Attch 1_SOW (F2MTR30155AW01) Vertical Lift 19 June 20.pdf
PDF 302 KB Posted
- Attached to
- Vertical Limit Module Storage System
- Solicitation number
- FA301620U0164
About this file
This statement of work and solicitation document outline requirements for the installation of vertical lift module storage systems at two buildings on Joint Base San Antonio Lackland in Texas. The statement of work provides specifications for three standalone vertical lift modules to be installed at one building, including tray and divider configurations and requirements for desktop computers, inventory software, and database software to control the systems. Two additional vertical lift modules are to be installed at a second building, with specifications provided for the hardware, trays, desktop computers, inventory software, and database software. The contractor will also provide training for users and maintenance staff. The solicitation indicates this is a 100% set-aside for women-owned small businesses to quote on the installation of the vertical lift module storage systems by 19 August 2020 for the Department of the Air Force Air Education and Training Command.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| RFQ (FA301620U0164) Vertical Lift Module.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Statement of Work
1 June 2020
Installation of Vertical Lift Module
343 TRS Supply Building 10263
1350 Scott Drive, JBSA Lackland, TX 78236 and
343 TRS Armory BLDG 3885 RM 120, 2520 Ladd Street, JBSA Lackland, TX 78236-5717
19 June 2020
1. DESCRIPTION OF WORK: The contractor shall provide all personnel, equipment, supplies, tools, materials, and non-personal services necessary to install three stand-alone Vertical Lift Modules (VLM) storage systems in support of the 343rd Training Squadron (TRS), Buildings 10263 and 3885, Joint Base San Antonio (JBSA)
Lackland, TX, as defined in this Statement of Work (SOW). The stand-alone vertical lift modules will be used to facilitate tracking and sustainment of thousands of weapons parts and items in support of 343th TRS, JBSA, and as defined in this SOW.
1.1. The computer systems shall be stand-alone, and not connect to the AF network. The contractor shall provide, configure, and install the workstations and software to control the VLMs.
1.2. The contractors shall configure the electrical connections from the mechanical rooms, to the location of VLMs as the existing electrical is 110 volts and 220 volts are required. Any items that need to be moved to accommodate the location of the VLMs will be the responsibility of the Government.
1.3. Building 3885:
1.3.1. One (1) Each VLM hardware shall have the following specifications.
Overall Unit Height: 9’16”
Overall Unit Width: 9’16”
Overall Unit Depth: 10’ 32”
Overall Tray Size: 96” Clear Width x 34” Clear Depth
Maximum Unit Capacity: 147,708 lbs.
Maximum Lifting Speed: 157.50 ft./min
Maximum Access Time: 37.84 seconds
Power Requirements 220 Volts 3 phases
1.3.2. Trays and dividers shall have the following specifications.
6 (EA) Trays configured with 3” high partitions dividers, and 24 (EA) adjustable cells
13 (EA) Trays configured with 4” high partitions dividers and 20 (EA) adjustable cells
7 (EA) Trays configured 7” high dividers and 30 (EA) adjustable cells
1.3.3. One (1) Each Desktop Computer which shall have the following specifications.
Processor: 1 gigahertz (GHz) or faster processor
RAM: 1 gigabyte (GB) for 32-bit or 2 GB for 64-bit
Hard disk space: 16 GB for 32-bit Operating System (OS) 20 GB for 64-bit (OS)
Graphics card: DirectX 9 or later with WDDM 1.0 driver
Display: 800x600
1.3.4. One (1) Each VLM Inventory Software Modules shall have the following specifications.
User Management/Configurable User Rights
Bin Management
Location Management
Material Management
Manual Picks, Puts and Returns
Basic Inventory Control, Expiry Dates and Barcode Checks
Basic Reporting
Transaction History
Multilingual Support
Built in Help files
Tray/Shelf Level Access Control
Warehouse control including automated vertical storage locations
Advance reports and chart features
Zone Handling
Label Printing
Serial Numbering sorting option
Track material by serial numbers
1 (EA) license for software use
1.3.5. One (1) Each Database software shall have the following specifications.
Processer min speed of 1 GHz
RAM Minimum 512 MB
Hard Disk Space 4.2 Disk Space Free
Stored Procedures
Views Replication
Triggers Advanced Query Optimizer
Snapshot Isolation Levels
Service Broker
Transact language support
Multiple Active Result Sets
Import/Export Wizard
Reporting Services.
Reports function.
Full-text Search, a powerful search engine for searching
Text-intensive data
1.4. Building 10263:
1.4.1. Two (2) Each VLM systems
1.4.2. Two (2) Each VLM hardware shall have the following specifications.
Overall Unit Height: 12’ 16”
Overall Unit Width: 18’ 16”
Overall Unit Depth: 10’ 32”
Overall Tray Size: 96” Clear Width x 34” Clear Depth
Maximum Unit Capacity: 147,708 lbs.
Maximum Lifting Speed: 157.50 ft./min
Maximum Access Time: 37.84 seconds
Power: 220 volt/3 phase
Operator Controls Located: Inside Overhead Center Universal Console
1.4.3. Trays and dividers shall have the following specifications.
40 (EA) light duty trays 507 pounds per tray
8 (EA) heavy capacity 1,080 pounds per tray.
