall

400 SF

38 8025803 402 Warren Cabanlit 424-2706 Paint rpr hallway ceiling 10 SF

39 7896825 381

Warren Cabanlit 424-2706

4th Floor, Lobby,Room B-402, Woman's Bathroom, paint repair the hole in the ceiling above the restroom toilet 125 SF

40 9425266 861

Paint Aircraft Parts Store: Big office, NCOIC office& Supervisor office 2688 SF

41 9166948 1314

Bathroom, paint applied texture on ceiling patch. 100 SF

42 8792764 549

Rm 233, paint training room walls

1640 SF

43 8435381 181

Warren Cabanlit 424-2706 Paint first floor 38556 SF

44 8435381 4

Paint RADAR training room

920SF

45 8376527 712

424-2706 Paint room 140SF

46 8075091 80

424-2706 Museum, paint wall 220SF

47 7786121 885

424-2706 CE Gym, Exterior paint 4000SF

48 3194636 959

B bunker, Exterior paint, Concrete foundation, concrete docks and ramp. Steel siding, trim, frames, personnel doors, roll up doors.

3240SF

3700248 960 foundation, concrete docks and ramp. Steel siding, trim, frames, personnel doors, roll up doors.

Paint 4 white lines 8" X 80' on the North side of building 960, two lines per dock left and right. 2880

SF

50 3194932 961 foundation, concrete docks and ramp. Steel siding, trim, frames, personnel doors, roll up door

3780SF

51 8338240 185

Rm. 250, second floor, paint drywall repair 120SF

52 8394883 665

Janitors closet, paint drywall repair 15SF

53 8469248 7763

Match downspout color (terracotta). 9 SF

54 7723726 648

Paint roof access ladder repair, 200 SF

55 7785813 895 Warren Cabanlit

424-2706 Paint exterior door repair, 70 SF

56 7501097 1 Warren Cabanlit

Paint main entrance door repair, 40 SF

57 7448867 139 Warren Cabanlit

Paint fire door repair that separates the Allied Trades shop from the Tire shop located on the southwest side of building, 50 SF

58 7432626 10 Warren Cabanlit

Paint door repair leading to the catwalk on the 13th floor in tower cab, 30 SF

59 7319669 7763 Warren Cabanlit

424-2706 Paint Janitor closet door, 42 SF

60 7428658 7763 Warren Cabanlit

424-2706 Paint window door, 30 SF

61 7418291 235 Warren Cabanlit

Paint window repair, south side of building, 150 SF

62 7400614 235 Warren Cabanlit

Paint 3 separate cracks. 2 cracks on ceiling in hallway and 1 crack coming off room 15 doorway, 150

63 7379352 1308 Warren Cabanlit

424-2706 Paint rm 210 wall repair 20SF

64 7343659 139

Paint 2 panels near eyewash station. 45 SF

65 8130342 438

Paint HVAC enclosure repair. 24

66 8130088 39

424-2706 Paint water fountain leak repair in

RAPCON building. 27 SF

67 8109779 228

Commanders Office, room 135 east wall, paint wall repair. 150 SF

68 8069517 434

424-2706 Paint door repair. 70 SF

69 8055151 130

424-2706 Paint door repair. 70 SF

70 9326902 1219 Warren Cabanlit

424-2706 Paint Guardmount Room. 540 SF

71 4372409 2012 Warren Cabanlit

424-2706 Restripe parking lot lines, 400LF

6892172 1721

Restripe parking lot lines, 160LF

6567139 402

Restripe parking lot lines, 520LF

74 8755368 139 Warren Cabanlit

Reflective yellow paint for equipment clearance, 450LF

75 7946062 14 Warren Cabanlit

Red line on the flight line control entry, 50LF

76 7918885 1707 Warren Cabanlit

New center line (With reflectors) and shoulder lines on the new paved area on Vandenberg dr, 50LF

77 7610518 1205 Warren Cabanlit

CEMIRT ADA & GOV restripe parking, 192 LF

78 7492036 434 Warren Cabanlit

Restripe personnel cross walks leading out from gym, 132 LF

79 7427550 924 Warren Cabanlit

Restripe Northeast Parking lot, 3120 LF

80 7359525 1707 Warren Cabanlit

Paint (2)right turn only markings around Sky Master round about leading from both BX and Commissary parking lots, 50 SF

81 9300505 1722 Warren Cabanlit

Demarcation lines painted on the ground/road at all installation gates: Main Gate Bldg. 600, Hospital Gate Bldg. 782, North Gate Bldg. 8993, and South Gate Bldg. 1003, 480LF

82 6839696 7763 Warren Cabanlit

10 pieces of signage that reads "NO PETS ALLOWED" to be put up on the fences around all the youth sports fields.

83 6656210 827 Warren Cabanlit

3 GOV parking signs that mount on wall

84 8386938 187 Warren Cabanlit

B3, Fabricate & install(660th Aircraft Maint Sq and 2010 AMC Maintenance Effective Award portion removed)

85 7610518 1205 Warren Cabanlit

CEMIRT ADAx2 & GOVx7 parking signs

86 7595575 600 Warren Cabanlit

BLDG 600, 1003, 8993 and 782, make and install four (4) "TURN

OFF YOUR HEADLIGHTS"

Signs to put at the installation access points

87 6034321 14 Warren Cabanlit

Hangar Avenue side (South), bldg number sign "DANGER ONLY

QUALIFIED PERSONNEL

AUTHORIZED BY THE

SQUADRON COMMANDER

MAY OPERATE HANGAR

DOORS."

88 7357345 660 Warren Cabanlit 424-2706

Make and install parking spot placards for Gold Star Family Members for five (5) parking spots at front of lot nearest Travis Avenue

89 8447564 VARIOUS Warren Cabanlit 424-2706 Make and install bldg. number signs 26 buildings 2 per bldg

ADDITIONAL REQUIREMENTS:

1. All work areas shall be kept as clean as possible during working hours. Debris will not be allowed to accumulate on work site. All debris will be deposited in an authorized container supplied by the contractor.

2. Working drawings shall provide sufficient detail to provide a clear and complete understanding of the work.

3. Special precautions must be made, as needed, to prevent any potential fire hazard. The fire reporting number is 424-4911 from a base phone or 911 from any commercial phone.

4. The contractor shall challenge any requirements in the scope of work (SOW) which are specifically in violation of the governing code. It is the contractor’s responsibility to comply with the governing code unless the construction representative provides specific documentation to the contrary.

5. The contractor shall ensure installation of all items included in the contract. The contractor shall be accountable for all related costs of items not installed.

6. All work shall be in full compliance with the requirements, spirit, and intent of the base compatibility plan (discussed at the Basic Content Pre-construction meeting and a copy provided by the Contracting Officer) and contract specifications.

7. All exposed and visible surfaces shall be finished and provide an aesthetically pleasing appearance.

8. The contractor shall field verify all drawing measurements and any other supplied information given at the site visit

9. Materials storage and clean up: The contractor’s materials and equipment shall be stored and protected after end of each day. Storage facilities are provided by contractor at an approved Government location. Clean up and removal of all debris, spoil and waste shall be accomplished at the end of each day’s work. Disposal shall be off base upon completion.

10. Working conditions: Contractor shall perform work in such a manner as to cause minimum interference to facility and surrounding areas utilities: Reasonable quantities of water and electricity will be provided to the contractor without charge. Needed temporary connections shall be installed maintained and removed at the contractors expense.

PERIOD OF PERFORMANCE:

All work orders will be completed in ninety days (90) days after receipt NTP.