Attachment_-_Submittal_List.pdf
PDF 227 KB Posted
- Attached to
- Dock & Shed Rehab Federal contract opportunity
- Solicitation number
- 140P6422R0005
About this file
This document outlines the requirements for a federal contract solicitation to rehabilitate a dock and shed. The National Park Service, Interior Regions 3/4/5, Ohio Major Acquisition Buying Office intends to issue a Request for Proposal for the Dock & Shed Rehab project at Apostle Islands National Lakeshore in Bayfield, WI. The work includes rebuilding an existing dock, making repairs to an existing shed, and moving the shed back to its original location. The solicitation number is 140P6422R0005. The contract value is between $1-5 million and will be firm-fixed price. Evaluation criteria are technical approach, past performance, and price. The NAICS code is 237990 for heavy and civil engineering construction with a $39.5 million size standard. The set-aside is 100% for small businesses. The document provides contact information for site visits and questions. Offerors must be registered in SAM and complete online representations and certifications by the solicitation closing date.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Sol_140P6422R0005_Amd_0002.pdf | ||
| Questions and Answers_0002.pdf | ||
| Questions_and_Answers_0001.pdf | ||
| Sol_140P6422R0005_Amd_0001.pdf | ||
| Bid_Schedule_-_Dock___Shed_Rehab.xlsx | XLSX spreadsheet | |
| Technical_Questionnaire.pdf | ||
| Technical_Questionnaire.docx | DOCX document | |
| Notice_to_Contractors.pdf | ||
| Attachment_-_Certification_of_Vaccination_Form.pdf | ||
| Specifications_-_Dock___Shed_Rehab.pdf | ||
| Attachment_-_Vaccination_Certification_Notification_Template.pdf | ||
| Past_Performance_Questionnaire.doc | DOC document | |
| Sol_140P6422R0005.pdf | ||
| Wage_Determination_-_Bayfield_Co.pdf | ||
| Bid_Schedule_-_Dock___Shed_Rehab.pdf | ||
| Past_Performance_Questionnaire.pdf | ||
| Attachment_-_Drawings.pdf |
Show all 17
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Submittal List with Review Estimate National Park Service (NPS) - Denver Service Center (DSC) | 1-27-21
SUBMITTAL LIST ACTION SUBMITTAL
REVIEW ESTIMATE
Park Acronym/Project Management Information System (PMIS) Number: APIS 219006 (Complete this portion for Architect / Engineer (A/E)
Project Title: HOCKENSON DOCK & HERRING SHED REHABILITATION construction service task order negotiation.)
SUBMITTAL REQUIREMENTS ARCHITECT / ENGINEER REVIEW TIME
(Indicate with X) (Indicate in whole or partial hours.)
INFORMATIONAL ACTION
S P
E C
IF
IC
A T
IO
N
S E
C T
IO
N
P A
R A
G R
A P
H N
U M
B E
R
DESCRIPTION
C E
R T
IF
IC
A T
IO
N
S O
R
L A
B O
R A
T O
R Y
T E
S T
S
R E
P O
R T
S O
R C
A L
C U
LA
T
IO
N
S O
R P
LA
N
M A
N U
F A
C T
U R
E R
D A
T A
A N
D I
N S
T R
U C
T
IO
N S
O T
H E
R
S A
M P
L E
S
S H
O P
D R
A W
IN
G
S
M A
N U
F A
C T
U R
E R
D A
T A
A N
D I
N S
T R
U C
T
IO
N S
O T
H E
R
A R
C H
IT
E
C T
C
IV
IL
E
N G
IN
E
E R
S T
R U
C T
U R
A L
E N
G
IN
E E
R
M E
C H
A N
IC
A
L E
N G
IN
E
E R
E L
E C
T R
IC
A
L E
N G
IN
E
E R
P R
O
JE
C T
M A
N A
G E
C
O R
D
IN
A T
IO
N
L A
N D
S C
A P
E A
R C
H
IT
E C
T
01 10 00 9.1.C General Requirements Satisfactory evidence of liability insurance coverage and workman's compensation, and any applicable bonds
X
Letter designating Project Superintendent X
Construction Schedule. (Must include shop drawings, procurement time including long lead time items, mobilization, trade work progression and completion at minimum.)
X
A comprehensive breakdown of the Schedule of Values. X Accident Prevention (Safety) Plan X A list of Subcontractors for this project. X Written statements from subcontractors certifying compliance with applicable labor standard clauses
X
Quality Control Plan. X Waste Management Plan. X
Submittal List with Review Estimate Template | National Park Service (NPS) - Denver Service Center (DSC) page 1 of 5
SUBMITTAL LIST ACTION SUBMITTAL
REVIEW ESTIMATE
Park Acronym/Project Management Information System (PMIS) Number: APIS 219006 (Complete this portion for Architect / Engineer (A/E)
Project Title: HOCKENSON DOCK & HERRING SHED REHABILITATION construction service task order negotiation.)