20 (EA) trays configured at 3" high perimeter dividers and 3 (EA) adjustable cells.
20 (EA) trays shall have 4" high perimeter dividers with 3 (EA) adjustable cells.
8 (EA) trays shall have 10"high partitions dividers with 2 (EA) adjustable cells
1.4.4. One (1) Each Desktop Computer which shall have the following specifications.
Processor: 1 gigahertz (GHz) or faster processor
RAM: 1 gigabyte (GB) for 32-bit or 2 GB for 64-bit
Hard disk space: 16 GB for 32-bit Operating System (OS) 20 GB for 64-bit (OS)
Graphics card: DirectX 9 or later with WDDM 1.0 driver
Display: 800x600
1.4.5. Two (2) Each VLM Inventory Software Modules shall have the following specifications.
User Management/Configurable User Rights
Bin Management
Location Management
Material Management
Manual Picks, Puts and Returns
Basic Inventory Control, Expiry Dates and Barcode Checks
Basic Reporting
Transaction History
Multilingual Support
Built in Help files
Tray/Shelf Level Access Control
Warehouse control including automated vertical storage locations
Advance reports and chart features
Zone Handling
Label Printing
Serial Numbering sorting option
Track material by serial numbers
2 (EA) license for software use
1.4.6. One (1) Each Database software shall have the following specifications.
Processer min speed of 1 GHz
Read Access Memory Minimum 512 MB
Hard Disk Space 4.2 Disk Space Free
Stored Procedures
Views Replication
Triggers Advanced Query Optimizer
Snapshot Isolation Levels
Service Broker
Transact language support
Multiple Active Result Sets
Import/Export Wizard
Reporting Services.
Reports function.
Full-text Search, a powerful search engine for searching
Text-intensive data
2. TRAINING:
The contractor shall provide user training and copies of the instruction guides.
Contractor shall provide operational and general maintenance training for the 343rd TRS staff.
3. GENERAL INFORMATION: All Outside Plant (OSP) and Inside Plant (ISP) cabling projects installed on
Lackland AFB, Medina Annex, or Camp Bullis as part of any MILCON, SABER, or other project shall meet commercial industry and Telecommunications Systems Cabling Standards. Please reference 13A Standards and
UFC 3-580-1 Telecommunication Interior Infrastructure Planning and Design with Change.
3.1 WORK HOURS AND SPECIAL CONDITIONS: Work hours shall begin at 7:30 a.m. through 4:30 p.m., Monday through Friday, exclusive of Federal holidays. At the option of the Government and with approval of the
Contracting Officer, work may be permitted on Federal holidays, weekends, or after 4:30 p.m. at no additional cost to the Government.
New Year's Day January 1st
Martin Luther King Jr's Birthday 20 January
President’s Day 17 February
Memorial Day 25 May
Independence Day July 4th
Labor Day 7th Sept
Columbus Day 12th Oct
Veterans' Day November 11th
Thanksgiving Day 23th November
Christmas Day December 25th
3.2 BASE FIRE REGULATIONS: The contractor shall comply with all JBSA-Lackland AFB Post Fire
Regulations. Contractor shall have all permits needed to perform job.
3.3 SITE MAINTENANCE AND CLEANUP: Site Maintenance: The contractor shall maintain work areas in a neat, clean, and safe condition. The contractor shall be responsible for providing, installing, and the removal of any temporary signage, barriers, barricade tape, etc. which may be required to control pedestrian in the work area.
The contractor shall collect all trash, debris, refuse, garbage, etc., which is. The aforementioned materials shall be removed from the site by appropriate means daily.
Contractor shall not work or store materials in a manner that would hinder or otherwise block pedestrian circulation to exit corridors and exit doors in the event of an emergency or fire. Storage of materials shall be coordinated with the customer.
The contractor shall be responsible for freight, unpacking, delivery and inside installation.
Disposal shall be outside the limits of Government property.
3.4 ENERGY CONSERVATION: The contractor shall use good judgment in the conservation of Government utilities. The contractor shall adhere to and enforce prevailing energy conservation practices.
3.5 CONTRACT MANAGEMENT: No changes in or deviation from the scope of service shall be effected without a modification executed by the Contracting Officer authorizing such changes.
3.6 RECORDS MANAGEMENT: The Contractor shall manage all data created for Government use or legally controlled by the Government, in support of the functional activity or required by AF publication, IAW with the AF
Records Management procedures in Air Force Instruction (AFI) 33-322, Air Force Manual (AFMAN) 33-363 and
Air Force Instruction (AFI) 33-364 (or their subsequent replacements).
3.7 INSPECTION AND ACCEPTANCE: The final inspection will be conducted by the customer, Contracting
Officer, and the Contractor, to determine whether the project can be accepted, or if corrections are required prior to acceptance.
3.8. SALIENT CHARACTERISTICS AND LAYOUT:
File details come from the government source that posted it. Updated .