Attachment-P_Bases.pdf
PDF 103 KB Posted
- Attached to
- WASO_BADL_WE DESIGN, Fabricate, INSTALL Federal contract opportunity
- Solicitation number
- 140P2122R0022
About this file
This document contains base production specifications for wayside exhibits for the National Park Service. It specifies requirements for various types of wayside bases including low-profile, visitor information signs, and upright bases. It details metal fabrication requirements such as saw-cutting, shearing, punching, drilling, tapping, countersinking, welding, preparation, finishing, assembly, painting, and use of dies for extrusions. Packaging and shipping methods are also outlined including use of environmentally friendly materials when possible and shipping of complete assemblies in logical containers to facilitate installation.
The related federal contract opportunity is a solicitation from the National Park Service for design, fabrication, and installation of wayside and bulletin exhibits at various locations. Services required include project management, fabrication, installation, training, and a one-year warranty. The anticipated award date is listed as March 2022.
View the file
Other files for this federal contract opportunity
Show all 26
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
| Attachment | P | Page | 1 | of | 3 | |
| National | Park | Service | 2/6/2020 |
National Park Service Harpers Ferry Center Base Production Specifications Index
SECTION 1 Base Production
1.1 Wayside Exhibit Base
| Attachment | P | Page | 2 | of | 3 | |
| National | Park | Service | 2/6/2020 |
SECTION 1. BASE PRODUCTION
1.1 Wayside Exhibit Bases
Produce, assemble and finish bases. All bases shall be fabricated in accordance with Attachment E, VIS and Wayside Hardware Specifications Manual.
1.1.A Wayside bases include, but are not limited to:
1.1.A.1. Low-Profile – A wayside that is inclined (at 30 or 45 degrees) to enable a reader to view a park feature that is being interpreted by the wayside.
1.1.A.2. Visitor Information Signs – Signs intended to convey a range of information to park visitors. Information conveyed by Visitor Information Signs can relate to pedestrian wayfinding, park regulations and safety, interpretation, resource protection, and general information. Interpretive wayside exhibits are included in this section.
1.1.A.3. Upright – A wayside that stands vertically and that typically provides information (rather than interpretation) at trailheads and other outdoor visitor contact points.
1.1.B Metal Fabrication
Metal fabrication includes, but is not limited to the following:
1.1.B.1 Saw-cut off – both square and angular – of standard aluminum and steel bar, rod, tubing, pipe angle, channel, and custom extruded shapes.
1.1.B.2 Shear aluminum sheet and steel sheet.
1.1.B.3 Punch, drill, tap, countersink, and provide similar milling operations.
1.1.B.4 Provide high quality welding of aluminum and steel.
1.1.B.5 Provide standard mechanical preparation and finishing of aluminum and steel including sandblasting, sanding, graining, and buffing.
1.1.B.6 Provide final assembly of manufactured components employing a variety of fasteners including screws, bolts, drive rivets, and pop- rivets.
1.1.B.7 Apply high quality paint finishes.
1.1.C Dies
Acquire and maintain all dies necessary for the creation of all extrusions
| Attachment | P | Page | 3 | of | 3 | |
| National | Park | Service | 2/6/2020 |
specified on page 182 of Attachment E, VIS and Wayside Hardware Specifications Manual.
1.1.D Packaging and Shipping
The contractor shall provide the following:
1.1.D1 Pack exhibits using “green” environmental methods as much as possible, such as recycled cardboard boxes, biodegradable “peanuts”, recycled paper and cardboard cushioning products.
1.1.D2 Whenever practical, ship complete base assemblies in individual containers, or in logical and coordinated sets of containers, to facilitate easy and rapid installation by the recipient; do not ship individual sign components from multiple subcontractors that require complex assembly by the recipient.
1.1.D3 Packing slip describing what is in each container.
1.1.D4 Drawings and written instructions required for assembly, installation, and maintenance of the base.
File details come from the government source that posted it. Updated .