SUBMITTAL REQUIREMENTS ARCHITECT / ENGINEER REVIEW TIME
(Indicate with X) (Indicate in whole or partial hours.)
INFORMATIONAL ACTION
S P
E C
IF
IC
A T
IO
N
S E
C T
IO
N
P A
R A
G R
A P
H N
U M
B E
R
DESCRIPTION
C E
R T
IF
IC
A T
IO
N
S
B O
R A
T O
R Y
T E
S T
S
R E
P O
R T
S O
R C
A L
C U
LA
T
IO
N
S O
R P
LA
N
M A
N U
F A
C T
U R
E R
D A
T A
A N
D I
N S
T R
U C
T
IO
N S
O T
H E
R
S A
M P
L E
S
S H
O P
D R
A W
IN
G
S
M A
N U
F A
C T
U R
E R
D A
T A
A N
D I
N S
T R
U C
T
IO
N S
O T
H E
R
A R
C H
IT
E
C T
C
IV
IL
E
N G
IN
E
E R
S T
R U
C T
U R
A L
E N
G
IN
E E
R
M E
C H
A N
IC
A
L E
N G
IN
E
E R
E L
E C
T R
IC
A
L E
N G
IN
E
E R
P R
O
JE
C T
M A
N A
G
O R
D
IN
A T
IO
N
L A
N D
S C
A P
E A
R C
H
IT
E C
T
02 41 13 1.3 Selective Site Demolition
Schedule indicating Work sequence X
Pre-Work photographs or videography before Work begins X
Post-Demolition photographs or videography X
Plans indicating location of salvageable items, location and construction of barricades, fences and temporary work
X
Accurately recorded locations of abandoned utilities, subsurface obstructions and any item relocated or buried
X
Disposal plan X
02 41 91 1.3 Selective Historic Demolition
Pre-Work photographs or videography before Work begins X
Post-Demolition photographs or videography X
Plans indicating demolition type, location and construction of temporary construction, and location of materials to be salvaged and reused.
X
Submittal List with Review Estimate Template | National Park Service (NPS) - Denver Service Center (DSC) page 2 of 5
Park Acronym/Project Management Information System (PMIS) Number: APIS 219006 (Complete this portion for Architect / Engineer (A/E)
Project Title: HOCKENSON DOCK & HERRING SHED REHABILITATION construction service task order negotiation.)
SUBMITTAL REQUIREMENTS ARCHITECT / ENGINEER REVIEW TIME
(Indicate with X) (Indicate in whole or partial hours.)
INFORMATIONAL ACTION
S P
E C
IF
IC
A T
IO
N
S E
C T
IO
N
P A
R A
G R
A P
H N
U M
B E
R
DESCRIPTION
C E
R T
IF
IC
A T
IO
N
S
B O
R A
T O
R Y
T E
S T
S
R E
P O
R T
S O
R C
A L
C U
LA
T
IO
N
S O
R P
LA
N
M A
N U
F A
C T
U R
E R
D A
T A
A N
D I
N S
T R
U C
T
IO
N S
O T
H E
R
S A
M P
L E
S
S H
O P
D R
A W
IN
G
S
M A
N U
F A
C T
U R
E R
D A
T A
A N
D I
N S
T R
U C
T
IO
N S
O T
H E
R
A R
C H
IT
E
C T
C
IV
IL
E
N G
IN
E
E R
S T
R U
C T
U R
A L
E N
G
IN
E E
R
M E
C H
A N
IC
A
L E
N G
IN
E
E R
E L
E C
T R
IC
A
L E
N G
IN
E
E R
P R
O
JE
C T
M A
N A
G
O R
D
IN
A T
IO
N
L A
N D
S C
A P
E A
R C
H
IT
E C
T
02 43 00 1.3 Structure Moving
Pre-Work photographs or videography before Work begins X
Post-Movement photographs or videography X
Plans indicating location of salvageable items, location and construction of barricades, fences and temporary work
X X
Moving Plan for relocation of existing structure X
Safety Plan X X
05 12 00 1.3 Structural Steel
Shop Drawings X
Welding Procedure and qualification records X X
Certified mill test reports for structural steel X X
Product test reports for bolts, nuts, washers, & other fasteners X X
Source quality-control reports X
06 10 00 1.4 Rough Carpentry
Product data X
Material certificates X X
Certificates of inspection X
Evaluation reports X X
Wood preservative treatment process X
Submittal List with Review Estimate Template | National Park Service (NPS) - Denver Service Center (DSC) page 3 of 5
Park Acronym/Project Management Information System (PMIS) Number: APIS 219006 (Complete this portion for Architect / Engineer (A/E)
Project Title: HOCKENSON DOCK & HERRING SHED REHABILITATION construction service task order negotiation.)
SUBMITTAL REQUIREMENTS ARCHITECT / ENGINEER REVIEW TIME
(Indicate with X) (Indicate in whole or partial hours.)
INFORMATIONAL ACTION
S P
E C
IF
IC
A T
IO
N
S E
C T
IO
N
P A
R A
G R
A P
H N
U M
B E
R
DESCRIPTION
C E
R T
IF
IC
A T
IO
N
S
B O
R A
T O
R Y
T E
S T
S
R E
P O
R T
S O
R C
A L
C U
LA
T
IO
N
S O
R P
LA
N
M A
N U
F A
C T
U R
E R
D A
T A
A N
D I
N S
T R
U C
T
IO
N S
O T
H E
R
S A
M P
L E
S
S H
O P
D R
A W
IN
G
S
M A
N U
F A
C T
U R
E R
D A
T A
A N
D I
N S
T R
U C
T
IO
N S
O T
H E
R
A R
C H
IT
E
C T
C
IV
IL
E
N G
IN
E
E R
S T
R U
C T
U R
A L
E N
G
IN
E E
R
M E
C H
A N
IC
A
L E
N G
IN
E
E R
E L
E C
T R
IC
A
L E
N G
IN
E
E R
P R
O
JE
C T
M A
N A
G
O R
D
IN
A T
IO
N
L A
N D
S C
A P
E A
R C
H
IT
E C
T
06 13 23 1.4 Heavy Timber Construction
Product data X
Material certificates X X
Certificates of inspection X
31 20 00 1.3 Earth Moving
Test reports from the independent testing facility on materials and compaction showing compliance with the Specifications
X X
Stockpile locations X X
Coordination for sampling of each material to be used X
Project Record documents X
31 25 00 1.3 Erosion and Sedimentation Controls
Product data for all materials X
31 62 19 1.3 Timber Piles
Product data X
Shop drawings X
Treatment data X
Pile-driving records X
Certified piles survey X
Material certificates X
Submittal List with Review Estimate Template | National Park Service (NPS) - Denver Service Center (DSC) page 4 of 5
Park Acronym/Project Management Information System (PMIS) Number: APIS 219006 (Complete this portion for Architect / Engineer (A/E)
Project Title: HOCKENSON DOCK & HERRING SHED REHABILITATION construction service task order negotiation.)
SUBMITTAL REQUIREMENTS ARCHITECT / ENGINEER REVIEW TIME
(Indicate with X) (Indicate in whole or partial hours.)
INFORMATIONAL ACTION
S P
E C
IF
IC
A T
IO
N
S E
C T
IO
N
P A
R A
G R
A P
H N
U M
B E
R
DESCRIPTION
C E
R T
IF
IC
A T
IO
N
S
B O
R A
T O
R Y
T E
S T
S
R E
P O
R T
S O
R C
A L
C U
LA
T
IO
N
S O
R P
LA
N
M A
N U
F A
C T
U R
E R
D A
T A
A N
D I
N S
T R
U C
T
IO
N S
O T
H E
R
S A
M P
L E
S
S H
O P
D R
A W
IN
G
S
M A
N U
F A
C T
U R
E R
D A
T A
A N
D I
N S
T R
U C
T
IO
N S
O T
H E
R
A R
C H
IT
E
C T
C
IV
IL
E
N G
IN
E
E R
S T
R U
C T
U R
A L
E N
G
IN
E E
R
M E
C H
A N
IC
A
L E
N G
IN
E
E R
E L
E C
T R
IC
A
L E
N G
IN
E
E R
P R
O
JE
C T
M A
N A
G
O R
D
IN
A T
IO
N
L A
N D
S C
A P
E A
R C
H
IT
E C
T
35 31 16 1.3 Steel Sheet Piling
Plans for clearing driving lane X X
Material test reports X
Product data X
Shop drawings X
Pile-driving equipment data
Certified copy of all mill test reports X X
Baseline driving lane X X
Field quality-control reports X X
35 31 19 1.3 Stone, Channel, Coastal Protection for Structures
Stone Source and Data X X
Stone Inspection report X X
Drop test results X X
Means and methods for placement of stone X X
Total: 0 18 52 0 0 8 0
Submittal List with Review Estimate Template | National Park Service (NPS) - Denver Service Center (DSC) page 5 of 5
File details come from the government source that posted it. Updated .